VIDEO PODCAST WITH iWEB-how to deal with huge file size

Hello folks,
I have created simple website for my video podcast. It all works fine, except one problem. I had used just small video clips for now, just for testing... and it takes long time for website to download. I can't even imagine, how slow it will be, when I have full 15 video episodes within my website. So I am wondering, is there any way of how to maintain that cool iWeb podcast structure (with podcast page, entry page and archive page) but not to embed those videos onto the page, but instead, play it externally? I have tried to just post the link to the video clip, but than "publish to the folder alternative" does not create correct rss.xml feed, because it does not know where those clips are. So it doesn't work in iTunes.
Any suggestions? Thanks for any input or advise.

Hello,
unfortunately, no answer yet. The only solution I can think of, is to create a Blog instead of Podcast, then post hyperlink to your video file on entry page. That way, the actual video is not embeded on that webpage, but it only downloads when someone clicks on it. That way you probably won't be able to use subscribe button and RSS subscribe button, but you can create your own Feed with Feed For All software (http://www.feedforall.com), put it on your domain, then post it's URL on your website. So if someone wants to subscribe to your podcast, he will copy that address and paste it into the iTunes or some other podcast readers.
I am a beginner, so this most likely is not the best solution, however, it works so far.
Good Luck

Similar Messages

  • How to make a huge file size fit

    I have a project which is (sounds silly) about 7 hours. the file sizes arn't that big about 300 meg each but the 0verall project size is 20 gig can I possibly somehow encode this size of project to fit on a 4.7 dvd or should I make one long film in FCP and export that as a QT or something like that......

    You have a couple of options.
    First, consider creating a DVD9 and using AC3 audio - your bitrate would have to be about 2.3Mbps... which is very low, and the visual quality may not be too great.
    Second, instead of using full D1 sizes, use Half D1, which reduces the horizontal resolution and therefore the file size. The visual quality is (IMO) better than VHS and you could encode at slightly over 4Mbps, which is getting acceptable.
    Third, consider making a two disc set. This is not such a bad option as you get to use full D1 encodes at higher resolutions, but of course need to make two DVDSP projects for the content.
    If you went for a double sided and dual layer disc you could achieve the same thing.
    Finally, consider using MPEG1. This has a max data rate of about 1.5Mbps, and so you should easily fit 7 hours on a DVD9... and probably on a DVD5, too (at about 1.4Mbps).
    In all cases, reduce the audio to AC3, no matter what.
    A final option is to be more aggressive with the editing decisions! Cut back on the total amount of footage and get it all on a DVD9 at higher bitrates.
    As a guide, four hours of D1 would need to be encoded at 4.5Mbps to fit on a DVD9, using AC3 audio at 192kbps (a stereo sound track).

  • HT1689 I subscribe to my video podcasts but some of them either has a small red E next to them and won't download new content or some just doesn't download new content. I have been watching the Rachael Maddow video podcast for at least a month with no pro

    I subscribe to my video podcasts but some of them either has a small red E next to them and won't download new content or some just doesn't download new content. I have been watching the Rachael Maddow video podcast for at least a month with no problems. Now suddenly it won't download the last nights show. I have read and followed all troubleshoot and cannot find a solution. I have unsubscribed and re-subscribed to no avail. Can someone help me with this problem?

    keian27 wrote:
    And now that my contract has expired, I have some options.  Last weekend, I called Verizon again threatening to leave.  The representative offered the same $75 rebate that was offered to me 6 months earlier.  I even offered up one of my device upgrades in place of a network extender, but that deal was knocked down.  And so now I’m left with the option to make a public spectacle out of this scenario and hope Verizon takes notice.  Failing that, I’ll be forced to leave Verizon behind.
    I don't understand. If having service in your home IS important to you and you already know Verizon's policy, why have you not instead started to search for carriers which cover your home? It seems a pretty easy decision to me, at least.

  • How to deal with OpenCL grey out issue.

