Very very urgent : ERROR collaxa ProcessJob::execute Failed to connect
Hi ,
When am starting the Server with opmnstarll its not starting and giving the following error, if anybody
faced this before please reply the solution which you followed asap.
<ERROR> <collaxa> <ProcessJob::execute> Attempt (1/30) ... failed to connect ...retrying in 15 seconds
thanks
JR.
Hi,
I think this problem is described in http://download-uk.oracle.com/docs/cd/B31017_01/linitan.1013/relnotes/install.htm :
2.1.18 OPMN Configuration Assistant Fails during Installation on NFS Storage
While starting up the BPEL process, the Oracle Process Manager and Notification Server (OPMN) Configuraton Assistant fails and the following error message is displayed:
<2006-11-08 03:51:07,096> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888
<2006-11-08 03:51:22,099> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888/orabpel <2006-11-08 03:51:37,124> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://144.25.145.91:8888/orabpel
<2006-11-08 03:51:52,127> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888/orabpel
<2006-11-08 03:52:07,131> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://localhost:8888/orabpel
<2006-11-08 03:52:07,132> <ERROR> <collaxa> <ProcessJob::execute> Attempt
(1/15) ... failed to connect ... retrying in 5 seconds ...
<2006-11-08 03:52:27,176> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888
<2006-11-08 03:52:42,179> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888/orabpel
<2006-11-08 03:52:57,182> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://144.25.145.91:8888/orabpel
<2006-11-08 03:53:12,185> <ERROR> <collaxa> <ProcessJob::execute> Timed out
reading http://iwin6509.us.oracle.com:8888/orabpel
However, this issue only occurs while installing the SOA suite on NFS/NAS storage.
To workaround this issue, set the timeout value to 1200 or higher in the opmn.xml file. Following steps describe how to set this value:
1.
Start the installation using runInstaller.
2.
Increase the value of start timeout to 1200 for the oc4j instance in the ORACLE_HOME/opmn/bin/opmn.xml file. For example,
<start timeout="1200" retry="2"/>
3.
Run root.sh to continue with the installation.
Regards, Gerwin
Similar Messages
-
主库一直报错,提示 如下: Error 1033 received logging on to the standby FAL[server, ARC0]: Error 1033 creating remote archivelog file 'wnadsdy' FAL[server, ARC0]: FAL archive failed, see trace file. Error 1033 received logging on to the standby PING[ARC2]: Heartbeat failed to connect to standby 'wnadsdy'. Error is 1033. tnsping 可以Ping 到备库 wnadsdy primary ip 172.31.0.41 standby ip 1721.31.0.112 primary db initwnad.ora wnad.__db_cache_size=687865856 wnad.__java_pool_size=16777216 wnad.__large_pool_size=33554432 wnad.__oracle_base='/opr/oracle'#ORACLE_BASE set from environment wnad.__pga_aggregate_target=671088640 wnad.__sga_target=989855744 wnad.__shared_io_pool_size=0 wnad.__shared_pool_size=234881024 wnad.__streams_pool_size=0 *.audit_file_dest='/opr/oracle/admin/wnad/adump' *.audit_trail='db' *.compatible='11.2.0.4.0' *.control_files='/opr/oracle/wnad/control01.ctl','/opr/oracle/fast_recovery_area/wnad/control02.ctl' *.db_block_size=8192 *.db_domain='' *.db_name='wnad' *.db_recovery_file_dest='/opr/oracle/fast_recovery_area' *.db_recovery_file_dest_size=10737418240 *.diagnostic_dest='/opr/oracle' *.dispatchers='(PROTOCOL=TCP) (SERVICE=wnadXDB)' *.log_archive_dest_1='location=/opr/oracle/wnad/archive' *.log_archive_dest_2='SERVICE=wnadsdy' *.memory_target=1656750080 *.open_cursors=300 *.processes=150 *.remote_login_passwordfile='EXCLUSIVE' *.standby_file_management='AUTO' *.undo_tablespace='UNDOTBS1' listener.ora LISTENER= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test)(PORT=1521)) ) ) SID_LIST_LISTENER= (SID_LIST= (SID_DESC= (SID_NAME=wnad) (ORACLE_HOME=/opr/oracle/product/11.2.0/db_1) (GLOBAL_DBNAME=wnad) ) ) tnsnames.ora WNAD= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test)(PORT=1521)) ) (CONNECT_DATA= (SERVER = DEDICATED) (SERVICE_NAME=wnad) ) ) wnadsdy= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test2)(PORT=1521)) ) (CONNECT_DATA= (SERVER = DEDICATED) (SERVICE_NAME=wnad) ) ) standby db initwnad.ora wnad.__db_cache_size=687865856 wnad.__java_pool_size=16777216 wnad.__large_pool_size=33554432 wnad.__oracle_base='/opr/oracle'#ORACLE_BASE set from environment wnad.__pga_aggregate_target=671088640 wnad.__sga_target=989855744 wnad.__shared_io_pool_size=0 wnad.__shared_pool_size=234881024 wnad.