Warning : No Rate found in the opening period

Hello,
i want to make the currency translation and it works, but everytime there is one message that irritates me.
SPRunConversion Version 7.0.114
Warning : No Rate found in the opening period
20081200 - 18 Rows Calulated
20081200 - 0 Rows Updated
What is the opening period and where can i set the parameter for each entity?
Thx
Dirk
Edited by: Dirk Unkelbach on Oct 2, 2009 11:59 AM
Edited by: Dirk Unkelbach on Oct 2, 2009 12:00 PM
Edited by: Dirk Unkelbach on Oct 2, 2009 12:01 PM

Hi Dirk,
Opening period is normaly used for carry forward rules, but you get this warning in currency conversion also.
You can set the parameters for Opening Period in the CATEGORY Dimension.
First Parameter is OPENING_PERIOD : if its blank it uses the last month of a year (=> DEC if you use calendar year)
Second Parameter is OPENING_YEAR: blank means previous year (same as inserting -1)
This means, if you calculate budget for  the whole year or a month in 2009, Opening Period is 2008.DEC.
If you dont have any rates in Time = 2008.DEC;Category=Budget (for each of your specific rates) you will get this warning.
Gruß
Jörg
Edited by: Jörg Finster on Oct 6, 2009 12:34 PM

Similar Messages

  • How to check the opening period

    Hi,
    During MRP run,the selection 2 Purchase requisitions in opening period.
    How system determine when is the opening period and propose for PR?
    Thank you

    Dear Sasy,
    Check this thread for example
    [Schedule Margin Key|SCHEDULE MARGIN KEY;
    Regards
    Madhu

  • After saving a file using Excel 2010 in the My Documents folder, it cannot be found using the open button in Excel 2010

    When certain files are saved using Excel 2010 to the My Documents folder, they cannot be found by using the Open button within Excel 2010.  But the file is always found using My Computer and following the path to My Documents.  What is
    even odder is that if I do a "Save As" within Excel and rename the file to the same name but with a "!" at the beginning of the name, it will then show up in the Excel Open window.  There doesn't seem to be a distinct pattern as to
    when the file can or cannot be displayed by the Excel Open button.
    I am using Windows 7 64bit along with Office 2010 64bit.  Windows has current service packs and updates.  There are perhaps 200 - 400 Excel files in the My documents folder. Some of them are .XLS and some are .XLSX.
    William Fearn

    Hi,
    Do you mean that you can't find the Excel file when you click Excel->Open->My Documents folder? 
    Do you use the other folder path to test?
    Dose the issue occur in other Office suits (Word, Power Point)?
    Do you get some error message, like "Windows cannot find 'FilePath\FileName', Make sure you typed the name correctly, and then try again."?
    Please try the following methods:
    Method1:
    1. Go to the registry. Click START, and in the RUN command line type REGEDIT and hit ENTER or click OK.
    2. Navigate to the following key: HKEY_CLASSES_ROOT\Excel.Sheet.8\Shell\Open\Command
    3. Double click on the (Default) instance over to the right. Right now this probably says something like:
    C:\Program Files\Microsoft Office\Office14\EXCEL.EXE /dde
    Change this value to:
    C:\Program Files\Microsoft Office\Office14\EXCEL.EXE /e "%1"
    4. Navigate to the following key: HKEY_CLASSES_ROOT\Excel.Sheet.12\Shell\Open\Command
    Again, double click the (Default) entry to the right and change
    C:\Program Files\Microsoft Office\Office14\EXCEL.EXE /dde
    to
    C:\Program Files\Microsoft Office\Office14\EXCEL.EXE /e "%1"
    Note : Please backup the registry key before you modify.
    Method2:
    Click the File tab, and then click Options.
    Click Advanced, scroll down to the General
    section, and then clear the Ignore other applications that use Dynamic Data Exchange (DDE) check box in the
    General area.
    Thanks
    George Zhao
    Forum Support
     Come back and mark the replies as answers if they help and unmark them if they provide no help.
     If you have any feedback on our support, please click "[email protected]"

  • Open period in the future month and year.

    Hi,
    I am doing testing data for GR PO. The open period is on Jan and Feb 2008 (since its a testing client). I've changed my posting & document date to Jan 2008, but still the system keep prompting the error message "Posting only possible in periods 2008/02 and 2008/01 in company code". Shouldn't the system already allow the posting. It is understood if only msg "Document date lies in the future. (Check your entry)" is prompted.
    Is there any configuration that relate on this. Hope someone can help me...
    Thank you.

