What is Sun's production process?

 

What is Sun's connection with nebeans?
I have noticed is offered as a download with the SDK
from SUN.
Will sun's connection ensure that netbeans will become
a major IDE for some time to come?Sun started this when they cancelled the community edition of Sun One Studio (Forte). They're very similar and I think Sun One Studio is actually based on Netbeans.

Similar Messages

  • What is resource to product process in SAP

    Hi friends..
          Good Morning,
             <b>What is resource to product process in SAP?</b>
             Based upon this process, i need to design the BPM..
    Please reply me ASAP. Points will be given for correct answers.
    Advance Thanks,
    Kumar

    Kumar
    probably the following help doc contains some related info
    http://help.sap.com/saphelp_nw70/helpdata/en/81/9f1f42b52dde2ce10000000a1550b0/frameset.htm
    regards
    krishna

  • What's in the JVM Process's Memory Space?

    Hello
    I'm noticing the following behavior on an NT system. On
    application startup, I see
    Total Heap 9 MB
    Used Heap 5.5 MB
    java.exe memory (from NT Task Manager) 36 MB
    After a "login" operation which loads a few more
    classes:
    Total Heap 12.5 MB
    Used Heap 8.2 MB
    java.exe memory (from NT Task Manager) 53 MB
    Heap memory leaks have been ruthlessly suppressed
    (thanks to OptimizeIt and careful programming). The
    behavior I do not understand is that the NT process
    (java.exe) increased in size by 17 MB when the Java
    heap increased by only 3 MB. The .jar file in which the
    application resides is less than 1 MB, so this 14 MB
    growth can not be attributed to new classes being
    loaded.
    Does anyone know what is going into the process
    memory space of java.exe? It tends to grow larger
    and larger.
    Should I even care? Do I want a large allocation of
    process memory for java.exe, or will that hamper
    performance of machines with less physical memory?
    Posts on related topics in this forum have sometimes
    advocated allocating a lot of memory to the JVM with
    -X options.
    Thanks

    Hello
    I am facing exactly the same problem on NT. However, on 2000 Server this problem doesn't seem to exist. Are you, by any chance, using JNI? We are extensively using JNI in our Servlets and found that there is definitely some momory leak there. We could not figure out any substantial leak at Java end. In NT's "Task Manager" java.exe is always listed first and very rarely the memory usage seems to come down. On 2000 Server the performance is far better.
    Please visit this link:
    http://forum.java.sun.com/thread.jsp?forum=33&thread=211330
    Regards
    Manish Bhatnagar

  • What is Sun's answer about PCA  patch manager free tool ?

    Hi all,
    this post aims on echoing customers'feedback.
    from customers'experience it seems that smpatch from patch manager tool is suffering of a lack of reliability.
    One of them moved to a new freeware called PCA-Patch Check Advanced
    http://www.par.univie.ac.at/solaris/pca/
    From PCA Web Site we can read:
    Sun has offered various tools in the past to analyze Sun/Solaris systems for patches which are installed or missing, e.g. PatchDiag, PatchCheck, PatchPro, smpatch (see the Sun Patch Portal for details). Some of them are not actively maintained, some are huge and opaque, some don't run on older Solaris releases or stripped-down machines. None of them really made me happy. Based on PatchCheck source I implemented PCA, which gets rid of the disadvantages of Sun's own tools.
    I would like to know what is Sun's position and could it be possible to integrate such a tool ?
    Thanks.
    Malek.

