In the MM Purchasing component, a contract is a type of outline purchase agreement against which release orders (releases) can be issued for agreed materials or services as and when required during a certain overall time-frame.
Contracts can take the following forms:
Quantity contracts
Use this type of contract if the total quantity to be ordered during the validity period of the contract is known in advance. The contract is regarded as fulfilled when release orders totaling a given quantity have been issued.
Value contracts
Use this type of contract if the total value of all release orders issued against the contract is not to exceed a certain predefined value. The contract is regarded as fulfilled when release orders totaling a given value have been issued.
You can also set up corporate buying contracts with your vendors. These are valid for all plants and company codes within a client (see Centrally Agreed Contract).
You can create a contract as follows:
Manually
You enter all data relating to the contract manually.
Using the referencing technique
As reference document (the document you copy from), you can use:
Purchase requisitions
RFQs/quotations
Other contracts
CREATION OF CONTRACT MANUALLY:
Choose Outline agreement --> Contract --> Create(ME31K)
The initial screen appears.
Enter the necessary data. If you make any specifications under the group heading Default data, this data will appear as the default data in each item.
In the Agreement type field, specify whether you are creating a quantity or value contract, for example.
Press ENTER .
The header data screen appears.
Enter the contract validity period. Check the other fields on this screen and make any necessary changes (e.g. the terms of payment) and define the header conditions.
Press ENTER .
The item overview screen appears.
On this screen, enter the information for each item (material number, target quantity, price, receiving plant, or account assignment, etc.) using the same procedure as with purchase orders.
Material without a master record: leave the field for the material number empty and enter the following:
u2013 Short description of the relevant material or service in the Short text field
u2013 Material group to which the material belongs, in the Material group field
u2013 Account assignment category
You can enter u (unknown) or the category of an account assignment.
u2013 The target quantity and the order unit
If you specify an account assignment category other than U (field A), you must enter the relevant account assignment data for the item. To do so, choose Item ® Account assignments (see also Account Assignment).
If necessary, review the details for each item. Select the item(s) to review. Then select Item -> Details.
Enter the desired conditions.
Enter further text for the item if any additional instructions to the vendor or Goods Receiving are necessary. Choose Item -> Texts -> Text overview.
Save the contract.
Hope it helps..
Regards
Priyanka.P
AWARD IF HELPFULL
Edited by: Priyanka Paltanwale on Aug 25, 2008 7:20 AM

Similar Messages

  • Creating variables in Process Flows and using thse variables in the filter

    Hi,
    I am new to OWB and in learing stage. Need to information.
    *1. as to how pass/create/use variables to OWB mapping ?*
    *2. Creating variables in Process Flows and using thse variables in the filter operator of the OWB mapping?*
    *3. Other mechanisms of how to create/use variables within OWB mapping itself ?*
    can you please provide the above details and guide me / help me in this regard.
    Thanks,
    skms.

    1. Add parameters to your mapping using the MAPPING INPUT PARAMETER from the pallette.
    2. Add parameters to the START operator in the process flow. Bind the process flow parameter to the Mapping parameter.
    3. May be appropriate to use CONSTANTS instead of parameters.
    Regards
    Si

  • Analysing Task Audit, Data Audit and Process Flow History

    Hi,
    Internal Audit dept has requested a bunch of information, that we need to compile from Task Audit, Data Audit and Process Flow History logs. We do have all the info available, however not in a format that allows proper "reporting" of log information. What is the best way to handle HFM logs so that we can quickly filter and export required audit information?
    We do have housekeeping in place, so the logs are partial "live" db tables, and partial purged tables that were exported to Excel to archive the historical log info.
    Many Thanks.