    Hi gurus,
    I've set the period as below. but still I can't do posting for PO GR.
    0001+              1      2008 2     2008 13     2006 16     2010        
    0001A      ZZZZZZZZZZ 1     2008 2     2008 13     2006 16     2010        
    0001D      ZZZZZZZZZZ  1     2008 2     2008 13     2006 16     2010        
    0001K       ZZZZZZZZZZ  1     2008 2     2008 13     2006 16     2010        
    0001M     ZZZZZZZZZZ  1     2008 2     2008 13     2006 16     2010        
    0001S     ZZZZZZZZZZ  1     2008 2     2008 13     2006 16     2010        
    0002+                        1     2008 2     2008 13     2006 16     2010        
    V001+                        1     2008 2     2008 13     2006 16     2010        
    Thank you.

  • Unable to close the posting periods in MM

    Hello
    while using MMPV  the system says that the date not current calender year. If I check OMSY the  open year is 2002.I need to know that how you close the open periods of previous years.I am supposed to close all the periods one by one but how to close them for the year 2002.
    I tried to initialise the periods as well but the system asks me to check OSS notes 487381 before initialisation.
    Please guide me as I've read all the threads related to this error but still unable to close the periods.
    Thanks & Regards
    Ashish

    Hi,
    You need to close the periods one by one from 2002. There is no other way.
    Go to OMSY check what is the current period,
    e.g it is 02/2002.
    then got MMPV,
    Enter 03 and year as 2002 then execute, repeate till 12/2002,
    then again start MMPV from 01/2003 to 12/2003. you have to perform this till current period of 2008.
    Thanks
    Edited by: anand k on Aug 20, 2008 12:44 PM

  • FI - Restrict Open periods

    I am implementing FICO and we already have deployed FIGL in our company. I need to restrict open periods from displaying. I am not sure whether I should restrict at the extraction or bring in the open periods and restrict based on T001B table in ECC which stores the open and closed periods at a given point. looking for the best solution if someone has implemented this.

    Hi,
    BI system is a common system used for reporting the R3 system data. Hence it is always advisable to pull all the data to BI and at report level you can filter on those data.
    In the Reporting cube level add a field called ZPeriod apart from 0FISCPER you have , Add an attribute Validity to this Zperiod infoobject maintain them with status fields like O for Open Periods C for Closed Periods.
    In the report restrict the Validity field with C for getting only closed periods data.
    ZPERIOD infobject has to updated with status daily from T001b from ECC system so that attribute will always have correct periods and their validity status. This is a good and dyanmic method of solution which can be used at report level.
    All these loads automate thro process chain so that no manual activity will be available.
    Dont go for filtering of data and if some other users need FIGL data as of today for validating or tallying it becomes difficult.
    Hope this helps for you.
    Thanks,
    Arun

  • OPEN PERIOD SLOW

    Hi,
    I'm having EBS 11.5.9 on Oracle9.2.0.4 db.I'm using UNDO management auto.Open period is taking longer.Per metalink note 136012.1 I may think manual undo managemnet.DOes any one had have issue,if yes what would be fix? If not does any one having 9i db and using MANUAL undo manager in EBS11.5.9 ?
    please advice.
    thanks

    sometimes is posible that if you choose to track the average balance for the SOB
    the open period was taking longer, because the system calculate more account balances

  • OIC Error - Processed date must be within open periods

    Hi
    We have setup the GL Calendar as well as the periods in the GL. We are still facing this problem.
    In the compensation manager responsibilty in Manage Transacations --> Create The error mentioned in the snapshot occurs while creating the new manual transaction.Though we have setup the primary ledger, the accounting calculator as well as the open periods and the date being selected in the Processed Date is within the open period specified as shown in the snapshot but still we are facing this error A tip for this could be that how will we know that our Operating Unit is attached to that particular ledger. If we can confirm that the OU selected in the snaphot is associated to the ledger for which we have defined the open period.
    Any help will be much appreciated

    Please post the details of the application release, database version and OS.
    Please post the complete/exact error message you get along with the navigation path to reproduce the issue.
    Thanks,
    Hussein

  • FM to find Open Periods

    Hi all,
    Is there Function Module to find the Open Periods for a specific Company Code.
    Thanks in Advance
    Johann

    Hi,
    Please check this FM.
    MR_PERIOD_DETERMINE
    FI_PERIOD_DETERMINE
    Also you can go to transaction codes MMRV and OB52.
    Regards,
    Ferry Lianto

  • MRP: Planning horizon & opening period

    hi MM Experts,
    please, explain what is "MRP planning horizon" and what is the impact on MD03 ?
    please expalin elso "the MRP Opening  period" and what's his utility ?
    both of them are in the OMI8 tcode.
    thanx in advance.
    SDA

