there is a requirement, where when planning is done based on a sales order delivery date. the system should plan based on the available capacity in house. the requirement is the system should automatically propose how much of work should be offloaded to vendor to meet the customers delivery date. Is this functionality available in PPDS. Pls guide.
Thanks
Vinay
Hi Vinay,
To meet this requirement in PPDS, you need to define vendor as a separate location in APO. Separate
work centers and capacity also to be maintained.
You need to carry out finite capacity planning in PPDS using bottleneck resources. You need to set
priorities in modes either PDS/PPM for normal resources so that it will get loaded first.
After the normal resources are loaded, the excess load will be given to vendor resources.
Regards
R. Senthil Mareeswaran.
Similar Messages
-
Work Center determination depending on vendor/supplier
Hi together,
is there a possibility in SAP QM Standard
to determine the workcenter for the resultrecording of specific Operation/Activity
depending on the supplier?
at the moment it's only possible for me to determine work center of the inspection operation (field: VORNR) depending on plant and material via inspection plan
thanks for help
br
Svenfor one material in one plant we sometimes do the inspection in Work center A, sometimes the inspection takes place in Work center B.
In order to select the operations to inspect, you enter QE51N, enter plant, material and work center.
As the place where the inspection takes place is dependant on the supplier, i'd like to know how to control that if there is a goods receipt of supplier 4711 to do the inspection at Work Center A, and if goods are coming from 9977 to do the inspection at Work Center B.
i saw the posibility to maintain the vendor in the inspection plan - but only maintaining the vendor does not solve my initial question :-)
this is how the inspection plan looks like.
Inspection Plan XY
- Material 123 - Supplier 4711
- Operation 1 - Workcenter A
- Operation 2 - Workcenter A
i tried to maintain another supplier- matnr relation on the plan, but still both operations are valid for this combination
Inspection Plan XY
- Material 123 - Supplier 4711
- Material 123 - Supplier 9977
- Operation 1 - Workcenter A <---
- Operation 2 - Workcenter A <--- the operations are valid for all material - supplier relations in the inspection plan? -
Hi Friends,
I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing. However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
regards
sandhyaHi,
You need to do the following:
1) Create an Activity type for the Assembly activity.
2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
3) Define a Cost Centre corresponding to the above Work Centre.
4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
7) Execute the Plan price calculation (T-code KSPI)
After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
Regards,
Assign points if useful -
Default Employee vendor Cost Center
hi,
Can you please let me know HOw I CAN GET THE DEFAULT VENDOR COST CENTER (F-02).
I was Tryed Substitutions But it is not working.
Regards,
Nageswarhi,
can you explain the issue a bit more.
Why you want to have cost center in line item of vendor.
Shayam -
Dears
Is it possible to block the work center from Quality department for creating any more production order because of quality issue
Like what we are blocking the vendor by using quality info record
Thanks in advance
FaisalYes Sujit
I understand that
But There is any method to evaluate Work center in QM prospective
In usge decision we have quality score is updating when ever we select respective UD code
Any tips on this pls
Faisal -
Operating time error in work center
while creating production order, i am getting the below error
"No working/operating time maintained in work center for scheduling"Hi,
Check following thing,
1.Check whether you have maintained time in capacity tab.
2.Check scheduling tab formulas.
3.Check in control key whether scheduling has been activated.
The error shows below message
C7014 - No working/operating time maintained in work center for scheduling - C7 014
Vendor Master (General Section) General Material Data
This documentation is copyright by SAP AG.
Diagnosis
No operating time has been defined for the work center specified in the operation.
System Response
Scheduling is carried out on the basis of an operating time from 00:00 hours to 24:00 hours.
Procedure
Maintain the operating time in the work center.
So maintain correct time in capacity tab
Regards / US
Edited by: Umashankarpmgl on Jan 20, 2012 2:58 PM -
Add Work center to operation's network
Hi,
I need to add a WORK CENTER KEY to a operation (inside a network).
I have to prove with FM: CO2O_ACTIVITY_MAINTAIN, but... nothing
can anyone help me, please??
best regards!The reason for turning off WEP was to confirm it is a WEP issue, you should turn it back on.
