Hi Gurus
I have created a project in cProjects and released, etc.
Is it possible to use a SAP PS Transaction to view the Rates assigned to each Task. I have tried using CJ20N but I have haven't been able to locate what I'm looking for.
Any guidance on this will be much appreciated.
Many Thanks in advance
Panduranga

Hi AP
I've very new to SAP PS coming from a CRM background.
I checked CN41 but could not see the Rates linked to the Project, I went into a number of views but could not locate.
Would you be able to guide me through to where I need to be.
Many Thanks
Panduranga

Similar Messages

  • Creation of WBSE in SAP-PS from all Phase of Project from cProjects

    Hi,
    Need suggestion for the automatic creation of WBSE in SAP-PS from each phase of Projects from cProjects i.e. multi level controlling scenario
    I have done the required configuration of Define Controlling Scenario where for the project type, controlling method has given (Multilevel Controlling (Structure Element, Automatic).
    But in my case only one WBSE is getting created for all phse s & project defintion of project in cProjects.
    Request you to suggest me on this issue.
    Regards,
    Ranjan

    Hi Vetrivel,
    Thanks for your prompt response. These are settings made for multi level controlling scenarios.
    1. Project Type:
    Accounting Intergation-accounting integration in my SAP ERP, as of relese of the project
    2. Define Object Links for Accounting Integration
    - 0FIN_INT_ERP_PS Single-Obj. Controlling on WBS Elements
    - Search Fields OLR3_TS_PRPS_SHLP
    - Proxy Class CL_DPR_OLR3_WBSELEMENT
    - 0FRAME9 frame has considered
    3. Controlling
    - Controlling Scenarios: PS01 Costing Variant
    - Then Costing Model has assigned to Controlling Scenarios
    - Assignment of Cost Elements to Cost / Revenue rate
    Please suggest me if i have missed some things. I am checking the planed cost in CN41 transaction of the PS module. Morever in Project in cProjects costing button is disabled & while doing calculate no planned cost os updating in Projects.
    I am following role based costing process. Project Role has defined & employee assiged to Projects.
    Thank you in advance.
    Regards,
    Ranjan

  • 'Released' System Status in Automatically created PS Project from Cproject

    Hi,
        My questions are related to  Automatic creation of PS project from cProject
    When We create a PS Project automatically from cProject, the Top Level WBS under Project definition is ' Released' Status . But We need it should be 'created' Status. Pls guide me to change this behaviour .
    regards,
    Ramesh Nachimuthu

    Hi Ramesh,
    In the current cProjects application design, nothing exists in standard. You have to create your own implementation, either by enhancing standard accounting class, or your own subsystem to trigger the interface at save.
    Zhenbo Wang started to write a sample code that could help you:
    Prototype 'Using Subsystem to synchronize the status of linked WBS elements
    BR
    Matthias

  • Upload projects from cProjects to RPM

    Hi RPM experts,
    My client is working with cProjects(linked to PS) , but now they are thinking about using RPM. How should we upload existing projects from Cproject to RPM in order to they are linked?
    Is it needed first creat the item and then linked to cproject or can they be uploaded and created automatically?
    We have seen this function /RPM/CP_UPLOAD, Is it the correct one?
    Thanks everyone for your help!!
    Sara

    Hi Sara,
    This is another way to achieve the Project Upload to cProject. You can create a link between existing cProject and an existing item. Then you can upload the PS project to cProject and Item through RPM application.
    For you next query about the mass creation of Item.
    you have two options
    1) Via Portal. Using Multiple Items create functionality
    2) Via RPM_DX transaction, where you can prepare an excel sheet with basic details of the items to be created and upload this excel via this transaction, by selecting appropriate options on the selection screen.
    With these two options you can create multiple Items at a time.
    Hope this answers your query.
    Thanks and Regards,
    Piyusha

  • Design view not working after importing project from Flex Builder

    After importing a project from Flex Builder to Flash Builder I am no longer able to see anything in the design view. I am using the flex 4.5 sdk.
    Any idea how I can get this design view working? I heard it could have something to do with the metadata directory but am slightly lost here?...
    Adam

    Could you please provide more information as to what exactly are you importing. Also does Design View not lauch at all or does it give errors. Would it be possible for you to share the logs.
    Meanwhile you can try cleaning the workspace and importing again to see if that solves the issue.

