What is project systems are related to fico

hi sap gurus anybody clesrly tell me about  project systems are related to fico   ,  and what are the relations to these sap fico and ps?
regards
venkatareddy

The Project System guarantees close and constant monitoring of all aspects of your project.Projects are generally part of the internal processes of a company.
There is no orgnization structure of project system like in FI ( Company code), CO ( Controlling Area), Funds management ( FM area).  but it depends upon other.
Therefore, The high degree of integration between the Project System (PS) and other SAP  application components means that you can plan, execute, and account for projects as part of your normal commercial procedures. This means the Project System has constant access to data in all the departments involved in the project.
Further, in project system mostly controlling & ligistical is more important.
Plz assign point as way of thanks

Similar Messages

  • What all Operating System are Supported on Oracle VM Server for Sparc ?

    hi,
    Does Oracle VM Server for Sparc Support's Solaris OS of different version
    or it also supports linux & windows OS also...
    thnaks in advance....

    The modern SPARC platform ( sun4v ) is locked in Solaris. No chances for open-source OS'es like Linux or *BSD.
    This is because the important hardware documentation is closed ( known only to Sun / Oracle engineers ). For example:
      *  virtualization features of CPU are documented only at hypervisor-call level (part of Sun servers' firmware), and only partially.
      *  CPU errata are closed ( Some errata for old UltraSPARC III were opened during OpenSolaris project, but that's all).
      *  crypto features ( SPU and MAU ) are closed.
    -- Konstantin

  • What different IDES systems are available?

    Hello.
    I know that there is a ECC IDES System available. Is there also a Netweaver Portal Ides Version available? Or an ides system with Netweaver portal, ecc, bi and BW with some prepopulated data and some basic webdynpro within the portal to show ecc, bi and bw content? Is something like that available?
    Thanks
    Danny

    Hi
    Following are the different IDES systems available to-date...
    For more details logon to <b>https://websmp205.sap-ag.de/ides</b> - customers & partners (OSS ID required).
    New Releases available
    IDES SAP ERP 2005 (SAP ECC 6.0) UNICODE
    IDES SAP CRM 2005 UNICODE
    IDES SAP SRM 5.0  UNICODE
    IDES SAP SCM 5.0  UNICODE
    IDES SAP ERP 2005 (BW 7.0/SEM 6.0) UNICODE
    IDES SAP ERP 2005 (SAP ECC 6.0) for IS Retail  UNICODE
    IDES SAP ERP 2005 (SAP ECC 6.0) for IS Healthcare NON UNICODE
    IDES SAP ERP 2005 (SAP ECC 6.0) for Campus Management
    Coming Soon:
    IDES SAP ERP 2005 (SAP ECC 6.0) for IS Oil  UNICODE
    Rgds
    Reddy

  • What versions of systems are compatible with BI3.5

    Can anyone provide the following systems version information for BI3.5 compatible?
    R/3 - version?
    Solution Manager version ?
    CRM version ?
    Portal version ?
    Thanks in advance.

    Hello GKR check this from service.sap.com
    https://websmp104.sap-ag.de/~form/handler?_APP=00200682500000002212&_EVENT=DISPLAY
    Sarhan.

  • What Systems are the Pros Using for Premier, After Effects, and SpeedGrade?

    I bought the full Creative Cloud in hopes of making a career for myself in audio/visual editing. The problem is, my system doesn't seem to be able to handle the software, particularly when changing back and forth between the three programs mentioned above. Beyond that, my first project failed to export properly. Moreover, all throughout its development the system lagged badly. And this is after having followed all the preferences recommendations available in the Adobe's tutorials and elsewhere on the Web.
    Here's my system:
    SYX-P67A-C43: Intel Core i7 2600 (an 8-core unit) at 3.4GHz, with 8 Gigs of RAM (soon to be 16) with a GTX 550 NVidia Card, 1Gig of RAM.
    As you can see, this is far in excess of what Adobe claims to be the minimum system requirements. It's obviously NOT.
    What systems are the Pros using (like the guys in the tutorials) for Premier, After Effects, and SpeedGrade? Give me the exact machines with all the specs so I can price one up.

