Warnings while transporting a process chain

Dear all,
I am getting the below warning message when I am transporting my process chain into Quality. Due to this, the PC is now in inactive version in the target system.
The logs shows the below message
No destination maintained in target client 001 -> Not activated
Message no. RSPC085
Diagnosis
When activating a process chain, this is checked and scheduled. Both the checking of a process chain and its scheduling require that
1. the function is executed in the target client of the import and
2. the user executing the function has the appropriate authorizations.
This is usually the case for the BW background user
The function can be executed in the target client if an RFC logon occurs in the target client. An RFC destination must be predefined for this purpose. This destination is used for logon to the target client from client 000 during import postprocessing.
This destination does not exist in this system.
System Response
The process chain will not be activated, which means that it will not be checked, scheduled, or saved in an active version. The process chain will only be adjusted to the local situation (for example, key changes with objects that are dependent on the source system), and will not be saved in a modified version.
Procedure
Create a destination for the import postprocessing.
Can some one please help on this.
Thanks and Regards,
Srinivas

Thanks..
Yes, this is the first process chain we are transporting.
I tried maintaining the paramters in RSTPRFC with the below settings..
Client: BW client 001
Destination: TPBWMANDTRFC
User: ALEREMOTE
PWD: ************
I want to know whether the details of teh destination are correct. If so, are these settings need to be maintained in QA and Prod systems as well?
Thanks and Regards,
Srinivas

Similar Messages

  • Create Package while transporting a process chain

    I want to transport a process chain but while doing so it is asking for “package” name. I do not have authorization to tcode SE21 to create a Package. I checked with ABAPer and he also does not have access to SE21.
    Is it mandatory to transport a process chain only via a “package”? Are there alternative methods available which you can suggest?

    Thanks..
    Yes, this is the first process chain we are transporting.
    I tried maintaining the paramters in RSTPRFC with the below settings..
    Client: BW client 001
    Destination: TPBWMANDTRFC
    User: ALEREMOTE
    PWD: ************
    I want to know whether the details of teh destination are correct. If so, are these settings need to be maintained in QA and Prod systems as well?
    Thanks and Regards,
    Srinivas

  • Schedule options while transporting in Process chains

    I have created a Process Chain which is scheduled for Immediate processing.
    I have to transport the Process Chain to Production System, where the process chain should run Daily. So should I change the schedule options before transporting or should the schedule options be changed in Production system.
    Will the schedule options also be transported to target system while transporting?

    Hi,
    I have to transport the Process Chain to Production System, where the process chain should run Daily. So should I change the schedule options before transporting or should the schedule options be changed in Production system.
    After importing into Production, it will not be triggered automatically. We need to exexute it in production manually.
    We have option to change the System settings ,to change the Process chain in Production.So that we can change the schedule options as per our requirements directly in Production. This setting is there in Trasnport connector screen.And this needs to be done in Production.
    Regards,
    Anil Kumar Sharma .P

  • Error while collecting the process chain in a transport request

    Hi Gurus,
    I am getting an error while collecting my process chain in a tranpsort request.I have to transport the request from DEV to QA system.
    When in RSA1--->transport connection i drag & drop the chain from left to right side pane then the Error occurs.
    1.Object 'REQUDELZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPV) of type 'Process Variants' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPT) of type 'Process Chain Starter' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    2.Object 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPT) of type 'Process Chain Starter' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'REQUDEL   ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPV) of type 'Process Variants' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    From one of the threads:
    (https://forums.sdn.sap.com/click.jspasearchID=10081153&messageID=4623856)
    i though it was the problem of patch level sap note(966131).
    Accordingly i tried collecting process chain in the request where the patch level is high(24).But same error is seen.
    I have activated chain again & then tried collecting the request i the process chain.But did not solve the error.
    I have to collect Process chain in a transport request.Can you help me out to solve the problem?
    Thanks in advance!
    Regards,
    Pallavi

    Hi,
    take a look:
    Data Warehousing
    "Errors occurred during post-handling RS_AFTER_IMPORT for MPRO L "
    Errors occurred during post-handling RS_AFTER_IMPORT for ROUT L
    Try to set the Process Chain Start to Immediate(background jobs) in the schedule, because this will trigger the process chain once tranported and may cause similar errors.
    Regards
    Andreas

  • Error while copying a process chain.

