WBS elements related to project definition

Hi all,
I need to extract all the WBS elements (PSPNR) from PRPS related to the project definition (PSPID) in PROJ. Please help me with the query.
For Example:
For project definition: 6HU-000000120
There are 2 WBS elements: 6HU-000000120(top level) and 6HU-000000120-1(second level)
Thanks,
Netrey.

Hi
Join the tables PROJ and PRPS using the field
<b>PROJ-PSPNR = PRPS-PSPHI.</b>
select af1 af2
         bf1 bf2
     into table itab
from proj as a join prps as b
<b>on apspnr = bpsphi</b>
where a~pspid in s_pspid.
Reward points if useful
Regards
Anji

Similar Messages

  • How to Find PS GUID with WBS Element (POSID) or Project Definition (PSPID)?

    Hi all,
        I am creating the custom Extractor similar to 0CO_OM_WBS_1 (WBS elements: Costs) to load into 0PS_C041 (Project System - Controlling (New)). I have the WBS Element (POSID) & Project Definition (PSPID) and I how can I find the GUID (UUID in X form Binary) so that I could map it into 0PSGUID InfoObject in the Transformation. We have WBS Element & Project Definition (PSPID) as Navigation Attributes of 0PSGUID instead of under some Dimension in 0PS_C041 Cube and that's why I am trying to find the GUID with WBS Element (POSID) or Project Definition (PSPID), PLEASE.
    Thanks,
    Venkat.

    Hi Bala
    Yes, you have put it rather correctly.
    We use WBS elements for booking and posting time (client requirement). So what I am looking for is WBS Elements with the system status TERL (Time and Expense Released).
    I talked of the deletion flag also, because a WBS element flagged for deletion can't be used. It's one of the criteria to screen the WBS elements.
    I hope it's clearer now.
    Vinitha.

  • 1 project definition with several wbs elements or several project definitin

    Hello
    I need projects as account assignment elements in CO (when entering vendor invoices for costs). Should I have 1 project definition with all projects /wbs elements underneath, or should I have 1 project definition uniquely defined for each project/wbs element? Some projects are not settled to assets und construction, some projects are settled to assets und construction.
    kind regards
    Arjan

    Arjan
    I don't think you can have Projects as account assignment objects. You can have WBS element as account assignment object.
    One alternative I can suggest, if you want to see project costs at higher level instead of breaking down the project into many WBS elements. Create a project with one WBS element only and use that WBS element as account assignment object.
    It is only possible to have a project with one or more WBS elements. I don't think you can define projects within projects.
    letus put it this way assume WBS elements are projects within a project. But make sure all the WBS elements are related to one project
    Hope you are clear now.
    Thanks
    Prasad

  • How to do budgeting at activity level and WBS element level in project syst

    Dear GURU's,
    Can any one please suggest me how to do budgeting at activity level and WBS element level in project systems, friends please I required set by step process.
    I need how to do this configuration to map this scenario.
    Regards,
    Bhanu

    Hi Bhanu,
    Use this link :
    http://help.sap.com/saphelp_45b/helpdata/en/86/98853478616434e10000009b38f83b/frameset.htm
    after page opens , click on BUDGET MANAGEMENT , There you will find each and every step you want .
    Thanks ,
    Dhruv Kumar Malhotra

  • Report to get WBS elements based on Project Type

    Dear Experts,
    Is there any report exists in Project Systems to get WBS elements based on Project Types.
    This we can check in the table PRPS-PRART.
    But i need to know the availability of T Code.
    Thanks in advance.
    Regards,
    Srinivasareddy Y

    Hi,
    If its a one time requirement using CN43N might help in meeting the requirement. However, first it has to be executed for a certain range of projects and then the layout will have to be changed accordingly. Instead of doing this if a custom report is developed with the input parameter as "Project Type" it would make it much more easier. You can even have the F4 search option for the input parameter. Doing this will help if the report is going to be used frequently in the future.
    Take your call and proceed accordingly.
    Regards,
    Gokul

  • PS report: wbs element relation with PO, Pur Req. and vendor

    Hello,
    I need to build a report on WBS element which also shows PO number, Pur. Requisition, vendor details along with budget, actual, committements.
    I found datasources that can provide informations except PO, Pur Req.
    Can anyone help in providing a soln to build a relation between wbs and vendor to bring the correct PO and pur req related to wbs.
    Thanks
    Anima

