WBS Element and functional area/location

Hi All Gurus here,
Can a WBS element link to functional area/location(object in PM)? or the other way round, which functional area/location link to WBS element?
Best Regards,
Elvio

Dear Elvio,
Please go through the information in the link,reward if useful.
http://projectsystems.wordpress.com/
Regards,
Naveen Dasari.

Similar Messages

  • Can PIR created at wbs element and MRP area of storage location level

    Hi,
    I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
    *When trying to create account assignment category Q for it, then there is an error message saying:*
    **only stock requirements are allowed when planning at MRP area level.**
    Does it mean it is not possible to create planned independent requirement for this case?
    Thanks!

    Select the "Issue storage location" as '2' here:
    spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
    & make sure:
    1. In the BOM  issue storage location is blank for the components
    2. For the FG products , in mrp area prod.storage loc is maintained
    3. Components are extended to the mrp area.
    Pl. revert with the results

  • WBS Element and Service No Link Table for Purchase Order document

    Hi Experts,
    We are Facing 1 Problem for finding link between
    WBS Element and Service No for corresponding Purchase Order document . Please Suggest me to find Related tables for Project system Module .
    Thanks and Regards
    BalaNarasimman.M

    Hi,
    The link will be in MM table, not PS table. Try EKKN.
    Regards

  • PS-Relationship between the system status in wbs elements and activities.

    Relationship between the system status in wbs elements and activities.
    We have the following requeriment with the system status in PS. We have a project with complete technically status and we want to undo the complete technically status in one activity without changing the complete technically status in the WBS element or the project.
    The reason is that after putting the complete technically status, users have to change the values in the P.O. We don´t want "open" all the project and we only need to "open" the activity where the P.O. are in.
    Is that possible? How is connected the system status between activities, wbs elements and the project son I can change the status in the below step without changing the higher steps?
    Thanks in advance.

    Hi Bala
    Yes, you have put it rather correctly.
    We use WBS elements for booking and posting time (client requirement). So what I am looking for is WBS Elements with the system status TERL (Time and Expense Released).
    I talked of the deletion flag also, because a WBS element flagged for deletion can't be used. It's one of the criteria to screen the WBS elements.
    I hope it's clearer now.
    Vinitha.

  • WBS element and Cost Center

    Hi Gurus,
    As far as I know, when the a/c assignment category is P in a PO, the costs are assessed on the cost object WBS element and when the a/c assignment category is K in a PO, the costs are assessed on the cost object cost center. But, as I drill down a WBS element, I find Requesting and responsible cost center.
    So, can I say that a WBS element is actually a child of the responsible cost center ?
          And all the costs assessed on a WBS element are eventually assessed on the responsible cost center?
    Please help in clearing my concepts.
    Thanks,
    Kumar

    hi,
    You assign the account assignment to WBS element based on the OPERATIVE INDICATOR...
    By this you specify the attributes of a WBS element and determine which tasks the WBS element can carry out in the project...
    Please check the LInk given for futher explainations:
    [WBS ELEMENT|http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/225e2a46e611d189470000e829fbbd/frameset.htm]
    check the table given at the bottom...
    Regards
    Priyanka.P

  • How to populate WBS element and Project definition in Additional Tab

    Hi,
    I have a 2 requirements
    1) we need to populate WBS element and Project definition of an order in PM
    IW 32 trasnaction (Additional data tab).
    2)Also i need to program settlement rules in CJ02 for WBS elements .
    How do i approach ?  when i do manually it is taking the values in IW 32 when the status is released.
    So i think first we need to chnage the Status from Created to released and then start working on step 1 and Step 2
    Kindly suggest.
    Thanks,
    Pradeep.

    Problem one solved ......
    Basically we need to put the status of WBS elememnts and then write a BDC for additional data tab.
    Looking into issue 2......

