What are the settings to make a iMovie export that isn't out of focus?
I'm stringing together my stills in iMovie 6 but when I go to export it's always out of focus no matter what the settings. It looks good on the computer inside iMovie.
Thanks for wading in.
The photos are coming from iPhoto. That makes them JPEG 1944 X 2592. Nothing exotic.
I've used a variety of settings trying to get it right, 320 x 180, AAC, H.264 or the "CD" settings at export, 1920 x 1080 Integer, Mpeg-4 video. I've tried almost everything except "Full Quality" which makes a file too large to send anyplace.
The funny thing is I didn't seem to have this problem before. Either the project was smaller or I've messed up my settings somehow. I'm not the type to fiddle inside the settings. "If it ain't broke don't fix it."
Any ideas anyone has are appreciated.
D.
Similar Messages
-
anyone know how to get mail to show the photos back to you?
ex: send pictures to friends, they reply w/ comments, but have no idea which pictures they are commenting on because they do not sho up in a reply.
thanks for your helpDid you ever get a reply to this. I have the same problem. I have the same problem when even when I reply to an email... no photo shows up in my new reply message. The only way I have figured out is to use the "forward" option.
But this still does not solve the problem when people email me back... I have no idea what photo they are speaking of. Instead of a photo... there is a <photo name of some sort>.
Let me know if you ever hear on this one.
Many thanks. -
Problem:
- What are the settings required to block a particular IP to make connection on particular port no running on another IP?
Environment:
Operating System : - Windows XP Service
Pack 1
System type : - 32 – bit Operating System
Description: - We
have requirement to block Port access from particular IP. It is specific requirement for a machine.
We have service which is running on
Server with IP: - 10.14.15.116 on
Port Number 3366 and we need to
block Client Machine IP: - 10.14.15.114 to make
any connections with server on this port. Not even client machine
should be able to telnet on server on port 3366.
I
will be really thankful.
For any kind of input which can assist us to complete the requirement.Does it allow in same way with firewall setting in Windows Server 2008?
I will read in details shared link, but as a matter of urgency; kindly let us know, if we can follow some concise instruction to do above activity.
I
will be really thankful -
What are the settings for datasource and infopackage for flat file loading
hI
Im trying to load the data from flat file to DSO . can anyone tel me what are the settings for datasource and infopackage for flat file loading .
pls let me know
regards
kumarLoading of transaction data in BI 7.0:step by step guide on how to load data from a flatfile into the BI 7 system
Uploading of Transaction data
Log on to your SAP
Transaction code RSA1LEAD YOU TO MODELLING
1. Creation of Info Objects
In left panel select info object
Create info area
Create info object catalog ( characteristics & Key figures ) by right clicking the created info area
Create new characteristics and key figures under respective catalogs according to the project requirement
Create required info objects and Activate.
2. Creation of Data Source
In the left panel select data sources
Create application component(AC)
Right click AC and create datasource
Specify data source name, source system, and data type ( Transaction data )
In general tab give short, medium, and long description.
In extraction tab specify file path, header rows to be ignored, data format(csv) and data separator( , )
In proposal tab load example data and verify it.
In field tab you can you can give the technical name of info objects in the template and you not have to map during the transformation the server will automatically map accordingly. If you are not mapping in this field tab you have to manually map during the transformation in Info providers.
Activate data source and read preview data under preview tab.
Create info package by right clicking data source and in schedule tab click star to load data to PSA.( make sure to close the flat file during loading )
3. Creation of data targets
In left panel select info provider
Select created info area and right click to create ODS( Data store object ) or Cube.
Specify name fro the ODS or cube and click create
From the template window select the required characteristics and key figures and drag and drop it into the DATA FIELD and KEY FIELDS
Click Activate.
Right click on ODS or Cube and select create transformation.
In source of transformation , select object type( data source) and specify its name and source system Note: Source system will be a temporary folder or package into which data is getting stored
Activate created transformation
Create Data transfer process (DTP) by right clicking the master data attributes
In extraction tab specify extraction mode ( full)
In update tab specify error handling ( request green)
Activate DTP and in execute tab click execute button to load data in data targets.
4. Monitor
Right Click data targets and select manage and in contents tab select contents to view the loaded data. There are two tables in ODS new table and active table to load data from new table to active table you have to activate after selecting the loaded data . Alternatively monitor icon can be used.
Loading of master data in BI 7.0:
For Uploading of master data in BI 7.0
Log on to your SAP
Transaction code RSA1LEAD YOU TO MODELLING
1. Creation of Info Objects
In left panel select info object
Create info area
Create info object catalog ( characteristics & Key figures ) by right clicking the created info area
Create new characteristics and key figures under respective catalogs according to the project requirement
Create required info objects and Activate.
2. Creation of Data Source
In the left panel select data sources
Create application component(AC)
Right click AC and create datasource
Specify data source name, source system, and data type ( master data attributes, text, hierarchies)
In general tab give short, medium, and long description.
