Visual report error on master project

Hi,
I've created 2 distinct projects with custom fields, filled-in with a macro based on resource pool custom fields. Works fine.
For these projects, I've created an Excel visual reports that uses the custom fields (as dropdown lists). Also OK on both projects.
When I just insert both projects as sub-projects of a master projects (with same custom fields imported in the master project), I receive an "unknown error" when running the visual report. Any hint ?
Thanks

Thanks a lot Don for your valuable suggestions.
We have already taken care of the points which you mentioned in your reply on development side. Also, we have downloaded crystal report from the link which you posted but on DEPLOYMENT side we are unable to run reports from our application.
It gives the notification when we try to install crystal report on a target machine as "You must have visual studio 2010 installed in order to install the crystal report".
The DEPLOYMENT problem we are facing is in RUNTIME environment on TARGET machine.  Our TRAGET machine has properly installed Win 7 Professional 64 bit,  .NET Framework Ver 4 and CRforVS_redist_install_64bit_13_0_1 . We also have properly installed application on this machine. We got no errors while installing any of the above. The problem starts when we fire a report on target machine from the application.
We get the error as "The type initializer for 'CrystalDecisions.CrystalReports.Engine.ReportDocument' threw an exception"
So, we are looking for an appropriate RUN TIME version of Crystal Report which can be installed on the target machine to fire reports (where visual studio 2010 is not installed).
Please help suggest an exact version to download for target machine and the steps if it has a specific procedure.
Thank you!
Ruchir

Similar Messages

  • Unknown Error occur when trying to get a visual report - Project 2013

    I have office 2013 home and student and ms project 2013. I am trying to get it to do visual reports and
    all i keep getting is an error message saying an unknown error has occurred and the requested action cannot be completed at this time. help please if anyone knows a solution.
    i got all the updates for Project and to Office. 
    the problem also occur on a different machine , with a different OS.
    Please help ! , this is important feature of project that i must have working.
    Thank you.

    Hi Ariel,
    Have you tried to repair MS Project from the control panel?
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Project 2007 (with server) - Visual reports custom templates export problem

    Hi,
    someone fimiliar with this situation?
    While creating
    and saving a new template in visual report using Project Professional 2007, some of the reports that was saved as template lose connection between Project cube and Excel.
    Those reports include Enterprise global custom fields, and on the first few times I open them (on different computers) it works fine but later some of the report
    templates won’t open, and error messages are received.
    Those are the steps I did to reproduce the problem:
    When I create the template I used “New template” and then I added the fields (some of the templates are “Task usage” based, and some “Task summary” based).
    Then when I try to open it later…
    Step 1 –Open the template
    Step 2 – the export gets stuck –
    Step 3 – if I check the excel that was opened I get error messages -
    Step 4 – another error message (after clicking OK on the previous one)
    When clicking OK or Cancel the excel is closed
    Step 5 – when going back to check visual reports on project another error appears 
    Ofir Marco , MCTS P.Z. Projects

    Easily fixed.  Just take the Excel.exe file and copy/paste from your Program
    Files/Microsoft Office/Office14 folder to the Office12 folder.
    As near as I can tell, Project is looking for the file in Office12.
    I think you also need to restart Project after doing so.
    -A
    Andrew Lavinsky [MVP] Twitter: @alavinsky Blog: http://blogs.catapultsystems.com/epm

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • Project 2010 keeps asking for Excel 2003 or later when trying produce visual reports.

    When I try to produce a visual report on project 2010, I am asked to have Excel 2003 or later installed on my computer.  I have office 2013 installed, and have looked for the Excel.exe file to move it but i was unable to find it. Any help much
    appreciated. 

    In addition to Paul's excellent advice, try this:
    Go into C:/Program Files/Microsoft Office/Office15 and copy the Excel.exe file
    Paste into C:/Program Files/Microsoft Office/Office14
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Master Detail report   report error: ORA-20001: Error fetching column

    Hi All,
    I am a newbie in apex and try to create a master detail form, where the detail is displayed as a report.
    After inserting a new row in the master form i like to create the detail. It displays then ORA-01403: no data found
    I also insert in the database table the details. If i want to edit then it shows the following report error:
    ORA-20001: Error fetching column value: ORA-01403: no data found
    Can anyone help me, because i am struggling for a week with this problem.