    First off, I'm not native english speaker.
    I have Nvidia GeForce 550 Ti video card, and its support OpenCL v1.1.
    I'm also face a "random" OpenCL grey out issue like other people here, but I found the "issue" and how to deal with.
    open a command windows (using WinKey + R, and type cmd <enter>)
    type "cd C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)" <enter>
    type "sniffer_gpu" <enter>  -->> to check your GPU has OpenCL in Photoshop?
    When GPU is in power-saving mode (core running in 51Mhz, using MSI Afterburner monitor), I running sniffer_gpu, got this report
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>sniffer_gpu
    Device: 0000000000328D68 has video RAM(MB): 1023
    Vendor string:    NVIDIA Corporation
    Renderer string:  GeForce GTX 550 Ti/PCIe/SSE2
    Version string:   3.0.0
    OpenGL version as determined by Extensionator...
    OpenGL Version 3.0
    Has NPOT support: TRUE
    Has Framebuffer Object Extension support: TRUE
    OpenGL ok
    Return code: 1
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>
    No OpenCL support
    Then, I switch GPU back to normal status (core running at 900Mhz)
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>sniffer_gpu
    Device: 00000000001F8D68 has video RAM(MB): 1023
    Vendor string:    NVIDIA Corporation
    Renderer string:  GeForce GTX 550 Ti/PCIe/SSE2
    Version string:   3.0.0
    OpenGL version as determined by Extensionator...
    OpenGL Version 3.0
    Has NPOT support: TRUE
    Has Framebuffer Object Extension support: TRUE
    OpenGL ok
    OpenCL ok, version=1.1 CUDA 4.2.1
    Return code: 3
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>
    OpenCL support !!
    Nowadays, most of new GPUs were support power-saving, but when sniffer_gpu running at GPU power-saving state, the OpenCL computing report maybe "time-out", cause the detector "guess" the GPU does not support OpenCL. This is why many people says "OpenCL" sometimes work, sometimes grey-out.
    I hope this bug can be fixed, or at least people can understand how to "enable OpenCL everytime when you launch photoshop".
    Bye.

    Do check the following link
    http://blogs.oracle.com/soabpm/2010/01/soa_suite_11g_weblogictransact.html

  • How to deal with deadlock on wwv_flow_data table when http server times out

    There are some threads about a deadlock on the wwv_flow_data table. None of them contain a real explanation for this behaviour. In my case I will try to explain what I think is happening. Maybe it helps somebody who is hitting the same matter.
    In my case with APEX 3.2.1 I am navigating from one page to another. Doing this APEX will lock the table wwv_flow_data. As soon as the other page is shown the lock will be released. But now this other page contains a bad performing query (standaard report region). After 5 minutes the http server (modplsql) will time out and present the message "No response from the application server" on the screen. In the meanwhile the query is still running on the database server and the lock stays on the wwv_flow_data table.
    Normal user behaviour will be that the user will use the back button to return to the previous page and tries it again to navigate to the other page or
    the user will try to refresh the page with the bad performing query.
    And voila now you will have a deadlock on the wwv_flow_data table since a second session is trying to do the same thing while the first hasn't finished yet.
    How to deal with it?
    First of all. Have a good look at the bad performing query. Maybe you can improve it that it will succeed before the http server will timeout.
    In my case the 11gr1 optimizer couldn't handle a subquery factoring clause in the best way. After changing it back to a classical inline query the problem was solved.
    Secondly you could increase the timeout parameter of the http server. Although this not the best way.
    Maybe it would better if APEX in a next version would release the lock on the table wwv_flow_date earlier or do a rollback just before the moment that the http server is timing out.
    regards,
    Mathieu Meeuwissen

    Hello Shmoove,
    I saw your reply here and you probably understand the problems the HTTP 100 response may cause.
    I am trying to send image that was taken by getSnapshot. The problem is that the server respond with this HTTP 100 message.
    I suspect that the reason that my server doesn't recognize the file that I'm sending from J2me is that the "server to client" response to the 100 message comes after the second message of (see what the TCPIP viewer shows down here):
    POST /up01/up02.aspx HTTP/1.1
    Content-Type: multipart/form-data; boundary=xxxxyyyyzzz
    Connection: Keep-Alive
    Content-length: 6294
    User-Agent: UNTRUSTED/1.0
    Host: szekely.dnsalias.com:80
    Transfer-Encoding: chunked
    400: Client to Server (126 bytes)
    78
    --xxxxyyyyzzz
    Content-Disposition: form-data; name="pic"; filename="david.jpg"
    Content-Type: application/octet-stream
    400: Connected to Server
    400: Server to Client (112 bytes)
    HTTP/1.1 100 Continue
    Server: Microsoft-IIS/5.1
    Date: Wed, 23 Mar 2005 00:47:02 GMT
    X-Powered-By: ASP.NET
    Any help will be appreciated,
    David

  • How to deal with "Error 1001. The specified service already exists" when install a service using installer package?