__streams_pool_size=0 *.audit_file_dest='/opr/oracle/admin/wnad/adump' *.audit_trail='db' *.compatible='11.2.0.4.0' *.control_files='/opr/oracle/wnad/control01.ctl','/opr/oracle/fast_recovery_area/wnad/control02.ctl' *.db_block_size=8192 *.db_domain='' *.db_name='wnad' *.diagnostic_dest='/opr/oracle' *.dispatchers='(PROTOCOL=TCP) (SERVICE=wnadXDB)' *.log_archive_dest_1='location=/opr/oracle/wnad/archive' *.memory_target=1656750080 *.open_cursors=300 *.processes=150 *.remote_login_passwordfile='EXCLUSIVE' *.standby_file_management='AUTO' *.undo_tablespace='UNDOTBS1' listener.ora LISTENER= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test2)(PORT=1521)) ) ) SID_LIST_LISTENER= (SID_LIST= (SID_DESC= (SID_NAME=wnad) (ORACLE_HOME=/opr/oracle/product/11.2.0/db_1) (GLOBAL_DBNAME=wnad) ) ) tnsnames.ora wnad= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test)(PORT=1521)) ) (CONNECT_DATA= (SERVER = DEDICATED) (SERVICE_NAME=wnad) ) ) wnadsdy= (DESCRIPTION= (ADDRESS_LIST= (ADDRESS=(PROTOCOL=TCP)(HOST=oracle-test2)(PORT=1521)) ) (CONNECT_DATA= (SERVER = DEDICATED) (SERVICE_NAME=wnad) ) )
Hello;
Very difficult to read your post.
If your standby is in "recovery - mount" a 1033 is normal assuming you are trying to shut down the standby.
Otherwise try this query on the standby:
select process, client_process, sequence#, status from V$managed_standby;
If there is a MRP or a MRP0 process, the database is performing managed recovery. Otherwise It's not ready and you may have found your cause.
Best Regards
mseberg -
fatal error
Acrobat has failed to connect a DDE server....
What can I do?Did you register and activate Acrobat? I don't remember the DDE issue off hand, but it should not be occurring with the regular Acrobat installation.
-
HI my patch was laready on 10.2.0.4 and just upgraded by databse from 10.2.0.3 to 10.2.0.4
though database and listener and agent are up and running at the OS
but on Grid Control I'm getting the error under
'Agent'
Failed to connect to database instance: ORA-01034: ORACLE not available.
Any Idea guys
Thanks
GaganI would check whether Oracle was still available. With the current state of Oracle software you never know.
If Oracle was available I would try to use sqlplus to connect to the database using the dbsnmp account.
If that works, it is SR time.
As you don't specify any O/S information, it is difficult to tell you more, especially as some releases of Oracle on some processors are flaky, and Oracle can not always reproduce the problems in house.
Sybrand Bakker
Senior Oracle DBA -
Urgent: Error: Client routine fdpvwr failed to prepare for file transfer
Hi Recently i have upgraded developer 6i by applying patches.
After when i am trying to submit active users and active responsibilities.
Those also getting completed
But when i am trying to click button view output or view log
I am getting error as "Client routine fdpvwr failed to prepare for file transfer"
Can anybody tell me what is the issue. Waiting for your reply
GaneshI am getting error as "Client routine fdpvwr failed to prepare for file transfer"
The error is reported in one note only, and it seems it is not applied to your current setup. I would suggest you log a SR to confirm if you need to apply patch 4653217 or not.
Note: 466743.1 - After Upgrade Of Db To 10.2.0.2, Receive Error When Viewing Conc Req Log/Output
https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=466743.1 -
USMT Errors - Request to SMP failed with error 0x80004005
The client I am at we are working on using USMT integrated with their OSD task sequence. Yesterday we setup a State Migration Point on the DP that is located at this office. We ran a task sequence for testing purposes that just basically does the Scan
State. The few machines we tested this task sequence on successfully completed the task.
This morning we have tried some more testing and now the task doesn't work. The job fails at the point where it is requesting user store space. The log files shows that it knows about the SMP and that it request access but it fails and continues
on trying to find another available SMP.
The first few attempts the errors are based on "Failed to connect to
\\SERVER.DOMAIN\SMPSTORED_241ADE445 (53)
"Cannot connect to http://SERVER.DOMAIN SMP root share"
"Request to SMP 'http://SERVER.DOMAIN' failed with error (Code 0x80004005) Trying next SMP.
"SMP request to 'http://server.domain" failed with error: E_SMPERROR_ENCRYPTKEY_EMPTY (103)
"ClientKeyRequestToSMP failed (0x80004005)
We have removed the SMP and have re-added it.
