Very urgent - System proposes monday as delivery date on weekends

Dear Experts,
I am facing a problem where the client whenever he makes a sales order on a week end i.e. saturday or sunday, the system automatically proposes monday as the day of delivery and the schedule line is also prepared for monday (inspite of the unrestricted stock being available). In the SO Type and the material master, the lead time is 0, the factory calendar for the shipping point and the plant has already been set to 7 days working.
However, on entering the date manually, the system takes the date as requested.
We can check this situation only on a saturday or a sunday as the system works absolutely fine on other weekdays.
Kindly suggest a solution so that the system proposes the delivery date as the present date.
Regards
Vineet Jain

Check Factory Calender setting for Plant & Shipping Point.
Also Check the following things
1) In sales doc type OR check LEAD TIME IN DAYS , if LEAD TIME IN DAYS is maintained , make it zero (T.Code: VOV8)
2) In the shipping point check weather PICK TIME and PACK TIME are maintained or not, if they are maintained , remove them. (IMG -> Enterprise Structure -> Definition -> Logistics Execution -> Define, copy, delete, check shipping point)
3) for the material , go to that particual MMR and check the RLT feild is maintained or not in sales gen/ plant view (T.Code: MM02)
4) For the material , check weather any Inhouse production , is maintained in MMR or not in MRP1 view (T.Code: MM02)
if you make zero all these things the delivery date will be the sales order creation date.
Regards,
Rajesh Banka
Reward suitable points.
How to give points: Mark your thread as a question while creating it. In the answers you get, you can assign the points by clicking on the stars to the left. You also get a point yourself for rewarding (one per thread).

Similar Messages

  • Delivery date in weekends in schedule line

    Hi friends
    we are using 7 days working factory calendar for a plant. But we do not want to have the delivery date on saturdays and sundays. (Delivery date in schedule lines). I used one Z lot size to refer the planning calendar(having monday to friday working).
    But the solution is not feasible as we are using different lot sizes like EX,MB etc.,
    Please let me know if you have any solution on this.
    Regards
    Ranga

    Hi Ranganathan,
    You create one more calendar with all the holiday same but only with saturday and sunday as holiday. Assign that calendar in SPRO -> Enterprise structure->Definition-> Sales and Distribution-> Define copy and delete, check sales organisation. in that assign in the factory calender in the sales org calendar.
    Try this if this is Ok reward the points.
    Thanks and Regards,
    Satish

  • Delivery date on the sales order

    Hi frnds
    I am facing an issue here. When the sales order comes of credit hold the system proposes a new delivery date in the sales order. How can i change the settings to avoid the system from assigning weekends(Saturday & Sunday) as the delivery date????
    I have checked that the factory calendar is set for weekdays only and also the propose del date is check marked in VOV8, OVX5 & OX10 have factory calendar asssigned but i am not able to figure out how to restrict the delivery date to weekdays to be proposed by the system.!!!
    Am i missing something???
    Will appreciate your suggestions.
    null

    Hi,
    The fields needs to be activated in the filed group in accounting.
    The path is SPRO -> Financial accouting -> Accounts Receivables and Accounts Payables -> Customer accounts -> Master data -> Preparations for creating Customer master data -> Define account groups with screen layout.
    Shiva

  • System does not propose the delivery date based on factory calendar

    Hi,
    I am creating a sales order for a delivery date for this sat which is (2/22/09)
    I have maintained 2 separate calendars for
    1) shipping point
    2) for the route
    The route has a transit time of 1 day and the calendar has sat and sunday as non working.
    the Shipping point has a pick/pack time of 1 day and the calendar has sat and sunday as non working
    The material is available in the warehouse
    Now when i create this sales order i enter the delivery date as 2/22/09, the system does not propose me the delivery date of monday (i.e 2/23/09) It accepts the 2/22/09 delivery date.
    In the schedule line i do see the date as 2/22/09 only.
    The delivery was created with the following dates
    Picking = 2/17/09
    Transportation Planning = 02/18/2009
    Loading =02/18/2009 
    Planned GI= 02/18/2009
    Delivery Date = 02/22/2009
    How can the system give me the delivery date of a sunday when the calendar doesnt allow sunday as working day.
    Also the route time is 1 day in transit so i am not sure why the system is proposing a 3 day transit time?
    Can any one explain the behaviour of SAP for the delivery date logic

