When running MD04, forecast (VSF) and planned orders are landing on the same day. This is causing confusion for the users. Is there a setting that's causing this to happen? We are using checking rule PP. Should we be using A instead? The planned order should actually be showing up before the forecast because we don't want the inventory to show negative from the forecast. Any help will be appreciated.
Thank you.
MZ
Hi MZ
On the standard MRP process, the planned order basic finish date will generally match the requirement date.
Check this document which explains the scheduling in more detail:
Backward Scheduling for In-House Production - Material Requirements Planning (PP-MRP) - SAP Library
BR
Caetano
Similar Messages
-
MRP several planned order same day
Hello,
I hace materials with lot size EX Lot-for-lot order quantity. The problem is when I have 2 planned issuses the same day, When I run MRP, SAP add quantities and create only a plannes orden. I need sap create one planned order for each planned iissue, with the same quantity.
Thanks in advance.Hi,
all this is checked.
I see in MD04 both
The system do
14.06.2010 PlOrd. 0000000418/SDeb 15
14.06.2010 DepReq 12915 5-
14.06.2010 DepReq 12915 10-
I need the system
14.06.2010 PlOrd. 0000000418/SDeb 5
14.06.2010 PlOrd. 0000000419/SDeb 10
14.06.2010 DepReq 12915 5-
14.06.2010 DepReq 12915 10-
thanks in advance -
Req. delivery date and plan order finish date relationship
Dear Experts,
I have a question on setting the req. delivery date and plan order finish date relationship. Now, I want the plan order finish date is one day before the req. delivery date, is it possible to set it in configuration? Please advised! Many thanks!
Regards,
Matt YimMatt,
Please use a schedule margin key(SMK) in the material master MPR2 view which has float after production defined as 1day.
If there are no SMK with that defination then you can define you own in customisation and assign the same in the material master. (SPRO--->Production ->MRP->Planning ->Scheduling and Capacity Parameters->Define Floats).
Regards,
Prasobh -
Mass update for production and planned order MRP controller
Hi Gurus,
It's anyway possible to mass update MRP controller for Production orders and Planned orders. If any please provide me step by step process.
Thanks,
B.Deethya.I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller -
Table for process order and planned order in apo
I would like to know the table for stratagy profile for particular process order and planned order.
in /sapapo/rrp3 there is one filed RECEIPT/Reqt.Element ( process order ) for this field which table it is coming and i required particular strategy profile for that process order .
Please help me the table in apo.Hi Venkat,
This value is stored in structure /SAPAPO/RRP_ORDREQ_STR
under the field name EXTRA.
You can check the details of the same in transaction se11
Regards
R. Senthil Mareeswaran. -
Process Orders and Planned Orders data
Hi,
I am working on extracting process order and Planned Orders data into BW. I could not find any standard DataSources available for my req, so I want to develop generic extractor. the main key figures are Actual Labor and Machine Hours, Target Labor and Machine hours.
Please help me if there are any standard datasource available or ECC tables to pull the data or any standard function modules available.
Thanks,
ReddyHi Sanath,
Thanks for your reply. I want to pull Actual Machine hours, Target Machine hours, Actual Labor hours and Target Labor hours.
these fields are not there in PLAF table.
I am looking for a table or datasource which can give those details.
Thanks,
Reddy -
Settings for the relation of requirement type and planned order type
Dear Gurus
Where we maintain the settings for the relation of requirement type and planned order type?Actually I have maintained strategy 60 for a particular material (planning material) so the requirement type is vsev and along with that the planned order type is coming is vp i.e non convertible planned order.That is ok the system is behaving right.But nowhere I can find the setting of vp with vsev how the system is picking vp?
Regards
Sandip SarkarHi!,
That is an inbuilt sytem setting and you can't change that.
Regards,
Uday -
Hi,
I'm SAP certified fresher.I've a question.Is it possible hiring and firing on same day? If yes how? if no why?
Kindly help me.
Regards,
Prasath.hello.
Yes,we can run 2 actions hiring and firing on a single day. for that check ur action type in t529a table. and check the boxes under - u( ,hiring action) and u(u0302,additional action).and for firing plz default feature msn20.and mention it in a same table t529a.
but u can not run both d action at a time. u have to rum both a actions separately.
regards.
sudha. -
Dependant Requirements and Planned Orders
Hi,
For dependant requirement, question is whether once the planned orders (of independent requirements) are converted to production orders, then only will the dependant requirements be converted to planned orders or it is converted once independent requirements are converted to planned orders? I.e. independent requirements are blown down all the way in MRP.
Thanks.
Rgds,
SueHi,
Let us take some example so that it is easier to explain.
Material A - Finished Good
Material B - Raw material
PIR generated for A - 100 Nos , MRP is run and Planned order created for A - 100 Nos. Now
For Mtl B Dep reqt is generated for 100 Nos.
If No stock is available then a planned order for 100 nos generated.
IF Stock is availabel then no planned order is generated.
When production order is created for Mtl A then the "dep reqt" status of Mtl B changes to
"ordres"(order reservation)status.U can check this MD04.
Thanks and regards,
Rajesh -
Plan SD order in Week and Plan order in PP in day
Hi,
I have planed a SD order in weeks and in PP the plan oder ist in day. but in PP I always get a plan order on monday.
How can I customize it to choose the start day in PP.
Thanks
DedeHi RB,
As you may be aware Billing plan can be either periodic or milestone billing. Billing plan is a schedule of individual billing dates for a single line item in an order. This is used mostly in Service , Maintenance or projects.
