We want the Engg BOM ( usage 2 ) to be exploded in Production Order.

Hi Gurus,
We want the Engg BOM ( usage 2 ) to be exploded in Production Order.
Please let us how this could be done.
Regards,
Ram

Dear Ram,
1.Check what selection ID is maintained in OPPQ for the plant for BOM selection.
2.For this selection ID set the first priority to Engg BOM for BOM usage - 2 in OS31.
Check with this and revert back.
Regards
Mangalraj.S

Similar Messages

  • Print indicator assigned to the MM movement type 101 F ( GR for Production Order )

    Hello!
    I'd like to know how to assign a print indicator to the movement type GR for Production Order 101_F
    When I use the IMG path : Material management/ Inventory Management and Physical Inventory/ Print Control/ Maintain Print Indicator for Goods Receipt Document, I can only assign the movement type 101 (Goods receipt) but not the movement 101_F.
    Thank you for your help!
    Charlotte

    Hello Dev!
    The movement 101 F is Goods Receipt for Production Order. The letter "F" corresponds to the movement indicator.
    I'd like to dissociate the movements types 101 and 101_F to have only one printed label.
    Regards,
    Charlotte

  • Want to change BOM usage from production 1 to design 2

    Dear Experts ,
                               Is it possible to change BOM usage from production 1 to design 2 ? Any mass change T code ?
    Neal

    If I make BOM universal , I need to ,make alternative BOM as Engineering BOM will have several levels and production BOM has all the components and assy on single level .
    MRP might pick up wrong BOM .
    Is there any T.code by which we can make mass copy or change BOMs . AS in system there are many BOMs which needs to be copied as is with new usage .
    Neal

  • BOM Selection Mandatory while creation of Production Order

    Hello Friends,
    I would like to know that is there any option other than production version which makes it mandatory to have valid BOM must for creation of Production order / coversion of planned order to Production order.
    I have tried with Production version option but it doesnt throw any error in case BOM with inactive status has been selected in it & also Production order gets created & released.
    Before going for user exit / enhancement option, I just wanted to ensure that it is not possible with standard SAP.
    Kindly share your views on the same.
    Your urgent replies will be highly appreciated.
    Regards,
    Tejas

    Hello Tejas,
    I think this is standard SAP Behaviour.
    Try with following exits:
    PPCO0018
    PPCO0012
    Also check out the following link:
    [How To Make BOM Mandatory while creating Production Order;
    Regards,
    Vinod

  • At the time of confirmation Costs are loaded to Production order

    Dear All,
    At the time of confirmation of the Production orders the costs are not
    debited/loaded to the Production order. They are not
    credited to the cost centers although all the necessay master data (Work
    centers, Cost centers, cost rates ) is there in SAP.
    Please help me..
    Regards
    janardhan

    >
    Janardhan CH wrote:
    > Dear All,
    >
    > At the time of confirmation of the Production orders the costs are not
    > debited/loaded to the Production order. They are not
    > credited to the cost centers although all the necessay master data (Work
    > centers, Cost centers, cost rates ) is there in SAP.
    >
    > Please help me..
    > Regards
    > janardhan
    Janardhan,
    1. Check whether the operation is assigned with Costing Relevancy Indicator and has a control key relevant for costing.
    2. Check whether in the routing the activity type is seen and it has some standard values maintained.
    Regards,
    Prasobh

  • Assembly indicator in BOM doesnu2019t consider BOM Usage

    In a business scenario we are using two types of BOM 1. Production BOM & 2. Engineering BOM.
    Letu2019s say for Material 'A' there is an engineering BOM & it consists of two components say 'B' & 'C'.
    Material 'C' has its own BOM but with usage "Production".
    Still in transaction CS03, when we display Engineering BOM (Usage: 2) for Material A.
    Assembly indicator for material 'C' is active though there is no engineering BOM for material 'C'.
    Is there is any condition for checking BOM usage for assembly indicator? Or what can be the solution to take into consider BOM usage.
    PP gurus please help.
    Many thanks in advance.

    Hi Sumedha
    BOM usage defines the area (such as engineering/design or production) where a BOM can be used.
    when ur material A is having C as component and C is having its own bom so it will show that in the system. bom usage is only for using the bom in diffrent area
    if u have an engineering/design BOM and if u want to use that in production that time it will give an error
    or massage that BOM usage is not as per requriement
    hope u got it
    regards
    Sachin

  • Sales bom usage

    can some one explain me where sales bom is uned.
    is there any  chance  where we can use it in a production process.