    I thought I posted this Friday, but I just noticed I never hit the 'Post Message Button', ha ha.
    This info below will help you translate some of the information in the tables, etc. You could report on it from the Audit tables directly or move them to another appropriate data table for analysis later. The concensus, though I disagree, is that you will suffer performance issues if your audit tables get too big, so you want to move them periodically. You can do this using a scheduled Task, manual process, etc.
    I personally just dump it to another table and report on it from there. As mentioned above, you'll need to translate some of the information as it is not 'human readable' in the database.
    For instance, if I wanted to pull Metadata Load, Rules Load, Member List load, you could run a query like this. (NOTE: strAppName should be equal to the name of your application .... )
    The main tricks to know at least for task audit table are figuring out how to convert times and determing which activity code corresponds to the user friendly name.
    -- Declare working variables --
    declare @dtStartDate as nvarchar(20)
    declare @dtEndDate as nvarchar(20)
    declare @strAppName as nvarchar(20)
    declare @strSQL as nvarchar(4000)
    -- Initialize working variables --
    set @dtStartDate = '1/1/2012'
    set @dtEndDate = '8/31/2012'
    set @strAppName = 'YourAppNameHere'
    --Get Rules Load, Metadata, Member List
    set @strSQL = '
    select sUserName as "User", ''Rules Load'' as Activity, cast(StartTime-2 as smalldatetime) as "Time Start",
          cast(EndTime-2 as smalldatetime) as ''Time End'', ServerName, strDescription, strModuleName
       from ' + @strAppName + '_task_audit ta, hsv_activity_users au
       where au.lUserID = ta.ActivityUserID and activitycode in (1)
            and cast(StartTime-2 as smalldatetime) between ''' + @dtStartDate + ''' and ''' + @dtEndDate + '''
    union all
    select sUserName as "User", ''Metadata Load'' as Activity, cast(StartTime-2 as smalldatetime) as "Time Start",
          cast(EndTime-2 as smalldatetime) as ''Time End'', ServerName, strDescription, strModuleName
       from ' + @strAppName + '_task_audit ta, hsv_activity_users au
       where au.lUserID = ta.ActivityUserID and activitycode in (21)
            and cast(StartTime-2 as smalldatetime) between ''' + @dtStartDate + ''' and ''' + @dtEndDate + '''
    union all
    select sUserName as "User", ''Memberlist Load'' as Activity, cast(StartTime-2 as smalldatetime) as "Time Start",
          cast(EndTime-2 as smalldatetime) as ''Time End'', ServerName, strDescription, strModuleName
       from ' + @strAppName + '_task_audit ta, hsv_activity_users au
       where au.lUserID = ta.ActivityUserID and activitycode in (23)
            and cast(StartTime-2 as smalldatetime) between ''' + @dtStartDate + ''' and ''' + @dtEndDate + ''''
    exec sp_executesql @strSQLIn regards to activity codes, here's a quick breakdown on those ....
    ActivityID     ActivityName
    0     Idle
    1     Rules Load
    2     Rules Scan
    3     Rules Extract
    4     Consolidation
    5     Chart Logic
    6     Translation
    7     Custom Logic
    8     Allocate
    9     Data Load
    10     Data Extract
    11     Data Extract via HAL
    12     Data Entry
    13     Data Retrieval
    14     Data Clear
    15     Data Copy
    16     Journal Entry
    17     Journal Retrieval
    18     Journal Posting
    19     Journal Unposting
    20     Journal Template Entry
    21     Metadata Load
    22     Metadata Extract
    23     Member List Load
    24     Member List Scan
    25     Member List Extract
    26     Security Load
    27     Security Scan
    28     Security Extract
    29     Logon
    30     Logon Failure
    31     Logoff
    32     External
    33     Metadata Scan
    34     Data Scan
    35     Extended Analytics Export
    36     Extended Analytics Schema Delete
    37     Transactions Load
    38     Transactions Extract
    39     Document Attachments
    40     Document Detachments
    41     Create Transactions
    42     Edit Transactions
    43     Delete Transactions
    44     Post Transactions
    45     Unpost Transactions
    46     Delete Invalid Records
    47     Data Audit Purged
    48     Task Audit Purged
    49     Post All Transactions
    50     Unpost All Transactions
    51     Delete All Transactions
    52     Unmatch All Transactions
    53     Auto Match by ID
    54     Auto Match by Account
    55     Intercompany Matching Report by ID
    56     Intercompany Matching Report by Acct
    57     Intercompany Transaction Report
    58     Manual Match
    59     Unmatch Selected
    60     Manage IC Periods
    61     Lock/Unlock IC Entities
    62     Manage IC Reason Codes
    63     Null

  • Scheduling Mappings and Process Flows

    Can you please tell me how to schedule mappings and process flows in a little detail, if any one has done that. I think OEM can be used for this but dont have any clear cut idea of doing it. Can the mappings/process flows be scheduled without using OEM console ?
    Waiting for you suggestions.
    rgds
    -AP

    Hi
    You can schedule your mapping and process flows with OEM or database job.
    You will find script templates in the OWB HOME/owb/rtp/sql directory
    and you can scheldule them.
    If you want to do it in OEM use the oem_exec_template.sql file createing an OEM job. Read the OWB documentation about it. If you have any question about it ask it, I have done this procedure many times.
    Ott Karesz
    http://www.trendo-kft.hu

  • HT3529 Is there a way to create, store and use preset messages for use with "Messages"?