  • How to load views in an MVC 5 project from a referenced DLL

    I wish to compile some controllers, models and views into a single assembly and then include it in mvc projects as needed.
    I initially tried using a class library and packaging EF6, MVC etc into the library, but the project that referenced library was unable to find and serve the views.
    I tried to write a Virtual Path Provider (using this example), but if each view does not have a unique name (eg. Index in various subfolders) then I get
    an error:
    "resource name cannot be used more than once".
    Another complication of this seems to be that even if I can get the VPP to serve the file (through treachery and deceit), the application complains:
    "'ModelType' is not declared. It may be inaccessible due to its protection level."
    If I try to inherit from System.Web.Mvc.WebViewPage, as reccommended in the example linked above, I get an error:
    "The 'inherits' keyword is not allowed when a 'ModelType' keyword is used."
    It seems that it is a 'close but not quite' scenario.
    I would really prefer to NOT embed the views as resources anyway.  According to
    this post I should be able to create the dlls as MVC projects themselves and then include them in other projects (Full-Fat MVC Project).  It is claimed:
    "if you follow this approach you can use the routes, controllers and views as if they were part of the main web app."
    However, when I tried this I wasn't able to get the view engine to look into the dlls.
    How can I make the view engine see the dll and the pathed views within it?

    I would recommend posting your question to the MVC sub forum under ASP.NET:
    http://forums.asp.net/1146.aspx/1?MVC
    Paul ~~~~ Microsoft MVP (Visual Basic)

  • Transferring the data from cProject to PS Project

    Hi,
         When we create a PS project from cProject some of the field values are not flowing.
    1. PS Project is not taking any  cProject Project type.  Is there any BAdI or Configuration Option available to change this behaviour?
    2. Person Responsible of the Project is not replicated in PS Project from cProject. Can We flow this detail from cProject to PS project?
    pls help me to solve these behaviours.
                             Thanking you
    regards,
    Ramesh Nachimuthu

    HI Ramesh,
    Both are unfortuenately not possible.
    1. PS Project is not taking any cProject Project type. Is there any BAdI or Configuration Option available to change this behaviour?
    >> the PS project type is determined by project profile. And PS Project profiel is determined by customizing, tocde  IAOM0, Business Scenario 'CPROJECTS'. In other words, only a PS project type is available.
    2. Person Responsible of the Project is not replicated in PS Project from cProject. Can We flow this detail from cProject to PS project?
    >> The reponsible of cProject is a BP, and the PS Project responsible is a person maintained in HR. They can have no relationship between them, though the name is the same. The corresponding information is not tranfered to the PS and there is no mapping logic applied so far.
    Kind regards,
    Zhenbo

  • Employee id's of resources assigned to the project

    Hi All,
    I need to send employee id's of the people assigned to a project from sap ps to third party ps system.
    I am able to find the projectid, netwrok id and activity id and work center assigned to it but how do i find which resource(employee id) of this work center is assigned to this activity.
    Regards
    Satish

    got the answer.
    M_CRAMV is the view and cmp3 is the tcode.

  • Employee id of the resource assigned to a project

    Hi All,
    I need to send employee id's of the people assigned to a project from sap ps to third party ps system.
    I am able to find the projectid, netwrok id and activity id and work center assigned to it but how do i find which resource(employee id) of this work center is assigned to this activity.
    Regards
    Satish

    Hi ,
    check the view   M_CRAMV or CMP3(Tcode).
    regards
    Prabhu

  • Error while creating project automatically from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi,
    The neccesary configuration for cProjects & SAP-PS interface are as follows.
    1. Project Types in cProjects, Object types, Organisation unit with Org structure in line with project profile
    2. Activate Accounting integration
    3. Object types for object link (WBSE in this case)
    4. Accounting integration using cost collector
    5. Easy cost planing settings both in R/3 systems & cProjects
    6. Project profile configuration in R/3 (cProjects standard)
    7. CO Scenario maintainance view determination (Multi level controlling-Project role, automatic)
    All the enterprise structure assignments should be same in cProjects & R/3.
    Hope this may help you.
    Regards,
    Rakesh Pradhan

