1)SAP Best Practices Baseline Versions will deliver preconfigured organizational settings for different scenarios with regard to the following areas: common organizational structures, logistic organizational structures, and intercompany organizational structures. these can be implemented on any of the component based on the platform availability, and cannot be directly used. For example with out installing an SAP sysetm you cannot implement baseline versions. So the relation would be Component or Product is primarily available to use the secondary component i.e Baseline versions on it.
The SAP Best Practices Baseline Package is available in different country versions (for example, for France, Nordics, Germany,
the United States, and the U.K.). The scope of these localized versions might differ depending on country-specific needs. Please check this link: http://www.sap.com/services/pdf/BWP_SAP_Best_Practices_for_Baseline_Package.pdf
2)The other products are
Customer Relationship Management (CRM)
Enterprise Resource Planning (ERP)
Product Lifecycle Management (PLM)
Supply Chain Management (SCM)
Supplier Relationship Management (SRM)
The SAP NetWeaver technology platform enables the composition, provisioning, and management of SAP and non-SAP applications across a heterogeneous software environment (release version from 640 to 700 and above)  Prior to the introduction of SAP NetWeaver as an integrated technology platform, SAP has developed a number of integration technologies and offered them as individual products, among them for example SAP Enterprise Portal, or SAP Exchange Infrastructure.
SAP NetWeaver Platform
SAP NetWeaver Portal (formerly SAP Enterprise Portal)
SAP NetWeaver Business Intelligence
SAP NetWeaver Visual Composer
SAP Auto-ID Infrastructure
SAP Composite Application Framework
SAP Netweaver Development Infrastructure
Thank you,
Shyam

Similar Messages

  • Install The ERP SAP Best Practices Baseline Package (VE)

    Hello
    We would like to install The ERP SAP Best Practices Baseline Package (VE)
    And reviewing the  Quick Guide to Installing the SAP Best Practices Baseline Package (VE), included in the SAP NOTE 1171816, in the list of components installed we need SAP ERP 6.0 with EhP3 with support package stack 1, but we received the installation disc of the Ehp4, and this version is not supported for the Baseline Package (VE).
    We are unable to find the installation the disc, or the media list for this solution (SAP ECC 6.0 EhP3).
    Can somebody tell me where can i find this?
    The information in the service.sap.com/instguides is about installing EhP4.
    We are using Windows 2008 EE with MS-SQL 2005.
    Thanks for your Help

    Hello Sunny,
    I hava setup MOPZ, and uploaded the correct packages to the SAINT transaction, but it gives me a warning, i need to include the following files to my upgrade queue:
    EA-APPL, 603       SAPK-603DHINEAAPPL   (SP Level: 0001)
    FINBASIS, 603      SAPK-60301INFINBASIS (SP Level: 0001)
    EA-PS, 603           SAPK-603DHINEAPS     (SP Level: 0001)
    SEM-BW, 603        SAPK-60301INSEMBW    (SP Level: 0001)
    I downloaded the packagesfrom SWDC but still is missing EA-PS, 603 SAPK-603DHINEAPS the file i downloaded was CSN0120061532_0028760.PAT
    In the SAP Note 1083533
    "If you receive the warning stating that additional Support
    Packages (level 0001) must be included in the installation of
    Enhancement Package 3, check the Support Package level of the
    relevant component. You can ignore the warning in the following
    cases:
    All components (Release 600) except EA-HR 600: Support Package
    level 0011
    EA-HR 600: Support Package level 0026
    - Note the following: In the case of a higher Support Package
    level (at least Support Package level 0012 or Support Package
    level 0026 for EA-HR), you must NOT ignore this warning."
    My SP level is 11 for all components and EA-HR is lvl 22, should i ignore this?
    Kind Regards

  • [More information] 'SAP Best Practices Baseline package for Brazil V3.607'

    Hi.
    When I study 'SAP Best Practices Baseline package for
    Brazil V3.607', I wonder somthing.
    I want solution of problem.
    ---------Problem---------
    In '100: SAP Best Practices Installation' document on point 3.4 Define Tax Jurisdiction Code it says
    Enter the Jurisdiction Codes according to the document SMB41_J_1BTXJURV_B020_NFE.TXT.
    I have search the internet for this document and the only hit is the actual Best practice document.
    Does anybody knows where to get this document?
    ASAP, reply for me.
    Thanks.