    ...although a little " old" now.....the fundamentals of your machine are still OK to get started IF you : 1. INCREASE your system memory to the full 32 GB....should make a BIG difference in performance.....8 GB is NOT enough, it will HINDER performance. 2. OVERCLOCK your CPU !!!.....many owners of your CPU have been safely running at 4.5 Ghz or HIGHER...some at 4.8 Ghz !!! This OC will make a DRAMATIC improvement  as  CPU speed is a huge factor in performance. 3. Improve your video card to a new NVidia 970 with 4 GB of video memory. 4. Check and MAKE SURE the power supply in your machine is ADEQUATE to handle everything, esp. if you overclock the CPU....generally 850 to 1,000 watts of a quality make is good. 5. Use a fast storage system...that means a SATA III SSD as your "C" drive, ( boot drive), being a Crucial M550 series,( or, M600 series), OR, a Samsung 850 Pro series SSD, ( more expensive). Other SSDs are NOT recommended, only these two makes are recommended for technical reasons. On this "C" drive, you should have Operating system, Programs, and Windows page file ONLY !! Your "D" drive can be ANOTHER single SSD to be used as a "cache drive" for all the previews, media cache, and cache files that Premier Pro creates PLUS, it can ALSO serve as the "Global Performance cache" used in After Effects. All your media and project files can go on your "E" drive. HERE you would have LIMITED OPTIONS because your motherboard only has TWO SATA III ports, ( which would already be used b the "C" and "D" SSDs). You NOW have only 4 SATA II ports left ......you COULD RAID 0 four 1 TB HDDs off these ports and have a 4TB backup drive connected to one of your TWO USB 3 external ports.....any DVD or Blue-ray can ALSO go on an external port.
    However, if you are into spending REAL MONEY !!!.....Go Haswell E and X99 all the way !!...THAT will give you great performance !!

  • What types of backend systems are involved (mainframe, SAP, etc.) for xi ?

    What types of backend systems are involved (mainframe, SAP, etc.) for xi project?

    Hi,
    you could involve all systems with PI (it depends of your scenario).
    This page is a good starting point for getting a better overview:
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/xi/first%252bstep%252bto%252blearn%252bsap%252bxi%252bor%252bpi
    Regards
    Patrick

  • Project System related

    Hi,
    I have requirement is it possible or not  plz. give me replay imm. anyone.
    In Project System,    after creating the Projectdefinition can we create directly a Milestone to that Project definiton without creating WBS Element,  Network header and Network Activity.  Is it possible or not.
    if it is possible how.  is there any standard BAPIs or RFCs
    plz. anyone help me imm.  it is very urgent.
    Thanks and Regards
    T. Ganesh

    Hi,
    PS datasources are not much different than any other application. Some of the datasources are delta enabled and some are full.
    For the deltas check using RSA3 if you are able to get any data for the deltas. Also check the PS tables on the R3 side to make sure that there is delta data in them.
    Check in RSA7 to see what data is there. Check your infopackage to see if there are any selection criteria there.
    If you did an init with data transfer and the delta immediately after that then chances are that you won't get back any records. If that is the case, suggest you wait for some postings and transactions to happen and then try the delta again.
    Cheers,
    Kedar

  • Which legacy systems are used for what purpose?

    Hi gurus,
    I tried looking in this forums, but couldnt gather much information on which legacy systems are used and for what purpose? <b>can any body send me a link that can help me understand when and where, which systems are used for what purpose..</b> I have a general understanding of Legacy systems so i am not looking for terminology explanation,  i would appreciate any thing that is related to business and explains the purpose.
    thanks,
    kishore karnati

    Hi,
    Term legacy system means tailor made system by group of software developer or any branded software which deals with the group requirement  like tally we user for finance.
    Legacy system can be based on any technology like visual basis as front end and oracle as back end or Developer 2k as front end and oracle as back end. For report most of the legacy system we have seen uses crystal report.
    You can develop and implement based on the requirement from the user though you need to define some specify process to keep the system streamline which is in your hands.
    Concept like devlopment/quality/production we don't have that verys strict concept.
    More and more they are not intergrated each other functionally mean lets say inventory has come to the godown then your vendor outstanding should increase in finance which does not happens you need to key in the seperate value for it.
    Hope this helps!!!