    Hi. Hope this helps.
    Planning horizon is the Time period in days, MRP will consider the requirements for Planning. We can define this in number of days in OPPQ and/or in OPPR.
    Simply it is = Cumulative lead time + Longest batching period.
    You can define the Planning horizon in OPPQ/OPPR as mentioned above
    & under MRP group then we assign this MRP group to material master in MRP1 view.
    NETPL ( Net change planning in planning horizon) you will get it in MD02, MD01: With this processing key only material where the indicator NETPL has been set in planning calendar are planned.For example if we set planning horizon as 30 days then in the material in which MRP relevant changes happened in last 30 days will only be planned. This planning restricts the scope of planning or number of material which reduces the runtime of planning run. Planning horizon is the period beyond it, requirements don't generate planned orders.
    Opening Period is...
    Opening period is like a "release window". The length of the opening period is the window of opportunity a planner has to convert the planned order to a purchase req.
    For example - Component A has a lead time of 14 days and opening period of 5 days. Requirement on 12-22-03
    Opening Date - 01/12/09
    Start Date - 08/12/09
    Finish Date - 22/12/09
    Now the planner can convert the order starting Dec. 1st, instead of Dec. 8. It basically is a buffer in the lead time to get things on order a little sooner than needed.
    Thanks.

  • Problems with the posting period....

    Hi guys,
    every once in a while the old problem with the posting periods occurs. This morning it hit me and I went out to repair it.
    Starting out from MMRV I checked the open period and it said 062009.
    Using MMPV, by mistake, I opened 112009, so that I'm able to post to 112009 PLUS the previous period 102009 (which is ok so far). Later on I checked OB52 to see, if finance is not the problem. The opened period lasts from 012009 to 122009.
    Long story short: everything seems perfectly alright, however it still doesn't work. It says: Posting only possible in periods 2009/11 and 2009/10 in company code 1000
    I don't see where there could be a problem now...
    Any help is greatly appreciated!
    Thx & regards,
    Bobby

    Hi,
    It is possible to re-open a previously closed period. However, it is NOT advisable to do so because the valuation data of the previous period could be affected.
    In general, it is only safe to reopen a previously closed period when no material postings have been done after the period shifting to the new period.
    If there has already been postings after the period shifting to the new period, reverting the period back will cause database inconsistencies in the history tables.
    If you decide to proceed with this process, you can use the program RMMMINIT, but, please review the documentation of this program first!! and the check the SAP notes 487381 (for the error message that you are receiving) and the 369637 (for an explanation about the inconsistencies that will be generated.
    Steps are as below;
    Go to Transaction Code SE38
    Enter program name RMMMINIT
    Execute or press F8 function button
    Enter your company code (From and To)
    Enter relevant date: Say 01/10/2009 for Oct. 2009 month to be opened as of now
    That means, user can post for the month of sept 2009 as well as Oct. 2009
    Refer SAP Note No. 487381 for more details.
    As per SAP Notes 487381 ( If the periods are opened in advance in mmpv to again change it to current period the following process should be follow ), Go to Tcode MMPI, then go to menu bar and select system -> user profile->owndata.In that screen , under the parameters tab enter MMPI_READ_NOTE in Parameter ID field and enter, then under short description you will get Initialise period. Next Save.
    Again go to MMPI enter company code, period and year and execute.
    Other way of doing it is follow these steps: ( *TRY in Sandbox But do not try in PRODUCTION SYSTEM*)
    1. Use t.code: OX18, and delete the plants assigned to your CO.Cd and save.
    2. Use t.code: OMSY and change the posting period to the one u want and save.
    3.Go to OX18 and assign the plants you have deleted in step 1.and save.
    Regards,
    Biju K

  • APP-INV-05447 No Open Period Found For Data Entered

    Brother Hussain
    I am new to this forum, currently I am learning Oracle APPs, I have practicing Conversion In this I am doing Item Import Project. I have done all the process of conversion like from flat file to staging table using sqlldr, then validation of data after successfully completed I started Interface. I want to add a quantity to my items. steps >
    Front End Steps OF Item Onhad Quantity
    1. Navigator Inventory Vision Operations - in this Transaction Transactions then I select Miscellaneous Transaction whenever I try to Click on Transaction Lines Error Is Coming with pop up window : " APP-INV-05447 No Open Period Found For Data Entered"
    Please Help Me I will be thankful to you.
    I asked My faculty of this error he told me some functional setting have to be done which I don't know .
    Brother You replied me by this :
    Please see these docs.
    INVTOTRX: APP-INV-05447 No Open Period Found for Date Entered [ID 200026.1]
    Entering an Inventory Transaction at End Date of Period in a different Timezone get Error:APP-INV-05447:No open period found for date entered [ID 1473890.1]
    APP-INV-05447 Error In Transact Move Order Form [ID 1446937.1]
    Transact Material error: 'No open period found for the date entered' if current system date is not in open period. [ID 743607.1]
    Batch Material Transactions Allowed When Inventory Period Is Not Open [ID 1296914.1]
    can I get the link of the said documents...