Kristopher Turner | Not the brightest bulb but by far not the dimmest bulb.Hi,
See if this thread helps solve the problem
http://social.technet.microsoft.com/Forums/en-US/c3883768-5a49-45bc-b173-5f7eff8eca53/usmt-capture-task-sequence-failing?forum=configmanagerosd
We
are trying to better understand customer views on social support experience, so your participation in this
interview project would be greatly appreciated if you have time.
Thanks for helping make community forums a great place. -
FRM-92050: Failed to connect to Server: /forms/lservlet-1 coming thru LBR
Hi,
Our EBS setup is as follows,
R12.1.1,
10g DB, 10.2.0.4 (patchset)
Sun Solaris 10 64 bit
Two node Apps Tier (AppServer1 and AppServer2) in a shared APPL_TOP.
and Two node RAC Database Tier (DBNode1 and DBNode2)
Highly secured and firewall environments.
We configured EBS R12 and we were able to login and launch forms , Submit conncurrent jobs and everythings worked fine.
http://hostname.domainname:8000
Now , our requirement is that all the users would be accessing our EBS through https and the flow is as follows,
Step1:
User => https://lbrname.domainname:443
here lbrname is our Load Balancer name. Here the request is identified as EBS request and LBR forwards that URL to our reverse proxy server
Step2:
Our reverse proxy server is Sun http web server 7 update 5. It converts it to http://hostname.domainname:8000 and offloads it to the apps tier.
We followed metalink note 380489.1 - Using Load-Balancers with Oracle E-Business Suite Release 12 to configure our EBS with load balancer .
(Section 2.1: Using Hardware Load Balancers with Single Web Entry Point).
After configuring we are able to login to the EBS URL using https://lbrname.domainname:443.
Now here is our problem,
When trying to launch any form , it gives the below error.
FRM-92050: Failed to connect to Server: /forms/lservlet-1
not sure how to proceed. Looked at google , metalink but not getting anywhere.
Can you please give some pointers as how to solve this problem ?
Thanks,
SasiHi Helios,
Thank you very much for your time.
Metalink ID 438522.1 & 367614.1 doesnt apply to our environment.
I had looked at 470890.1 and it looked like we are ok but I'm going to double check on that.
FRM-92050: Failed to connect to Server: /forms/lservlet:-1 http://ID 470890.1
On the laodbalancer (Big IP) i need to check with our network team.
FRM-92050: Failed To Connect To Server: /forms/lservlet:-1 http://ID 793409.1
Thanks again.
Sasi -
Failed to connect to backend system
Hello,
I have installed visual composer and experience some errors.
My system fails to connect to the backend system in VC. I am able to create SAP transaction iviews for the system, see the alias, and user mapping is configured.
When I perform the System Connection test for my system which based on the load balancing template. All the test fail except the ITS test.
- SAP Web AS - SAP Web Application Server
- ITS Connection Tests the connection to an SAP
- Connection Test for Connectors Tests
- Connection Test Through DQE
Must all these test pass, or is it enough with only a subset of these tests. Does the alias have to be the same as the logical system.Hi Jørgen,
It is a genuin problem. Just tell your Portal Administrator to give the userid (which you are using to log in to the portal from VC) the full authority for the alias you want to access from VC, as it is the portal administrator who has the rights to give access to various portal users. In the portal, the administrator can give a user the access to an alias by selecting that alias and change the required property.
Try the following flow to get the required document:-
help.sap.com->SAP Netweaver->SAP Netweaver 2004->people integration->portal->Administration Guide->System Administration->Permission,Role/User........
Check out the given help document, I hope it will help you in solving your problem.
Check out the section 3.2 (specially steps 25-30) in the pdf file provided in the following link :-
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6209b52e-0401-0010-6a9f-d40ec3a09424
Thanks in advance,
Deep. -
Several days ago, I created a workbook with 5 worksheets in Discoverer Plus 9.02 against a 10g database. Everything worked fine until today when I tried to re-saved the workbook into the database. I saw the error message that said "Failed to connect to database". When I hit the OK button in the error message dialog box, my sessions were terminated. Again, the error happened whenever I tried to re-save the workbook into the DB. I didn't see such error before.
Hi Andy,
We are having a similar issue. We recently upgraded from 4.1.48 to 10.1.2.48.18. We are using Plus/Viewer. Imported workbook has several worksheets. Query runs but then receive an error stating 'Contact with the server has been lost...' I set the row retrievel to 20 rows but still get this error message.
Have you found a resolution to this problem?
Thanks in advance for any help.
Barbara -
Failed to connect to database instance: ORA-12541: TNS:no listener
Hello -
This is the error in grid alert:
Failed to connect to database instance: ORA-12541: TNS:no listener (DBD ERROR: OCIServerAttach).