    Is there a way to create, store and use preset messages for use with "Messages". I often have a recurrinig message to send, after a repeating event, and need to enter the same short message each time. It would be nice to have this short message stored and selectable so that I do not need to enter each time.

    found an answer that seems to work:
    https://discussions.apple.com/message/17997300#17997300

  • OWB : Runtime Repo for Target and Process Flows on Different M/C

    Hi,
    I have an environment where the Runtime Repositories for the Target Warehouse and Process Flows ( Workflows ) are on different machines. I have deployed :
    * the mappings and Target Tables on the Target Warehouse
    * Process Flows on the Workflow Server which resides on a seperate M/C.
    When I try executing the Process Flows for the Mappings , it errors out indicating that the objects may not have been deployed. Looks like the Process Flows cannot see the Mappings deployed.
    Can somebody help me here ?????

    I think target schema and runtime rep shuould be in same instance

  • Internal Order process config details and process flow

    Hi All,
    Please help me,
    I need process flow and configuration for assets to buy from vendors and store it and sell to our stores.
    how to config Internal order configuration step by step and post to Asset management. (Instead of normal sales for revenue account).
    Thanks and regards

    Dear Ravi,
    1. first create an internal order through KO01. That internal order type should be for investment purpose.
    2. Give the relevant detials and go to investment tab and give investment profile.
    3 Then in toolbar go to extras and select "asset under construction". An asset under construction would be created and give the details of this asset.
    4. Then release the internal order in KO02.
    5. Then go to GB60 and post a invoice with this internal order as account assignment object.
    6. GO to KO02 and in extras see the order balance. that amount would be reflected in the order.
    7. now go to KO88 and execute the internal order through which your internal order will be credited and AUC which you created would be debited.
    8. Now go to KO02 and see the order balance it would show 0 as it is moved to AUC.
    9. Now to go to settement rule and give the asset to which u want to transfer this amount and take the category as FXA and give the detials.
    9. now go to KO02 and change the status of internal order to "TECO complete".
    10 Now go to KO88 and execute the order and now the AUC is credited and your asset is debited.
    This is the exhaustive steps which i think wil solve your purpose.
    But make sure the configuration about the order type and investment profile are properly maintained.
    Thanks
    sap firdo

  • TAS and process flow

    Dear All,
    We are trying to use TAS for existing imeplentation.
    We are not able to assign load id to Sales Order manually even config settings are done for manual one.
    Pls. guide whether the process flow is correct for this.
    Create Load ID --> Assign to SO --> Creat Outbound Delviery --> Create Bulk Shipment --> Create Loading Confirmation --> Create Delviery Confirmation.
    Information on SAP help and in PDF file of TAS is quite confusing.Process flow is not clear.
    Thanks and Regards,
    Vijay Mundke