    Hi everybody,
    I wrote a "Class Library" project which is a service using Visual Stodio 2008 recently, then tried to use a Visual Studio 2008
    Setup Project to install it.
    Here is what I did for the "Class Library":
    1. Finish the program.cs, Service.cs
    2. Add Installer
    3. Change the serviceInstaller so that "StartType" to be Aotumatic
    4. Change the ServiceProcessInstaller2 so that "Account" to be LocalSystem
    5.
    6. Click in F5 (Start Debugging)
    Here is what I did for the Setup Project:
    1. Add the exe file built from the "Class Library" project to the Application Folder
    2. On the Custom Action Editor, add the exe file from 1 to Install and Commit
    3. Change the property of the project so that "RemovePreviousVersion" to be true
    4. Click on F6(Build Solution)
    Then I tried to run the msi file from the built of the Setup Project. Because I modified the two projects serveral times, I uninstalled the Class Library using "Control Panel->Add or Remove Programs" before I reinstall. Two things I notived:
    1. After unstall, the registry was not cleaned up about the installed program
    2. After several rounds install/uninstall, I got "Error 1001. The specified service already exists"
    My questions are:
    1. How to cleanup the registry when uninstall a program?
    2. How to deal with the "Error 1001. The specified service already exists"?
    3. Did I do anytbing wrong with the "Class Library" or the "Setup Project"?
    Thanks a lot!
    Helen

    Hi Simon, not a problem!
    I spent some more time on this and here are few more notes:
    it is called Major Upgrade, when you are installing new version of the product upon a previous one and
    MSI supports 2 strategies:
    Strategy 1. Install a new version and uninstall previous one. (Install a new version right upon previously installed version (file merging is performed based on dll version number) and the delete previously
    installed files)
    Strategy 2. Uninstall previous version and install a new one (Delete all previous files and install from scratch new files.)
    From the first look it seems that 1st strategy is weird and buggy. But, remember, MSI is great because it's transactional!!! That means that if once some of the phases (Installation, Uninstallation, Rollback, Comit) fails, your machine
    will be reverted to the previous state and it'll be still functional. 
    Let's consider both strategies:
    Consider you have installed product_v1.msi and you want to install product_v2.msi.
    Strategy 1
    1. MSI engine copies files from Product_v1 directory to TEMP directory
    2. MSI engine merges files based on the assembly version (between v1 and v2)
    3. Once merging is completed successfully it removes files in TEMP (RemoveExistingProducts  action triggers it) and you got product_v2 installed, otherwise if it fails MSI engine revert machine to V1 and copies previous files from TEMP.
    Strategy 2
    1. MSI engine tottaly removes all files from v1.
    2. MSI engine installs v2 files and if something goes wrong you cannot revert back, because RemoveExistingProducts  allready worked out and MSI doesn't have files to revert machine back
    I recommend to everybody to use Strategy 1 and leverage MSI transaction functionality. And you can set this strategies by defining sequence of RemoveExistingProducts action. See more info
    here.  So, I think it's not even a bug in VS as I said in the upper post it is default recommened behaviour.
    AND, you got "Error 1001. The specified service already exists"
    because if we follow Strategy 1 MSI engine tries to install Windows Service on top of the existing service and OF COURSE it fails MSI engine (StopServices, DeleteServices actions are executed before actual
    installation and  they look at ServiceControl table). In order to stop service first and delete them you have to fill ServiceContol table of the MSI (and then StopServices, DeleteServices actions will recognize what to they have to stop
    and delete), like this:
    *clip*clip*clip*
    ' see http://msdn.microsoft.com/en-us/library/windows/desktop/aa371634(v=vs.85).aspx for more info
    ' Update the Service Entry to stop and delete service while uninstalling
    query = "INSERT INTO ServiceControl (ServiceControl, Name, Event, Arguments, Wait, Component_) VALUES ('MAD_Service', 'Service name', '160', '', '1', '"
    + componentName + "')"
    Set view = database.OpenView(query)
    : CheckError
    view.Execute : CheckError
    ' Update the Service Entry to stop and delete service while installing
    query = "INSERT INTO ServiceControl (ServiceControl, Name, Event, Arguments, Wait, Component_) VALUES ('MAD2_Service', 'Service name', '10', '', '1', '"
    + componentName + "')"
    Set view = database.OpenView(query)
    : CheckError
    view.Execute : CheckError
    *clip*clip*clip*
    We can uninstall service first by following Strategy 2, but then we lose transactional support.
    So, Simon did I encourage you to change your code a bit?:)
    And, btw, if you don't want to change the strategy, please don't rely on SequenceID in MSI table, it can be change, you have to get the at the runtime.
    Hope it will help to everybody!
    See also more advanced explanation of how MSI works
    here.
    Truly yours, Marat