But the test of connection string in database configure screen is successful. tnsping works too.
Grid version: 11.2.0.1.0, no patches.
Target database version: 10.2.0.2
Connect string: (DESCRIPTION = (ADDRESS_LIST = (ADDRESS = (PROTOCOL = TCP) (HOST = s08) (PORT = 1528))) (CONNECT_DATA = (SID = S08) (GLOBAL_NAME = S08.WORLD)))
Any ideas?OK.. Are you testing the connectivity from "Preferred Credentials " setting page?
Try to configure target from
Targets-->databases--> then select your database and click on "configure" button.
Enter all the details and press "Test Connection" button once it shows that connection is successful go to next page and finally save the setting.
Let me know how it goes.... -
Failed to connect to verizon cloud on Windows 7.
I signed up with Verizon Cloud, installed on my Windows 7 PC, and getting an error after logging in:
"Failed to connect to the verizon cloud. HTTP result=422, Status code=4601, Authorization code=0
Anyone knows how to solve this problem? Thank you much, Mike.I signed up with Verizon Cloud, installed on my Windows 7 PC, and getting an error after logging in:
"Failed to connect to the verizon cloud. HTTP result=422, Status code=4601, Authorization code=0
Anyone knows how to solve this problem? Thank you much, Mike. -
Error during GR(very very urgent)
Hi all,
i am using a developed program for GR.i used this program before.there was no error.but now i am facing error like
<b>PO ordered quqntity exceeded by 18,000 EA.</b>.i am using <b>BAPI_GOODSMVT_CREATE</b> for goods transfer.
In the selection screen, i am putting
PO number- PO1
material number- MAT
GR quantity- 18,000
delivery order-111
i want to receive the material MAT of quantity 18,000 from that PO.initially i have ordered PO quntity as 1 lakh. Till now i have received 42,000 materials,now i try to receive 18,000 materials.but it is showing this type of error.
This error is fired from the return parameter of that BAPI only.error having message class-M7 & error no-022
is comming.
i am giving my coding below.plz suggest where is the problem.it is very very urgent.recently my company has added some patches to update the SAP.is this the cause for that error.plz suggest.
any idea will be highly appreaciated.
Regards
REPORT zmui001
LINE-SIZE 140
LINE-COUNT 65
NO STANDARD PAGE HEADING.
*-- DATA DECLARATION--
*-- tables
TABLES : ekpo,
ekbe,
marv.
*--Includes
INCLUDE : <icon>. " Include for Icons
*-- Types
TYPES : BEGIN OF t_mseg,
ebeln LIKE ekko-ebeln,
name1 LIKE lfa1-name1,
lifnr LIKE lfa1-lifnr,
eknam LIKE t024-eknam,
mblnr LIKE mkpf-mblnr,
matnr LIKE ekpo-matnr,
maktx LIKE makt-maktx,
lgort LIKE mseg-lgort,
charg LIKE mseg-charg, "chg: 10/17/2005
menge LIKE mseg-menge,
budat LIKE mkpf-budat,
bldat LIKE mkpf-bldat, " chg : 08/18/2003
xblnr LIKE mkpf-xblnr,
END OF t_mseg.
DATA: BEGIN OF t_ekbe,
ebeln LIKE ekbe-ebeln,
ebelp LIKE ekbe-ebelp,
bwart LIKE ekbe-bwart,
matnr LIKE ekbe-matnr,
menge LIKE ekbe-menge,
END OF t_ekbe,
BEGIN OF t_ekpo,
ebeln LIKE ekpo-ebeln,
ebelp LIKE ekpo-ebelp,
matnr LIKE ekpo-matnr,
menge LIKE ekpo-menge,
END OF t_ekpo.
TYPES : BEGIN OF t_options.
INCLUDE STRUCTURE itcpo.
TYPES : END OF t_options.
*--Internal tables
DATA: BEGIN OF i_item OCCURS 50. "Create Material Document Item
INCLUDE STRUCTURE bapi2017_gm_item_create.
DATA: END OF i_item .
DATA: BEGIN OF i_return OCCURS 20. "Return parameter
INCLUDE STRUCTURE bapiret2.
DATA: END OF i_return.
DATA: BEGIN OF i_part OCCURS 0, " Internal table for split data
part(20),
END OF i_part.
DATA: BEGIN OF i_return1 OCCURS 20. "Return parameter
INCLUDE STRUCTURE bapiret1.
DATA: END OF i_return1.
*-- Work areas
DATA: BEGIN OF wa_header . "Material Document Header Data
INCLUDE STRUCTURE bapi2017_gm_head_01.
DATA: END OF wa_header .
DATA: BEGIN OF wa_return . "Output Structure
INCLUDE STRUCTURE bapi2017_gm_head_ret.