    Hi All,
    I get an error message while copying the process chain in Production environment.It says "SAP System has status 'not modifiable'".Choose display object or Cancel.I hope this is because of the config. that there is no option to create anything .
    Please confirm.
    Regards,
    Shailja.

    Hi Shailja,
    That means that you can not change that type of object on Quality or Productive server.
    Go to Administrator Workbench, sub menu Transport Connection, there you will find a button called Object Changeability (with a truck). Click on that and change the types of the concerned objects to 'Every changeable' in your case.
    Beware that you must change the status not with a double click but with a right click
    also refer the following thread you can find your solution
    Error message after process chain transport
    Hope this helps
    Regards
    Karthik
    <3rd Reminder for points removed>
    Message was edited by:
    Moderator

  • Error while running the process chain

    Hi, I am getting following error while running the process chain.
    "Lock NOT set for: Deleting the data completely from a data target"
    Please suggest.
    amit

    hi,
    This is due to a lock on the objects which is being used by ur load.
    Even if master data used by this would be in a lock by an attribute change run. wait till that attribute change run finishes and then repeat.
    If this target itself is locked by someother process like rollup , compression , this error would appear. In this case also repeat the step after those locking process finish.
    some general locks during loading:
    Sometimes parallel processing in DTP might lead to this, its better set the DTP and infopackage in serial processing. In this case change the settings and then repeat the process.
    There is a specific case in which the Serial DTP gets locked by itself, in this case repeat it untill it succeeds.
    You can identify the above scenario as below. This is applicable only if the DTPs processing mode is serial.
    if u see in SM 37 this load would have three DTP processes running.
    it should have only two.
    In this case cancel the process and repeat it untill u get it right.
    hope this helps u
    regard,
    ranjith
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:44 AM
    Edited by: Ranjith  Kumar Murugesan on Sep 12, 2008 10:46 AM

  • Error while designing the Process Chains

    Hi All,
    I have a issue on Process Chains.
    In my Project there are 2 ODS.
    ODS 1 : Status Header ODS (ZODS)
    ODS 2 : Service Order Header. (0CRM_PROH)
    In CRM, if any Service Order is created, it is available in delta Queue(RSA7) immediately.
    While loading the data to ODS 2(Service Order),it is checking the data from status ODS 1(Status ODS)
    For Example, I am loading the data of service Order 80001 to ODS 2(0CRM_PROH). Before loading to ODS 2, i am checking whether this service Order Number(80001) is available in ODS 1.
    If the service Order 80001 is there in ODS 1, it will update the data to ODS 2.
    If the service order 80001 is not there in ODS 1, it will not Update the data to ODS 2.
    Problem i am facing :
    1. First i am loading the data to ODS 1 (Status ODS). Early Morning 2.30AM and it completes the data load at 2.40AM. And document posting is happening on 2.37AM and ODS 1 doesnt pull the data of document posted.
    2. Once the ODS 1 is completed, by 2.41AM, the data loading will happen for ODS 2 (Service Order Header).It brings all the data including the document posted on 2.37AM.
    3.While loading all the data is available, and while loading to ODS 2, it is checking the status ODS. And it is checking for the document posted on 2.37AM and this document is not there in Status ODS 1 and the data(posted on 2.37AM) will not update in ODS 2.
    Because of this, some records are missing in ODS 2. And while loading, we cant stop the document posting also.
    How can i achieve this using the process Chain.
    Design i have tried in Process Chain :
    1. Start Variant.
    2. Load Infopackage to PSA only for ODS 2.
    3. Load Infopackage to PSA and activate ODS for ODS 1 (Status ODS)
    4. Read PSA (of ODS 2) to Load data to ODS 2.
    5. Activate the ODS.
    I tried, but i got a error message while designing the process Chains.
    No type "Activate DataStore Object Data" process can be in front of process "Read PSA and Update Data Target" variable PSA_SERVICE_ORDER in the chain
    Pls suggest how to recify this according to my design.
    Thanks & Regards,
    Ram.