    - Sun is always interested in customer feedback, and is interested in
    the concerns expressed here.I'd also very muck like Sun to be interested in fixing the customers problems, which has not been done in my cases. No solution or explanation has been given to my many cases opened on smpatch, and this, even though in some cases, patches were made (months later): I was never told about them. Which makes me wonder about the point of having paid support contracts in the first place.
    But since UM was developed by interns, it's no wonder there's trouble maintaining it (how do I know? I've been an intern doing Java development, and I made the exact same beginner's mistakes, not knowing to handle exceptions, leaving debug output on stdout, being unable to make proper localisation).
    It's obviously not the work of experienced Java programmers. Hard to trust it...
    - We do understand that opaque is bad, but one of Sun's goals is to
    provide complex analysis beyond matching patches with installed
    packages. This analysis and its support processes will necessarily
    be somewhat opaque.What analysis are you talking about? smpatch is not even able to tell me that security fixes are available for NSS, which has been part of Solaris for years. PCA does.
    And what about Studio? Why can't smpatch tell me there are patches for that, too? And why aren't free patches, that are neither recommended nor security (such as the man patches) shown by smpatch when running without a contract?
    - We are interested in the concerns surrounding stripped-dow
    systems, and are considering a "light" version of our tools that would
    support minimal systems. However at this time there are no plans to
    release a light version.And what about systems without a network?
    And what about not forcing me to read and agreeing to a, abusive license agreement, which can't even be printed, nor shown full screen (5 lines at a time!)?
    And, please, can you explain me why I should agree to respect Reuters so-called intellectual property? What does it have to do to with keeping my systems up to date reliably and easily? Is it a competition between Sun and Microsoft to put the most ludicrous licenses on line?
    Anyway, I'm sure Solaris 11 will introduce some new bloated offspring of the PatchProManagerUpdateConnection family, so I'm not holding my breath. Rather than repeat this experience again and again, I'll stick with PCA.
    Laurent

  • Problem in Production Process

    Hi
    My client receives vehicle from customer and changes into ambulance.Assembly process is done here.
    According to him there are stages in production like:
    1. Structure
    2. Insulation
    3. A/c fitting
    4. Despatch
    These are the stages.Now he wants to issue items to each stages with fixed decided quantity.*There is BoM for each stage but
    problem is no new parent item is formed*.So i cant use production process.For this i have made store,  Structure, Insulation, A/c fitting, Despatch as warehouses in the system so that items could be issued from store to these warehouses stages wise.
    Now the items issued to structure, insulation will make medical component as a item.And item issued to A/c fitting, Despatch contribute to form ambulance component.
    Now during delievry medical component,ambulance component and vehicle that was received will be invoiced to customer.
    Please suggest me how can use this process in SAP B1?
    Thanks

    There is no purchase of vehicle it is just receipt of vehicle from the customer and then passing the same vehicle through various stages and then  receive ambulance at the last.
    At each stage items are issued from store.
    If i could use production process then it was easy for me to alott a serial no to the production process but now imn not able to solve this production  procedure in B1, so tracking will be definatly nxt issue.
    But in system what i calculate is that he wants inventory transfer from store to these warehouses and then at last consuming them to form new product.

  • SAP IS-Retail and Production process

    hi experts,
    i am working on SAP IS-Retail. We have a scenario like our retail client is basically deals with FMCG, Footwear, White goods, Fashion related Items. In these items some of the items are inhouse produced. So in this scenario how can we proceed this Production Process and enter Production Planning in SAP IS-Retail. Whether SAP IS-Retail supports Production Planning and Quality Management. If supports till what extent this supports. If not what is the alternative solution..
    Solution needs some what urgent basis...............
    if anyone provide a White Paper then also will be appreciated.......
    any suggestions also higly appreciated............
    Regards
    Venkat

    Venkat
    Try the following links. These should help. This may not be a completer answer but it should be the official SAP answer that you should communicate to your client.
    Standard Functions Used in SAP Retail with Articles ( http://help.sap.com/saphelp_erp2005vp/helpdata/en/92/b22aae5a2711d3ae46080009d2232d/content.htm )
    Standard Functions Not Supported in SAP Retail  ( http://help.sap.com/saphelp_erp2005vp/helpdata/en/92/b22ab45a2711d3ae46080009d2232d/content.htm )
    Also remember the official SAP recommendation there ,is not to use Articles and Materials in the same application instance.
    Milan.

  • CREATING SERIAL TRACEABILITY DURING PRODUCTION PROCESS IN DISCRETE MANUFAC

    We are manufacturing part with serial number identification.
    We can identify the history fo material + serial combination only after completing our production and transfer completed part to storage. 
    We are interesting in creation serial history / traceability during our production process.
    WE could not found any solution via Phase confirmation or via Equipment management or even Material movements
    We must to know in what operation sereal number exist in real time traceability.
    With regards.
    B. Betzer

    Basically the Serial Number is Unique irrespective of the operation.
    That will be carried out through outthe life cycle in the way of particular Material+Serial Number combination
    So you can give the Serial Number in the Particular Work Order and Operation
    I assume there will be a Marking Machine that needs to Punch/engrave/print the Serial Number and you are interested to give work order to that machine
    Prabakaran K

  • After I import the photos into light room from a folder, the deveop module cannot be accessed? What can I do to process those photos that are on my hard driive?