    I have branched off your original post here APP-INV-05447 No Open Period Found For Data Entered
    Pl continue the discussion in that thread for continuity purposes.
    MOS Docs are only available to those customers who have a paid support contract with Oracle - sharing them in any manner is a violation of that contract
    HTH
    Srini

  • APP-INV-05447: No open period found for date entered

    Hi All
    I try to do Inter-Organization Transfer in OPM. But I got this error "APP-INV-05447: No open period found for date entered".
    What shall I do for this error?
    I controlled Inventory Calendar. The period is open.
    Thanks

    Hi,
    I got the same problem. Pleas tell me what's your solution?
    Parts Requirement Order stuck in Transaction Interface with the error
    " No open period found for date entered
    No open period found for date entered
    Transaction processor error
    No open period found for date entered
    No open period found for date entered
    Transaction process".
    Details are as follows:
    Transaction is Done on 30-NOV-2009.
    Source Org Period is open on 30-NOV-2009
    Destination Org Period is closed on 30-NOV-2009.
    Due to destination Org is closed, this transactions stuck in interface.
    I have opened the Cost Periods (DEC Month) for both Source and Destination Org, and resubmitted all lines after updating Transaction date to 01-DEC-2009. Still transaction could not go through.
    How should I handle this error?
    Regards,
    Chakry.

  • Hi, after installing Adobe CC I tried opening Adobe Photoshop. This failed. I get the opening window where it says installing plugins searching etc, after which PS opens in full screen. Just moments after that there's a fail warning, no code number, only

    Hi, after installing Adobe CC I tried opening Adobe Photoshop. This failed.
    I get the opening window where it says installing plugins searching etc, after which PS opens in full screen.
    Just moments after that there's a failure warning, no code number, only the warning that PS failed to open and PS will close.
    I tried downloading it for a second time, but this did'nt solve the problem.
    Befor the CC version I used a one year student version of Adobe CS6.
    What can I do?

    Regarding the Flash Player problem, disable Hardware Acceleration to circumvent driver incompatibilities.
    Regarding the Flash Pro installation problems, post in the Flash forums or http://forums.adobe.com/community/download_install_setup

  • Every time I open Iphoto I get the following message:  "A photo has been found in the iPhoto library that was not imported.  Do you want to import it?  Yes or No"  Any suggestions?

    Every time I open Iphoto I get the following message:  "A photo has been found in the Iphoto library that was not imported.  Does anyone have any suggestions?

    Quit iPhoto and to to the iPhoto library (by default in your pictures folder) - right click (control click) on it and select show package contents - find the folder named import (on importing) and drag it to the desktop - DO NOT MAKE ANY OTHER CHANGES - launch iPhoto and you will be fine.
    Open the import(ing) folder and if there is nothing in it that you need move it to the trash and empty the trash
    LN

Maybe you are looking for

  • Help with project...

    I have aproject to do in my cs class. I seriously do not know what to do here: "For this project you will write a program that will aid in the cracking of a substitution cipher. Basically, it is a form of frequency analysis. Your program will read in

  • CS6 - Camera Raw 7.1 won't open Nikon D7100 RAW files anymore

    I have a Toshiba laptop with Windows 7 installed on it. I use CS6 and a few days ago, I started having trouble when loading files (JPEG & RAW files via Camera Raw). If I loaded more than two or three files, it would crash Photoshop. I tried loading J

  • Back to My Mac Doesn't Work

    Has anyone figured out how to make "Back to My Mac" work? I have 2 Macs running Leopard and a .Mac account, but do not even see a "Sharing" category in Finder, so it does not seem to work. Are there any directions or suggestions as to how to make thi

  • Guarantee EOIO Processing in File-RFC-RFC-IDoc Scenario

    Looking for some opinions on the following set up we've got.  We're trying to build QoS EOIO on a scenario that goes File Sender->RFC and then RFC->IDoc.  My question is basically have we effectively ensured that our scenario will be EOIO from file t

  • Deploying in-house Apps

    A client of mine wants to produce their technical docs catalogue as an iphone app for their sales reps and third-party designers to use whilst on-site. Due to this being simply for in-house purposes it wouldnt be viable for submission to the AppStore