    Hi Vijay,
    the process can have different variantions, but the document you want to send to the tas system has to have the load-id assigned. The load-id triggers the tas relevance.
    If you want to send the sales order to an external system, you need to assign the load-id to the sales order.
    usually, the sales order is sent to a TPI system (transportation planning system) and the transportation system sends back the delivery and bulk shipment (idoc OILSHl). This means that this order goes to this truck. The shipment represents the truck on which the delivery is scheduled. Each document that is posted after-event is a function module (one for the delivery and one for the bulk shipment).
    Then, you would send the bulk shipment to the terminal (refinery or depot). This means that a load-id needs to be assigned to the bulk shipment (idoc OILSHL). The TAS system receives the shipment and the loading must be done with reference to this shipment/load/id. Then, the TAS sends back the loading data (OILLDD), mainly the OILLDD file contains the reference, the material data, the load qty, the unit, the density, the temperature. The OILLDD idoc has many fields, but only a few are mandatory. I can send you a list of the mandatory fields if you can use it.
    Then, the system posts the load confirmation automatically based on these data. depending on the set-up, you can either have the system post the load confirmation only or the load confirmation and the delivery confirmation. Both documents have standard function modules. I strongly recommend to use the standard function modules. They work. I have used them on several projects and all you need are some exits. If you post only the load confirmation, the delivery confirmation can be posted manually. If the customers are invoiced based on arrival quantities, the delivery confirmation can have different quantities (temperature can be quite different, especially in India). If invoicing is based on loaded quantities, you can post both the load and delivery confirmation with the same data or set up the customizing that a load confirmation will be the end of the process (based on the incoterm).
    before, you can do the customizing, you need to check which processes you have. To know whether you have a shipment or a pick-up process triggers whether you should send a sales order or a shipment to the terminal. Most oil companies have their own fleet and deliver their fuel via a truck to the customer -> in this case, you need to send a bulk shipment to the terminal. But, often, the customers also pick-up the fuel at the refinery. Then, you only need a sales order and a delivery and goods issue is sufficient. However, if you need to manage the plate number at the refinery, you might want to process both of these variants via a bulk shipment. In all cases, the loadings will come back with an OILLDD idoc.
    Depending on the answer to this question, you can set-up the tas relevance customizing. If you choose to send bulk shipments, you set up tas relevance for shipments. This defines simply in which cases a load-id is required in the shipment. Say you have 2 refineries which are represented in the transportation planning point (ref1 and Ref2). If only one refinery will have an automatic interface, you set up only that one to require a load-id. If you have several product groups (say Bitumen, white fuels) and some of them are automated (typically fuel) and other not (bitumen) and you have set them up as bulk shipment types, then you can further differentiate. Then, you need one load-id type for each process variation.
    I like to use the following:
    PU-ORDER (you send an order and the tas posts the delivery and goods issue)
    SH-LC (you send a bulk shipment and the TAS posts the load confirmation only)
    SH-LCDC (you send a bulk shipment and the TSA posts load and dlv confirmation)
    SH-DC (the load confirmed shipment is sent to the arrival terminal and the arrival terminal sends back the delivery confirmation)
    The most commonly used is the SH-LC.
    After that, you call the control structures and the LID function groups the same name. (Types are A for pick-up, B for load confirmation and E for delivery confirmation). It makes the whole thing much clearer. Then, you just have to assign to each function group the inbound function modules of the standard.
    Standard load confirmation for SH-LC for example and standard delivery confirmation for SH-DC.  I hope this helps.
    Regards, Petra

  • HFM Process Control and Process Flow History

    Hi,
    When I review the Process Flow History for top parent members of the consolidation, the POV shows <Scenario> <Year> <Period> <Entity> <Entity Currency>. For all other applications and entities, the <Entity Currency> member shows but I've built a new application and the <Entity Currency> shows as "EUR Total" (EUR is one of the currencies) except that EUR is not the default currency of application or the entity's value. Could anyone explain to me why it would show that way or where it could be coming from?
    I'm using HFM v11.1.1.3.
    Thanks in advance.

    did you add new metadata?

  • No template found creating Tabs and Processes in HR Flexible Performance UI

    Dear Experts
    We will be using EHP4 Flexible Performance UI.
    I have created the sample performance template in PHAP_CATALOG and have transported this to our DEV playpen client.
    Within the config Master client I want to configure the u201CDefine Tabs and Process Configuration for Templateu2019 IMG node and after I log in it takes me to the web dynpro screen u201CWeb dynpro ABAP configuration for Appraisalsu201D, I get the error u201CNo template foundu201D.
    When I check the Help it says 1) to check the template has been created and 2) that the template has been released
    I checked and the template does exist in PHAP_CATALOG and has been released.
    Has anyone encountered this problem and has a way to fix this?
    Thanks
    Oliver

    Hi Maurice,
    Thanks for your quick reply.
    Yes the template has been definitely released.
    Yes Iu2019m using the same user to create the template and trying to do the process tabs u2013 I have SAP ALL Access.
    Also, when I transport this template from the DEV master client - to a DEV unit test client I can actual run the process template setupu2026u2026u2026u2026.
    Developer has checked the code and DEV Master client is the same as DEV Unit test clientu2026u2026u2026.interesting.
    Have you ever come across the issue where the source client where template has been created and released that you could not create the process tabs?
    Any other ideas how I could solve this?
    Many thanks
    Oliver