    Dspsac,
    Delivery date can be any date.  For instance, if your customer insisted on a Sunday delivery, you would accommodate him, regardless of any calendar.
    From the delivery date, the system counts backwards USING THE FACTORY CALENDAR ASSIGNED TO THE ROUTE by the number of days in the route.  You have to consult the FC assigned to your Route to determine if the GI date has been properly calculated.
    From the GI date, the system counts backward Pick/pack time, using the shipping point calendar, to arrive at Material availability date.
    Calculations are explained in SAP online help
    [Transportation and Delivery Scheduling|http://help.sap.com/erp2005_ehp_04/helpdata/EN/dd/5607e7545a11d1a7020000e829fd11/frameset.htm]
    Regards,
    DB49

  • Schedule line delivery date on saturday  and sunday its confirm for monday

    HI Experts
    in cash sales process or normal OR also  when i create sales order monday its work fine system take todays (current date) as delivery date and i can do delivery on same date
    but if i create sales order on saturday system take coming monday as delivery date and give goods confirmation on monday date  but iif i change manually system allow me to change the date for saturday and i can do delivery but i want it system should take delivery date as saturday (same date only )
    because in my client there is no holiday all 365 as working day
    in VOV8 its blank no lead time
    factory calendor and logistic i define as all 7 days as working day
    and sales org and plant i assign calendor
    Please guide me where i miss and how can i solve this issue
    thanks in advance

    Hi,
        Check "OVLY" and "OVLZ" and If the sceduling is active for he shipping point /sales document type.  Check "OVXD" and see If the Loading time/ Pick/pack time is determined from it. If they are getting determined from shipping point check the shipping point calender in "SCAL" .If it has saturday and sunday as holidays ,then you may have to change them. And check If the customer has goods recieving hours assigned to him (In customer master unloading point). If he has only 5 working days and If he accepts only goods at 8 am in the morining then system would propose like this.Kindly please let me know If you need any more Information on this.
    Regards
    Ram Pedarla

  • MD04--- Delivery date--***URGENT***

    Hello Gurus,
    In md04 the delivery date is pushed out to open sales order date and i see exception 15
    What setting in the system makes it look for dependent requirements
    WE WANT delivery date as per PLANNED LEAD TIME
    Can any one help me get through this
    Will award  full points
    Justin

    what is checking group 32 what is <b>And planned delivery date is 95</b>
    I am not getting you.
    If there is no commited date in the PO, that means available qty is zero?
    Why are you using STO, you told it is PO?
    If I correct- you create a sales order, then you create PO to get that material
    Now in sales order you have availability check activated, hence it will look for the receipt element.
    Now you are creating PO manually and entering the delivery date manually...
    let us say del date you eneterd today.
    Your planned delivery days let us say 20 datys,
    the system will say "can delivery date met? - it is warning message. if you stll save syetem will save that order.
    Now when you see the date in MD04 and if you run MRP, then if the delivery date us not matching with SO delivery date, then system will give resceduling date, which willnot be copied to PO unless you change it.
    See below MD04 sumulation
    <b>DATE---recp/issue-resch date-qty--balance</b>
    20.11.2007Stock--
    0
    10.12.2007SO--
    -10 -
    -10
    15.12.2007PO10.12.2007-- 10 -
    0
    Since as per the date proposed by system as per MRP2 view data(planned del days) is 15.12.2007. But required del date from SO is 10.12.2007, hence MRP reschedules and give youn indication that del date should be 10.12.2007 instead of 15.12.2007.
    Is it the case with you? if not please give example like what i gave above.
    Message was edited by:
            Rajesha Vittal
    Message was edited by:
            Rajesha Vittal