    Dear Dimitry,
    the Best Practice baseline content is freely available to anyone w/o any charge.
    You find the whole content about it at:
    SAP Best Practices package for Russia V3.607 (English)
    SAP Best Practices package for Russia V3.607 (Russian)
    Kind Regards,
    Jan

  • SAP Best Practices Baseline package for Russia V3.607

    Dear colleagues,
    My partner - BearingPoint Russia - has an interest to SAP Best Practices Baseline package for Russia V3.607
    Would you please help to find the contact whom they can ask the questions about content & price to?
    Best regards,
    Dmitry Popov

    Dear Dimitry,
    the Best Practice baseline content is freely available to anyone w/o any charge.
    You find the whole content about it at:
    SAP Best Practices package for Russia V3.607 (English)
    SAP Best Practices package for Russia V3.607 (Russian)
    Kind Regards,
    Jan

  • Help on Installing the SAP Best Practices Baseline Package

    We are in the process of installing the SAP Best Practices Baseline Package. We are on ECC5.0. Any tips/ tricks/ gotchas will be greatly appreciated.

    hi Mani,
    check this out:
    http://help.sap.com/bp_bblibrary/500/documentation/BL_Quick_Guide_EN_DE.doc
    regards
    sham'm

  • SAP Best Practice Baseline upgrade.

    Dear All,
    Im quite confuse here. I install SAP BP Baseline v1.603 (Malaysia) using system copy. Everything working find and now i try to upgrade it to SAP ERP 6.0 EHP4..May i know is it possible to upgrade to EHP4 for this best practices because i cannot see the content upgrade for EHP4 available for Malaysia. Can i use SAPEhpi to upgrade it to EHP4? or maybe SAP Best practices not allowed to upgrade to EHP4.
    Thank you

    Dear Muhamad,
    It is possible to upgrade to EHP4.
    SAP BP Baseline v1.603 is based on ERP6.0 EHP3.
    You can refer to the following comments in note 1301301:
    In order to allow you making use of functions and features
    provided withhigher SAP ERP enhancement package versions, in a
    system upfront set-up via SAP BP package activation based at
    least on "SAP ERP 6.03", please follow the below mentioned steps
    to bring your system to the desired enhancement pack level:
    -  System set-up according to the requirements stated in the
       QuickGuide of the SAP BP package to be activated
    -  SAP BP package has been activated with the required scope
    -  System update using SAP EhPI to the wanted enhancement package
       level
    -  Technically SAP provides a so called "Vendor Key" for SAP EhPI
       updates of systems containing SAP BP add-ons. This is only to
       ensure that the update is technically completed. When SAP EhPI
       asks for a decision regarding installed add-ons, choose "KEEP"
       for the SAP BP add-ons. In the next step a vendor key has to
       be provided.
    For technical reasons, vendor keys are specific for the "start
    release" the update is performed from:
    SAP EhPI updates on system based on SAP_BASIS 700 - column "Key
    (700)"
    SAP EhPI updates on system based on SAP_BASIS 701 - column "Key
    (701)"
    If a vendor key does not fit at all or a software component is
    not listed below, create a customer message on component
    BC-UPG-ADDON.
    SW Component      Key (700)            Key (701)
    BP-ERP05          1831003              2899480
    BP-INSTASS        2056515              2031478
    "IMPORTANT NOTE" :
    The functionality of the already installed SAP BP add-ons based
    on the previous SAP application version - the activation of a SAP
    BP package based on the previous SAP application version - can NO
    LONGER BE USED. But of course the functionality of the new SAP
    application version as such can be used.
    But just as mentioned in this note,
    you can use the vendor key to continue with the EHP4 update, but the
    version BP-ERP05 is NOT compatible with EHP4(note 1226284).
    Therefore, do not use BP-ERP05 on EHP4. You should install the
    latest version of BP add-on version for ERP6.0 EHP4.
    With Best Regards
    Julia Song