    Hi,
    While using the material in each dept. the usage differs so for that sap provided this function. for sales bom is used only sales and also that material already exist in the plant. and mm bom the material has to procure from the some third party that all functionality will control throgh the maitaning bom usage.
    You can use OS20 T code for the usage.
    Refer this thread also,
    https://forums.sdn.sap.com/click.jspa?searchID=16427620&messageID=4368923
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Sep 18, 2008 11:16 AM

  • BOM Usage and Sales order BOM

    Can some one bring our the difference between BOM usage in the creation of a material bom and a Sales order BOM - To be more specific, when you are creating a BOM using the tcode cs01, I get a field called BOM usage where I can select it as 5 and define it as relevant to Sales and Distribution. I can also create a BOM which is Sales order specific using CS61 tcode. what is the difference between the two? When will the bom created using CS61 explode and when will the other one explode?
    Thanks for your reply in advance....

    Hi
    while using the material in each dept. the usage differs so for that sap provided this function. for sales bom is used only sales and also that material already exist in the plant. and mm bom the material has to procure from the some third party that all functionality will control throgh the maitaning bom usage.
    further your explanation i give below info.
    Text
    BOM Usage
    Definition
    This key defines the area (such as engineering/design or production) where a BOM can be used.
    Use
    By setting various indicators, you can define the maximum configuration of the item status and define whether an item must be or cannot be processed in a particular area (such as production).
    Examples
    A material is used in the areas production and costing in a company. For each area, you maintain a separate BOM with different items:
    Production BOM:
    This BOM contains items that are relevant to production. These items are copied to the planned order. Dependent requirements are generated for them, and they are copied to the production order.
    Costing BOM:
    This BOM contains items that are relevant to determining the material costs of a product.
    When you calculate production costs using a quantity structure, the system automatically determines the BOM and all the BOM items that are relevant to costing, in order to calculate manufacturing costs.
    pls find the config table which will give u clear picture about bom usage.
    STLAN     PMPFE     PMPKO     PMPKA     PMPRV     PMPVS     PMPIN     PMPER     ANTXT
    1     +     .     .     -     -     -     .     Production
    2     .     +     .     -     -     -     .     Engineering/Design
    3     .     .     .     .     -     -     .     Universal
    4     -     -     .     -     -     +     .     Plant Maintenance
    5     .     .     +     +     -     -     .     Sales and Distribution
    6     .     .     +     .     -     -     .     Costing
    7     .     -     .     .     -     -     -     Empties
    8     -     .     -     -     -     -     -     Stability Study
    M     .     .     .     .     -     .     .     External Munitions Display
    Z     +     .     +     +     -     -     .     Rebranding Sales BOM (1:1)
    Thanks
    Regards
    Hari Shankar

  • Mass Realease of Production Order of BOM Item Multi Level

    Dear Gruru,
          I have one requirement from client, if i release fert or halb production order then it will relaese all order as per BOM.
    how it's possible, what are setting required for this. i used sp proc 52 for all materials in bom. in this some material are serilized & non serilized also.
    Please help me,
    Best Regards,
    Dev

    Dear,
    I understood that you are expecting the full cycle for special procurement key 52. See the below steps for the same.
    1.     For your SFG good you have to set the SPK 52 in MRP 2 material master. This has to done for all SFG goods.
    2.     SPRO Settings t code OPJH
    If the indicator set and not set ( Collective order with automatic goods movements)
    You always set this indicator if you want to treat production orders that are linked to collective orders in the same way with respect to costs as production orders that are not linked to collective orders.
    If this indicator is set and if you have used the special procurement key for the secondary requirements of a material to be produced to define that a collective order is generated then there are automatic goods movements between the production orders in a collective order. This means that a subordinate production order delivers the material he produces to stock. At the same time as the goods receipt posting a goods issue posting is made for the superior order. When the goods movement is
    posted
    costs are credited from the subordinate order
    costs are debited to the superior order
    If this indicator is not set then, in the case of collective order processing, there are no goods movements between the individual
    Production orders. The costs collected for each order are then settled
    to the superior order in period-end closing.
    These are the main steps if you have any query, donu2019t hesitate to revert.
    regards,
    ganesh

  • Document Flow from BOM to Production Orders

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    I have three documents. One is attached at the BOM header level under the documents tab. The second with item category D is entered as a line item in the BOM Items. The third is in the Item Level under the item's documents tab in the item details. All have same document type.
    When I create the production order the second document is copied in the document overview of production order. First and Third are nowhere to be seen.
    Is there any config or user exit to achieve the same?

  • Document Flow to Production Orders from BOM

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    Dear Geravine,
    You can use a Production Scheduling profile to specify that in a production order or process order
    particular business transactions are carried out in parallel
    generation of document link from material master on order creation
    generation of document link from BOM on order creation
    generation of document link from material master on order release
    generation of document link from BOM on order release
    Include the check boxes for Document links for material and BOM both under order creation and order release.
    Check in T Code OPKP.
    But in my understanding only the document that are attached to the header and the items with D category alone gets
    transferred to the production order.
    Regards
    Mangalraj.S

  • Add a new component in Production order while not being in BOM

    Hi all,
    I would like to know how to forbid the addition of a new component in a Production order that doesn't exist in the BOM.
    Currently when we create a Production Order, the components of its materials are read from the BOM. If we add a component that doesn't exist in the bom the system allows it without any problem. We want to forbid this and let components be added to a PO only when they take part in the BOM.
    Any idea?
    Thanks in advance.