    After I import the photos into light room from a folder, the deveop module cannot be accessed? What can I do to process those photos that are on my hard driive?

    If you are using a standalone version of Lightroom, you may have updated with the CC-licensed update. That will not work. If this is your situation then it will be necessary for you to uninstall Lightroom and then install an update from a different website. Assuming that you are using Lightroom 5, this is where you need to download from:
    Product updates
    After you make the change you will be able to continue from where you left off. The switchover does not affect your images or your catalog.

  • Web for Forte - what is the right product?

    We are using Web Enterprise on a new application and on another existing
    Forte application.
    Concerning our experiences on the new application:
    1) Watch what version of Forte and WE you use. Earlier that 3.M.2 and WE
    E.1, we experienced a page truncation bug (that Forte admitted was their
    bug).
    2) Upgrades between Forte versions have been difficult as each upgrade means
    an upgrade to the WE pieces. The only way we have been successful in these
    upgrades is by recreating the repository, creating the new HTTP/HTML
    libraries/projects, and importing (in order) our projects. This is time
    consuming. It would be nice if Forte did not force the WE upgrade when the
    Forte version changes.
    3) As of yet, we have not been able to get a load balanced Web Access SO to
    work. The help desk has suggested using a higher port number range (from
    1780 up to 6000) but we haven't tried this yet.
    Concerning our experiences with the existing application conversion:
    1) The GUI interface of a windows application and a browser application are
    basically different. There are things that are easy in a std GUI that are
    much more difficult with a browser. So, if using std HTML, typically the
    application will behave somewhat differently.
    2) We used JavaScript within our HTML to do some basic editing within the
    browser. This was much easier than doing std HTML to Forte for every type
    of edit. In fact, we even used Forte to dynamically generate JavaScript in
    certain circumstances.
    3) We did NOT use Java at all.
    4) The Forte application we are converting is old (4+ yrs) and was not
    designed in the ideal way. Much of the processing logic and sql is embedded
    inside windows. My point is that if the architecture of the existing
    application is 'good' (good separation of pure GUI functions from business
    rules from db access), then moving to WE can be fairly easy. If every Forte
    window operation calls some method rather than invoking inline code, then
    that is a good step. If every window operation calls some external
    (non-window) method, then that is even better. That makes the replacement
    of the Forte GUI with a browser based GUI much easier.
    5) We tested, very briefly, the Window Converter operations of WE. It did
    seem to work but we really could not utilize this facility because of the
    poor design of the Forte GUI. We would have been forced to re-write our
    existing GUI to take advantage of this.
    6) We are attempting to reuse what we can from the existing application but
    we are also taking advantage of this rewrite to implement a cleaner
    architecture within a newly developed framework.
    Jerry Fatcheric
    Verizon Wireless
    Hi Forte Experts
    We are developing an application in 'pure' Forte 4GL, but have now reachedthe point >where some 20 windows must also be used from a WWW interface,
    both for dataentry and >lookup of info.
    So what is the right product(s) to look for / buy? Forte for Java ,WebEnterprise, >WebEnterprise Designer or is the functionality already in
    30M2 and all we need to do >is to open the documentation-kit...?
    Suggestions or War-stories are welcomed...
    thanks
    jens chr /KAD Denmark

    Adobe makes three products that could work here: Photoshop Elements, Lightroom and Photoshop. Other companies also make programs that will do these tasks.
    You make it sound like this is a one-time need. If that's true, I would think that the Adobe products are overkill. In fact, to edit the photos you might want to look at freeware products like RawTherapee, and there are plenty of freeware slideshow applications.