  • Listing WBS elements and object relations

    Hello Friends,
    I want to output all wbs-elements and attached objects in a list, but I'm not sure how to do this. Is there a standard report for this? In trans cj03 you can only se the relation between one wbs-element and its related objects... I want to view them all. I considered to make a report with quickviewer but I am not sure which tables to connect, as the data-fields in transaction cj03 only reffers to structure fields... I would appreciate any input...
    best regards
    Ballo

    Hi Robert,
    Check out the conversion routine attached to the WBS element, and you need to add code in your program to convert it before downloading.
    If no conversion exit is available, you need to write code to select its mapping from database table.
    cheers
    swastik

  • WBS Element and it's associated Employees

    Hi All,
    In CJ20N, we will be allocating Employees to a WBS Element.
    I would like to know from which table, the WBS element and its Employees can be retrieved?
    Regards
    Pavan

    Did you try with the infotype table PA0027 - Cost distribution infotype. Or you can check in PA20 and infotype number 0027.
    Here the WBS elements will be assigned to the employees with their % of allocation.
    Hope this helps you.
    Regards,
    Subbu

  • New OM Objects since Enhancement Package 4 (Job Family and Functional Area)

    I was wondering if anyone had implemented the new OM objects Job Family and Functional Area that came out with ehp4.  If so, what was your experience?  I am curious whether the new objects are are saved in IT0001 as the other OM objects (job, position, and org. unit) are.  Also, if the new objects are available in the PNP logical database for query reporting.

    Hi,
    Just to add on to REDu2019s comments, there are two new evaluation paths as well which traverse through the job architecture u2013
    Top to bottom: FN-JF-CS
    Bottom to top: SC-JF:FN
    These can be used in report RHSTRU00.
    Hope this helps.
    Donnie

  • 1.- I´m creating a Muse site which contains videos, photos and sound. All videos, sounds and pictures are located in diferent folders in my PC. Since Muse doesn't organize the project and its files like Dremweaver (all files in a single folder). How can I

    1.- I´m creating a Muse site which contains videos, photos and sound. All videos, sounds and pictures are located in diferent folders in my PC. Since Muse doesn't organize the project and its files like Dremweaver (all files in a single folder). How can I manage my site (containing all the media)  in order to upload it to a server?
    2.- Is there a Adobe Muse community in spanish language?
    Thanks for your help
      Mauricio444

    Kevin is suggesting that you store the projects you create while working through his book in a folder called RoboHelpProjects. It is not where you have to store every project you ever create.That is for the purposes of his book.
    RoboHelp initially defaults to My RoboHelp Projects but it's up to you whether you do. Generally on the forums we advise against that as  it is part of your profile and can result in excessively long path names in a few cases. Generally where authors create file names that are so long they almost serve as the content.
    Projects always have a root folder, call them Project 1 and Project 2 for this purpose. You can have those folders directly off your C drive (or other local partition) or within in a parent folder as above.
    Now to what you can and cannot do. You can delete a whole project by selecting Project 1 or Project 2 in Windows Explorer. Obviously if you delete the parent folder you will delete all your projects within.
    What you must not do is delete individual files within a project using Windows Explorer, for that you use RoboHelp's Project Manager. The exception is if you go to Tools > Reports there is a report Unused Files. Files listed there will have to be deleted using Windows Explorer for the very good reason they do not appear in Project Manager and, therefore, cannot be deleted that way.
    If you think about it, it is similar to Word. There is no option to delete a document there other than using File > Open and right clicking. Not very intuitive.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • Difference between WBS element and internal order?

    What is the main difference between WBS element number and internal order number?
    Points will be given!

    Hi,
    WBS:
    The work breakdown structure (WBS) is a model of the project that organizes project tasks into a hierarchy.
    It is the functional basis for further planning steps in a project, for example, for process planning, cost planning, scheduling, capacity planning or costing, as well as project control.
    It gives you a clear picture of the project and facilitates the coordination and implementation of the project from a management standpoint.
    It shows the work involved in a project.
    check this link also
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/a9/8a853488601e33e10000009b38f83b/frameset.htm
    Internal order:
    Internal orders are normally used to plan, collect, and settle the costs of internal jobs and tasks. The SAP system enables you to monitor your internal orders throughout their entire life-cycle; from initial creation, through the planning and posting of all the actual costs, to the final settlement and archiving:
    check this link also
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/a9/ab7f68414111d182b10000e829fbfe/frameset.htm
    if this helps,please assign points.
    Thanks,
    Rau