DATA: END OF wa_return .
*-- Work areas
DATA: wa_mseg TYPE t_mseg,
wa_ekbe LIKE t_ekbe,
wa_ekpo LIKE t_ekpo,
wa_options TYPE t_options,
i_ekbe LIKE STANDARD TABLE OF t_ekbe,
i_ekbe2 LIKE STANDARD TABLE OF t_ekbe,
i_ekpo LIKE STANDARD TABLE OF t_ekpo.
*---Variables
DATA: v_first, " variable to get first digit
v_set TYPE c,
v_found TYPE p,
v_menge TYPE p,
v_ebeln LIKE ekko-ebeln,
v_lifnr LIKE ekko-lifnr,
v_belnr LIKE ekbe-belnr,
v_postdate LIKE mkpf-budat,
v_bukrs LIKE marv-bukrs,
v_datum LIKE sy-datum,
v_lgort LIKE mard-lgort, " Stge. location
v_bwart LIKE mseg-bwart, " Movement type
v_infnr LIKE eina-infnr, " Info record no.
v_ltsnr LIKE eina-ltsnr.
*---Constants
CONSTANTS: c_comma TYPE c VALUE ',', " For splitting data at commas
c_01(2) TYPE c VALUE '01', " For movement code in Bapi
c_b TYPE c VALUE 'B', " For mvt. Indicator in Bapi
c_save(4) TYPE c VALUE 'SAVE', " For button text
c_clear(5) TYPE c VALUE 'CLEAR', " For clear button
c_mvmt(4) TYPE c VALUE 'MVMT',
c_ok(2) TYPE c VALUE 'OK',
c_error(5) TYPE c VALUE 'Error'.
*--SELECTION SCREEN DESIGN--
SELECTION-SCREEN BEGIN OF BLOCK blk1 WITH FRAME.
PARAMETERS: p_bar(75) , " Scanned data from barcode
p_ebeln LIKE ekko-ebeln, " PO number
p_matnr LIKE ekpo-matnr, " Material number
p_menge LIKE ekpo-menge, " Quantity
p_lifnr LIKE ekko-lifnr, " Vendor code
p_frbnr LIKE mkpf-frbnr, " Reference doc for goods mvt
p_status(5) TYPE c.
SELECTION-SCREEN END OF BLOCK blk1.
SELECTION-SCREEN PUSHBUTTON 15(10) v_save USER-COMMAND mvmt.
SELECTION-SCREEN PUSHBUTTON 40(10) v_clear USER-COMMAND clear.
INITIALIZATION -
INITIALIZATION.
v_save = c_save .
v_clear = c_clear.
*--AT SELECTION_SCREEN--
AT SELECTION-SCREEN .
IF sy-ucomm = c_clear.
PERFORM f_clear.
ELSE.
IF sy-ucomm <> c_mvmt.
if not sy-tabix is initial and sy-ucomm <> c_mvmt.
*--- Extracting the data by splitting the scanned values.
PERFORM f_get_split_data.
*--- Validating the input data.
PERFORM f_check_inputs.
ELSE .
*--- Validating the input data.
PERFORM f_check_inputs.
*-- Determining the posting date and period check.
PERFORM f_get_posting_date.
*---Post goods movement
PERFORM f_post_receipt.
ENDIF.
ENDIF.
SUBROUTINES *
*& Form f_check_inputs
Validating the input parameters
FORM f_check_inputs.
*-- Validating material no.
SELECT SINGLE matnr INTO p_matnr
FROM mara
WHERE matnr = p_matnr.
IF sy-subrc = 4.
p_status = c_error.
MESSAGE e003(zm) WITH 'Material no.'.
ENDIF.
*-- Validating JHT reference no.
SELECT SINGLE ebeln
lifnr
bukrs
INTO (p_ebeln, v_lifnr , v_bukrs)
FROM ekko
where unsez = p_unsez. chg:07072003
WHERE ebeln = p_ebeln.
IF sy-subrc = 4.
p_status = c_error.
MESSAGE e003(zm) WITH 'Purchase order no.'.
ENDIF.
*-- Validating material po combination
SELECT SINGLE *
FROM ekpo
WHERE ebeln = p_ebeln
AND matnr = p_matnr.
IF sy-subrc = 4.
p_status = c_error.
MESSAGE e003(zm) WITH 'Purchase order no.' ' and Material no.'.
ENDIF.
*--- Checking for DO entry . (chng : 30/06/2003)
IF p_frbnr IS INITIAL.
MESSAGE e018(m7) WITH 'Delivery no.'.
p_status = c_error.
PERFORM f_clear.
ENDIF.
*-- Validating material po do combination
SELECT SINGLE a~belnr
INTO v_belnr
FROM ekbe AS a
INNER JOIN mkpf AS b
ON abelnr = bmblnr
AND agjahr = bmjahr
WHERE a~ebeln = ekpo-ebeln
AND a~ebelp = ekpo-ebelp
AND b~xblnr = p_frbnr.