  • What is International business Division related bond licences, ARE forms?

    What is International business Division related bond licences, ARE forms?

    Hi Goutam
    In International Business, to encourage the exporters, Government of India have introduced various incentive schemes to bring more revenue to country.  Listing a few for your information.
    <b>1)  Duty Entitlement Pass Book Scheme
    </b>
    Duty Entitlement Pass Book Scheme (DEPB Scheme)- The scheme is easy to administer and more transparent. The scheme is similar to Cenvat credit scheme. The exporter gets credit when he exports the goods. The credit is on basis of rates prescribed. This credit can be utilised for payment of customs duty on imported goods.
    The objective of the scheme is to neutralise incidence of customs duty on the import content of export product. The neutralisation shall be provided by way of grant of duty credit against the export product.
    Exports under DEPB scheme are allowed only when DEPB rate for the concerned export product is finalised.
    Under this scheme, exporters will be granted duty credit on the basis of notified entitlement rates. The entitlement rates will be notified by DGFT. The entitlement rates will be a % of FOB.  The entitlement rate will be fixed on basis of SION (Standard Input Output Norms) and deemed import content. Value addition achieved in export product will also be taken into account.  Supplies made to unit in SEZ are also entitled to DEPB.  DEPB is issued only on post-exportation basis. Excise duty paid in cash on inputs will be eligible for brand rate of duty drawback.
    <b>2)  Export Promotion Capital Goods (EPCG) scheme
    </b>
    EPCG scheme - Under Export Promotion Capital Goods (EPCG) scheme, a licence holder can import capital goods (i.e. plant, machinery, equipment, components and spare parts of the machinery) at concessional rate of customs duty of 5% and without CVD and special duty. Computer software systems are also eligible. Import of spares of capital goods is permitted, without any limit. Jigs, fixtures, dies, moulds will be allowed to the extent of 100% of CIF value of licence. Spares for existing plant and machinery can also be imported. Second hand capital goods upto 10 year old can also be imported under EPCG scheme.
    EPCG authorisation is issued with validity period of 24 months
    <b>3)  Advance License</b>
    An advance licence is granted for the import of inputs without payment of basic customs duty. Such licences shall be issued in accordance with the policy and procedure in force on the date of issue of the licence and shall be subject to the fulfillment of a time-bound export obligation, and value addition as maybe specified. Advance licences maybe either value based or quantity based.
    As per the latest amendments to the EXIM Policy, the facility of Back to Back Inland Letter of Credit has been introduced, to enable an Advance Licence holder to source his inputs from domestic suppliers.
    Value based advance license
    Under a value based advance licence, any of the inputs specified in the licence maybe imported within the total CIF value indicated for those inputs, except inputs specified as sensitive items.
    Under a value based advance licence, both the quantity and the FOB value of the exports to be achieved shall be specified. It shall be obligatory on the part of the licence holder to achieve both the quantity and FOB value of the exports specified in the licence.
    <b>4)  Drawback
    </b>
    Drawback is allowable if any manufacture, process or any operation is carried out in India [section 75(1) of Customs Act]. Thus, drawback is available not only on manufacture, but also on processing and job work, where goods may not change its identity and no ‘manufacture’ has taken place.
    Type of Drawback Rates – All Industry Drawback rates are fixed by Directorate of Drawback, Dept. of Revenue, Ministry of Finance, Govt. of India, Jeevan Deep, Parliament Street, New Delhi - 110 001. The rates are periodically revised - normally on 1st June every year. Data from industry is collected for this purpose. The types of rates are as follows :
    <b>All Industry Rate</b> - This rate is fixed under rule 3 of Drawback Rules by considering average quantity and value of each class of inputs imported or manufactured in India. Average amount of duties paid is considered. These rates are fixed for broad categories of products. The rates include drawback on packing materials. Normally, the rates are revised every year from 1st June, i.e. after considering the impact of budget, which is presented in February every year. All Industry drawback rate is not fixed if the rate is less than 1% of FOB Value, unless the drawback claim per shipment exceeds Rs 500.
    The AIR (All Industry Rate) is usually fixed as % of FOB price of export products. However, in respect of many export products, duty drawback cap (ceiling) has been prescribed, so that even if an exporter gets high price, his duty drawback eligibility does not go above the ceiling prescribed.
    <b>Brand Rate</b>  - It is possible to fix All Industry Rate only for some standard products. It cannot be fixed for special type of products. In such cases, brand rate is fixed under rule 6. The manufacturer has to submit application with all details to Commissioner, Central Excise. Such application must be made within 60 days of export. This period can be extended by Central Government by further 30 days. Further extension can be granted even upto one year in if delay was due to abnormal situations as explained in MF(DR) circular No. 82/98-Cus dated 29-10-1998.
    <b>Special Brand Rate</b> - All Industry rate is fixed on average basis. Thus, a particular manufacturer may find that the actual duty paid on inputs is higher than All Industry Rate fixed for his product. In such case, he can apply under rule 7 of Drawback Rules for fixation of Special Brand Rate, within 30 days from export. The conditions of eligibility are (a) the all Industry rate fixed should be less than 80% of the duties paid by him (b) rate should not be less than 1% of FOB value of product except when amount of drawback per shipment is more than Rs. 500 (c) export value is not less than the value of imported material used in them - i.e. there should not be ‘negative value addition’.
    <b>5)  ARE Forms
    </b>
    Any goods manufactured in India and exported, means the rebate of duty or tax, as the case may be, chargeable on any imported materials or excisable materials used or taxable services used as input services in the manufacture of such goods. To account all these transactions, Central Excise have asked the manufacturers to submit various forms depending upon their business.  ARE form is mainly used for exports for claiming excise duty either by Letter of Undertaking, Bond or Rebate.
    Last but not least, unfortunately, in SAP, but for excise, none of the issues are addressed.
    Hope this information would suffice.  Reward if this helps you.
    Thanks
    G. Lakshmipathi