    Hi,
    You can try this..
      .......................................... Start  ...................................................
    Load data to PSA (ODS 2) ..................................... Load data to PSA (ODS 1)         
    ..................................................................................Load data to ODS 1
    ...................................................................................Activate ODS 1
      ........................................... AND ..........................................................
      ........................................ Load data to ODS 2 .............................................
       .......................................... Activate ODS 2 ...........................................
    Regards,
    Anup.
    Edited by: Anup ShankarBS on Sep 3, 2009 4:56 PM

  • RFC ERROR while running BI Process Chain

    I'm recieving the following error while running certain Process Chains in BI.
    RFC error: FAILED
    RFC Message: FAILED
    The system log in BI shows the following.
    Communication error, CPIC return code 017, SAP return code 672
    672 Logon to Netweaver failed
    Other process chains work correctly via CPS.
    Any Ideas?
    Thanks

    This looks like a BW problem. Do you get the same message when you submit it manually in SAP?

  • Applying variable filter while executing a process chain

    Hi,
    I have a  client requirement discussed below:
    I have a process chain containing multiple DTPs. The user wants to have a filter variable for fiscal year period while executing the process chain(i.e fiscal period selection screen should come for him to enter fiscal period). And the entire process chain should run for that selected fiscal period.
    Please help me with solutions of this dynamic process chain triggering.
    Points will be assigned if helpful.
    Regards,
    Sourabh

    Hi,
    You can craete a variant with some set of value and through ABAP code you
    can run the process chain according to your requirement.
    Thanks,
    Saveen Kumar

  • Error while designing the process Chain.

    Hi All,
    I have created the Process Chain.
    1. Start Variant.
    2. Load data to PSA for ODS 1.
    3. Load data to ODS 2
    4. Activate the ODS 2
    5. Read PSA and load data target to ODS 1.
    6. Activate the ODS 1.
    While checking the process Chain, i am getting the error message as
    "No Type "Activate Datastore Object data" process can be in front of process "Read PSA and data target" Variable PSA_CONFIRM_ITEM in the chain.
    Can u pls help on this issue.
    Thanks,
    Jelina.

    Hi,
    You can try this..
    ..................................................... Start ...................................................
    Load data to PSA for ODS 1 ..................................Load data to ODS 2
    ...................................................................................Activate ODS 2
    .............................................. AND ..........................................................
    ........................ Read PSA and load data To ODS 1 .............................................
    .......................................... Activate ODS 1 ............................................
    Regards,
    Anup.
    Edited by: Anup ShankarBS on Sep 4, 2009 10:47 AM

  • Reverse transport of process chains ( Quality  to Dev ) ?

    HI all ,
    i need to transport the process chains from Quality to development .
    i have started collecting the process chains by using only necessary objects as grouping  ,
    here i am getting all the objcets like  DTP , INfopakage , infoobjces , etc and Source system also .
    i dont want to transport all the objests & just want to transport only process chains .
    can any one plz tell    me how to proceed with this .
    Thanks ,
    Edited by: BIuser on Dec 22, 2011 4:05 PM

    Hi,
    Please check the steps mentioned by Kamal,
    Source system conversion after transport -  RSA1->Tools->Conversion of Logical System Names.
    Check the thread,
    No Source system exist
    Also in your case you are trying to move some objects from Quality to Development.
    So kindly check with Basis also if they have maintained proper transport paths.
    Regarding BDLS runs, during system copy one bw system will be copied on different BW system having different R3 system connection. In such cases  basis does several BDLS runs where the target BW systems will have transformations of source BW system (source system). Once the basis completed BDLS runs the source system of source BW system will be changed to target source system in target BW system.
    Please check with Basis if you are doing a system copy.
    Thanks,
    Vinod

  • (Urgent)Transports of Process Chains

    Hi,
    I have transported the process chain to Quality.
    In Development we tested and it worked fine.
    But in Quality it failed saying "no variant found for a process compression".
    Help me out.

