What is Cost Center and Activity type

Can any one make me understand Conseptually, what is Cost Center and Activity Type

<b>Cost Center:</b>A cost centers is an organizational unit within a controlling area that represents a clearly delimited area of responsibility where costs are monitored against a budget.
Cost centers represent areas of responsibility (management areas) that generate and influence costs.
Cost centers are the locations at which the costs are incurred
<b>Activity types</b> describe activities produced by a cost center. They are measured in units of time or quantity. Activity quantities are valuated using a price.
For example: the maintenance department provides maintenance service at a labor hourly rate of SAR 2000 or USD 1000.
When the activities produced by a cost center are used by other cost centers, orders or projects, this means that the resources of the sending cost center are being used by the receiver objects.
By recording the planned and actual quantities consumed, you reallocate cost incurred on the sender into the receivers.
Activity Types can be grouped to facilitate reporting and cost allocation.
Hope it clears your basic doubt on Cost center and Activity type
Assign points if helpful.
Regards,
NareN.

Similar Messages

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • Cost center and activity type

    Hi,
    how can I link a cost center to an activity type ?
    Regards

    Hi..
      You can defined a activity type to a cost centre category not a particular cost centre.
      Suppose you have one activity 99xxxx you can defined it to cost centres cat "P" for prod
      you can defined it in KL01 activity master creation.
      If you want to assign one specific activity to be used for a particular cost centre then creat the cost centre under spl cat and creat master data for activity type for that cat.
    kkumar
    Edited by: kkbdsp on Mar 29, 2011 10:03 AM

  • Blocking of Cost centre and activity type

    Dear all,
    Please tell me how to block cost centres and activity types which will no longer be used
    best rgds,
    Manoj

    Hi,
    There are two ways .
    If you wish to use the cost center number for any other cost center , then you need to delete the cost center by KS04 & you need to mention the future period for which the same should deleted, normally, starting would be 1st day of next year to 31.12.9999
    Keep in mind, cost center can only be deleted , if no data (Actual/Plan/reversal) is posted in it. You may do it , before starting next year's budget processing.
    If you wish to just block the same , lock Actual primary/Secondary & Plan primary/Secondary in the control tab.
    Regards,
    Deepak Kolwankar

  • IW41 using HR data (cost centre and activity type)

    Hi all,
    Does anyone know the steps required to make IW41 determine the Cost Centre and Activity Type from the HR master?
    We can change the Activity Type by user-exit CONFPM04, but not the Cost Centre.
    Also posted [here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=329923].
    PeteA

    Hi Pete,
    Which cost center field are you using? SKOSTL (sender cost center) should be changeable in export structure AFRUD_EXP. It is this field that is written to the AFRU table (not KOSTL). I did a quick check through debug and it looks possible to set a value in the exit that gets written to AFRU-SKOSTL.
    -Paul

  • Creat Cost center assig  activity type, cost center need to be tras to COPA

    Dear All
    I have created a Cost Center, and Assigned  Activity Type by KP26
    Now this Cost Center need to be transported to COPA
    Plz let me know the procedure what are the steps need to be followed.
    With Regards,
    kamal

    if you want to run an assessment of cost centers to CO-PA, you should create and run a cycle in KEU5.
    Dude
    I have gone to this particular transaction code, I have given period from
    1 to 12 and fil year 2007
    and given test run,
    and given Detal list
    its asking me the cycle , and date
    where i  there is no cycle being defined and date given as 22.02.2008
    Its throughing the error msg  cycle has not been created.
    With Regards,
    kamal

  • Know the price from cost center and actyviti type

    Hi expert,
    I Know the cost center and the actyvity type.
    I have to know the price: I can use the transaction KSBT but I need to know some BAPI
    or tables without using KSBT .
    Any idea ??
    tks a lot,
    bye.