  • FAQ: Revel basics: What operating systems are supported by Revel?

    Q:What operating systems are supported by Revel?
    A: Adobe Revel is a Cloud based photo hosting service accessible via a free photo app for your Mac, iPad, and iPhone. You can download the Revel App on your iPhone and/or iPad using the same Adobe ID associated with your Photoshop.com account. To See Revel in action click here. See also "Working with Adobe Revel". With the app, you can upload, download, and share files, as well as edit photos.
    Q: Can I access Revel through a web browser?
    A: You can access web version of Revel at www.adoberevel.com. The web version of Revel includes almost all the features of Revel EXCEPT the ability to edit your photos for Mac and Windows Android users you can download Revel Importer. Revel Importer is not a full version of Revel but it does give you a way to import the photos on your Android phone into your Revel photo library.
    Q: What are the differences between the Revel apps for different devices and platforms?
    A: The key differences are as follows:
    iPhone, iPad and Mac — Access, organize, edit, and share your photos on all your iOS devices, anywhere you are.
    Web — Upload, access, and view your photos via your web browser.
    Revel Importer for Android
    Revel currently supports JPEG files only. At Adobe, we are committed to continued innovation with Revel, and plan to support additional platforms, features, and formats in the future.
    Coming soon:
    Adobe Revel for Android®
    NOTIFY ME
    Adobe Revel for Windows®
    NOTIFY ME
    RELATED LINKS:
    Getting started with Revel
    PS.com Revel Product Page  (includes links to app store)
    Revel basics: What file formats does Revel support?