    Your problem seems to be related to the usage of primary keys. You have to look into that and get more details.
    Denes Kubicek
    http://deneskubicek.blogspot.com/
    http://www.opal-consulting.de/training
    http://apex.oracle.com/pls/otn/f?p=31517:1
    http://www.amazon.de/Oracle-APEX-XE-Praxis/dp/3826655494
    -------------------------------------------------------------------

  • Excel busy when I try to modify a template of MS Project visual report

    (Sometime) when I try to modify a xlst template for MS Project (2013) visual report MS Project say me that excel is busy.
    But Excel is closed. I try to close and re-open bot excel and MSProject but say me always that cannot open visual report (based on my custom template) because excel is busy.
    In my template I inserted also an external connection to other data (coming from another database).
    The template is populate with "visualize report" ....
    Also If I try to modify the template (using MS PRoject function) MS Project say me that MS Excel is busy...
    I used that template sussefully... but when I make some update to template file (for example add a table o a simple text) then MS Project is not able to open excel file.... but I don't understand why. So I have to rollback modifies and take previous template
    version.
    [Note:] could be something related to which sheet (of template xlst file) has focus on when saved?
    thank you.
    regards
    db
    Daniele.b75

    
    could depend by what I choose when close & save the template?
    Excel ask me...
    Sometimes I try to click on SI .... or NO ... but always MS Project says me that Excel is busy.
    please.... help
    thank you
    Daniele.b75

  • Crystal report error on Target Machine

    We have to provide application exe to our clients. The application is developed in Visual Studio.Net 2010 and by using SAP crystal report CRforVS_13_0. Client must be able to fire reports on their target machine on which the Dot Net framework and u201CCRforVS_redist_install_64bit_13_0_1u201C run time utility is installed. But it gives a crystal report error on the target machine.
    Our development and target machines have Win 7 Professional, 64-bit OS installed.
    Kindly provide us with an appropriate run time version for target machine in order to fire reports or any other solution in order to make our project work on target machine.
    Thanks!

    Thanks a lot Don for your valuable suggestions.
    We have already taken care of the points which you mentioned in your reply on development side. Also, we have downloaded crystal report from the link which you posted but on DEPLOYMENT side we are unable to run reports from our application.
    It gives the notification when we try to install crystal report on a target machine as "You must have visual studio 2010 installed in order to install the crystal report".
    The DEPLOYMENT problem we are facing is in RUNTIME environment on TARGET machine.  Our TRAGET machine has properly installed Win 7 Professional 64 bit,  .NET Framework Ver 4 and CRforVS_redist_install_64bit_13_0_1 . We also have properly installed application on this machine. We got no errors while installing any of the above. The problem starts when we fire a report on target machine from the application.
    We get the error as "The type initializer for 'CrystalDecisions.CrystalReports.Engine.ReportDocument' threw an exception"
    So, we are looking for an appropriate RUN TIME version of Crystal Report which can be installed on the target machine to fire reports (where visual studio 2010 is not installed).
    Please help suggest an exact version to download for target machine and the steps if it has a specific procedure.
    Thank you!
    Ruchir

  • Master Project / Resource Pool

    We currently have a master project schedule that shows all our current on going projects in one schedule but unfortantely when we try to run a Visual Report for Resource Usage, it is taking some people and multiply their hours.
    So say "Dave" was scheduled for 100 hours total across all projects, when we run the report it is now making him show that he is scheduled for 300 hours.
    We have a resource pool and all our PM's pull from this.
    Can you please help us in trying to figure out why, this report is not working correctly.
    Thanks :)