In extraction tab specify file path, header rows to be ignored, data format(csv) and data separator( , )
In proposal tab load example data and verify it.
In field tab you can you can give the technical name of info objects in the template and you not have to map during the transformation the server will automatically map accordingly. If you are not mapping in this field tab you have to manually map during the transformation in Info providers.
Activate data source and read preview data under preview tab.
Create info package by right clicking data source and in schedule tab click star to load data to PSA.( make sure to close the flat file during loading )
3. Creation of data targets
In left panel select info provider
Select created info area and right click to select Insert Characteristics as info provider
Select required info object ( Ex : Employee ID)
Under that info object select attributes
Right click on attributes and select create transformation.
In source of transformation , select object type( data source) and specify its name and source system Note: Source system will be a temporary folder or package into which data is getting stored
Activate created transformation
Create Data transfer process (DTP) by right clicking the master data attributes
In extraction tab specify extraction mode ( full)
In update tab specify error handling ( request green)
Activate DTP and in execute tab click execute button to load data in data targets. -
What are the settings required for QM in procurement
Hi Team,
What are the settings required for QM in procurement. I have set indicator for QM in procurement in QM view in material master.
I am not clear about following fields to be maintained in QM view.
QM Control Key
Certificate type
Target QM system
Tech. delivery terms Indicator.
Please suggest me in which case to be used this fiels. Is it relivant to Quality Certificates.
ThanksHi,
All meaning are
QM Control Key :
If you activate the indicator for QM in procurement in the material master record at the client level, you must also store a control key at the plant level for quality management in procurement.
Certificate type :
Certificate types applies to the Certificate processing in procurement & Certificate creation
Target QM system :
whether the vendor's verified QM system, according to vendor master record or quality info-record (for a combination of vendor/material) meets the requirements for QM systems as specified in the material master
- If you activate the indicator for QM in procurement in the material master record at the client level, you must also store a control key at the plant level for quality management in procurement. If you want Procurment control then accordingly define Control Key.
- If you want Vendor's perticular certificate for Material then you have to define Certificate type.
Also, you have to maintain Material, Vendor's Info record at plant level.
Thanks,
JM -
What are the best plug ins for iMovie 11 running on Lion?
What are the best plug ins for Imovie 11 or Imovie HD running Lion? Especially transitions & effects for still pictures.
Thank youHi
For iMovie'08 to 11 - There are no Plug-ins - not supported at all
iMovie HD (in reality HD5) - doesn't work under Mac OS X.7 - at all
iMovie HD6 - can take Plug-ins and run under Mac OS X.7 - BUT some of the Plug-ins doesn't work under X.7
old list on - Plug-ins - Only relevant to iMovie HD6 (May be they are too old)
Stupendous software
www.stupendous-software.com
GeeThree
www.geethree.com
cf/x.
www.imovieplugins.com
Apple
www.apple.com/downloads/macosx/video/ezediapluginsforimovievol1.html
www.imovieplugins.com/fxhome.html
fxStabilizer - for iMovie - Google it
Yours Bengt W -
I wrote an install program (.exe) that is downloaded from a website. When run, it 1) leads a customer to browse to a directory, and 2) copies files (.exe, .dll, etc.) from a website to that directory. When I run, the installed program works.
What are the steps to make it seamless for a customer to use the install program and then use the installed program?
bhs67This site https://msdn.microsoft.com/en-us/library/vstudio/2kt85ked%28v=vs.110%29.aspx provides a basic description of the Visual Studio Windows Installer.
Near the bottom of the page is "You can unlock all the features of InstallShield by paying to upgrade to the full version of InstallShield." Where do I find info that describes the differences between the "free" and the "full"
versions?
bhs67
Hello,
The default feature does support the task for your requirement, so there is no need to pay for the other features unless you want to use some feature which is not free.
In addition, as this thread
InstallShield LE not available with VS 2012 RTM? shared, even through there is a link to InstallShield LE in the New Project dialog under Deployment solutions, but it belongs to third-party that I would recommend you consider posting this issue
at the following forum to get supports about InstallShield.
http://community.flexerasoftware.com/forumdisplay.php?133-InstallShield
Regards.
Carl
We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
Click
HERE to participate the survey. -
What are the settings for iPhone, iPad and iMac to sync ical and contacts?
How can I get all three items to sync? What are the settings on the iMac with Lion on board? I put all my stuff on iphone but iMac & iPad do not have the items synced even though I have everything on icloud?
They're asking a question about carrier settings for their iPhone. I think that has everything to do with Apple.
Maybe they did already ask Straight Talk. I've called Straight Talk before... they're not too helpful.
You know, this forum would be much friendlier if people in this forum would quit squabbling, & posting comedic replies, not too mention name calling (like I did), when people are just needing some help.
It's also frustrating that people stick up for the guy who doesn't help, but rather takes the time to post some smart alec reply. Granted, I shouldn't have name-called... some people just frustrate me when they act like that.