If you want to bill a customer on a certain date for the specified quantities, I suppose you should use Scheduling Agreements to fulfill your requirement.
Regards
Raj -
Plan Order Conversation in to Process Order and Plan Order in Back Dates
HII
we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
Regards
AhmedDear
Problem No 1 : we are working in a process industries with three plants each of them have three order type. we have define MRP group in "OPPR" then assign each MRP group to Orde types in "OPPE". Now the problem is whn i convert plan order in process order for any material systme automaticaly pick the order type PIi01.
Answer :
1.Please check the OPPR -Plant and MRP group -Select Order Type Button -Check what Order Type you have assinged here ( PI01( May be the default Process Order Type )
2.If you are maintaing MRP group ( 0001 or 0002) , did you asisng the same in MRP1 view ?? because
3.Did you maintain the similar Order type in OPKP -Define Production Scheduling Profile ? -This has highest priority .
4.Did you maintain correct order type in OPJH-Maintain Order Type ??
Refer the expert comments on the same issue : Strategy group to define production order type
Problem No 2: 2nd Problem is system system is not creating plan order for prrevios dates. say i enter PIR for month of november from first november to 30th november and run MRP on 29th the sytem create plan order on 30th of november with exception message 30.
Answer : You can plan the order in back dated , if you maitain Satrt date in the Past optiuon in OPU3/OPU5-Define Scheduling parameters .Goto OPU3 -Select the Order Type -Double click -Maintain 90-60 days in the Start Date in the past in Scheduling Control and Details scheduling tab .
Hope it helps
regards
JH -
Exception message for PrdOrd and Planned order
Hi Gurus,
It possible based on prdord and planned ord we need to get the Exception message information. It's there any standard transaction code or any sqvi report?
Note:
Exception Message:
10 - Reschedule in
20 - cancel
05 - Opening date in the past
26 - Excess in individual segment
Please find this information in MD04 (single order). i am looking for same time multple orders with exception message report.
Thanks and regards,
Deethya.BHi
You can use MD06 with refrence to you plant and MRP Controllers. Also you can define your own traffic lights so that based on these you get your exception messages.
Hope this helps,
Regards,
Ravi -
Modeling dummy product and planned orders
Hi SAP Gurus,
I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
I am modeling subcontracting requirement and i need to create following master data.
All the below products are at plant P.
P has the components as Q_D
Q_D has the components as Q
Q has the components as R
Where Q_D is the dummy product produced at plant P.
P and Q are subcontracted items to the vendor V.
P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
Please advise.
Thanks.
JagadeeshHi senthil,
Check if the forecast date is beyond PPDS horizon.
Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
Bye.
Nitin -
Process Order and planned order issue
Hi people,
1. While creation of process order using COR1, production version is determined by the system automatically and after that BOM is determined. My requirement is when BOM components are determined it has to compared with ZTABLE which contains restricted components and if entry exists in ZTABLE, then determine a new production version from MKAL but i am not abkle to find any enhancement point or BADI or user exit for the same.
2. During conversion of planned order to process order, it is always required to read PP master data before saving the order.
Can't find any enhancement for the same also.
Please help guys how to get this done.
Regards,
DheerajKinldy check the below user exit, one of them should help you ....
PPCO0001 Application development: PP orders
PPCO0008 Enhancement in the adding and changing of components
PPCO0004 Sort and processing exit: Mass processing orders
reg
Dsk -
Production order and planned order qty should not consider in MRP
Dear All,
i do not want to consider the previous month production order qty and plenned order qty (Nothing but WIP qty) in the current momth MRP, but the stock has to consider in MRP.
Example,
Before MRP,
material : XYZ
Stock : 1000
Prod Qty : 500 for 02.04.2008
PIR Qty : 2000 for 02.05.2008
After MRP, the requirement should be as below said,
material : XYZ
Stock : 1000
Prod Qty : 500 for 02.04.2008
PIR Qty : 2000 for 02.05.2008
Pld OrdQty : 1000 for 02.05.2008
For the above requirement ,i have done settings in the availabilty check like , for include planned order and include production order are "DO NOT TAKE IN ACCOUNT".
Even then also the planned order qty is generating for the "500" only.
please give the solution for the above said requirement.
thanx in advance
Regards
Srinivashi
MRP will always consider the prod order qty while doing nert req calculation.One thing u can do is TECo the prod orders and un MRP then it wont consider prod order qty.
The Availability check will check whether the components r avalaible or not based on ur scope of check
Reward points if useful
Amit
Maybe you are looking for
-
JBO 35007 Row Currency has changed - Master Detail Table
Hi, I have a one master table and one detailed table. I can create rows in the master table with no errors. However, when I try to insert rows in the detailed table, I receive JBO-35007 error, Row currency has changed. How do I fix this? thank you
-
Import Placeholders in Profile Manager not working
What is the trick to getting the import placeholders option to work in Profile Manager. The instructions say to format a CSV file with name, serial number, UUID, IMEI and MEID numbers all separated by commas and if you don't have a number to leave th
-
when I try to unzip the files I get the following error msg "checksum error in adbeapecore.dll"
-
Cannot start SAP XI - Integration Respository and Directory
Dear Expert, Some of developers cannot start Integration repository and directory at his/her client. It still running after logon with "PISUPER" user. Do I missing some necessary applications on the clients? Please advise. Thank and regards,
-
Problems stting up RAID (Mirror) for boot drive.
I have a Mac that I want to setup mirroring on the boot drive (it's running Mac OS X Server and once I get everything going I need to minimize downtime). Since you can't move a drive with data into a raid set I first cloned the boot drive to a 3rd dr