WCM Work Operation tab  is disappearing in Maintenance Order

HI All,
I am facing problem in WCM.
In the Maintenance Order,Work Operation tab  is disappear after seleting Task list.
After saving the maintenance order and open in change mode,The WCM operation tab appears again.
Can anybody help me on this
Thnaks in Advance
Vishal

HI Uwe,
Many many thanks
As per note implementation,
General task list secetion problem is solved
but still we are facing the problem in selection of Functional task list 
Can you please suggest on this
Thanks
Vishal

Similar Messages

  • Work-center timings not reflecting in maintenance order.

    Hi,
    My requirement is, I want the work-center timings to reflect in my call object (Maintenance Order) generated through a maintenance plan.
    My scenario is: I've made a work-center with the following data,
    wrkcntr category as 0005; usage 004; control key PM06 with scheduling indicator checked;
    in capacities start-finish timings as, 06:00-14:00; operating time of 8hrs, and factory calendar is chosen for maint. people.
    The order type say pm08 is selected.
    now in the maint. plan we choose this work center in the planning data field.
    Task-list is also attached and the data are OK.
    in maint. plan scheduling parameter shift factor etc NOT given.
    Now when after schedulling I got one order with the
    SchedStart: DD.MM.YYYY 06:00
    Sched.Fin.: NEXT DATE 06:00
    but I need the date to be 06:00 to 14:00 as in the respective work-center.
    For for fastly solving the problem my analysis:
    I checked the order,goto operation tab,goto dates tab and found that basic finish time of activity is 24:00:00
    If this is the reason than how to make it 08:00:00 default for this order type.
    Thanks in advance,

    Hi Tyag,
    the details are cmins as below
    Erl. start: 19.09.2008 06:00:00      Earl. fin. 20.09.2008 06:00:01
    LatestStart: 19.09.2008 06:00:00  LatestFin. 20.09.2008 06:00:01
    Act. start:                    00:00:00  Act. finish                  00:00:00
                                                     FcstFinish                  00:00:00
    Restriction
    StartPoint
    End                                                         24:00:00   
    I am new to this and need your help.
    The req is how to reflect wrk center timing in the wrk order generated through a maintenance plan.
    Regards,
    sanjay
    Edited by: ganesh sarasvati on Sep 23, 2008 11:47 AM

  • Is Operation wise costing feasible in Maintenance Order?

    Hi Gurus,
              I have a requirement of enhancement so that the acual cost can be populated operationwise.
              Is this feasible in R/3.
              If yes what are the difeerent points I have to take care.
    With best regards,
    Narendra Dere

    Hi,
    Costing is on the basis of activitiy type which yuou carry out for maintenance
    And these activities are nothing but your operations
    so carry costing for activty it means you calculated cost of operation.
    Kapil

  • Standard Value and Activity at maintenance order

    Dear All
    I have created a standard value and attached a parameter of unit meter cube with the work center, however when i create maintenance order of same work center (by using IW31) system is not showing standard value parameter i attached on work center. It only shows activity type to select and operation duration in HRs.
    Kindly respond on you earliest.
    Thanks
    Regards
    Navaid

    Dear Narasimhan
    In this process operation we are consuming natural gas that i want to take as an input that how much gas has been consumed during maintenance. I have created a standard value key and then attached that with workcenter. now i want to take that gas consumption value during confirmation.
    Regards
    Navaid

  • Maintenance Order Number Ranges.

    Hi Gurus,
    I am working on the configuration of the Maintenance Orders for my client. I am trying to create 5 different number ranges for the five different order types to be used for five different processes. I have created the number range groups but strangely enough the groups are not visible in the list. Can you please suggest what should I do and where am I going wrong? I am creating the groups ( which are visible when I try to create new ones) from menu bar--> groups and insert.
    Thanks in advance.
    Anoop

    Hi Anoop,
    As per the referred case, what the system does is that the number range interval created while creating the new number range group gets assigned to an already existing number range group because there are several number range groups already defined, having no number range interval assigned to them so whenever a new number range interval is added, the number range interval gets linked with the already existing groups despite assigning the number range interval to the newly created group. The system does not even create the new number range group. For this you can change the text of existing groups or else assign each group with an interval and then start creating new groups with the desired number ranges other wise it would not create the group but the number range interval would definitely be created.
    Regards,
    Muhammad Usman Kahoot
    Edited by: Usman Kahoot on Nov 8, 2011 6:28 PM

  • Work field in operation tab pages of maintenance order.