    If you have a master project with links to many projects plus a resource pool, then you have a fragile system based on old DDE technology(DDE does teh auto update between files). If any of these files are ona wide arear network where network quality is less
    than 99.99% then file corruption is likely. If any user moves, overwrites or renames any of the linked files the file corruption die are thrown.
    So, my first suspect is a file corruption. To fix break all the links then re-create master and pool (with new blank projects). Ideally use master files where projects are inserted with no link. This consolidates resources as well. I use a recorded macro
    to re-create a master when needed.
    If you have Project 2007 it is ESSENTIAL that you apply SP3 and the latest cumulative update. Project 2007 without Service Packs is very bug ridden.
    Rod Gill
    The one and only Project VBA Book
    Rod Gill Project Management

  • Unable to load report error

    Hi
    This started with an asp.net application which I have been maintaining for several years, on an XP 32-bits box. Alas, the box died, and I have acquired a new Development machine, now with Windows 7/64-bits. I have installed Visual Studio 2010 and Crystal reports (13.0.,9), including runtime for 32 and 64 bits.
    I got the "unable to load report" error, and I think I have tried everything I could find on the web related to solving this issue.
    Finally I got Down to creating a new dummy asp.net application with a dummy report just displying the text TEST. This report Works fine when run from within VS, but if I deploy it to the web server on the Development machine I also get the unable to load report failure.
    I believe this is a configuration issue. The application has run fine for years, I just can't get it to Work on the new development machine.
    Please help
    Peter

    Make sure that process has read / write rights to the %TEMP% folder. Process Monitor may help.
    - Ludek
    Senior Support Engineer AGS Product Support, Global Support Center Canada
    Follow us on Twitter

  • Visual report issue with PP 2010 - Displaying too many years

    Hi,
    I am using project pro 2010.  When I display a report (e.g. Resource Cost Summary), and if I add the Monthly Calendar field in the report, it displays 7 columns from 2010 to 2016 even though there is data only for 2014 and 2015. I need to manually
    filter out all years with no data.
    Is there a setup that would display only the years and months with data?
    It was working fine before I update MS Proj.
    Thanks!

    Benoit1 --
    First of all, do you have your copy of Microsoft Project 2010 patched with the most recent Service Packs and Cumulative Updates?  If not, I would strongly recommend you do that.
    I am not able to duplicate your problem, but there is a way to work around it.  In the Excel PivotTable, click the Year pick list, deselect the years you do not want to see in your Visual Report, and then click the OK button.
    Hope this helps.
    Dale A. Howard [MVP]

  • Webi error for master data attributes if universe is on top of BI query

    Hi All,
    We are using BO XI R2 SP5 integrated with SAP BI 7.0.
    We have built a universe on top of a BI query and when we try to build a web intelligence report that includes master data attributes like Customer City,Customer Region etc BO throws the following error:
    Error 1:
    Database error: [SOFA Driver] : Error getting members for hierarchy (level=ZFI_I03/ZFI_I03_Q0003, member=[ZFI_I03___F172], opcode=[ZFI_I03___F172]) . System error in program CL_RSDM_READ_MASTER_DATA and form VALUEREAD-02- (see long text). Contact your Business Objects administrator or database supplier for more information. (Error: WIS 10901)
    For a universe built on a different BI query with master data attributes mentioned above,a different error occuring.
    Error 2:
    Your Web Intelligence session has timed out. Log out and log in again to InfoView. (Error: WIJ 77778)
    We have tried:
    1) We have executed the function module BAPI_MDPROVIDER_GET_DIMENSIONS with necessary inputs query/cube and we got correct output, like members, optional properties, selected properties and restrictions.But, still our problem remains same.
    2) Transaction u201CRSRTu201D and executed the query,transaction RSRV to check SID-tables and the related masterdata.
    Above steps we performed in response to SAP tickets 541052 / 2009,541131 / 2009 based on logs generated,but still the error persists.
    What is working:
    If a universe is built on top af an infocube directly, then there is no problem with master data attributes in webi report.
    Please let us know if you need more details to help us resolve this issue.

    Hi Naresh,
    based on the MDX you can identify that those are navigational attributes and thats why the issue is not happening when talking to the cube directly because when you connect to the cube directly the navigational attributes are not available.
    Take a look at note : 996197
    not sure if it will solve the problem because there are other notes when you search for the error message but this was most of the times the one that resolved the issue.
    the issue is in the BAPI functions
    Ingo

  • Problems panel no longer reporting errors until I run

    I've been using Flash Builder and just the other day it stopped reporting errors in the problem panel for any projects until I try to run them.. saving is no longer enough. I know this isn't an issue of external files because I'm in class and my neighbours have the same code and it's updating the problems panel on save for them!
    Anything I can try to get it back to normal short of reinstalling?