    Hi Sushil,
    Which version of BW are you using?
    If its BW 7, then look at the datasource 2LIS_02_ACC
    http://help.sap.com/saphelp_nw04s/helpdata/en/ed/62073c44564d59e10000000a114084/frameset.htm
    Hope this help you
    Anima

  • Copy std wbs element in operative project & copy material components to SO

    Dear Friend's
    As i know following things not possible in std. sap ps. Still i would like to know is there any possibility to acheive same in std. sap ps.
    1) I have created one std. project template, which is made for standardise Projects. Here we can copy same template for operative Projects. But my client having a requirement like they wanted to just copy a Single Std. WBS Element of any level from that std. project template to create operative project...can is it possible in std. sap ps.
    2) Can is it possible in std. sap ps to copy the material component (like fert, halb, roh, hibe, hawa etc.) which we have planned in Project Builder to Sales Order.
    3) In std. sap ps we can handle projects through multiple plants & multiple business area's. In my scenario cross plant & cross business area material's is supplied to any particular project. so same way can we create Sales Order for multiple plants & multiple busniess area's.
    Thanks & Regards,
    Sandeep

    closed.

  • Automatically PO creation from WBS element in a project

    Hi,
    Is it possible to create Purchase Order automatically from the project that has only WBS element (no network)?
    My project has only WBS element and my client want to trigger PO creation automatically for prorements to projects.
    I appreciate your replies.
    Regards,
    Ja

    Hi Ja,
    Sorry, but you cannot create a PO automatically for a project that has only WBS elements and no network or acitivites. Since materials can only be attached to activities in a project it is mandatory to have an activity to trigger a PO automatically from the project.
    You may have to create a PO manually and then assign the WBS as account assignment.
    Regards,
    Gokul

  • WBS element deletion after project release

    Hi,
    getiing an error ,scenario is after deletion of WBS element  if i try to add same wbs..throwing an error that WBS element XYZ version RELEASED already exists.
    thanks

    Hi,
    You can refer this thread for more details;
    Re: Restoration of original WBS code
    Regards,
    Kabir

  • Create a Campaign as WBS ele. under a Project  which doesn't exist in CRM

    Hello Gurus,
    We are trying to create a campaign as WBS element under a project definition which does not exist in CRM system as Marketing Project.  We looked at the BADI CRM_MKTPL_R3_INT and could see that we can change the XML data in method CHANGE_XML_DATA.  But in ECC  , system is looking for GUID of  the project definition and is not able to replicate the campaign as per the requirement.  Please suggest a way to replicate Campaign as WBS element under a project definition which is not available as Marketing project in CRM but exists in ECC.
    ECC system is looking for Project Definition guid in FM PR_assignments_pre_read.
    Regards,
    Ashwini

    Hello Randhir,
          Sure...We have a system Landscape in which Non-SAP systems  communicate to SAP system.In our Scenario, the project definition (in our terminology it is called project code) is defined in non-SAP system and it gets replicated to SAP ECC  and then whatever campaign that we create in SAP CRM should be created as WBS element under that project code which was replicated from non-sap system.Reporting will be done based on the project code in other systems.
    For information, We are not replicating Marketing Plans to ECC.
    Regards,
    Ashwini.

  • BAPI for finding child WBS elements under a Parent WBS element

    Hi friends,
    I am working on the transaction ZIOS02 transaction. On releasing the Parent or Main WBS element in ZIOS02 transaction I need to copy some data from ZIOS to PRPS based on WBS element.
    I have a Bapi for retrieving all the WBS elements based on Project Definition (BAPI_PROJECT_GETINFO) but i want to know whether is there any BAPI for finding the child WBS elements when we give a Parent WBS elemnts as Input to BAPI.
    Could any one please help me in the query ASAP.