One of the problems with WEP is that the actual standard relies on a 10 character HEX key for 40bit WEP and a 26 character HEX key for 128bit WEP.
In order to make things easier for people, vendors use certain algorithms to convert simple alphanumeric passwords (or passphrases) into HEX keys, thus enabling people to use simple memorable WEP password rather than lengthy HEX keys.
The problem is that different vendors use different algorithms to generate the HEX key and therefore a ASCII password on an AEBS will be hashed differently on a Netgear client and vice versa.
One thing is a 13 character 128 bit WEP password will be hashed by all vendors in the same way (if you use 40bit WEP then a 5 character password is required).
Having said that, this will only work if they use an algorithm, some don't and in these cases you must use the HEX key regardless of the length of the plain text password.
AirPort: Joining an encrypted wireless network
http://docs.info.apple.com/article.html?artnum=106424
Choosing a password for networks that use Wired Equivalent Privacy (WEP)
http://docs.info.apple.com/article.html?artnum=108058
Accessing a Airport Network with a Windows XP PC or laptop (with XP SP2)
http://www.ifelix.co.uk/tech/1011.html
Accessing a Airport Network with a Windows XP PC or laptop (with XP SP1)
http://www.ifelix.co.uk/tech/1010.html
Also confirm that you are not using MAC Address access control. -
How do I create a new Work Center for the transaction launcher and links
Hi
The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
Regards
DeclanHi Robert,
Thanks again for taking the time to reply.
Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
Is this correct?
Cheers
Declan -
Changing operations work center during creation of PM order
Hi all,
I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
Does anyone know such possibility?
AssafAssaf,
Have a look at BADI IWO1_TL_INTEGRATION2.
Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
Which system are you running?
PeteA -
All default routing value has to be changed, while changed the work center in production order
Dear friends,
our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
Thanks&Regards
Sabhapathy RHi Rahul,
Thanks for reply. I am maintained in diff value maintained routing , Ex :First routing i have work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
Now I think you get to know what the client requirement, kindly do the need full.
Regards,
Sabhapathy R -
Work center wise production order infomation report
Hi all,
i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
i have three operation in production order.
my order scheduled start date - todays date.
In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
Clent want like that (with quantity break) report..
Any standard report ???
If customization.... How it can be mapped in SAP.??
Thanks in advanceHi,
You can use the FM COIS_SELECT_ORDER_DATA_READ.
CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
EXPORTING
iv_prod_order_sel = lv_prod_order_sel
iv_proc_order_sel = lv_proc_order_sel
iv_planned_order_sel = lv_planned_order_sel
iv_rem_objects_only_sel = lv_rem_objects_only_sel
is_objects_to_read = ls_objects_to_read
it_parameter = lt_parameter "General Structure for PARAMETERS and SELECT-OPTIONS
it_status_hdr = lt_status_hdr
it_status_opr = lt_status_opr
it_status_cmp = lt_status_cmp
TABLES
ct_ioheader = lt_ioheader
ct_ioitem = lt_ioitem
ct_iodocl = lt_iodocl
ct_ioopdocl = lt_ioopdocl
ct_iomamo = lt_iomamo
ct_ioconf = lt_ioconf
ct_ioopconf = lt_ioopconf
ct_iosoconf = lt_iosoconf
ct_iogomo = lt_iogomo
ct_ioopgomo = lt_ioopgomo
ct_iosogomo = lt_iosogomo
ct_iogmer = lt_iogmer
ct_ioopgmer = lt_ioopgmer
ct_iosogmer = lt_iosogmer
ct_iosequen = lt_iosequen
ct_iooper = lt_iooper
ct_iosoper = lt_iosoper
ct_ioopcomp = lt_ioopcomp
ct_iooppreq = lt_iooppreq
ct_iosopreq = lt_iosopreq
ct_iooppord = lt_iooppord
ct_iosopord = lt_iosopord
ct_ioopmst = lt_ioopmst
ct_ioopprt = lt_ioopprt
ct_ioopcap = lt_ioopcap
ct_ioopscap = lt_ioopscap
ct_iosocap = lt_iosocap
ct_iososcap = lt_iososcap
ct_ioopsccf = lt_ioopsccf
ct_iososccf = lt_iososccf
ct_ioprodlist = lt_ioprodlist
ct_iomatver = lt_iomatver.