IF sy-subrc = 0.
MESSAGE e019(zm) WITH v_belnr.
p_status = c_error.
PERFORM f_clear.
ENDIF.
p_status = c_ok.
ENDFORM. " f_check_inputs
*& Form f_get_split_data
Extracting the data by splitting the Scanned data
FORM f_get_split_data.
*-- Splitting the data at commas
SPLIT p_bar AT c_comma INTO TABLE i_part.
*-- Assigning the parts to variables.
LOOP AT i_part.
v_first = i_part-part+0(1).
TRANSLATE v_first TO UPPER CASE.
CASE v_first .
WHEN 'V'.
p_lifnr = i_part-part+1(10).
WHEN 'P'.
p_matnr = i_part-part+1(18).
WHEN 'Q'.
p_menge = i_part-part+1(13).
WHEN 'K'.
p_ebeln = i_part-part+1(10).
WHEN 'D'.
p_frbnr = i_part-part+2(16).
WHEN OTHERS.
CONTINUE.
ENDCASE.
ENDLOOP.
ENDFORM. " f_get_split_data
*& Form f_get_posting_date
Determing the posting date for document
FORM f_get_posting_date.
*-- get the current period for todays date.
DATA: l_period LIKE t009b-poper.
CALL FUNCTION 'DATE_TO_PERIOD_CONVERT'
EXPORTING
i_date = sy-datum
i_periv = 'K4'
IMPORTING
e_buper = l_period
E_GJAHR =
EXCEPTIONS
input_false = 1
t009_notfound = 2
t009b_notfound = 3
OTHERS = 4
IF sy-subrc <> 0.
MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
ENDIF.
*-- Determining whether the open period
SELECT SINGLE *
FROM marv
WHERE bukrs = v_bukrs.
IF sy-subrc = 0.
IF l_period = marv-lfmon .
v_postdate = sy-datum.
ELSE.
CALL FUNCTION 'BAPI_CCODE_GET_FIRSTDAY_PERIOD'
EXPORTING
companycodeid = v_bukrs
fiscal_period = marv-lfmon
fiscal_year = marv-lfgja
IMPORTING
first_day_of_period = v_postdate
return = i_return1.
IF NOT i_return[] IS INITIAL.
LOOP AT i_return1.
MESSAGE i016(zm) WITH i_return-message.
ENDLOOP.
ENDIF.
ENDIF.
ENDIF.
ENDFORM. " f_get_posting_date
*& Form f_post_receipt
Post the goods receipt for entered data.
FORM f_post_receipt.
PERFORM f_fill_item.
PERFORM f_fill_header.
PERFORM f_execute_transfer.
PERFORM f_clear.
ENDFORM. " f_post_receipt
*& Form f_fill_item
Updating the item data for the GR
FORM f_fill_item.
Checking for IQC cycle is done here.(chng : 23/07/2003)
PERFORM f_check_iqc.
*---- Assigning movement type as per IQC cycle.(chng : 23/07/2003)
IF v_lgort IS INITIAL.
MOVE '101' TO i_item-move_type.
SELECT SINGLE lgort INTO i_item-stge_loc
FROM ekpo
where ebeln = v_ebeln and " chg :07/07/2003
WHERE ebeln = p_ebeln AND
matnr = p_matnr .
ELSE.
MOVE v_lgort TO i_item-stge_loc.
MOVE v_bwart TO i_item-move_type.
ENDIF.
MOVE p_matnr TO i_item-material.
MOVE p_menge TO i_item-entry_qnt.
move v_ebeln to i_item-po_number. " 07/07/2003
MOVE p_ebeln TO i_item-po_number.
MOVE v_lifnr TO i_item-vendor.
MOVE c_b TO i_item-mvt_ind.
select single ebelp into i_item-po_item " chg :29/07/2003
from ekpo
where ebeln = p_ebeln
and matnr = p_matnr
and elikz = ''.
SELECT ebeln
ebelp
matnr
menge
INTO CORRESPONDING FIELDS OF TABLE i_ekpo
FROM ekpo
WHERE ebeln = p_ebeln
AND matnr = p_matnr
AND loekz = '' .
SORT i_ekpo BY ebeln ebelp matnr.
LOOP AT i_ekpo INTO wa_ekpo.
IF v_found = 0.
SELECT ebeln ebelp
bwart menge
INTO CORRESPONDING FIELDS OF TABLE i_ekbe
FROM ekbe
WHERE ebeln = p_ebeln
AND ebelp = wa_ekpo-ebelp
AND matnr = p_matnr.
and elikz = '' . CHG -- 03/19/2004
IF sy-subrc = 0.
LOOP AT i_ekbe INTO wa_ekbe .