    Hi friends,
    I have got the answer for finding the child WBS elements.
    In Function module BAPI_Project_get_info.
    Use parameter subtree = 'X' and give the WBS element name in tables section under I_wbs_element. You will get all the child WBS elements which are under Main WBS element.
    Thanks
    Satish Raju

  • Creating WBS element using bapi BAPI_PS_INITIALIZATION

    Hi All,
    I have created Project definition successfully  using function module "BAPI_PROJECT_MAINTAIN" .
    But while trying to create Wbs-Element for the project definition using same function module  "BAPI_PROJECT_MAINTAIN"   we are getting the following error
    Key does not correspond to mask: TR.XXXXX.X.X.XXX
    Could any one help me out to resolve this issue.
    Thanks in advance.
    harsha p

    Hi harsha p,
    Error CJ609 "Key does not correspond to mask:TR.XXXXX.X.X.XXX" is always caused by an inconsistency between the project/WBS object number and the coding mask. Therefore, to solve the problem can you please try to run report ZZADJUSTPOSID from note 453280 attached?
    The report should be imported into your system manually by SE38.
    Please run it first in test mode to check the wrong entries and then correct them in update mode.
    Best Regards,
    Edna

  • Read wbs elements

    Hello
    i have a wbs element of the second step and read all third steps and fourth steps of this element (our project structure has 4 steps)
    Is there a function module to read alle wbs elements of this second step element?
    i found the FM BAPI_PROJECT_GETINFO to read all wbs elements of a project definition but the performance of the FM isn't good. So i need another FM
    Thanks for your help.

    The BAPI you are reffering is good enough. If you want to read only WBS with hierarchy below it, input only WBS without Project defn and pass X in subtree. If you pass Proj Defn, all WBS will be read.
    Hope this helps.
    Regards

  • CADO Report - Missing Project Definition and WBS elements

    While running CADO (time sheet data) report for employee, data is not being pulled up for the WBS Element and Project Definition. What could be the reason? Here time is entered against a network activity but for some entries WBS element and project definition is dispalyed and for remaining it is not.

    Yes....these activities are assigned to the WBS element in the project. As I mentioned earlier for the same activity in some cases WBS element is populated.

  • Creating projects and wbs elements

    I am running a conversion and for the upload portion I need to create projects and the relevant wbs elements in the system.  I have been looking over the forums etc and have seen many notes regarding BAPI_BUS2001_SET_STATUS, BAPI_PROJECTDEF_CREATE, and BAPI_PROJECT_MAINTAIN.
    My problem is this.
    I need to update the APPR and PREP system statuses of the projects I create and I can find no way to do this with a BAPI.  I also need to update the location of the project (stort) and the only BAPI I can find that will allow me to do this is BAPI_PROJECT_SAVEREPLICA which seems incorrect to use in this manner.
    in short:
    How do I update project system status of PREP and APPR?
    How do I update project location (stort)?
    Having no luck finding solutions so any help is appreciated.

    Hi,
    I've used these BAPIs but not for your fields. But maybe I can help you. There is no field LOCATION in the project definition but there is field LOCATION on WBS level. So have you tried to change this field on all WBS elements for your project?
    Unfortunately your system statuses are not supported by this BAPI. All supported statuses are mentioned in BAPI documentation. There is a FM STATUS_UPDATE_PROJECT which might help you but you need to be careful what you do. There are some additional FM STATUS_* for generic object status modification but again, you have to be sure that you can set up that system status without any additional checks.
    Good luck

Maybe you are looking for

  • Help! No Audio Output device is installed

    My speaker in bottom right for My sound say "No Audio Output Device Is Installed" and i have tried to go through many things to solve such as go into device manager and enable or update through there etc...to no avail.   I stumbled across a thing tha

  • Rollback Airport update 2005-001

    Any way to rollback Airport Update 2005-001 ? After having problems with 10.4.3, I updated to 10.4.4 with some trepidation, but that worked beautifully. Then I made the mistake of accepting the Airport update in Software Update. My airport connection

  • Abap fgs report

    hi guru's,      i have a problem with my code can anyone help me out with this,actually i am fetching invoice quantity from vbrp based on sales order (vbeln and posnr).actually i have 3 line items in sales order. but they invoce for this particular s

  • Can I buy a simm card in europe to get data and cell coverage

    Can the Samsung S4 receive a simm card that they sell at airports in foreign countries for a specified amount of data and calling

  • OEM Agent Deploy installation fails

    Hi, I'm having a problem doing a new full agent push install 10.0.2.0 to a Linux box from a windows OMS. I'm really after any suggestions of what to investigate next to resolve this problem. Last successful message appears to be: INFO: File to proces