    Hi Indira,
    Check out whether all the objects included in the process chain are also transported to Quality server.
    The error might have occured becuase the corresponding object of a process in the process chain might not be active or missing in the quaality system.
    Hope this helps,
    Regards

  • Transport Request is not Generating while Deleting the Process Chain

    Hello,
    We have a old process chain across the Land scape(D->Q->P),now due to some reasons we have created a new one in Dev Sys.
    Now we want to delete the Old Chain in Dev Sys and want to transport the same to remaining systems. But the problem is when we click on delete, straight away a pop up is coming as Do you want to delete the chain YES or NO.
    Could any one of you suggest why it's not asking for a TR.
    Thanks
    Best Regards
    Lucky.

    Thanks Chanda
    One more problem
    The dtp which is there in the old chain is used in the new one also, when I am trying to add to a transport request, It is displaying this dtp has been locked with the new request.
    I have deleted the new chain request and as you suggested trying to create a new transport request for the old chain,after giving the new description for new transport, strangely a pop up is coming as Specify a Request.
    When I continue, finally it is ending with errors.
    The user terminated processing of objects REQUEST (In RED)
    Operation cancelled at user's request(In YELLOW).
    Can you suggest what could be the cause for this.
    Thanks.

  • Transportation of process chain

    Hi,
    I have transported Process chain from Development system to Quality system,but i cannot see my transported process chain in BWQ, i did't get any problems while transporting request from development to Quality, in STMS also succesfully imported.but my problem is why i cannot see my process chain in RSPC of Quality system.
    Thanks&Regards
    YSN

    Hi,
    You can use T-code se10, searched the request numbers by userID. Then, you can check the request with your Process Chain to see if you have included all process variant and elements for your process chain.
    In my experience , if you collected elements of process chain  by Transport Connection and transported, you should be able to see everything of transported chain on QAS/PRD.
    Hope it helps
    Best Regards
    S.F

  • Transport of process chains

    I added new mail messages to my Meta chain in each local chain process type. will I have to transport the entire process chain again the underlying process types
    or only the mail message variants are fine to be sent to QA and PRD
    Edited by: AAL123 on Sep 19, 2011 1:04 PM

    Hi,
      You can move the variants only but its always recommended to move the entire chains to next systems. But make sure that in case if the process chain was included in any of the previous transports, then that transport should have been released.
    Also while collecting make sure that you are not including any objects like Data sources etc. Also in case if the chain is already in production then no need o worry. But in case if the chain is being transported for first time then do use the option "Start using a Metachain or API" or set the schedule date to future date else the chain starts running automataically as soon as the chain is moved to production.
    Also check the below link, it might be helpful to you:
    http://www.sap-img.com/business/transport-process-chains-to-test-system.htm
    Hope that the above info is helpful for you?
    Thanks

Maybe you are looking for

  • System Error in Comm channel monitoring of RWB

    Dear all, I have a Proxy to webservice scenario (HCM-PI-SuccessFactors). At receiver side i am using SOAP AXIS adapter. In RWB, the status of the channel is green and running. But when i ping the channel, it shows System Error. I have made changes in

  • Firewire external writer not seen by Windows 7

    I have Windows 7 x64 running very sweetly in my MacBook Pro 2.2 on a Kingston SSD 128 V series. I installed the X64 drivers from the SL disk as detailed elsewhere in this forum. Everything is working except a Freecom LS Pro external DVD writer, when

  • Open new window from standard tab

    I searched the forum for my question but didn't have any success.  Sorry if this question was already been discussed. Is there a way to open a new browser window when you click on a standard tab?  My client wants a separate window to open when you cl

  • IOS IPS Signature-File

    Hi Guys, We have recently purchased a Cisco ISR 2921,  and on its docs it is writen that this product has a License for IOS IPS Signatrue File,  but on the product Flash Memory there is no  IOS IPS Sig-File.   and while i try to download the sig-file

  • I have a FacePad Flytouch 3 SuperPad 2 Android 2.2 10" Tablet and would like to install firefox.

    I tried to install firefox mobile. I click on Android market and get the download screen. When I click on "choose device on which to install" the drop down comes up blank. When I click it says it is not compatible. Is there a way to install?