    Can you check if "Build Automatically" is checked in the Project menu?

  • Payment not possible because of reported error Message no. FZ311

    i am a fresher in FI module... kidly give the solution  how to solve the error in automatic payment program..f110...
    i have attached my log here....
    Job log overview for job:
    F110-20140315-A1    -X / 13365701
    Date
    Time
    Message text
    Message class
    Message no.
    Message type
    ABAP program
    Screen no.
    15.03.2014
    13:36:59
    Job started
         00
        516
         S
    15.03.2014
    13:36:59
    Step 001 started (program SAPF110S, variant &0000000002023, user ID RAGU)
         00
        550
         S
    15.03.2014
    13:37:00
    Log for proposal run for payment on 15.03.2014, identification A1
         FZ
        402
         S
    15.03.2014
    13:37:04
    >
         FZ
        693
         S
    15.03.2014
    13:37:04
    > Additional log for vendor 100263 company code ALRF
         FZ
        691
         S
    15.03.2014
    13:37:04
    >
         FZ
        693
         S
    15.03.2014
    13:37:04
    >
    Due date determination additional log
         FZ
        799
         S
    15.03.2014
    13:37:04
    >
    Document 6
    004 line item 001 via INR      200.000,00-
         FZ
        700
         S
    15.03.2014
    13:37:04
    > Terms of payment: 15.03.2014    0  0,000 % 0  0,000 %    0
         FZ
        701
         S
    15.03.2014
    13:37:04
    >  00 days grace period is being considered
         FZ
        726
         S
    15.03.2014
    13:37:04
    >   Payment must take place before 15.03.2014; next payment on 16.03.2014
         FZ
        728
         S
    15.03.2014
    13:37:04
    > Item is due with 0,000 % cash discount
         FZ
        721
         S
    15.03.2014
    13:37:04
    >
         FZ
        693
         S
    15.03.2014
    13:37:04
    >
    Payment method selection additional log
         FZ
        699
         S
    15.03.2014
    13:37:04
    >
    Payment me
    thod selection for items due now to the amount of INR      200.000,00-
         FZ
        601
         S
    15.03.2014
    13:37:04
    > Payment method "C" is being checked
         FZ
        603
         S
    15.03.2014
    13:37:04
    > Street or P.O. box entry is missing
         FZ
        617
         S
    15.03.2014
    13:37:04
    > No permitted payment method exists
         FZ
        608
         S
    15.03.2014
    13:37:04
    Information re. vendor 100263 / paying company code ALRF ...
         FZ
        305
         S
    15.03.2014
    13:37:04
    ... payment not possible because of reported error
         FZ
        311
         S
    15.03.2014
    13:37:05
    End of log
         FZ
        398
         S
    15.03.2014
    13:37:06
    Job finished
         00
        517
         S

    Hello Experts,
    I am blocked with a strange issue which is similar to FZ311 mentioned above.
    Enclosing the screenshot for your reference.
    I am bit confused whether anything needs to be configured within the FBZP or it is purely the vendor master data .
    Any help will be appreciated.
    Kind Regards,
    Sanjay

  • Communication channel reports error after system restart.