  • SAP Best Practices baseline package for France on dvd

    Hello guys
    Can someone tell me what's the material number of the dvd documentation of SAP Best practicse baseline package for France and how to ordre it. I did not find it on sap shop and I cannot download it due to the quality of the internet connexion in the region where I m located. I mean, the documentation like the one you have on this sap marketplace website.
    Tks for your help.
    Marcous

    Hello Marcous,
    the material numbers of the dvds for baseline France are: 50098552 (documentation) and 51038439 (config).
    For obtaining the best practices please see the instruction under the following link:
    [url]http://help.sap.com/bp_bl604/BL_FR/html/index.htm[url]
    On page 3 you can find the following:
    "SAP Software Distribution Center on the SAP Service Marketplace (http://service.sap.com/swdc)
    or order via their contracts department. SAP Best Practices are provided free of charge"
    So in your case you should contact your contract department.
    Cheers,
    Andreas

  • What is SAP Best Practices?Could it be installed to my IDES ECC6?

    Hi,
    Could the SAP best practices be installed to my IDES ECC6?
    And how to??
    Let's take example for High-Tech industry.
    Thank you very much.

    Dear Hoo,
    In the best Practices there will be different release versions so based on that you need to prepare the system with the help of BASIS people.
    You have to apply some notes and patches before installing the specific industry version.
    High tech Industry installation guide
    Go to http://help.sap.com here you select SAP Best Practices >Click on Industry packages>Click on High Tech in this page you can able to find the Installation & Upgradation guide from this you can down lode the installation steps based on that you can install.
    I hope it will help you,
    Regards,
    Murali.

  • What is SAP best practice for SU24 "no check" indicators

    Hi Experts,
    Let's say during testing if we find a t-code needs some authorization objects for end to end execution, and those objects are maintained as "CHECK" "NO" in USOBX_C.
    Please suggest the best practice...
    Should we change the proposal in USOBX_C to "CHECK" "YES" and populate specific values in USOBT_C or we can insert those authorization objects manually in the roles without changing proposals??
    As far as I know, it makes upgrade activities more difficult when there is more customization in these tables....However manual insert of auth objects are not impacted during upgrade and also any SU24 maintenance of custom t-codes.
    Thanks,
    Deb
    Edited by: Julius Bussche on Feb 8, 2012 10:31 AM
    Subject title made more meaingful.

    Normally there is some thought which went into the "no check" flag so you should put some thought into it before testing it to turn it on. It might force you to grant access for that transaction context but have the implication that in other transactions the user can access too much again.
    There are however some authorization objects which were added with support packs with this "no check" in the hope of adding the authority-checks into the code to make them possible, but deliver them as backward compatible with existing roles. This is a work-around for not being able to deliver it as deactivated globally in transaction AUTH_SWITCH_OBJECTS.
    You can find the candidates by sorting the + 12k entries in USOBX_C by object name and finding those which were dealt with in a very liberal way. Check the docs and OSS notes for them.
    Other than that I can only say that a best practice which I believe in is to remove some of the odd things in SU24 immediately after the installation. This means that you later (and as required) only need to add proposals and checks. That is much less error-prone than removing proposals and checks again!
    Cheers,
    Julius

  • Install Best Practices- Baseline Package for ECC 6.0 EHP4

    Hi All,
    I know its not the right forum to post this message, but posting here as i didnt get the info from the related forum, apologies for that.
    Now we are planning to install SAP Best practices-Baseline Packages for ECC-EHP4 in our new server.
    Can anybody help me out what are the steps to be carried out. Now we have completed installation of Linux & we want to install BP for General, not for any specific industry.
    B/regds,
    CB