    Just to avoid confusion - during provisioning, the phone is downloading a configuration from remote server. Phone is client. Provisioning process require a server (HTTP or FTP or TFTP) running somewhere.
    You are speaking about browser, not server, so it seems you are speaking about manual configuration of phone, not the provisioning. Even in the case you are speaking about server, you speaking about upgrade of OS, not the provisioning (HTTP/FTP/TFTP) server software. On the other side, you are speaking about "initial profile downloads from Windows 7" asking about browser versions. I'm confused. Can you explain what are you trying to do in more details ?
    Something like: "I did A, expecting B as result but C happened".
    Debug/log from phone device and/or catched communication between browser and phone and/or phone and provisioning server may help to analyze the problem.

  • Full backup ( ~ 1 TB ) using external HD - speed USB vs. Firewire vs. eSATA  - what are relative speeds - how to install eSATA on mid-2010 Mac Pro desktop ( dual hex-core processors)_

        Hi All,
         I'm trying to resume regular scheduled Full backup ( ~ 1 TB ) of drives using external HD (to allow off-site redundant backup storage) .
         What are relative speeds of USB vs. Firewire vs. eSATA ?
         I suspect eSATA connection may be considerably faster … how to install eSATA on mid-2010 Mac Pro desktop ( dual hex-core processors)?
          ( The quicker and easier backup protocol is, the more likely one is to use it to backup on a routine repetitive basis.)
    Thanks

    Jim Bogy wrote:
    ...I suspect eSATA connection may be considerably faster … how to install eSATA on mid-2010 Mac Pro desktop ( dual hex-core processors)?
          ( The quicker and easier backup protocol is, the more likely one is to use it to backup on a routine repetitive basis.)
    Adding a USB 3.0+eSATA PCIe card, which The hatter mentions, is the best solution that I've found. See http://eshop.macsales.com/item/CalDigit/FASTA6GU3/. The card is not cheap, but the USB 3.0 works flawlessly (which can't be assumed; ask me how I know) and the eSATA connection allows booting from the connected drive. Grant Bennet-Alder's point about HD speed is important to consider; in addition, the size of the individual files being backed up and where on the backup disk they're going will affect overall transfer speed. For example, using the USB 3.0 connection on that CalDigit card going to a Toshiba 3TB external, the transfer rate for a big file (say a virtual machine file) from an internal SSD boot drive was about 145 MB/sec while a bunch of little files might drop to 30 MB/sec and both rates decrease as an inner partition on the external is used. All told, a nearly 700 GB backup took under 1.5 hours. Using a HD as the source added almost an extra hour, though a WD external was used for that. Using a WD green drive plugged into this http://eshop.macsales.com/item/NewerTech/FWU3ES2HDK/ with an eSATA connection took about 2.5 hours also, but that was bootable whereas the USB 3.0 connection is not.
    Another point to consider is that USB 3.0 is ubiquitous on PC's now so there's lots of price competition for externals; not so much for eSATA externals.

  • What is program roll area and  system paging area?

    hello sir,
    i am new to abap, plz give me the answer for the following question,
    1.what is program roll area and  system paging area?
    2.from these two, system allocate memory from which one of the memory?

    check this link.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/02/96274f538111d1891b0000e8322f96/content.htm
    http://help.sap.com/saphelp_nw2004s/helpdata/en/34/d9c8b9c23c11d188b40000e83539c3/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/34/d9c8b6c23c11d188b40000e83539c3/frameset.htm
    Message was edited by: kishan negi

  • What systems are successfully using PPRO 6.02 please?