  • How to deal with credentials for external applications using a Java Client/

    Hi Guys,
    This is the case. I am integrating an external application with an ADF Application. I have implemented some programmatic ViewObjects that are being filled up by a REST Java Client Wrapper. Everything is working fine but the issue is that the credentials the wrapper is using are hard coded inside the java class. I am thinking to ask for the credentials at the beginning of my taskflow and then store them somewhere and use them then to create my client wrapper (passing them in the constructor).
    However, I don't know if my approach is good and I would like you to share your experiences or how to deal with this.
    Regards

    You can use Credential Store Framework to store the credentials securely in the weblogic server instead of hardcoding in the java class.
    The Credential Store Framework:
    - enables you to manage credentials securely
    - provides an API for storage, retrieval, and maintenance of credentials in different back-end repositories
    Check the documentation on CSF API -
    http://docs.oracle.com/cd/E29505_01/core.1111/e10043/devcsf.htm
    Major Steps -
    1. Create a credential map and key in em console to store the password (http://docs.oracle.com/cd/E25054_01/core.1111/e10043/csfadmin.htm)
    2. Use CSF API to retrieve the stored password
    3. In jazn-data.xml give permissions to access CSF key and map

  • How to deal with payment of vendor to us (credit notes I guess)

    Normally I use F07 for outgoing payments, it's linked to vendors, but how to deal with incoming payments of vendors?
    We got paid two invoices(credit notes I guess) and I want to put them under the right vendor, but how do I do it?
    I can't use F07 I think because I need to use positive amounts (for normal purchase invoices) and can't use negative amounts in this transaction. F08 is for ingoing payment but that session is linked to customers I thought..not for vendors?
    How to deal with this kind ot transactions? What transaction can I use the best for payments like this
    (we got paid an amount , no invoices yet, but I know the vendor).

    whith F-02 it is possible I noticed.

  • How to deal with file(for example .xml)? what format of dir should be?

    I'd like to operate the file in disk, and want to use relative directory?
    How to deal with file dir? what format of dir should be?

    Hi Kamlesh,
    Thanks for your response.
    Actually, In the "Process External Bank Statement" window, i see that there are few entries which is for the previous year and which has not been reconciled. I have never worked practically on BRS and hence, i am scared to make any changes in the clients database without being confident on what i am doing. I need to reconcile for one of their Bank a/c for the month of April '08. I have the copy of the statements for the month ending 31st Mar 08 and 30th Apr 08. The closing balances are as below:
    31/03/08 - 2300000.00
    30/04/08 - 3100000.00
    Now my OB for Bank a/c for April '08 in SAP is 2300000.00 Dr.
    When i go to External Bank Reconciliation - Selection Criteria Screen (Manual Reconciliation), here are the detail that i enter:
    Last Balance: INR -7,000,000.00000 (Grayed out by the system)
    Ending Balance: INR -3,100,000.00000 (Entered by me)
    End Date: 30/04/08 (Entered by me)
    "Reconciliation Bank Statement" Screen opens up and shows the below balances in the screen:
    Cleared Book Balance: INR -7,000,000.00000
    Statement Ending Balance: INR -3,100,000.00000
    Difference: INR 3,800,000.00000
    As per the Bank statement, i have found all the transactions listed out here for the month of Apr '08 but, i also found that the open transactions for the previous month from April '08 have been lying in "Process External Bank Statement" window.
    Could you please help me solve my issue as to what needs to be done or could you also get me some links from where i can get few documents for processing External Bank Reconciliations?
    That will be of a great help for me. I need steps as to what needs to be done first and then the next so that i can arrive at the correct closing balance for the month April '08.
    Thanks in Advance....
    Regards,
    Kaushal