  • How system determine delivery date in sales order

    Hi, sap gurus
    I am new to sdn forum please help me regarding my question
    1) how the system will determine delivery date in sales order
    2) what are factors effects to conform sales order stock
    3) what is different between static check and damanic check in credit mgt
    Thanks and regards
    nishad

    hi,
    Reg question:1 - System determines the Requested Delivery Date based on the Scheduline assigned to the item category of the item in sales order.the schedule line in the order transfers the requirements trhu MRP (can be individual or collective) . If its ruch order , you configure the order type "Deliver Immediately".
    In Detail:
    The TOR depends on the Requirement Type (MMR), Requirement Class(MMR), Checking group(MMR) and the Sc line category (Line Item). For the TOR to happen u need Plant at line item, scheduline category markd for TOR, Requirement Class marked for TOR and Checking group in MMR (Availability check)
    What all stocks need to be checked during Availability check is controlled by using the checking rule.. for example for AV -02 Ind Requirements a checking rule will be assigned and this checking rule- and then what all stocks need to be considered to determine the delivery can be maintained here.
    Rgds
    Sai

  • Propose delivery date in Sales order to pick current date

    Hi,
    I want to set the delivery date in SO to pick the current system date. Users should be able to change it to a future date <b>but not to a past date</b>.
    Can anyone advice on how this can be done? I tried VOV8, but still, it didnt get determined properly.
    Any advice?
    Thanks
    Keshi

    Hi,
    In VOV8 if you click on the popose delviery date then the system will determine the delivery date as today's only. If the users try to change the delivery date in the past then the system will give a warning but it will be changed.
    In the sales screen of the sales order the date which is there is the "<b>requested delivery date of the customer"</b> This is the date by which the customer is expecting the material at his/her place. You can change it to the past but schedule line will not allow you to deliver the material in the back date.
    But for the particular item if you go in the schedule lines try changing the delivery date in the past. The system will create 2 schedule lines and the schedlue line for today's date only will be confirmed. So no question of delivery in the past date.
    Hope this clarifies your doubt. Reward points if solution helps.
    Regards,
    Allabaqsh G. Patil

  • Required Delivery Date Not coming good for only few customers

    Hi Gurus,
    I have a very peculiar problem, related to the RDD (Required Delivery Date) in Sales Orders.
    We have configured the system with D+2 as the delivery date and the system is proposing us the dates accordingly.
    Also above VOV8 configuration of Proposing of Delivery Dates we have a user exit working (Don't know why they have design this user exit when we have a standard functionality of proposing of RDD) which is putting the RDD to D+1.
    Now when we just enter into VA01
    The system ll show us RDD as D+2. (as per VOV8 config)
    When we put the customer no. and press enter the above mentioned user exit ll activated and changes the RDD to D+1
    Now the main issue is that, for only few of the customers the system picks up the delivery date as D+1 without considering the next day which is Saturday (which is wrong as per business process as we don't deliver on Saturday's).
    For all other customers the system ll propose a correct delivery date of Monday when we enter the order on Friday.
    What ll be the solution for this??
    Thanks in Advance
    Ajay

    Now the main issue is that, for only few of the customers the system
       picks up the delivery date as D+1 without considering the next day
    May be in the exit, any of the following would have been predefined to check
    a)  Account Group
    b)  Sales Area or Sales Office
    c)  Tax Classification
    d)  Account Assignment Group
    Please compare this with one customer to whom, it is coming correctly.
    thanks
    G. Lakshmipathi

  • How is delivery date calculated

    How can anyone please explain how delivery date is calculated using forward and backward scheduling
    I want to have it broken down into the following steps
    for eg for delivery date calculation following dates are used
    Material Availabilty Date
    Material Staging Date
    Pick/pack time
    Transportation PLanning date
    Loading date
    Goods issue date
    Transit Date
    Delivery Date
    Can some one please give me an example and explain wht these dates are
    for eg customer needs delivery date on  11/20/2008
    how would the system cacluate whether it can meet the delivery date using backward scheduling
    and if it doesnt meet how does the system do the forward scheduling
    also i am not clear with the following dates
    material avaialibilty date
    material staging date
    transportation date
    can some one please explain me all this in detail
    Also i have another question at the sales order creation when is shipping point and route determined
    coz based on the ATP check only material avaialabilty date is determined and if we have a bacjground job running every 1 hours for atp then immediately when we create a sales order is a route and shipping point determined (just before we save the sales order)
    Let me be more clear
    Suppose customer representative recevies a order on the phone
    he enters sold to party, ship to party ,PO number,delivery date and material number and then hits enter
    so at tht time the shipping point and route is determined ?
    also when an atp check runs and if the delivery date is not met then the system will propose a new delivery date but if we have a different route configured say for eg overnight so we can meet the delivery date and we want to change this route to overnight what must we do?
    should we change the shipping condition in the header?
    I am not very sure about the process can you please also explain me this in detail?
    Thanks