    hello all,
    i am very interested in upgrading to cs6 PPRO,
    however, the forums seem to be full of threads
    about issues/problems resulting from the release
    of cs6 and the subsequent updates...
    cuda issues (MPE has to be turned off)
    white screen, locking up issues
    registry issues
    AME not completing exports
    however, not everyone's systems are hurting...
    there are reports of 'no problems here' using cs6
    is it possible for 'successful users' of PPRO cs6
    to post their computer specs and which version of PPRO cs6
    they are using...
    this might help isolate which computers/os/graphics card/ etc. are/are not having
    success with the different releases of PPRO cs6...
    i hope this thread helps all of us figure out what's going on
    have a great day...
    jeffrey

    tfi productions 44 wrote:
    hello all,
    re:  tclark513's statement about lasvideo having to do registry fixes:
    if you were experiencing issues and then found a fix/workaround
    and now you feel your system is stable under cs6
    please let us know that, too...
    thanks a bunch,
    jeffrey
    Sep 6, 2012 3:04 PM   in reply to zuccon123
    Report
    OK I found the performance issue with 6.0.2 atleast so far that I am seeing are the Hyperthreading cores are not being utilized on Windows. I will list the registry changes below. Unfortunately these will not work on OSX.
    I will also insert image so you can see the registry locations for each.
    Type Regedit in the search. Go to the following location
    HKey_Local_Machine\System\CurrentControlSet\Control\Session Manager\Memory Management
    Change the Large System Cache from 0 to 1. Right Click on Large System Cache and select Modify. Change Value data from 0 to 1 and hit ok.
    The Core parking requires searching for the Following Registry Key.
    0cc5b647-c1df-4637-891a-dec35c318583
    - Go to Regedit
    - Find this key by selecting Edit and then Find at the top:- " 0cc5b647-c1df-4637-891a-dec35c318583 "
    - Within this key, there is a value called: " ValueMax "
    - This value represents the % number of cores the system will park - the default 100% ie: all Cores are potentially park-able
    - Change the value from 64 to 0 so the " ValueMin " and " ValueMax " are both zero
    - You will have to find the key a few times and repeat the process for each time it is found - the number of instances will depend on the number of power profiles in your system
    So Far the Playback performance after those changes is back to normal.
    Eric
    ADK
    PLEASE BE CAREFUL AND BACK UP WHAT YOU WANT TO KEEP.

  • Time machine only copies User Info and Users (Applications, Library, and System are missing) from my quad core Mac Pro.  45 Gb of 162 Gb are missing.  Any one having success with time machine copying all folders using Mavericks?   What do I need to do dif

    Time machine only copies User Info and Users (Applications, Library, and System are missing) from my quad core Mac Pro.  45 Gb of 162 Gb are missing.  Any one having success with time machine copying all folders using Mavericks?
    What do I need to do differently?

    The late, great Pondini was investigating that issue before he passed away.
    See here: https://discussions.apple.com/thread/5125969
    I think there might be information there on how to reset Time Machine to do a full backup. I think you basically have to reset it and start over.

  • BI Content related to PS(Project Systems)

    Hi All,
    I want information regarding BI Content related to PS(Project Systems). Can anybody send links or documents regarding the same.
    Thanks,
    Gaurav
    Edited by: Gaurav Kanungo on Jan 8, 2008 7:47 AM

    http://help.sap.com/saphelp_nw70/helpdata/en/b4/60073c0057f057e10000000a114084/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/1f/13fb383a094d63e10000000a11402f/content.htm

Maybe you are looking for

  • LE8 won't remember audio recording path (among other issues...)

    Why won't LE8 remember the audio recording path I set for each project? Each time I open a project I've been working on (by dropping the project onto the LE8 icon in the dock-LAME) and arm a track to record, it says that that the path to the external

  • Palm TX

    I have a wireless keyboard for my Palm TX...need something to show me what all the keys are for, is there a manual out there somewhere? Thanks Post relates to: Palm TX

  • Where do we block costcenter

    Hi, Please tell me where do we block cost center which come from SAP-HR payroll posting. Saurabh

  • Depreciation Stop

    Hi, I want to stop the depreciation of a asset for a period on one year, how can i do that? regards, Gayani

  • Premiere 12 won't recognize Cannon ZR960 and allow capture

    Premiere Elements 12 won't recognize my Cannon ZR 960 video camera so I can capture video from mini cassette to my Mac computer