    Please post this question in SAP Basis Forum.
    Alternatively, you can check documents in scribd/ help.sap.com
    Raghavan

  • Importing best practices baseline package (IT) ECC 6.0

    Hello
    I hope is the right forum,
    i've a sap release ECC 6.00 with stack abap 14.
    In this release i have to install the preconfigured smartforms that now are called
    best practices baseline package. These pacakges are localized and mine is for Italy:
    SAP Best Practices Baseline Package (IT)
    the documents about the installation say that the required support package level has to be with stack 10.
    And it says :
    "For cases when the support package levels do not match the Best Practices requirements, especially when HIGHER support package levels are implemented, only LIMITED SUPPORT can be granted"
    Note 1044256
    By your experience , is it possible to do this installation in this support package condition?
    Thanks
    Regards
    Nicola Blasi

    Hy
    a company wants to implement the preconfigured smartforms in a landscape ECC 6.0
    I think that these smartforms can be implement using the SAP best practices , in particular the baseline package ....see service.sap.com/bestpractices  --> baseline package;  once installed you can configured the scenario you want....
    the package to download is different each other ,depends the localization...for example italy or other country but this is not important at the moment....
    the problem is the note 1044256...it says that to implement this, i must have the support package level requested in this note...not lower and above all not higher.......
    before starting with this "baseline package" installation i'd like to know if i can do it because i have a SP level of 14 for aba e basis for example....while the notes says that want a SP level of 10 for aba e basis.
    what i can do?
    i hope is clear now....let me know
    thanks
    Nicola

  • How to check verison of Best Practice Baseline in existing ECC system?

    Hi Expert,
    How to check verison of Best Practice Baseline in existing ECC system such as v1.603 or v1.604?
    Any help will be appriciate.
    Sayan

    Dear,
    Please go to https://websmp201.sap-ag.de/bestpractices and click on Baseline packages then on right hand side you will see that On which release is SAP Best Practices Baseline package which version is applicable.
    If you are on EHP4 then you can use the v1.604.
    How to Get SAP Best Practices Data Files for Installation (pdf, 278 KB) please refer this link,
    https://websmp201.sap-ag.de/~sapidb/011000358700000421882008E.pdf
    Hope it will help you.
    Regards,
    R.Brahmankar

  • SAP Best Practice Integrated with Solution manager

    We have a server in which we installed SAP Best practice baseline package and we have the solution manager 7.01 SP 25
    We maintained the logical port but when we try to check connectivity to solution manager we got the following error:
    Connectivity check to sap solution manager system not successful
    Message no. /SMB/BB_INSTALLER375
    Can anyone guide us how to solve the problem and also if there is another way to upload the solution defined on the best practice solution builder into sap solution manager as a template project
    Thanks,
    Heba Hesham

    Hi,
    Patches for SAPGUI 7.10 can be found at the following location:
    http://service.sap.com/patches
    -> Entry by Application Group -> SAP Frontend Components
    -> SAP GUI FOR WINDOWS -> SAP GUI FOR WINDOWS 7.10 CORE
    -> SAP GUI FOR WINDOWS 7.10 CORE -> Win 32
    -> gui710_2-10002995.exe

  • SAP best practice and ASAP methodology

    Hi,
            Can any body please explain me
                                                          1. What is SAP best practice?
                                                           2. What is ASAP methodology?
    Regards
    Deep