    Hi,experts,
    i need to enter work time in operation tab pages of maintenance order followed by two decimal digit like 2.55 mint or 2.65 H.System is not allowing to enter two or more than this decimal digits,it is allowing upto only one decimal digit like 1.5 H,2.3 min etc.How can I enter value like 2.56 min.Client is not accepting to enter after converting the unit.this is required for one of my specific scen.please suggest how I will enter 2.55 min or 2.55 H etc.thanks in advance.
    rgd
    rajib

    As standard the field is set to 1 decimal place.
    You cannot change this value without modifying your system (not recommended)
    I think you can enter more decimal places in the confirmation documents e.g. IW41
    PeteA

  • Default Value in Operation Tab for Work and Numbers

    Hi All,
    When i save maintenance order, Work and Number column in operation tab defaulted with values as 2 & 1. Due to this duration is 2HR.
    Calculation key is set as Calculate Duration in configuration.
    Any Idea how Work and Number column in operation tab defaulted with values as 2 & 1 ??

    Sunil,
    This is not standard..
    Go to the Planning tab and click on the <SELECT ALL> button to see if any task lists have been automatically assigned. If so, then have a look at user-exits IWO10020/21.
    In addition to the checks above, also check if you are using transaction variants or GuiXT.
    PeteA

  • Work/duration in the operation tab of PM order

    Dear all,
    Why earliest finish - earliest start is not equal to duration but equal work in the operation tab?
    The work is the total number of hours for the operation. The duration is the hours per person.
    work = duration * number
    If the work is done by two Electricians together ,I think it should be equal to duration.
    If the work is done by two Electricians one by one ,I think it should be equal to work.

    Does it relate to the work center formulas which is filled in the scheduling tab if work center? ...

  • Work Order field define and display in Operation TAB

    I have a question about the user field define in work order's operation:
    I define the user field in the standard IMG for operation's Enhancemen use. but the field can only display in the operation's details' Enhancemen Screen. 
    What I want is the User field can display in the Operation list screen.
    BTW:what does the Equipment numnber in Operation TAB 's   meaning
    thanks  a lot

    Duplicated [here|Work Order field define and display in Operation TAB;

  • How to use WCM for a maintenance order ?

    HI friends,
         Can u please tell the steps how i should use WCM in a maintenance order?
    Regards,
    M.Alagesan

    Hi Alagesan,
    To use WCM in Maintenance Orders, you should have activated either a Standard or Enhanceed Model Architecture for the Planning Plant in SPRO. (SPRO>PMCS>WCM--> Master Data --> Architecture)
    Also you should Activate WCM for Maintenance Orders (SPRO>PMCS>WCM--> Approvals)
    Then the Reference Object you are using for Order creation should have the Permit(Approval) used above assigned to it & Auto Proposal should be checked.
    When you create a Order on such Equipment, WCM will get activated Automatically. Also you can activate using Operational Control key of WCM.
    If Standard Model the Flow is Order --> Work Clearance Application --> Work Clearence Document. Release Permits in Order and proceed to Tag in WCD. Then Release the Order for Execution.... and so on.
    If Enhanced Model the Flow is Order --> Valuation --> Work Approval --> Work Clearance Application --> Work Clearence Document. Release Permits in Order and proceed to Tag in WCD. Then Release the Order for Execution.... and so on.
    Regards,
    MLN Prasad

  • Maintenance order - Copy header long text in first operation.

    Hi gurus,
    I have the following requirement I dont know hoy to solve it.
    In our system, there is a certain maintenance order class for corrective operations. During creation, the short text in order header is transferred automatically to the first operation one.
    But this behaviour doesn´t works with long text, although for each operation there is the possibility to enter a long text.
    Any ideas? Thanks in advance.