    Hello,
    We have third party adapter Aria installed in our PI 7.1 system and whenever systems is restarted interface is reporting errors
    in default trace and communication dies. but after we manually activate each time it works properly.
    Is anyone had similiar issue ?
    Our env. PI 7.1 Sp6 on AIX 5.3 with Oracle 10g
    1.5^H#DAD940003002003700000019000C1090472DA00666EED4D9#1245188236500#
    com.sap.engine.core.thread.execution.ExecutorImpl##com.sap.eng
    ine.core.thread.execution.ExecutorImpl####n.a.##416c9f105abd11deb4e9dad940003002#
    System [43]##0#0#Warning##Plain###Too big value[100
    0] specified for maxConcurrency argument on Executor [Thread
    forcom.sap.ip.bi.sdk.dac.connector.sapq.rarresource adapter] creation.
    Allowed max concurrency rate for every Executor is not more than 30% of
    the total thread pool capacity [60]. Thread Management will
    lower the max concurrency rate of this executor to [18]. Config tool
    can be used to increase the value of ApplicationThreadManager p
    roperty [ExecutorPoolMaxSize] to reach higher quota for Executor
    concurrency. Switch the severity of this location to DEBUG to see t
    he stack trace of the executor creation.#
    #1.5^H#DAD940003002003500000017000C1090472DA00666EED4D9#1245188480930#System.err##
    System.err#J2EE_GUEST#101##n.a.##6a74c5905abd11de9
    dacdad940003002#Application [45]##0#0#Error##Plain###Jun 16, 2009
    4:41:20 PM org.apache.commons.httpclient.HttpMethodDirector execut
    eWithRetry
    INFO: I/O exception (java.io.IOException) caught when processing
    request: Invalid keystore format
    #1.5^H#DAD940003002003500000018000C1090472DA00666EED4D9#1245188480933#System.err##
    System.err#J2EE_GUEST#101##n.a.##6a74c5905abd11de9
    dacdad940003002#Application [45]##0#0#Error##Plain###Jun 16, 2009
    4:41:20 PM org.apache.commons.httpclient.HttpMethodDirector execut
    eWithRetry
    INFO: Retrying request
    #1.5^H#DAD940003002003500000019000C1090472DA00666EED4D9#1245188480938#System.err##
    System.err#J2EE_GUEST#101##n.a.##6a74c5905abd11de9
    dacdad940003002#Application [45]##0#0#Error##Plain###Jun 16, 2009
    4:41:20 PM org.apache.commons.httpclient.HttpMethodDirector execut
    eWithRetry
    INFO: Retrying request
    #1.5^H#DAD94000300200350000001B000C1090472DA00666EED4D9#1245188480943#System.err##System.err#
    J2EE_GUEST#101##n.a.##6a74c5905abd11de9
    dacdad940003002#Application [45]##0#0#Error##Plain###Jun 16, 2009
    4:41:20 PM org.apache.commons.httpclient.HttpMethodDirector execut
    eWithRetry
    INFO: I/O exception (java.io.IOException) caught when processing
    request: Invalid keystore format
    #1.5^H#DAD94000300200350000001C000C1090472DA00666EED4D9#1245188480944#System.err##System.err#
    J2EE_GUEST#101##n.a.##6a74c5905abd11de9
    dacdad940003002#Application [45]##0#0#Error##Plain###Jun 16, 2009
    4:41:20 PM org.apache.commons.httpclient.HttpMethodDirector execut
    eWithRetry
    INFO: Retrying request
    #1.5^H#DAD94000300200350000001D000C1090472DA00666EED4D9#1245188480948#
    com.ariba.asc.connector.exception.util.ExceptionMgr##com.ariba
    .asc.connector.exception.util.ExceptionMgr.handleError(Exception e,
    ChannelProfile cp)#J2EE_GUEST#101##n.a.##6a74c5905abd11de9dacdad
    940003002#Application [45]##0#0#Error##Plain###
    [CC_AdvanceShipNotice_cXML_Sender_2] [Error Level] 2[Error Code] ECC103[Error Desc]
    Ariba SN Not Available[Error Message] Cannot connect to Ariba
    SNcom.ariba.asc.connector.exception.AribaSNException: Cannot connect t
    o Ariba SN
    at com.ariba.asc.connector.cxml.util.CXMLSender.sendRequest
    (CXMLSender.java:207)
    at com.ariba.asc.connector.cxml.util.CXMLSender.sendCXMLRequest
    (CXMLSender.java:122)
    at
    com.ariba.asc.connector.controller.action.ProfileUpdateAction.sendProfileRequest(ProfileUpdateAction.java:167)
    at
    com.ariba.asc.connector.controller.action.ProfileUpdateAction.updateProfile(ProfileUpdateAction.java:142)
    at
    com.ariba.asc.connector.controller.action.ProfileUpdateAction.updateChannelProfile(ProfileUpdateAction.java:110)
    at
    com.ariba.asc.connector.controller.action.ProfileUpdateAction.perform
    (ProfileUpdateAction.java:72)
    at com.ariba.asc.connector.controller.ScheduleTaskMgr.run
    (ScheduleTaskMgr.java:88)
    at com.sap.engine.core.thread.impl3.ActionObject.run
    (ActionObject.java:37)
    at java.security.AccessController.doPrivileged(Native Method)
    at com.sap.engine.core.thread.impl3.SingleThread.execute
    (SingleThread.java:152)
    at com.sap.engine.core.thread.impl3.SingleThread.run
    (SingleThread.java:247)
    Caused by: java.io.IOException: Invalid keystore format
    at sun.security.provider.JavaKeyStore.engineLoad
    (JavaKeyStore.java:632)
    at java.security.KeyStore.load(KeyStore.java:1150)
    at
    com.ariba.asc.connector.cxml.util.AuthSSLProtocolSocketFactory.createKeyStore(AuthSSLProtocolSocketFactory.java:218)
    at
    com.ariba.asc.connector.cxml.util.AuthSSLProtocolSocketFactory.createSSLContext(AuthSSLProtocolSocketFactory.java:275)
    at
    com.ariba.asc.connector.cxml.util.AuthSSLProtocolSocketFactory.getSSLContext(AuthSSLProtocolSocketFactory.java:300)
    at
    com.ariba.asc.connector.cxml.util.AuthSSLProtocolSocketFactory.createSocket(AuthSSLProtocolSocketFactory.java:315)
    at
    com.ariba.asc.connector.cxml.util.AuthSSLProtocolSocketFactory.createSocket(AuthSSLProtocolSocketFactory.java:384)
    at org.apache.commons.httpclient.HttpConnection.open
    (HttpConnection.java:704)
    at
    org.apache.commons.httpclient.HttpMethodDirector.executeWithRetry
    (HttpMethodDirector.java:384)
    at
    org.apache.commons.httpclient.HttpMethodDirector.executeMethod
    (HttpMethodDirector.java:170)
    at org.apache.commons.httpclient.HttpClient.executeMethod
    (HttpClient.java:396)
    at org.apache.commons.httpclient.HttpClient.executeMethod
    (HttpClient.java:324)
    at com.ariba.asc.connector.cxml.util.CXMLSender.sendRequest
    (CXMLSender.java:169)
    ... 10 more