IF wa_ekbe-bwart = '101'.
v_menge = v_menge + wa_ekbe-menge.
ENDIF.
IF wa_ekbe-bwart = '102'.
v_menge = v_menge - wa_ekbe-menge.
ENDIF.
IF wa_ekbe-bwart = '122'.
v_menge = v_menge - wa_ekbe-menge.
ENDIF.
ENDLOOP.
chng: 03/19/2004 compare po qty against receipt
v_menge = v_menge + p_menge .
IF wa_ekpo-menge >= v_menge .
v_found = 1.
MOVE wa_ekpo-ebelp TO i_item-po_item.
ENDIF.
ELSE .
v_found = 1.
MOVE wa_ekpo-ebelp TO i_item-po_item.
ENDIF.
ENDIF.
CLEAR : wa_ekbe, i_ekbe, v_menge.
ENDLOOP.
IF v_found = 0 .
MESSAGE e003(zm) WITH ' delivery items'.
ENDIF.
APPEND i_item.
CLEAR : i_item, v_found .
ENDFORM. " f_fill_item
*& Form f_check_iqc
Checking the storage location for the (chng : 23/07/2003)
FORM f_check_iqc.
CALL FUNCTION 'Z_M_GET_IQC_STATUS'
EXPORTING
matnr = p_matnr
lifnr = v_lifnr
IMPORTING
lgort = v_lgort
bwart = v_bwart
ltsnr = v_ltsnr
infnr = v_infnr
EXCEPTIONS
non_iqc_vendor = 1
OTHERS = 2.
IF sy-subrc <> 0.
CLEAR : v_lgort , v_bwart , v_ltsnr.
ENDIF.
ENDFORM. " f_check_iqc
*& Form f_fill_header
Updating data in the header
FORM f_fill_header.
MOVE v_postdate TO wa_header-pstng_date.
MOVE sy-datum TO wa_header-doc_date.
MOVE p_frbnr TO wa_header-ref_doc_no.
ENDFORM. " f_fill_header
*& Form f_execute_transfer
Executing the goods movement.
FORM f_execute_transfer.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = wa_header
goodsmvt_code = c_01
IMPORTING
goodsmvt_headret = wa_return
TABLES
goodsmvt_item = i_item
return = i_return.
IF i_return[] IS INITIAL .
COMMIT WORK.
*--- UPdating Info record for IQC cycle ind.(chng : 23/07/2003)
IF NOT v_ltsnr IS INITIAL.
UPDATE eina SET ltsnr = v_ltsnr
WHERE infnr = v_infnr.
ENDIF.
REFRESH : i_item.
CLEAR : wa_header,v_ltsnr , v_infnr,v_bwart,v_lifnr.
MESSAGE i012(migo) WITH wa_return-mat_doc.
PERFORM f_do_print.
ELSE.
REFRESH : i_item.
CLEAR : wa_header,v_ltsnr , v_infnr,v_bwart,v_lifnr.
PERFORM write_errors.
ENDIF.
ENDFORM. " f_execute_transfer
FORM write_errors.
WRITE: 0(90) sy-uline ,
/0'|',
3 'System messages for GR posting',
90 '|',
/0(90) sy-uline .
LOOP AT i_return.
CASE i_return-type.
WHEN 'E'.
MESSAGE i016(zm) WITH i_return-message.
WHEN 'W'.
MESSAGE i017(zm) WITH i_return-message.
WHEN 'I'.
WRITE: /0'|',
icon_yellow_light AS ICON ,
'|',
10 i_return-message,
90 '|'.
MESSAGE i018(zm) WITH i_return-message.
WHEN 'S'.
WRITE: /0'|',
icon_green_light AS ICON ,
'|',
10 i_return-message,
90 '|'.
MESSAGE i018(zm) WITH i_return-message.
WHEN OTHERS.
WRITE: /0'|',
icon_red_light AS ICON ,
'|',
10 i_return-message,
90 '|'.
MESSAGE e016(zm) WITH i_return-message.
ENDCASE.
AT LAST .
WRITE:/0(90) sy-uline .
ENDAT.
ENDLOOP.
ENDFORM. " write_errors
*& Form f_clear
Clearing the input parameters
FORM f_clear.
CLEAR : p_ebeln ,
p_bar,
p_matnr,
p_frbnr,
v_lifnr,
p_menge,
p_status.Hi all,
can anyone suggest any idea?
Regrds
pabitra -
When using CCC (Carbon Cophy Cloner) or Disk Utility to clone a Mac HD of one new iMac to another, over ThunderBolt, we are getting I/O errors. Even though the clone fails, the destination system does boot and log in, however, the logins take a very very very long time.
Thoughts.
