What are the  configurations in which late 2012 rMBP13 can drive a 4K monitor?

Hi,
I couldn't find any confirmed report anywhere of using a 4K monitor with late 2012 rMBP. Can anyone please confirm whether this is at all possible? I am looking to buy the new Dell UP2414Q in particular.

I don't think that MacBook drives a 4K display. Nor the 2013 version either. Apple 30" display size max:
Graphics and Video Support
Intel HD Graphics 4000
Dual display and video mirroring: Simultaneously supports full native resolution on the built-in display and up to 2560 by 1600 pixels on up to two external displays, at millions of colors
MacBook Pro (Retina, 13-inch, Late 2012) - Technical Specifications
I don't think the Dell goes faster than 30Hz -- be sure you see one working before you buy. Old British broadcast TV at 50 Hz used to drive me nuts, so I can't imagine watching stuff at 30Hz.

Similar Messages

  • What are the configuration steps required ?

    Hi
    Gurus,
    Client requires:
    "We have construction going on at our warehouses and the projects are going
    to take about a year.  We need to track retainers on the payments we make to the contractor. 
    Payments are due in a couple of weeks and it is a priority to monitor progress on the construction."
    Example:
                                                                    GL Account#         
    Debit  Construction In Progress                      122000          100%
    Credit  Vendor                                                601095            90%
    Credit  Accounts Payable / Retainage            202000            10%
    At this time we have a request for a solution to process what is necessary
    to compile with the following scenarios.
    what are the configuration steps required.
    Thanks
    Anil

    Hi,
    Whether the contractors are treated as one time vendors or regular vendors. If you have to create new account group for subcontractors
    Does only one account group related vendors need the retainage analysis or for all the vendors. Will be mainly the general contractors at each location  One group is sufficient even they are at different location you can maintain the same in REGION
    Does only single partial payment exists and the remaining due amount to be treated as due on a particular date or multiple payments exists against the same invoice. The 10% must accumulate in a liability account over the life of the contract and is paid at the end. There may be multiple of payments which you need to knock off against the service entry sheet(study above reply)
    The construction cost which is treated as outstanding to Vendor to be exclusive of the cash expenditure made for such construction. Yes, but the entire 100% needs to debited to CIP Until and unless the work is not completed so how you can treat as outstanding payment to vendor. If you want you can maintain a provision for this
    Check with above and above replies.
    Regards,
    Sankar
    Edited by: Durgasankar.Innamuri on Jul 29, 2010 10:17 AM

  • What are the  configuration tht pi administration have to perform

    hi friends
      i am new to pi can any one help me what are the  configuration tht pi administration have to perform and post installation to be done after installing pi in stand alone box?
    plz help
    thnks
    ravi

    Hi,
    This might help you
    /people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    https://websmp101.sap-ag.de/~sapidb/011000358700009389172004E.PDF
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    http://help.sap.com/saphelp_nw04s/helpdata/en/78/f59442062bcd6ae10000000a155106/frameset.htm
    http://help.sap.com/saphelp_nw2004s/helpdata/en/49/9dd53f779c4e21e10000000a1550b0/frameset.htm
    Regards
    Agasthuri Doss

  • What are the configuration need between R3 and XI when we use RFC sync adap

    hi,
    What are the configuration need between R3 and XI when we use RFC sync adapter.
    Regards
    siva.

    if its the sender adapter ref:
    RFC adapter
    Sender- /people/michal.krawczyk2/blog/2005/03/29/configuring-the-sender-rfc-adapter--step-by-step
    Receiver;
    http://help.sap.com/saphelp_nw04/helpdata/en/c8/e80440a832e369e10000000a155106/content.htm
    Also;
    trouble shooting rfc/soap -
    /people/shabarish.vijayakumar/blog/2008/01/08/troubleshooting--rfc-and-soap-scenarios-updated-on-20042009

  • WHAT ARE THE FORMS (SCRIPTS) WHICH ARE NOT PROVIDED BY STANDARD SAP?

    WHAT ARE THE FORMS (SCRIPTS) WHICH ARE NOT PROVIDED BY STANDARD SAP?

    Hi Pravin
    For a beginner in CRM - Sales would be a right choice to understand how CRM behaves when integrated with backend R/3.
    Still as far as CRM goes, most of the components are not exposed to their fullest potential and that is why its not outshining the competitors in market.

  • What are the configuration changes required to deploy OEM from one VM host to other?

    Hi,
    I have oem setup on one host and corresponding database is on another host. Now i want to deploy both EM and database setup on another host, so what are the configuration changes required to run the setup.

    Check this link, this may be helpful
    http://docs.oracle.com/cd/E25178_01/doc.1111/e24473/ha_outages.htm

  • What are the modules in which we can create a party site?

    Hi Gurus,
    I would like to know, what are the modules from which we can create a party site.
    Please repond.
    Thanks,
    Venkatesh

    Hi,
    There can be numerous modules which create party sites , Leads/Quotes/Order/Recievable/HR/IB/ISupport etc.
    Actual number of modules depend on the kind of implementation.
    Run this query in your Oracle instance , to get an idea of various modules which has created Party sites in your system.
    SELECT meaning,
    description
    FROM fnd_lookup_values
    WHERE lookup_type = 'HZ_CREATED_BY_MODULES'
    AND lookup_code IN (SELECT DISTINCT created_by_module
    FROM hz_party_sites)
    -Idris

  • What are the pros and cons of a solid state drive for imac?