  • Organizational unit transfers ,how to deal with the person in it ?

    Hi,All,I need your help!
    if an organizational unit has been transfered to another upper organizational unit ,and there are already persons assigned to different positions of it,so how to deal with this problem?are those person's IT 0000,0001should be changed too?and how to maintain this kind of change?is a personnel action necessary?or there is some other more efficient way for it?

    Hi
    In IT0001 You have a Position which is linked to a Org unit. If you want to change the org units reporting relationship then you have to change it in OM by creating a new relationship with the upper org unit.
    All the person are assigned to position so nothing needs to be done in  PA.
    Reward points if useful.
    Regards

  • IMac SSD full - how to deal with the two drives

    Greetings all,
    I've been using an iMac i7 with two drives SSC and HDD.  Recently, I've been having issues with the SSD being close to full.  I use it for applications only, although some apps need lots of space (iTunes, iMovie, Photoshop, etc.)  I use Lightroom and have all the images on the spinning drive.  Does anyone know how to deal with this issue?  Any way I can move the music from iTunes to the separate drive, or any way to figure out what exactly is using most of my space?
    Thanks in advance for your help.
    erlkonig

    Here's some utilities for analyzing disk space:
    DiskInventory
    GrandPerspective
    OmniDiskSweeper
    WhatSize
    You might want to consider putting your home directory on the HDD.
    How to Move the Home Folder in OS X – and Why
    Moving your home folder in OS X

  • How to deal with the barcode?

    i'm developing a file storage system in java, there're two barcode on each file(one is pdf417, the other one is code128) , but now ,there's a problem confused me :
    i use the barcode scanner to scan the file and get images of these files from the scanner , but i have no idea how to deal with these images,
    i need the barcode information on the images, and i know there're some java components can help me to read the barcode from images , for example : BarcodeReader from Barcode Library, but these components were too expensive for me , is there any other way can solve this problem?

    yes, look for a cheaper component...
    Or write your own...
    Or save up until you can afford the more expensive ones...

  • How to deal with the growing table?

    Every tables are growing in any applications. In some applications, tables become larger and larger quickly. How to deal with this problem?
    I am developing an application system now. Should I add a lot of delete commands in the code for each table?

    junez wrote:
    Every tables are growing in any applications. In some applications, tables become larger and larger quickly. How to deal with this problem?
    I am developing an application system now. Should I add a lot of delete commands in the code for each table?Uh, well, yes if you continually add rows to a table the table will grow ... sooner or later you will want to delete rows that are no longer needed. What did you expect? You have to decide what the business rules are to determine when a row can be deleted, and make sure your design allows for such rows to be identified. This is called ..... analysis and design.

  • How to deal with the rejected stock if it is rjected by QC

    Dear All,
    please let me know how to deal with the rejected  stock from Quality point of view.i.e., for incoming materails and Finished if returned from customer
    Regards,
    P.Vijaya

    hi
    if material is rejected for incoming material then you can create Notification for incoming material due to  you can return back material with print for that you have to record defects in result recording. in T-code QM02 if result is recorded with defects. or you can create with Qm01.against vendor
    if material is returned from costumer you can create inspection lot for that for that you have to maintained inspection type 06 in material master. you can result record for that you can create notification for that. or rework for this material as per quality check or can scrap
    if have any problem please come back
    regards
    Pravin

  • Pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

    pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

    pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

Maybe you are looking for