I have the following question with respect to completed instances, I am using Oracle BPM 11g:
1)How long does the completed instance stay in the system by default, how do we configure this setting?
2)How do we archive the completed or unwanted instances
3)Which database does these instances information are stored.
Regards
Venkat

Hi Venkat,
The SOA Suite is responsible for storing all instances of BPM (active, suspended or terminated).
No more the concept of purging instances that were in version BEA Aqualogic 5x, 6x.
So the records of instances will be stored in the database "forever" until you make a DBA or a purge of data in the database.
More information: http://docs.oracle.com/cd/E17904_01/integration.1111/e10226/soaadmin_partition.htm
Regards,
Paulo H.

Similar Messages

  • Oracle BPM 11g Grab Instace

    Hello BPM Experts,
    Is there any way to grab and abort/reassign the instances in oracle bpm 11g.
    -Srinivas

    In order to grab an instance (or "Alter Flow" as it is known in 11g) keep in mind that the logged in user has to be assigned to the Process Owner role for the project.
    An individual can claim an instance in the Workspace so that only that person can see and work on it. End users can escalate work in their queue specifically to their manager and only their manager. Managers can delegate work in their queue to subordinates. By delegating, they provide the end user the same permissions to edit and approve the task assigned that the manager has. Reassigning work is similar to delegating but it is a way that someone can give the task to someone else who is not necessarily their subordinate. Take a look at the Workspace documentation (http://docs.oracle.com/cd/E21764_01/user.1111/e15175/toc.htm) to get more details on this.

  • Mapping LDAP Role in Building Your First Process with Oracle BPM 11g

    I'm working on "Building Your First Process with Oracle BPM 11g" I'm at the end of step where assigns user for the requester. The problem is in identity lookup, "Realm" is empty for Remote_WLServer.
    Servers are up and running. Demo user community has been loaded - I can see the list of users and groups in the administration server under myrealm. We haven't done much since SOA suite 11g installation. I'm probably the first one who uses this. I wonder we have a missing set up? Can you me what's missing? Appreciate your help in advance.

    I get this error message when I clicked gear icon.
    "Server exception is : Connection refused from server"
    Here is the result of testing Remove_WLServer connection. Does this cause the issue?
    Testing JSR-160 Runtime ... failed.
    Cannot establish connection.
    Testing JSR-160 DomainRuntime ... skipped.
    Testing JSR-88 ... skipped.
    Testing JSR-88-LOCAL ... skipped.
    Testing JNDI ... skipped.
    Testing JSR-160 Edit ... skipped.
    Testing HTTP ... success.
    Testing Server MBeans Model ... skipped.
    Testing HTTP Authentication ... success.
    2 of 9 tests successful.
    I have installed JDeveloper 9i, 10g, and 11g in my laptop. SOA is installed on linux.

  • Oracle BPM 11g

    Hi All,
    I am using Jdeveloper 11g Rel 1. (11.1.1.6.0) with BPM Studio for Implementing Sales Application.
    1) Application File = SalesQuoteLab.jws.
    2) Project File = QuoteProcessLab.jpr
    3) Process File = RequestQuoteLab.bpmn
    I have completed the All the Roles (Sales Rep, Approvers and Contracts) with complete flow.
    In the Business Practices Role (Swim Lane -
    a) I created a Exclusive Gateway Named as (Is Business Practices Review Required ?)
    b) which has sequence flow (Yes) to Human Task Named (Business Practices Review)
    c) I created a new Exclusive Gateway named as (Business Practices Outcome) This Gateway has
    i) Outgoing condition flow (Business Practices Rejected) to Human Task (Enter Quote Details) in Sales Rep. Role.
    ii) Outgoing Unconditional flow (Business Practices Approved) to Parallel Gateway (Approvals ) in Approvers Role.
    Here the Point is :
    When I am Trying to do this step
    "Drag the outgoing sequence flow from Business Practices Review to Business
    Practices Outcome gateway" (Exclusive Gateway)
    I am not able to draw the outgoing sequence flow from Human Task (Business Practices Review) to Business
    Practices Outcome gateway. It denies even when I am clicking the Artifacts --> Sequence Flow Icon from Component Pallete
    or from the tool bars icons - Artifacts --> Sequence Flow.
    Due to this in my second Phase of Simulation Activity, (have completed all the simulation pre-requisites) When I start the Simulation I am getting the following error.
    "Node 'Business Practices Review' does not have any incoming Sequence Flows"
    Please correct me how do I do this step.
    "Drag the outgoing sequence flow from Business Practices Review to Business
    Practices Outcome gateway" (Exclusive Gateway)
    For this I have referred many guides and Tutorial, but none could provide the solution.
    Please response ASAP, awaiting your timely and valuable solution. to the post or to my id : [email protected]
    Thanks and Regards
    Ajaz Ahmed
    Oracle Corporate Trainer / Consultant
    Mumbai - India