    Hi there,
    When a sales order is logged & the user enters the requested delivery date, system 1st does the backward scheduling date. Pla note that the factory calender mentioned in the shipping point & route plays a crutial role in defining the working days & confirmed delivery date.
    For eg:  Customer has raised an order on 11/15 & requests delivery on 11/20/2008.
    the following times are important in delivery scheduling.
    Transit time: maintained in route
    Loading time maintained in the shipping point
    Transportation planing time maintained in the transportation planning point.
    pick pack time maintained in the shipping point.
    Material availability time maintained in MM02 --> MRP screens. This is the time that the material can be manufactured (for inhouse producted items) or external processing time (for externallly procured materials like TAS items).
    From the requested delivery date 11/20 system does the backward scheduling & determines the following dates:
    Goods issue date, loading date, pick pack date, transportation planning date & material availability date.
    Time between:
    goods issue date - reqested delivery date: transit time
    Goods issue date - loading date: loading time
    transportation planning date - pick pack date: picking pack time
    Material availability date - transportation date: transportation planning time.
    Consider that the factory calender has all days of the week as working dates (to make it simple to explain). Also transit time is 3 days, loading time is 1 day,pick pack time is 1 day, material availability time is 3 days.
    From 11/20 ussing backward scheduling system determines the following dates:
    Goods issue date: 11/17
    Loading date: 11/16
    Pick pack date: 11/15
    System will check if material is available on the 11/15 to start pick / pack. If it is available then system will confirm the reqested delivery date. Else it will check when the material is available. For eg basing on the MRP settings mnaterial is available only on 11/18. So from 18th system does forward scheduling & redetermines all the dates. So pick / pack date is 11/18. Loading date is 11/19, goods issue date is 11/20 & possible delivery date is 11/23. So system will confirm the delivery date on 11/23. This is when complete delivery is required. If partial delivery is allowed, then system will check how much quantity is available on 11/15. Accordingly it will give 2 delivery dates.
    In the above example include teh factory calender which will have 5 day week with Fri & Sat as holidays. Accordingly dates will change.
    Here replenishment lead time also plays an imp role. Pls refer http://help.sap.com/erp2005_ehp_03/helpdata/EN/6b/2785347860ea35e10000009b38f83b/frameset.htm for further information
    Regards,
    Sivanand

  • MRP delivery date

    Suppose for the material ABC reorder point is 10 and i have stock 10 qty. I got a requiremnt and deliveried the 10 qty available.
    Now when runnign MRP with value in the filed create purchase requisition as '2' (i.e create PR in the opening period) whether the system will create planned order or purchase requisition and why.How the system will calculate the delivery date.
    Whether we have to delivery date manually or system will propose?
    Thank you.

    hi,
    Delivery date is calculated based on the Planned del time entered in the MRP view of the MMR...
    RLT - Planned del date + GR processing time + purchasing processing time...
    So del. date will be auto. defaulted...
    Now the planned order and the PR's will be created 5 and 5 for the indicator '2' with the combination of the procurement indicator for the both(External + internal)..
    If you want all 10 PR's to be created from MRP use indicator 1
    If you want all 10 to be planned orders from MRP use indi. 3...
    Hope it helps..
    Regards
    Priyanka.P

  • Requested delivery date in a Sales Order?

    Hi,
    In one of my client Functional document, it is mentioned that
    [Material Availability Date] = [Requested Delivery Date] u2013 [No days in route]
    I want to know that from where does the system get the requested delivery date when we create a sales order?Is it determined automatically based on certain parameters or is defaulted always to the order creation date?