  • Error while creating projects in SAP-PS from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi Ranjan,
    If the companay code does not belong to the Co area,  the system will certainly raise an error message. The question is, where do the values come from.
    Woud you please check the customizing in ERP system, if you can find the inconsistence:
    1. Customizing of the Proj.Profile under 'Create Project Profile' , SAP standard delivered is CPR0001, may be replaced by customer,
    Which Co-area & company code are used. In Tab 'organization'
    2. Which responsible Org.unit is maitained at involved cProject, to which co-area or company codes is this org.unit assigned.
    3. If the Badi under the
    Integration with Other mySAP.com Components ->
    Collaboration Projects -> Controlling ->  Business Add-Ins (BAdIs),
    which set the org. information hardly via Badi method.
    Kind regards,
    Zhenbo

  • Std report T.Code to view the Employees those are assigned to the Project

    Dear Guru's,
                          We are assigning Employeeu2019s in u201CActivityu201D  u201CPersonal assignment Tabu201D, for these employees we are booking the u201CTime sheetu201D against u201CNetwork activityu201D. 
                   Are there is any standard report is available to view the Employees those are assigned to the Project. If it is available please provide the Transaction Code.
    Regards,
    Bhanu Prathap

    Hi
    Nitin is correct if there is no HR then it is difficult to set up resource planning based on workforce. Nitin is also correct in poinitng out that yu do not have to implement HR fully, just set up the personeel master data (HR Mini Master) with a basic set of data infotypes.
    If however you do not plan to set up HR ot the personnel master then you need to do creative thinking -  e.g. set up all your people as individual work centres and assign to activites - the work centre description can be the name of the person and the workcentre number can be the employee number - restrcitcions is the field length, etc - however the down side of all this is that standard reports with personnel number number will not suffice and you will have to do some work for your reporting - not major as the data is stored in SAP tables

  • While creating project from inactive dc not able to view the project struct

    Dear All,
    I have created project from inactive dc now when I open the project in the webdynpro explorer I am not able to view the application, component and models.  I have tried reloading and repairing but still the structure is not appearing.  Can anyone tell what I may be doing wrong.
    Thankyou
    Regards,
    Ganesh

    Dear Bala,
    I have got about 8 to 10 DC's out of which only this one is showing the missing structure and as this dc is being used by other dc's I am getting the error like missing component.  Previously we were using the client desktop and doin the work now we have shifted it to our individual systems.  Now any project I am creating whether from same track or different same problem comming the structure is missing.
    Regards,
    Ganesh
    Edited by: Ganesh Sawant on Sep 8, 2009 9:42 AM

  • Error While Creating Project From Active Workspace.

    Hi Friends,
    While I am trying to create Project (WebDynpro DC) from my Active Workspace.
    I am getting few errors..They are as follows.
    1> .classpath (read only exception) --- By mistakenly .classpath was added to one of my activity and it is in DTR. So kindly suggest me a solution to Delete this file.
    2> Resource ProjectProperties.wdproperties is not in sync with latest version.
    To delete resource:
    - check-in changes and then delete.
    - revert resource and then delete.
    Kindly suggest me some solutions.
    Thanks and Regards.
    Yajush Mishra

    Hi,
    The neccesary configuration for cProjects & SAP-PS interface are as follows.
    1. Project Types in cProjects, Object types, Organisation unit with Org structure in line with project profile
    2. Activate Accounting integration
    3. Object types for object link (WBSE in this case)
    4. Accounting integration using cost collector
    5. Easy cost planing settings both in R/3 systems & cProjects
    6. Project profile configuration in R/3 (cProjects standard)
    7. CO Scenario maintainance view determination (Multi level controlling-Project role, automatic)
    All the enterprise structure assignments should be same in cProjects & R/3.
    Hope this may help you.
    Regards,
    Rakesh Pradhan

  • Creation of Project from Sales Order

    Dear All,
    I am doing Customer Project.
    My Client want to Create a Project Directly from Sales Order. I think we can do it using Assembly Processing. But, I have not worked on it.
    If any one worked on this scenario kindly guide me in this case. Also, let me know any documents are avialble in this scenario.
    Thanks and Regards,
    Atul R. Rajmane