  • WBS element hirearchy function module

    Hi All
    Is there any function module in R3 that accepts WBS element as input and gives its hirearchy? I would like to know the function module name that accepts WBS elements in the internal table as input and gives all associated hirearchies as output in the internal table.
    Please advise
    Thanks
    Vennela

    Hi,
    we can see WBS Hierarch from cj20n tcode.
    Can you please give us an idea about what you are trying to do with WBS, extracting into Bi or other use in R/3 itself.
    Regards,
    Vamsi.

  • Report with cost center, Wbs element and cost element

    Dear Experts,
    I am creating Income Statement report with report painter using table CCSS.
    In this report, I need cost centers, cost elements/ GL accounts and WBS elements.
    Report is okay except sales. Because my cost elements for revenue are created with the category "11", it is not showing in the report.
    Please suggest what changes to make to get sales revenues in the report.
    Thanks

    Hi Simi
    Structure CCSS of Report Painter is combination of several tables including COEP
    Even your revenue should have been updated in COEP table...
    May be your report's selection conditions are preventing the revenues from being displayed... Can you check that?/
    Also, you can build this report from FI Structures
    Br, Ajay M

  • WBS Elements and Asset Under Constructions have different Cost Centers

    Hello Experts,
    We have created a WBS element in one of the projects.
    As per standard process, when we create the WBS Element the Asset under construction is also getting created through the settlement rule within the WBS.
    These assets should have the same Cost Center as the WBS has. However we are in a situation wherein the Cost Center in the asset under construction is different than the Cost Center in the WBS.
    I have checked the settings like automatic account assignment, etc but all settings look correct.
    Can you please explain first what could be the reason for such a difference between Cost Centers in WBS and AuC's and what is the solution to avoid it in future?
    Thanks in advance
    Leena

    Thanks for your replies...
    @ Alex - There is no Investment Programme ID maintained for this WBS in question since there is no IM for this project.
    @ Abdul - Please elaborate more on Validation and Substitution.
    Regards,
    Leena.

  • Report:actual costs:statistical wbs elements and assets assigned to them

    Hi all,
    I would like to run a report that gave me this info:
    WBS Element (all statistical)
    Assets assigned to each WBS
    Actual costs
    It would be perfect CJI3 but it doesn't show assets. In AM I haven't see either any report that shows WBS elements...
    any ideas???

    Thanks for your reply but this is not the question.
    The question is:
    Example:
    I have 100 WBS Elements. Each of them has an average of 5 assets assigned. (what makes 500 assets)
    I post lot of invoices in each asset.
    I would like a report that tells me at once the total actual amount posted in each ASSET and group those costs by each WBS element.
    Thanks and regards,
    Miguel

Maybe you are looking for

  • Is it possible to make all automation data quieter in one go?

    I have a song with about 50 tracks on it and it have mixed it too loud. I'm happy with the the levels and the mix but just need to mix it at a quieter level. However there is a substantial amount of volume automation many of the tracks. Is there anyw

  • Problem with the Collaboration Instant messaging

    Hello, When a user is trying to send a message in the Collaboration Launch pad under instant message instead of the user name we get another name. Can anyone please tell me the solution. Thnx in advance. cheers Murali

  • How to check if Connection Pooling is used in our application

    We have an ASP.NET application designed by developer team. All the files are .aspx They are all hosted in an Windows IIS and connect to Oracle database. I was reading some forums where people are suggesting to use "connection pooling" for better data

  • Update Failed ... as always

    My recent attempts to update three different CC apps have failed. I have tried the common uninstall-then-reinstall "solution" that seems to be a favorite solution around here, but it does not work. The error logs show that it is the "CSXS Infrastruct

  • How to close PROGRAMMATICALLY FileDialog object ?

    Hi All, I'm developing some module that is going to run in a separate thread and to be kind of Demo Runner, in other words it will simulate human events such as mouse clicking and key strokes. At one of the application sequence stages FileDialog is o