    What are the pros and cons of a solid state drive for imac?
    I wonder if the SSD is good for replacing a failing hard drive?

    However they are dramatically faster than magnetic disk drives, useful for startup and shutdown and frequently accessed apps and fi.e

  • What are the different types of bind that we can use to configure COREid?

    Hi
    What are the different types of LDAP bind that we can use to configure COREid?
    Thanks for your input.

    (http://download-west.oracle.com/docs/cd/B28196_01/idmanage.1014/b25343/idconfig.htm#BABGAECB)
    7.5.2 Creating an LDAP Directory Server Profile

  • Freight Material why it is required and what are the configuration?

    Hi experts,
    My clientsu2019 requirement is they want freight material to be configured in DIEN material type? I want to know why they want this and what are the steps to configure it apart from material master
    Plz need your help
    Thanks
    Krushna

    Hi experts Please need your help

  • There are many jre exe files: what are the differences and which I choose?

    Having some problems, that I will describe in another message, I was looking for the latest jre.
    I saw that on www.java.com there is 6 update 1, whereas on www.sun.com there is already 6 update 2. So, I would like to know when an update is made available on www.java.com and through automatic updates?
    Also, I saw different names, and I would like to understand in an exact way what are the differences:
    jre-6-windows-i586.exe;
    jre-6-windows-i586-iftw.exe;
    jre-6u1-windows-i586-p-s.exe;
    jre-6u1-windows-i586-p-iftw.exe;
    jre-6u2-windows-i586-p.exe;
    jre-6u2-windows-i586-p-iftw.exe;
    I understand that te iftw part means the it is a small download, only the setup module. But why there are some files that end with "-p", some with "-p-s", sm with "-i586"?
    Thank You
    Rodolfo Giovanninetti

    The question mark icon on the dlls indicates that LabVIEW is unsure of
    the location of the DLL, or is unable to locate the DLL on your
    system.  This can happen if the DLLs do not exist, or if the "Call
    Library Function Node" just specifies the name of the dll, and not the
    entire path to the dll.  IVI and Instrument driver VIs will
    typically not supply the entire path to the DLL, whch would cause the
    question mark icon to appear.
    If your application is working properly, then you should ignore the
    question mark in the dependencies list.  If your application is
    broken because the DLLs cannot be found, they are installed with the
    following drivers:
    ivi.dll is installed with the IVI compliance package, which is available at the following link:
    Drivers and Updates: IVI Compliance Package
    You should also install the latest version of NI-VISA, which is required by the IVI Compliance Package:
    Drivers and Updates: NI-VISA
    ag3325b_32.dll is installed with the your instrument's IVI driver, which can be found below:
    Agilent 3325b Instrument Driver
    Jason S.
    Applications Engineer
    National Instruments

  • What are the new things which I can do with developers accounts

    My father has an developers account and I don't  know what are the things the developer has? Can any one list the new feature of developers account

    Have you tried looking here:  https://developer.apple.com ?

  • What are the configuration steps for cheque process

    hi,
    sap gurus,
    what are the steps for cheque process if our customer wanted to pay by the mode of cheque.
    regards,
    balaji.t
    09990019711.

    Hi,
    Kindly go to OVFD where in you will have to create a new payment procedure if it's not there in standard SAP. Then, you will have to assign this new payment guarantee procedure in customer in sales area data>billing document screen. As far as standard SAP is concerned you will be able to assign the payement by cards in customer master, but for DD process I think you will have to create it.
    Hrishikesh

  • What are the different kind of parameter/attributes we can set in  XI ?

    Hi  Experts
        Yesterday i have attended an interview ....one question was
        1) What are the different knid of parameters we can set in XI ? Have done ?
            what and all the cases we will set the parameters/Attributes?
    and one more was
       2) How will you do Stress testing in XI ?
    Awaitng for responses
    Adv thax and regards
    Kiran lvs

    Hi,
    1) What are the different knid of parameters we can set in XI ? Have done ?
    what and all the cases we will set the parameters/Attributes?
    -First you should ask in which stage or where do you want to configure parameters ,i mean  Whatever parameters we can set in XI all comes under this question like all sort of Adapters,each of adapter can have its own set of configuration , configuration parameters,XI admin config parameters.. etc..
    and one more was
    2) How will you do Stress testing in XI ?
    In general stress tesing will be done by testing team
    Stress testing by way of sending more messages and performance also
    see the below links
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/3a67c790-0201-0010-89aa-d27d97dd1374
    Rules of thumb on size of messagetypes in XI
    /people/sravya.talanki2/blog/2006/02/28/simulating-xi-messages-proto
    Measure Performance
    Regards
    Chilla..

  • What are the pin connections from 7764 to stepper motor drive

    what are the pin connections from UMI 7764 to stepper motor drive? I use PCI 7340 controller. Third party driver  is not branded, but assembled.  It has 3 inputs, one for (A,A/) one for (b,b/) one for enable, apart from ground pin.

    Dear enigmata,
    Here is a link to the UMI Manual that describes the signal connections:
    http://www.ni.com/pdf/manuals/321941b.pdf
    What you really need is the documentation for the input of the "translator" mentioned on the left side of the last diagram you posted. It is still not possible to tell which of you drive inputs correspond to step and direction (or CW, CCW) because in the circuit that you posted, these signals have already been converted by other circuitry in the drive to the A, A/, B, B/ output signals for the stepper motor.
    I agree with Jochen: Without the documentation you will need to test it out as he described in his last post.
    Best Regards,
    Nate Holmes
    National Instruments

Maybe you are looking for