    It is based on few parameters like
    1. The relevant document type and in there Requested Delivery Date and there you will get Lead time in days and you can entar the number of days there. As it Specify the number of days after the current date that the proposal for the requested delivery date in the sales document should be.
    2.In material Master MRP2 screen you will get Scheduling Screen where you will get
    In-house production
    GR processing time
    Plnd delivery time

  • Sales order delivery date

    HI gurus
    I have an item in sales order which is a trading material so  i need to raise a purhcase order whenever a sales order is generated for the GR processing days in MM it is given as 15 normally happens and PO is raised now  when the delivery date is ready now but when the goods within two days when i run once again availibility it will change the delivery date or not
    Thanks in advance

    Hi there,
    I thumb rule that you have to follow when posting the thread is, to be clear in what you are asking. Looking at the thread posted, can you make out anything? No spaces, no full stops. How will people understand what your query is? Just read back your question & help us understand what does the query mean.
    From what you have given, you are saying that in material master MRP views, GR processing time is mentioned as 15 days. What after that? Are you asking of the materials are available before that 15 days & you run an availability check is the delivery date going to change? Is that what you are asking?
    If the material is already available on that date, system will confirm the reqested delivery date. If item is not available then system will propose a new confirmed delivery date basing on the availability check. It will not propose a date which is earlier to the requested delivery date. It either confirms the requested delivery date or proposes a confirmed delivery date at a later time.
    For eg when the customer requests delivery on the 25th in the sales order, then if material is available, system will confirm 25th as the delivery date. If material is not available,, then it will check item availability & proposes 28th as confimed delivery date. It will never propose 22nd as delivery date.
    Regards,
    Sivanand

  • Sales order delivery date not update on PO delivery confirmation

    Hi all,
    I have the following issue. When a sales order is created for a material that is to be purchased a purch req is automatically created. Next I create a Po from this Purch req. When I confirm the delivery date to a later date in this po and do this without entering a storage loc in the po, the delivery date in the sales order remains unchanged, which should be adjusted according to the confirmed delivery date in the PO.
    When I do this with a storage location, the date is changed in the sales order.
    Anybody any ideas on what could be the reason for this?
    Thanks,
    Kevin.

    Hi there,
    I thumb rule that you have to follow when posting the thread is, to be clear in what you are asking. Looking at the thread posted, can you make out anything? No spaces, no full stops. How will people understand what your query is? Just read back your question & help us understand what does the query mean.
    From what you have given, you are saying that in material master MRP views, GR processing time is mentioned as 15 days. What after that? Are you asking of the materials are available before that 15 days & you run an availability check is the delivery date going to change? Is that what you are asking?
    If the material is already available on that date, system will confirm the reqested delivery date. If item is not available then system will propose a new confirmed delivery date basing on the availability check. It will not propose a date which is earlier to the requested delivery date. It either confirms the requested delivery date or proposes a confirmed delivery date at a later time.
    For eg when the customer requests delivery on the 25th in the sales order, then if material is available, system will confirm 25th as the delivery date. If material is not available,, then it will check item availability & proposes 28th as confimed delivery date. It will never propose 22nd as delivery date.
    Regards,
    Sivanand

  • Scheduled Delivery Date

    Hi Guys
    I have an issue with the scheduled delivery date being determined incorrectly.
    If an order is created with the required delivery date of saturday or sunday, the system is confirming the schedule lines for that day/date. The factory calendar has been setup with working days (Mon, Tue, Wed, Thur and Fri), plant and shipping point have been assigned the same factory calendar. Based on the calendar the system should not confirm it for the weekends.
    Also if i create the order for the current week with the delivery date of weekend(saturday/sunday) then the system pushes it out to to monday but if i create it for the next weekend or following month weekend then the system confirms it.
    Can someone suggest the possible solution??
    Thanks

    Dear Comes,
        Kindly check whether the factory calender maintained for your plant and shipping point is maintained for your Sales organisation and i think you can also assign it for storage location. So make sure all the factory calender are same.
    regards,
    Sudhir