Admittedly, there ARE some grey areas when it comes to carrier questions... but let the moderators do their job when someone is asking innappropriate stuff. And if the mods aren't chiming in, then that's a good indication that what the thread is about IS in fact Apple related. -
What are the Settings for DefaultFreq as YTD...
Hi Experts,
If I want to set “DefaultFreq” as YTD, what are the settings I have to do.
1) In Application profile (Time Periods, View, and Periods).
2) In Scenario (DefaultFreq and Default View).
And also the load data file format.
Pls explain me in detail.
Thanks in advance
SaiHi Sai
1. When you are creating the frequencies in Application profile for MTD, QTD or HYTD Frequency, System Automatically creates the YTD Frequency.
So no need to do any changes for Application Profile.
2. Create a scenario name with YTD, like Actual,Budget...
In Scenario Dimension mention below details.
Member- YTD (YTD is Scenario name)
Description –YTD Scenario
DefaultFreq-YTD
DefaultView-YTD
ZeroviewForNonadj-YTD
ZeroviewForadj-YTD
DefFreqForICTrans-YTD
3. To Load the Data into HFM Select the Scenario: YTD and Period: *[Year]*
Select the Proper POV to load the DATA.
Scenario:YTD
Year: 2012
Period:[Year]
View:YTD
Entity:India
Value:INR
Account:ExtSales
ICP:[ICP None]
Custom1:NOCC
Custom2:NO Cust
Custom3:[None]
Custom4:[None]
Sample Data file
!Data
YTD;2012;[Year];YTD;India;INR;ExtSales;[icp none];nocc;no cust;[none];[none];90000
All the best......
<Font color="Blue">
Regards
Dev
</Font> -
What are the settings for rework order quality inspection
HI,
Iam doing production order confirmation at the GR time some oprations are rejected.that operations i want too rework order CO07 process without GR ,i want to Quality inspection in REWork order.
What are the settings for rework order Quality inspection?Refer beautiful document
http://wiki.sdn.sap.com/wiki/display/HOME/ReworkInProduction -
WHAT ARE THE SETTINGS FOR AN ICLOUD EMAIL ACCOUNT
I am trying to create an iCloud email account on my iPad with IOS 6.0.1
what are the settings for Host name in incoming and outgoing mail servers?the information on that link doesnt work. my icloud address is [email protected] not [email protected].. although i tried both on my galaxy note 2. either way the server information is not verifying.
-
What are the settings for automatic service PO?
What are the settings for automatic service PO?
Hello,
I would like to know if it is possible to automatically create the PR for services. It would be similar to MD04 but instead of being for stockable materials, it would be done for non-stockable materials (services in this case).
PR would be generated monthly, because this services have to be paid every month, for example electricity, water, rent, phone bills.
I hope you can help me, thank you! -
What are the settings for Transport?
What are the settings for Transport?
u will get three panel in transport connection in BW side
here u need to collect object and drop them to 2nd panel
then u need to select whether u want o select all objects or only necessary objects
select as per ur requirement hten u need to write thse object in a NEw request
now executte nad go to Se10 and relaease sub task and main task
now ask basis team to impot it in QAS test it and again trnasport these to Production environemnt.
assign points if helps -
What are the settings for web?
What are the settings for web?
800mbps Quicktime for the web,< </div>
The compression is reducing the number of pixels being shown in order to maintain the bitrate. So rapid motion, which requires nearly all of the pixels to be redrawn, causes things to stutter.
Compression is really, really hard to do. Really.
bogiesan -
What are the settings for verizon email on ipad?
what are the settings for verizon email on ipad? have tried everything must be missing something.
Have you looked here?
https://www22.verizon.com/foryourhome/vzrepair/vziha/requestrepair.aspx?CMP=DMC- CVZ_ZZ_ZZ_Z_ZZ_N_X221
Check: What are my email settings
Maybe you are looking for
-
Posting problems with FM Credit Memos SD-FICA Mess Class FKKFMCHK 018
Hi, We use Funds Management FM, SD and FI-CA, in Public Sector, we are customizing credit and debit memos. Doing testing, we trying to post Credit Memos in FI-CA from SD, but actually system is giving a dump. Initially, we could post some credit mem
-
Takes a long time to select a files when importing files
When I am selecting a files through the import function, it takes a long time (sometimes 5 minutes) for the computer to allow a file to be selected. I have just reformat the drives and did a fresh install of all application. I am running OS 10.4.4 on
-
Where can i find a converter program?
im not sure if this is where to post this question but i need a prgram that can convert video files to ipod formats, but the more formats it can convert the better. i have a video i want to edit in imovie but it isnt the right format, hence i convert
-
Batch Split Items appearing in the billing document
Dear Friends, Batch determination is active in our system. In the delivery there are two main items. 10 and 20 and each has Batch split and the sub items are 90001 and 90002 respectively. Now in the billing document there appears are four items with
-
Help for N900 that randomly reboot and that have s...
DISCLAIMER A moderator deleted an entire thread with details that have helped many many users with N900 phones that are rebooting because they believed we were discussing debranding N900s.. Firstly, the N900 is not branded.. Secondly, we were discus