    Dear,
    Please refer these links,
    [SAP best practice |http://www12.sap.com/services/bysubject/servsuptech/servicedetail.epx?context=0DFA5A0C701B93893897C14DC7FFA7D62DC24E6E9A4B8FFC77CA0603A1ECCF58A86F0DCC6CCC177ED84EA76F625FC1E9C6DCDA90C9389A397DAB524E480931FB6B96F168ACE1F8BA2AFC61C9F8A28B651682A04F7CEAA0C4%7c0E320720D451E81CDACA9CEB479AA7E5E2B8164BEC98FE2B092F54AF5F9035AABA8D9DDCD87520DB9DA337A831009FFCF6D9C0658A98A195866EC702B63C1173C6972CA72A1F8CB611798A53C885CA23A3C0521D54A19FD1B3FD9FF5BB48CFCC26B9150F09FF3EAD843053088C59B01E24EA8E8F76BF32B1DB712E8E2A007E7F93D85AF466885BBD78A8187490370C3CB3F23FCBC9A1A0D7]
    [ASAP methodology|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/asap%2bfocus%]
    ASAP methodology is one methodlogy used in implementing SAP .
    The ASAP methodology adheres to a specific road map that addresses the following five general Phases:
    Project Preparation, in which the project team is identified and mobilized, the project Standards are defined, and the project work environment is set up;
    Blueprint, in which the business processes are defined and the business blueprint document is designed;
    Realization, in which the system is configured, knowledge transfer occurs, extensive unit testing is completed, and data mappings and data requirements for migration are defined;
    Final Preparation, in which final integration testing, stress testing, and conversion testing are conducted, and all end users are trained; and
    Go-Live and Support, in which the data is migrated from the legacy systems, the new system are activated, and post-implementation support is provided.
    ASAP incorporates standard design templates and accelerators covering every functional area within the system, as well as supporting all implementation processes. Complementing the ASAP accelerators, the project manager can create a comprehensive project plan, covering the overall project, project staffing plan, and each sub-process such as system testing, communication and data migration. Milestones are set for every work path, and progress is carefully tracked by the project management team.
    Hope it will help you.
    Regards,
    R.Brahmankar

  • SAP Best Practice!!!

    Hi All
    Please let me know if anybody of you have loaded best practice? i want to load Best practice for a particular country.
    require steps and things needs to be taken care.
    Regrds
    Yogesh

    Link: http://help.sap.com/
    Path: SAP Best Practices --> Baseline Packages --> Based on SAP ECC 5.00 --> Select Country: for eg, Localized for India --> Technical Information --> Building Blocks --> Select Country for eg, India --> List of Basic Configuration & scenarios will be listed.
    Select the required basic configuration / scenario. These will consist of overview, configuration guide, business process, master data &so on ...........
    Regards,
    Rajesh Banka
    Reward suitable points.
    How to give points: Mark your thread as a question while creating it. In the answers you get, you can assign the points by clicking on the stars to the left. You also get a point yourself for rewarding (one per thread).

Maybe you are looking for

  • SWF created in Flash MX 7 won't play in browser w/Flash Player 9

    I just noticed that my website, which I made from a template from templatesheaven.com, isn't playing in Flash Player 9 in a browser. It plays in the standalone player for some reason, but when I look at it on the web, it shows just the count-in (or w

  • AD certificate error

    I m trying to do ssl.I imported certifcate succesfully still it saying culd not find ssl.SSLHandshakeException: sun.security.validator.ValidatorException: PKIX path building failed: sun.security.provider.certpath.SunCertPathBuilderException: unable t

  • Lync 2013 Edge & Web proxy

    Hi Everyone I'm having a little trouble getting my head around the setup for Lync external access. I have setup an ADFS server, Lync 2013 server(works internally), 2012 web proxy server(doing nothing) and an edge server(currently doing nothing). My u

  • VGA port loose

    I regularly connect a 2nd monitor to my laptop through the VGA port. Recently I have been having issues with it and the wire staying in properly. I had been able to prop it up a little, but that now is not even working and not that practical all the

  • Developer traces_Errors in ST11_ECC6_Oracle10g_Solaris10

    Hiello, When I check ST11 all the work process traces are showing errors . 1. Can we delete the developer traces in production environment??? 2. What could be the reason for the errors in dev_w0 trc file: "dev_w0", trc level: 1, release: "700" ACTIVE