    Hi Ole,
                This is the standard Behaviour of the system as the system is designed to make sure that there are some Operation maintained in the Operation Tab, and if not maintained then copy the Header Text, that too for the Short Text only.
    please make sure that you are calling the Task List or maintaining the operation in the Operation Tab.
    Hope it helps you.
    regards,
    yawar Khan

  • Block production work center during maintenance order

    Dear Experts,
    iam trying to do the integration between PM and PP, I want to block the production work center from any production order  when there is any maintenance order opened for a certain equipment which is inside this  work center ,
    till now i did the following:
    1) the production work center is now inside the equipment location tab
    2) when i open any maintenance order i put system condition as zero
    now what i only achieved ,
    - in transaction CM25 the capacity is black for the period of the maintenance order
    BUT the work center is not blocked and any production order can be created without any error
    please help and much thanks in advance
    Best Regards

    Hi,
    Till time you have performed right things to integrate PP-PM & system is also responding according to setting.
    Showing block capicity in CM25 against the Maintenance Order.
    If you want to block production order as well, you need to do one more setting.
    go to t- code OIOI, selection Production order types (those you want to block) & in capacity Availabilty choose Collect conversion as 3 : No creation if there is insufficiant caacity.
    i hope this will definately solve your problem.
    - Yatharth

  • Can User Exit works for Settlement Rule in Maintenance Order creation?

    Dear Experts,
    I have this situation where I tried to create an Internal Maintenance Order via IW31 for multiple equipments from different functional location (different cost centers) using the Object List.  However, the settlement rule has a problem to pull out as there's no Equipment in the reference object. That's the reason, I'm looking at the User Exit which I understand the IWO10027, can do the work.  Since I'm new to User Exit, can I enhance the settlement rule by the following condition.
    The costs spent on each equipment will be used as a basis of calculating the weightage (via equivalence no) for the settlement rule.
    Can it be done that way?
    regards,
    Abraham

    Sanjay,
    This data can be checked in the following user-exits:
    COZF0001: Change purchase req. for externally processed operation
    COZF0002: Change purchase req. for externally procured component
    PeteA

  • How to customize standard text in operation tab of PM order

    Hi everybody,
    I am Rajat.
    I have question in SAP PM:
    In operation tab of PM order we have standard text, rt now i m using fresh system...kindly let me know how to enter values in that so that when i take drop down i'll see those values.
    Kindly reply with the path, for customization and t-code or path for master data both.
    Thanks
    Warm regards
    Rajat

    and IMG path - plant maintenance and customer service - maintenance and service processing - Assign standard texts for short message to order types
    Thanks
    S.N

  • Why has "Pin as App Tab" command disappeared when I right click on a web site?

    Very much like FF4 and especially App Tabs. Today when I relaunched FF (1) App Tabs have disappeared (I have been reading how to keep them when I reopen FF) and (2) I no longer have a "Pin as App Tab" command when I right click on a web site I want to pin. Anyone got any clues? I am wondering if there is a conflict with Cooliris?

    Start Firefox in [[Safe Mode]] to check if one of the add-ons is causing the problem (switch to the DEFAULT theme: Tools > Add-ons > Appearance/Themes).
    * Don't make any changes on the Safe mode start window.
    See:
    * [[Troubleshooting extensions and themes]]
    If it does work in Safe-mode then disable all extensions and then try to find which is causing it by enabling one at a time until the problem reappears.
    * Use "Disable all add-ons" on the [[Safe mode]] start window to disable all extensions.
    * Close and restart Firefox after each change via "File > Exit" (Mac: "Firefox > Quit"; Linux: "File > Quit")

Maybe you are looking for

  • How do I add multiple contacts in a category in mail

    How do I add multiple contacts in a category in mail so I don't have to add them one at a time when I receive an email with multiple recipients in the CC? Thanks in advanced, Bill

  • In mail attachments are not deleted even though mail is deleted

    In mail attachments are not deleted even though mail is deleted

  • Is anyone having trouble with vocal glitching in playback?

    Listening back to vocals with the full band, one vocal track sounds weirdly garbled/distorted (almost auto-tuned sounding, not over-driven). But when I listen to it "solo," it sounds normal. This only happens on certain tracks and I can't seem to fix

  • Connecting MIDI controller via USB

    Does anyone know how to connect a Roland SH-201 to a MacBook Pro via USB to use as a midi controller in Logic Express 8. I've installed the SH-201 driver, however I am getting a warning saying it is not compatible with an Intel based Macbook. Just so

  • Valuation of Foreign Currency

    Hi Experts, I have already performed the needed configuration prior to the execution of foreign currency valuation in FAGL_FC_VAL. Exchange rate were also maintained in OB08. I tried to simulate the report using key date 08/01/2014. However, there ar