This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
Thanks and regards,
Pradip
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:27 AM -
In the report level user wants two persons against each work center.
Hi Experts,
Please let me know the solution, I have provided scenario below.
check the query which the user is referring to report:
Example
Work center Person
KNE33102 44003850
According to the user, the names for the Work centers should be as follows:
Work center Person
KNE33102 44003850,
KNE33102 44003603
I have check the data in T-code-CR03, each work center getting two persons, as can be shown below.
Work center Person
KNE33102 44003850,
KNE33102 44003603
In RSA3 it can be seen that both the records are being extracted
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
In BI , when checking in PSA, it can be seen that the data is also being loaded to BI (Two persons loaded against Work center-KNE33102)
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
But when loading to the Info Object, one person has deleted. Because of this, in the report level displaying one person.
Note:-Please let me know what is the procedure, in the report level user wants two persons against each work center.Hi,
As you said in your post the data has mentioned up to 2009. can you try execute the query till to date .
Regards
sivaraju -
Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
Ø Open Question:
a. Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center? We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
b. Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
Regards .. Dheeraj SainiWhenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.
-
How can I create a new work center
I try to create a new work center.I found a transaction 'OP42' . But I can't set a personal number and name.where should I write them, or should I use any other transaction??
Thanks...Hi,
Pl go to <b>CR02 -Capacity-Goto menubar select Goto -Individual capacity -Enter personal name here</b>.
Hope this helps.
Regards,
Mani -
Error when launching Work Center
Good Day;
I am getting the following error when I try to launch Work Center (Solman_workcenter).
We are running solution Manager on a 4.6C system.
Any ideas??
The URL http://sd07x797.prod.net:8080/sap/bc/webdynpro/sap/ags_workcenter/ was not called due to an error.
Note
The following error text was processed in the system SM1 : Exception condition "FAILED" raised.
The error occurred on the application server SD07X797_SM1_01 and in the work process 1 .
The termination type was: RABAX_STATE
The ABAP call stack was:
Method: GET_BPM_SOLUTIONS of program CL_AGS_BP_INTERF_MON==========CP
Method: WDDOINIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: IF_WDR_COMPONENT_DELEGATE~WD_DO_INIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: DO_INIT of program CL_WDR_DELEGATING_COMPONENT===CP
Method: INIT_CONTROLLER of program CL_WDR_CONTROLLER=============CP
Method: INIT_CONTROLLER of program CL_WDR_COMPONENT==============CP
Method: INIT of program CL_WDR_CONTROLLER=============CP
Method: INIT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WDR_COMPONENT_FACTORY~CREATE_COMPONENT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WD_COMPONENT_USAGE~CREATE_COMPONENT of program CL_WDR_COMPONENT_USAGE========CP
Thanks All.
Regards
Don> I am getting the following error when I try to launch Work Center (Solman_workcenter).
> We are running solution Manager on a 4.6C system.
I'm pretty sure you don't run SolMan on 4.6c.. maybe on the same server but certainly not in the same instance
What support package level is your SolMan?
Markus
Maybe you are looking for
-
How can I sync my MS Outlook calendar with my iPhone 3G?
How can I sync my MS Outlook calendar with m iPhone 3G?
-
Sound Blaster Audigy 4 pro optical In probl
Hello, I recently purchase a audigy 4 pro, My current setup is 3 wires(green, black, orange) going from my Logitech X-530 5. speakers to the audigy 4 sound card, from there, the AD_Link and Ad_Link2(firewire) going to the Audigy's External I/O, now w
-
[SOLVED] TeXLive: Installing font package and updating font map fails
I am trying to install the newtx package, which is available here at CTAN [1]. Since I don't want to mess with my TeXLive installation, I am trying to do that as a local user only. So I placed the package into ~/texmf/tex/latex/. , ran texhash on tex
-
How to maintain cluisterview for new business roles in SAP CRM2007
How to maintain cluisterview for new business roles in SAP CRM2007. Table - CRMV_UI_NB Regards, Biplab
-
how do i reload 10 4 x when my system will only shut down by holding down the power button. G4 Imac 17"