    Hi
    In visual Admin check for that particular Adapter Service there would be a parameter which has to be set as boolean (true) , am not sure , actually it is present in rest of adapter , kindly check
    lemme know if any parameters present
    rgds
    srini

Maybe you are looking for

  • PC's cannot see my iMac on a Windows network

    Hi. I am on a uni campus network. I can see everyone's computers (almost exclusively they are pc's) but no one can see me. However, when I use Shakespeer to connect to a P2P sort of network made of the same computers (ie, the uni doesn't know about i

  • I Tunes - Sync (Btw Comps)

    Hi there, in conjunction with the NY, my laptop absolutely died on me yesterday - won't even register the power feed. I had my i-tunes installed on it, the back-up I have is a few months old... Is there a simple way of getting the material I have pur

  • Integrating Screenshots into Indesign documents

    Hi,I'm an fairly inexperienced indesign user,I'm trying to develop pdfs/e-books which will contain quite a few screenshots unfortunately when placing screenshot images into my documents I lose a lot of resolution and my screenshots end up looking rub

  • Oracle EDQ Real time Integration

    Hi, Will it be possible to create 1:m relationship WSDL file in EDQ. I have a requirement where Customer is the Parent entity and other child entities such as Address, References, Privacy preferences etc. would have a multiple entries for one custome

  • Siebel Sync with Notes 8

    Hi there, We work with Siebel 7.8.2.3 and synchronise calender and contacts with Notes 6.5 via Siebel Client Sync. As Notes 6.5 is running out of support by April 09 we want to upgrade to Notes 8. Problem is, that Notes 8 version is not supported for