    Hi Roberto,
    Use - BAPI_ACTIVITYTYPE_GETPRICES.
    If helpful award points
    Regards,
    Vivek

  • Link b/w cost center and activity of a WBS

    Hi,,
    Can anyone let me know how work center and activities of a WBS are linked?
    Please let me know ASAP...
    Regards,
    Balu

    I got to know...
    Take object id from AFVC for the activities and give it to CRHD to get the cost center

  • Cost center and movement type 551

    Hi all!
    Can the cost center be determined automaticaly when creating this movement type 551?
    Regards

    Hi Eduardo,
    first of all the field status of the MM movement type (trx. OMJJ) has to allow cost center (set to repuired or optional). Afterwards you can use the CO substitution to determine the cost center.
    Cheers,
    Daniela

  • Send cost centre and attendence type not filled automatically

    Hello,
    I am configuring the time recording in ESS. I configured the recording profile and in cats2 it looks good. The send cost centre and attendence type get filled automatically. But when I do the same thing in ESS the values are not populated. Is there something I have to take into account in order to get this done?
    Thanks a lot, Vanessa

    Dear Venessa,
    Please note that in contrast to personal templates, which enable you to prefill the data entry area when you start time recording, the system first displays default values when you create a new account assignment row with one receiver object and at least one working time.The system only proposes default values when you create a new account assignment row. In ESS, this is correct, because it does not make sense to provide default values for the sender cost center and activity type if you are only entering an attendance or absence type.
    Hope this helps,
    Regards,
    Roy

  • Timesheet Booking - Master record for CC and Activity Type

    Hi All,
    We have maintained the Personnel number HR Master Data for Info Type = 315 as follows:
    Period: Start 01.02.2010 to 31.12.9999
    Sender Cost Center: 101067106
    Activity Type: 007000
    Period: Start 01.05.2009 to 31.01.2010
    Sender Cost Center: 101067101
    Activity Type: 006240
    I am trying to book/edit the time for Week 04.2010 [Data Entry Period 25.01.2010 - 31.01.2010] in CAT2 Transaction Code then getting an error message as-
    u201CCreate a master record for 101067106/007000u201D
    Message no. KL001
    Also Price Planning is not yet done for new/latest combination of CC and Activity Type i.e. Period: Start 01.02.2010 to 31.12.9999
    I think system is picking up latest/current Cost Center and Activity Type in an error message and not according to Data entry Period entered CC and Activity type in CAT2.
    Also one thing we have observed that in CAT2 Transaction Code CC filed is showing current Period cost Center only for all Period.
    Is it standard behaviour from Logic point of view.?
    Please suggest the solution regarding the above mentioned situation.
    Many Thanks in advance.
    Swapnil Kharul

    note that
    When are default values used from the employee master record?
    The default values are only used for new CATS records, not for changing,
    not for copying. If you also want to use the default values changing,
    not for copying. If you also want to use the default values from the
    employee master record when changing and copying from the work list, you
    can use SAP enhancement CATS0002.
    The system only uses default values, if you enter a number of hours and
    choose 'Return'.
    The cost center from infotype 0001 ('Organizational Assignment') is
    proposed, if in Customizing of the data entry profile, you selected the
    'Master cost center' field in the 'Default values' area.
    The system proposes the cost center and the activity type from infotype
    0315 ('Time Sheet Defaults'), if in Customizing of the data entry
    profile you selected the 'Cost center' field (or the 'Activity type'
    field).
    If you have chosen both fields, the cost center from infotype 0315 has
    priority, if you have defined it for the corresponding period.
    read the note 333884 it explains that only creating new values the data from 0315 defaults

  • KO88 - Error when settling for Cost Center AND Auc for the same Internal Or

    Hi Experts,
    We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
    We did the following:
    1. Created Auc Class
    2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
    3. Created Allocation Structure "CV" with two assignments:
    01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
    02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
    4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
    5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
    6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
    When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
    But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
    1. Assignment 02 is not AUC, is CTR;
    2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
    Did you face any problem like this?
    I cannot find out what is the missing configuration, or if it is a program error...
    Kind Regards
    Mayumi Blak

    Hi Ajay
    I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
    I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
    When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
    The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
    I'm thinking about changing message KD506 to warning, do you know if this can help?
    Kind Regards
    Mayumi Blak

  • PM Order Confirmation create actual posting in Cost Center, with CE type 43

    Dear Expert,
    I would like to know the business flow of Plant Maintenance that impacts cost center reporting.
    During PM order confirmation, it will create an actual posting in Cost Center from Cost Center Reporting (No FI posting), say CC Operation, with Cost Element type: 43, which is attached with the activity type of Labor Cost assigned the the PM module.
    Example: Cost Center: CC Operation, Cost Element: 840001 (CE type: 43), Amount: USD 100- (negative sign)
    My Question:
    How does this posting (currently is in controlling only) in cost center Operation with Cost Element type: 43 be reflected in my FI reporting?
    Let say there is an FI posting of labor cost in CC Operation, amount USD 100, then from Cost Center Reporting, it actually offset both amounts, and this cost center become 0 in amount.
    Kindly advise the concept of Plant Maintenance.
    This seems like same with the concept of KB21N.
    Thanks.