  • Best way to create tasks and assign to sharepoint groups

    Hi everyone, I have a custom list which contains newsletter info that is to be seen by around 400 groups (they are stores) and then I need them to mark each list item as 'completed'
    I have been trying to figure out the best way to do this and decided to keep the custom list and somehow link it to a task for each item in the list. We have nintex so was thinking of creating a workflow to create a separate task for each group (store) so
    they can mark it as completed.
    Is this the best way to go about it or am I completely off track?
    Basically all I need is a list which contains around 30 items and around 400 groups (stores) which contain users (store staff) to be able to mark items on the list as completed so it recognises that each store has completed each task.
    Thanks

    Hi  ,
    According to your description, you want to find the best way for creating tasks for 30 list items and assigning the task to around 400 groups.
    For the workflow, it is heavy  that  you need to create around 12000 (30*400) tasks .  In my opinion, the best way is to do with a custom timer job. For more information, you can refer to the
    blog:
    http://www.splessons.com/2013/12/create-a-timer-job-in-sharepoint-2013/
    Thanks,
    Eric
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support,
    contact [email protected]
    Eric Tao
    TechNet Community Support

  • Create filter in Process Flow

    hello,
    I wanna figure out how to make filters in Process Flow, because I don't see them. Something like:
    - if to_char(sysdate,'yyyy') from dual > 2006 then include a mapping.
    thank you
    br

    Create a PL/SQL function that does the appropriate if statement and returns 0,1 or 2. Add this function to your workflow and ensure you turn on Use Return as Status in the configure of the process flow for the function. Join the Success/Error/Warning as appropriate skipping the extra map(s) based on the return value.

  • Whats the difference between the iOS Paid Applications contract and the iAd Network Contract

    I'm a developer for iOS Apps and I am interested in setting up the iAd Network on my apps. I went into itunes connect to look at the required contracts and saw that there is a contract required for Canadian Developers (i'm in Canada). I looked at the contract and it seems to be the same as the contract required to sell iOS Paid Applications. My question is, is there any difference between the two Canadian contracts and do I need to fill the iAd Network Canadian Contract out again even though one has already been done.
    Thanks for the help in advance.

    Probably not much different or different at all with the final BETA version. You get the BETA by being a registered iOS developer. Why on earth would you want a BETA?

  • Linkage and process flow for credit memo

    Hi Experts,
       I am creating an outbound zfunction module for consignment settlement.Need to select frbnr,lifnr,budat,ebeln,werks,lgort,erfmg
    based on object key of nast table.Kindly please advise the flow and linkage of the fields for selection.
    Thanks.
    Stazin.

    Hi Charan,
    Has vendor sent you a credit memo or a subsequent credit?
    Usually a credit memo refers to a goods return and a subsequent credit to a prior invoice that was set with a higher price than it should (for example).
    So you can simply make a credit memo against the PO with the value/quantity in the vendor credit paper.
    Go to MIRO and choose transaction 2 Credit memo, insert the original PO and adjust value/quantity. After saving the document the PO / Stock and value are updated.
    Regards.

  • Easiest way to create h2s and h3s in Robohelp 8

    I've created my toc book in RoboHelp 8, but having a tough time determining how to drill down
    in the topic further than an H2 - I would like to create H3's - but not having luck yet......
    How do you do this?

    Hi there
    I have no clue as to how Help Studio works. It seems many of the Help Authoring Tools (HAT) out there operate in different ways.
    In RoboHelp, we have individual HTML pages. Each of these is known as a Topic. You also have a Table of Contents (TOC). You may have RoboHelp build one for you or you may build it yourself. You do either using the Table of Contents pod. The Table of Contents is represented by Books and Pages. Think of these as you would a Web Page. They are simply links to the HTML Topic pages.
    Does that help any?
    Cheers... Rick
    Begin learning RoboHelp HTML 7 within the day - $24.95!
    Click here for Adobe Certified Captivate and RoboHelp HTML Training
    Click here for the SorcerStone Blog
    Click here for RoboHelp and Captivate eBooks

Maybe you are looking for