Edit: Already ran Disk Utility. Also reinstalled a fresh OS on top of the cloned OS and it seemed to remedy the problem. Then, cloned to next machine in the row of the lab. Same problem.OK, by that I assume that you used Disk Utility to repair the subject disk and it reported "The volume (name) appears to be OK" in green.
Also verify you followed the instructions here: http://help.bombich.com/kb/usage-scenarios/i-want-to-clone-my-entire-hard-drive- to-a-new-hard-drive-or-a-new-machine
If so, the Thunderbolt connection begins to look suspicious.
Reinstalling OS X subsequent to the "clone" operation may be an acceptable workaround but you should not have had the I/O errors you describe, nor should the login times (subsequent to the initial login, that is) be unacceptably long. It calls into question the integrity of all the information that was transferrred.
I'll try to attract the attention of a CCC expert who will likely provide more competent assistance. You can also try the Bombich support site: http://help.bombich.com -
Hi All,
We have provided the partner details like AS2ID,URL,Port and certificates.
They ask me to do some sample testing whether files are reaching to partner system or not.
I done all the required steps in IR and ID...
1. Can anyone suggest me how to do the testing
2. Where to monitor for AS2 messges?
3. How to see the our output files whether we are sending the correct files or not?
4. Outbound -- How we will come to know whether file reached to partner or not?If we set sync Mdn.. where we can see the MDN..?
5. Inbound-- How we will come to know whether file has sent to us or not?
Someone pls explain step by step how to do the testing using AS2 adapters for both Outbound and Inbound.
Its Very Very urgent.
Waiting for your replys..
Regards
Deepthi.Hi Deepthi,
1. Can anyone suggest me how to do the testing
A) Like message monitoring in RWB we have a particular link to monitor the message through differnt seeburger adapter.
I dont remember the link right now.
2. Where to monitor for AS2 messges?
A) Through the same link.
3. How to see the our output files whether we are sending the correct files or not?
A) u mean to check the output file data or strucutre if strucutre is not proper then u will get the error message and ur mapping fails.
4. Outbound -- How we will come to know whether file reached to partner or not?If we set sync Mdn.. where we can see the MDN..?
I have no idea.
5. Inbound-- How we will come to know whether file has sent to us or not?
File is sent over wan so when it will be pickd up by XI.
Thnx
Chirag -
Hi...
I am working on customizing existing JSP Page. The idea is to retrieve the customer name as show in 1 and send is as run time parameter to SQL query and use the result of select statement to pass it to 2.
<INPUT TYPE="HIDDEN" NAME="soldtoCustPartyName" VALUE="<%= soldtoCustPartyName %>">.............1
The above line of code gives the customer name. We need to find the site id for the above customer and pass it to the following line of code. site id will replace the hardcoded number '7945'.
pageContext.setAttribute("party_site_id", new BigDecimal(7945), PageContext.REQUEST_SCOPE);...............2
Hence we create database connection to find out site id. The query will return the site id depending upon the customer name as in 1. SQL statement will be something like:
select site_id from ..... where fixed conditions and sitename = (from 1).
How can we create SQL statement to take run time values.
For eg. we do the following to execute Query after connecting to the databse..
Statement statement = connection.createStatement();
ResultSet rs = null;
rs = statement.executeQuery("SELECT party_id from apps.hz_party_sites where cust_name='IBM'");
<% rs.next(); %>
<% out.print(rs.getInt("party_id")); %>
How can the above query be modified to take run time value for cust_name.
THIS IS VERY VERY URGENT.....PLEASE HELP.......Where are these run time values coming from? The user is entering the values into a form with that input?
If so, then the user will need to submit the form, you need a servlet to process the form, take the value from the parameter with the same name as the input, insert it into the SQL statement, and run the database query, get the results and store them in the context you want.
Maybe you are looking for
-
Does mini display port support audio on my Imac? Late 2009
Hello, I would like to connect my Imac to my home entertainment system. I have the late 2009 21.5" model. If I get a mini display port to HDMI adapter will that run both audio and video for me or do I have to run seperate audio? Thanks!
-
Double click on the node,ALV tree, subscreen
Hi, I have a small requirement in ALV Tree left side i get a tree and when i double click on one of it , i'm trying to display the subscreen. even though i am setting the paramaters to the screen but i'm unable to get those values in the subscreen. e
-
AD Password Filter - SSL Issues with MSFT CA ?
- We have completed implementing one way EXPORT profile sync between OID to AD - SSL configs are complete as per documentation and password synchronizing from OID to AD successfully - We now want to implement a new import profile to synchronize ONLY
-
Problems reading xmp data into dng files
Hi there, I am working on a Mac and have exported files as lossy dng for colour correction externally. They have done the work for LR 5 process (I am using CC) and returned xml files. I cannot seem to read this data into the dng files for further edi
-
Hello, Request you please explain me the following topics A) what is Gatp/Rules Based. regards Stephan