    Hi,
    Transaction Flow
    As per prerequisite we need to create following:
    1-       Standard WBS
    2-       Standard Network
    3-       Material
    4-       Link between the Network, Material and Standard WBS;o
    5-       Create Sales Order
    Create Standard WBS
    TCode : CJ91
    Path:  Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard WBS® Create
    After entering the data press enter.
    Now select   icon to display the WBS element.
    You can add / delete the WBS element here.
    Remember that For All WBS Element, Operative indicator Account Assigned & Planning Element should be ticked.  Billing element should be ticked for the WBS element that will be assigned in the allocation of material to Std. Network
    Click on   icon to go back to the header.
    Here release the WBS elements.
    Make sure to release the WBS elements. (Remember without Release Status system will not allow to post any actual cost to new created project)
    Create Standard Network
    TCode: CN01 
    Path: Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard networkà Create
    Select the   icon to copy from Template.
    Now enter standard Network (Which one you want to copy).
    Here you will link WBS to Network.( it is very important to create a new operative project from sale order ) Then press Enter
    Select the     for choose activities:
    You can create activity here as per requirement.
    You can maintain the relationship among the activities. Now Press the Total Tab :
    Now here you can decide that under which WBS element activity will assigned .
    Save the network
    Create Material
    TCode: MM01
    Path: Logistics ® Production ® Master data ® Material master or Logistics ® Material management ® Material master and then Material and create (special or general)
    Create material with using already exist material
    Maintain the necessary setting in Material Master. (It is necessary for Assembly processing).
    Select Sales ORG 1
    Press the conditions :
    The amount which enters here will be the sale value of material. During creation of sale order system take the sale order value from here.
    Select the relevant Item Category Group.
    Maintain Strategy in MRP3 View and save then Exit.
    Assignment of Material to Network:
    TCode: CN08
    Path: Logistics ® Project management ® Basic data and then Standard structures ® Network parameters from sales order ® Edit.
    Click the   icon to enter new line.
    Here we will link material to Standard Network & Standard WBS. 
    Assembly Processing
    Create Sales Order:
    TC: VA01/VA41
    Path: SAP Menu àLogistic àSales and DistributionàSalesàOrderàCreate
    Select the Order Type / Sale organization and Distribution Channel
    Enter
    Enter the Required field like Ship to party, PO No. , Required Delivery Date, Material No. and Quantity .Then Press Enter.
    Save the Sales Order and note down the Sale Order Number.
    Sales order number will use the project number
    Check in Project Builder.( CJ20N)
    Now we can see that System has created new operative project in background.
    And it has assigned activities to WBS accordingly.
    **source-somewhere at SDN,i forgot.will try to find original source then post here for reference and proper acknowledgement*
    regards.

Maybe you are looking for

  • HT204406 Apple TV 2 drooping i Tunes account every 10 minutes

    Using Apple TV.I have to close i Tunes every +- 10 minutes to re start when watching a TV show downloaded to my primary PC when using Home Sharing

  • RSNASTED Query

    We need to send an outbound idoc (DELVRY03) on Post Goods Issue in VL02N. All config and custom code is working fine. The idoc is generated. However, we also need to know teh idoc number as soon as the idoc is generated. This idoc number needs to be

  • Changes to customer search and Pull RFC [ALE/Idoc's]

    Hi All, I'm having a scenario as above in my project regarding the ALE/Idocs: Customer Reference Server(CRS) is the Database through which the data is pulled. At present whenever customer wants the data it is pulled by the RFC method from CRS, now we

  • MatLab 7.1 doesn't run on a quad G5 with 10.5 installed

    Just upgraded to 10.5, and tried to run MatLab (7.1) on my Quad G5. Here's what the console reports: any recommendations on what to fix? 10/27/07 11:19:06 AM [0x0-0x5c05c].org.x.X11_launcher[1907] command=/usr/X11/bin/xterm 10/27/07 11:19:06 AM com.a

  • Photoshop install help

    Can anybody suggest how I can reload photoshop elements 10 on to my new mac with no optical drive. The wonderful suggestion from Adobe was to pay more and upgrade to elements 12 ! Thanks for any better suggestions !