    For the Oracle BPM 11g documentation go to http://download.oracle.com/docs/cd/E14571_01/soa.htm for the documentation (look at the "Oracle Business Process Management Suite" section).
    10g and 11g Oracle BPM are vastly different. A couple key differences:
    - 10g runs on Ecllipse and 11g runs on JDeveloper
    - 11g has full access to the SOA Suite adapters natively using SCA
    Dan

  • Oracle bpm 11g Release

    Hi,
    Are there any news about oracle BPM 11g release? When it will be released (I heard early 2010). We are starting a new project and nnewd to decide weather to use version 10g or new features of version 11g.
    Thanks,
    Matej

    Thanks for the links.
    I was not aware of them. I've reviewed them,. They are pretty high level. We are looking for the documentation about integration with other applciations.
    See for example:
    How to listen to instance events in ALBPM
    Thanks,
    Matej

  • JSP Integration with Oracle BPM 11g

    Hi,
    Could you let me know, How to Integrate JSP with Oracle BPM 11g.
    Thanks

    Thanks for the information.
    But i was looking at how to integrate JSP with oracle bpm 11g.
    IN Oracle BPM 10gR3, We will integrate jsp in screenflow. In 11g, I am not sure how will we integrate JSP.
    Could you please let me know how to integrate JSP with BPM 11g. Thanks!.

  • Parametric roles in Oracle BPM 11g

    Hi all!,
    For all of us that was asking how to do the parametric roles in Oracle BPM 11g, here´s how to do it, hope it helps.
    Regards!!
    Z3uV4k
    https://docs.google.com/file/d/0B7YrnfO7h717M2U1MTlmMmEtZjI3Mi00ZTNhLWFhNTQtYzkyZjc5OGI5Y2I4/edit?pli=1

    Might also want to look at a blog post I wrote based on an idea Arun Pareek came up with.  (click here)
    The differences are (1) that this lets you assign parametric roles to groups or application roles instead of individual users making them simpler to maintain and (2) IMO it's a lot easier to do using this technique.
    Dan

  • Rules of thumb for sizing an Oracle BPM 11g deployment

    Anyone out there have some rules of thumb they are using to size out an environment for Oracle BPM 11g? I know processing power can vary widely for process complexity and amount of data floating around. Still, I get asked questions like how much processing power do I need for this solution? I have a current client looking at 2500+ potential human workflow users with 1000 concurrent at peak load. Short of running some performance test myself and extrapolating numbers I am at a loss. Hoping some others can chime in with some thoughts.

    an update... my rule of thumb for 50 users has proven to be a bit high. Looks to be 30-40 per core when you split out the BPMN engine from other computing intensive processes such as the ESB. Without splitting up overall SOA/BPM functionality over multiple servers concurrent user counts of various technology really takes a hit.

  • Import Oracle BPA model (EPC) to Oracle BPM 11G

    Hi,
    I have my business process modeled using Oracle BPA product (EPC format). Now I need to import this model into Oracle BPM 11G which uses BPMN 2.0 format. Does any of the softwares provide a way to transform EPC models to BPMN 2.0 format.
    These are the some of the approaches that I tried to perform the conversion:
    1. Use share blueprint option for EPC model
    Issue with this approach: The model imorted in jdeveloper is not BPMN 2.0 format, It is .xpdl file
    2. Installed tutor macros on Oracle BPA, however this macro is enabled only for BPMN 2.0 process models, not for collobration models. Recreating the entire model as BPMN 2.0 Process model (I don't prefer this approach since this include manual conversion of the models from EPC) also does not work.
    Issue with this approach: After importing model in OBPM is all activities appear as human task, new human task is created for start and stop activities along with start and stop events.
    3. Use share blueprint option in Oracle BPA, this works only for BPMN 1.0 formats.
    Issue with this approach: The SOA -> share blueprint option is not enabled for BPMN 2.0 type models
    Ideal solution for me would be if there is a way to import the models created in EPC format into oracle BPM 11g without recreating the models manually. Can anyone help me with this?

    Hi,
    Actually it's tool couldn't help you resolve your tasks.
    It hasn't options "share blueprint" for BPMN 2.0 type models.
    And I don't know software which can transform EPC model to BPMN 2.0 model...