    Hi Karthikeyan,
    My issue and concern is similar to the issue raised as follows:
    Secondary Cost Element Configuration for Plant Maintenance Order
    http://scn.sap.com/thread/3488730
    In this forum, it says that the posting in CO, during PM order confirmation is ...
    +10 for Order and -10 for cost center A
    After PM Order settlement:
    -10 for Order and +10 for cost center A
    From the cost center and PM Order CO report, they are 0 in value ...
    Is this the correct way?
    Thanks,
    -Chin

  • Cost Center and GL account in Sales Order / Delivery

    I have a requirement where we want user to specify what cost center and GL account should be used while posting goods issue.
    Currently GL account and Cost Center is automatically determined based on OBYC configuration.
    Is there a way  user can populate Cost center and GL account at Sales order or Delivery document level and what ever they have specified will be used for Posting Goods Issue.
    If user doesnt specify anything then standard OBYC determination should take place.
    I looked at OVF3 transaction which can default cost center (though no GL account) but its not useful in our requirement.
    I also looked at OKB9 transaction but not sure if we can use it either.
    Again we want user to enter Cost center and GL account at either SO or Delivery document level and then that should be used for Post goods issue.
    Thanks in advance.

    Hi,
    In delivery under tab GOODS MOVEMENT DATA
    After valuation type column COST CENTER & G/L Account column available
    Now with the help of FI consultant make it change mode so user can maintain  also I observe that if delivery created without reference to order then that fields are in change mode means user cn maintain data for this but if with reference to order it is disable mode
    Check in t-code OMJJ FIELD SELECTION FOR MOVEMENT TYPE
    Put movement 601
    Then select movement type and double click on filed selection (from 201)
    Then go to additional account assignment and for cost centre make it optional or requirement
    or Else under field selection enjoy for movement type 602 indsert field KONT0 and KOSTL and check
    If this can not work there is option field selection for G/L account check that with FI
    Kapil

  • Where to assign cost cnetre and actvity type

    hi
    all
    can any body tai lme
    where to assign cost cnetre and actvity type
    i assgn this actvity type in work center
    so than when ia ssign ctr to work cnetre
    actvity type automatically seen there

    i got some thing
    whats about teh date teh date mentioned in
    ctr-01.04.2007 to 31.12.2999
    kl01-01.04.2007 to 31.12.299
    now iam going to craet work cnterin costing tab the validy date i also mention the same 01.04.2007 to 31.12.2099
    what should imaintain in kp26
    should i maintain the version 0 and what to writte in from to to period
    any idea

Maybe you are looking for

  • Apple wireless keyboard multimedia key not working well??

    it's strange, i cannot use the multimedia key at all with a mini, no matter with fn combination or not. i cannot activate playbacak function on f7 to f9. even change speaker volume with f11 n f12 key. i have check system preference with the fn key as

  • Trouble re-sizing a logo in InDesign.

    I am trying to resize a logo to place on a business card. When I insert the logo and hit ctrl+shift to resize with the cornerbox I shrink it and the box becomes smaller but the image stays the same size. So pretty much it is merely just zooming into

  • WRV200 and Bittorrent

    I have a WRV200 router and it works fine I also use Bittorrent and i need to forward the ports . On the internet i found some solutions which doesn't work for me The download is very slow Please help

  • Mountain Lion (Mac OSX v10.8) is recommended for Premiere Pro

    Mountain Lion (Mac OS v10.8) upgrade improves performance and stability with Premiere Pro. Be sure to check for drivers for third-party I/O hardware and such, since such drivers often lag the OS release. Mac OS X Mountain Lion (v10.8) compatibility F

  • Nikon D70 wrong image size

    I haven't figured out why Aperture is telling me the size of the images coming from my D70 are 3024 X 1998 px instead of 3008 X 2000 px. Does it stretch the images ? Until it does it right I don't trust it and don't dare to translate all my photos in