    SS,
    You can use an userexit to check before saving the order, based on the BOM(Order master data tab) used in the order, it should validate the component material number. If it finds a new material in the order, it should terminate the save with a message to user.
    The following enhancement is available for production orders:
    PPCO0008  Enhancement for adding and changing components
    This enhancement is used to check components (for instance against a standard parts database), which have added to or changed in an order. This check can then refuse to copy a component into the order or can replace one material number with another.
    The enhancement PPCO0008 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOMK_006
    Enhancement for adding and  changing components
    Activities
    1. Create the enhancement
    To do so, create a new project or use an existing project.
    2. Activate the project.
    The enhancement can only take effect after you have activated the project.
    Regards,
    Prasobh

  • Production Order BOM...

    Hi,
      I am trying to get the associated BOM with a particular Production Order. I was told to use the FM 'CS_BOM_EXPL_MAT_V2', but that gives the material BOM. Is there any FM or BAPI that I can use to get the Production Order BOM? Thanks,Sagar.

    hi ,
    Thanks for info ,have u heard of BOM usage ? like 1 for production / 5 for sales bom .So When u creating the production order Sap will explode BOM of the FG material , So there is no BOM that is only for production order.
    But i will agree with ur problem , what is user can delete Some materials in the Final Confirmations of Production orders So to resolve this issue USE table <b>RESB </b> with RSNUM of AUFK-AUFNR.
    correct me if i am wrong.
    Regards
    Prabhu

  • Batch Determination in Production Order Component Overview Screen on the basis of FIFO, Thickness, Grade, width etc.

    I am facing a difficult scenario. Pl. help me out. In my Business Process I am assigning Batches in Production Order Component Overview Screen. Here I am assigning relevant batches to BOM Components manually, My Management want SAP to suggest batches automatically on FIFO basis, thickness, grade, width & first batches should automatically assign to Production order.  Can you pl. tell me how to configure this scenario.
    Or can I pull stock overview screen at Production Order Component screen to assign relevant batch to BOM Components
    Once batches assigned in Production Order component screen cannot be changed. It can be changes by specific persons only.

    Hi,
    Automatic Batch Determination for production order components is possible by configuration.
    You can also refer below discussions to map your scenario.
    Batch determination in production order | SCN
    Automatic Batch Determination in Production order
    Regards,
    Naresh

  • To see the cost of production order  after settlement to header material

    hello guys,
       In make to stock,we settle the total cost of prodution order on header material,right(if we keep as the default rule( distribution rule in order type)?
         If i want to see that cost of production order which we settled against the header material,where should i check it?should i check in material account or somewhere else?
             Thanking you guys in advance.

    Dear,
    There is a little missunderstanding in your thought.
    If the material of price control S, When you do the GR, the STD cost of material is deducted from production order cost, then when you settle the production order, the variance is settled to variance account/PD account. hence the production order cost balance is zero.
    Example- Production order cost is 60000
    After GR the production order cost balance is 60000-50000 = 10000.
    After settlement production order cost balance is zero.
    Now your question is where can i see the production order cost?
    You can see the production order cost in the production order itself.
    In the production order...cost disply option just filter the origin with test settlement and GR.
    Then total up the cost, then you can see the cost as 60000.
    please come back if you need more help.

Maybe you are looking for

  • Slideshow with Videos and Pictures

    Hi! I am trying to make a slideshow with photos and various short videos interspersed among the photos. I have a customized playlist for the slideshow so that there is music playing when the photos are being shown. My problem is that the music contin

  • Problem with Applications folder

    In trying to put my photos on to a flash drive, all the pictures ended up in the "Applications" folder.  I tried the restore from time machine but could not succeed.  Is there a way I can correct this problem?

  • How do I remove facebook birthdays from my calendar in ios 7?

    I have been unable to remove facebook birthdays from my iphone 5 calendar. My contacts haven't been synchronised, only my calendar? I have deleted the app, signed out from it, nothing seems to work. Can anyone help?

  • Tomcat 3.3, Cocoon 1.8.2. util.xsl not found

    Hello, Once I installed Tomcat and Cocoon, I wanted to test my installation by loading up the Cocoon information URI : http://localhost:8080/cocoon/Cocoon.xml Problem: java.lang.RuntimeException: Error loading logicsheet at file://org/apache/cocoon/p

  • ITunes 11.0.4 - high CPU use

    Hello, since I upgraded to Mountain Lion 10.8.4. and iTunes to 11.0.4 a couple of days ago, iTunes keeps fooling around using up to 130% of my CPU (how is that even possible?!) when playing music. As soon as I pause the music, the CPU-use goes back t