  • Oracle BPM 11g Workspace -  Load Management Among Users

    Hi,
    We are using version Oracle BPM 11g - 11.1.1.5 Feature Pack.
    Kindly throw light how to distribute work among users in a group. This can be achieved using group rules in BPM workspace.
    1. Logged in as weblogic in bpm workspace.
    2. Go to Preferences -> My Rules -> Other Rules tab.
    3. Enter the group name and click search icon.
    4. Select the group & click green plus icon to create a rule.
    5. Here, select the Round Robin option.
    6. Save the rule.
    Yet tasks are assigned to all the users in the group & not in Round Robin fashion.
    Please help.
    Thanks.
    Edited by: user10307325 on May 9, 2012 10:33 PM

    Were you able to achieve this . Maybe this can help -
    Check hbuelow's reply @ Unable to see the application in BPM Workspace for Sales Quote tutorial
    Edited by: Sudipto Desmukh on May 9, 2012 7:02 PM

  • Oracle BPM 11g Engine Data base

    Hi All,
    Could you please share Oracle BPM 11g Engine data base details like tables..etc..
    Thank you.
    Regards,
    Srinivas

    Were you able to achieve this . Maybe this can help -
    Check hbuelow's reply @ Unable to see the application in BPM Workspace for Sales Quote tutorial
    Edited by: Sudipto Desmukh on May 9, 2012 7:02 PM

  • Oracle BPM 11g + Tomcat

    Is it possible to execute Oracle BPM 11g project on Tomcat ?

    I would take a shot and say mostly its NOT. SOA Suite 11g can be installed and accessed (runtime) only on 2 App Servers: Oracle Weblogic Server (former BEA Weblogic) and IBM WebSphere. If I am not wrong, a small framework (part) of SOA that is ADF Framework is about to support on open source Sun Glassfish app sever like that. But core SOA Projects may not be able to deploy on Tomcat.
    Thanks
    Ravi Jegga

  • Oracle BPM 11g Docoumentation

    HI,
    Any one have Oracle BPM 11g documentation?
    Could you pls share the link.
    Could you pls share the BPM 11g probs & cons.
    Regards,
    Anandh P

    Here's the link to the Oracle BPM Documentation: http://download.oracle.com/docs/cd/E17904_01/soa.htm
    This is the 11.1.1.4 SOA documentation link that includes SOA, BAM, Business Rules and BPM.
    Dan

  • Oracle BPM 11g Examples

    Where I can download Oracle BPM 11g Examples. Demo applications to study BPM in more details.

    Oracle needs to get it together in regards to BPMN 11g demos. There should be a collection of BPMN demos that can be used to show off the various components to people like worklist, workspace, and fusion middleware control. More than likely we have to wait until OpenWorld when there is likely to be a flood of new material released.

  • Oracle BPM 11g Certification

    Know this is a repeat of an already answered question regarding Oracle BPM 11g Certification (certification for oracle BPM 11G but would like to see if there might be an update on when this might be available.
    Thanks,
    Dan
    Edited by: Daniel Atwood on Jan 3, 2011 7:55 AM

    Under the BPM Suite of products, we have a certification for Oracle Webcenter 11g. You can find more info on our website at: http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=389
    Regards,
    Brandye Barrington
    Certification Forum Moderator

Maybe you are looking for

  • Need to synch calendar and contacts, but also open attachments with OWA

    I have a client with a Tour 9630.  They are using Exchange 2007 so we cannot use BES or BPS on that server (their only one). His biggest gripe using the redirector was that he could not open attachments.  After doing some digging, I found out that yo

  • Items in template contain errors, only correct items are transferred

    Hi guys, When we create SC with items from the old SC the message appears: "Items in template contain errors, only correct items are transferred". I checked SC, there are no error messages. I found that field SOURCE_REL_IND in the table BBP_PDIGP is

  • Cost settlement only for assets that have been paid

    Dear all, i need to do, at the end of the month, the cost settlement from wbs to asset only for the the part of asset that have been paid. I don' t know how to do this using standard sap funcionalities. Theonly way that we think to use is: - setlle o

  • Clock keeps crashing in 2.1?

    Anybody else have this issue? When i try to access date&time through settings it goes black and to the home screen Same when I try to access clock through the home screen

  • IMovie on iBook G4

    I have two computers, an iMac G4 desktop and an iBook G4. My vidoe camera is a Canon and I have used iMovie many times on the desktop to create iMovies from this camera, through a Canopus translator. However, I am unable to transfer videos through th