  • What is the Earlier Inspection process

    Dear Folks,
    What is the earlier inspection process ?
    And my actual requirement is , i want to do the final inspection process for  a material with refernece to a production order and i want to do another operation with reference to the same production order after completion of this final inspection operation.
    I heared that through earlier inspection process it is possible. But i do not what is that.
    Can anybody explain the earlier inspection process.
    thanx in advance .
    Regards
    Srinivas

    Hi,
    Early Inspection Lot:
    Excerpts from Std SAP documentation:
    An inspection lot with inspection lot origin 04 is created when a
    production or process order is released. You can use this inspection
    lot to inspect goods receipts of the finished quantities and then
    manage them after goods receipt posting in the inspection lot stock.
    Recommendation: Avoid making a usage decision for this type of early
    inspection lot before any goods receipts have been posted. The usage
    decision will then have a stock quantity of 0, but will not have the
    status completely credited. This means that any following goods
    receipts will be posted into the stock for this inspection lot. You
    must then credit this lot from the stock quantity yourself, even if
    you do not intend to perform further checks.
    Hope this helps
    Regards
    Dheeraj

  • Production process flow

    Hi all,
    Below is the list of doubt.
    1.can any one sent me the production process flow diagram with tranaction and the tables that have used in the transaction.
    2. what is mean by backlash in production process
    with regards,
    paul

    backflush means automatic good issue document generation after the actuall physical issue of the material in the shop flooor.
    suppose u have backflush for component in the order, then u will issue the same while production of the header material, but there is no updation in the system so when u will do teh confirmation for the order then automatically in the background document will be generated for the issued componenets.
    backflush can be defined in Material master, work center and routing with decending priority....

  • Co product process related queries..

    Dear Experts,
    Request you to guide me on the below process.
    Co product process and costing
    Material (A) is consumed under production process and SFG1 (60%)and SFG 2 (40%) are produced. Need to set co product for the same.
    1) Where i will set co product indicator in SFG1 or SFG2.
    2) If both are co product then where is my main material.nee to define one main product along with two co products or i can produce two co product without main products.
    3) Where i will set portionment structure or source structure.
    4) How to define equivalence no.
    5) What tcode or process need to be done in order to distribute cost in 60 and 40 %.
    Request you to guide me the complete process flow along with costing process.
    your help will be highly appreciated.
    regards
    RR

    Dear Ajay,
    Thanks for your advice
    I have ticked co product indicator in SFG1(Main Product) and SFG2 (CO product).
    I have bom of SFG1 inside that SFG2 is a component as Co product with - ve QTY
    I have ticked co product and assigned source structure in SFG1.
    Inside source structure There are 3 assignement seperatly for SG1 and SFG2 based on material cost ,production cost and others ratio is 60 for main and 40 for co product for all assignments.
    While Running cost estimate system of SFG1. System is showing Sfg2 as co product and value based on ratio.If i will execute cost estimate of SFG2 then system is showing SFG1 as co product  vice versa.
    Is it correct approach.If no then where i m lacking.
    regards
    Raman Rana

  • What is the difference between Process and Threads

    What is the difference between Process and Threads

    http://forum.java.sun.com/thread.jsp?forum=45&thread=525518&start=0&range=15#2519429

  • How to find what type of middleware product we are using in SAP CRM ?

    Hello All,
    Ca anyone help me in getting the information  for the following :
    1) How to find out what type of middleware product we are using in our Project? ( Currently our SAP CRM version is 4.0 and the middleware is using for R/3 to SAP CRM and vice versa)
    2) Do we have a product called u201CMessaging wareu201D used in SAP ?
    Kindly revert at the earliest .
    Cheers
    Sreedhar

    Hi Sreedhar,
    What you've mentioned is exactly the task of CRM Middleware, which sits on the CRM server and governs the data flow.
    By any chance are you trying to find out about DOE(Data Orchestration Engine) used by SAP NetWeaver Mobile ?
    maybe this link would help then:
    http://help.sap.com/saphelp_nwmobile71/helpdata/en/7f/c9391404c74fabb8ccc321bac64e8d/content.htm
    -Rohit

  • Discrete production process after creating sales order with raw materials

    Dear all,
    I need your support on a specific solution related to discrete production process.
                                After creating a sales order where the materials are marked as raw materials (ROH), with reference to the sales order the production order is created and the store issues the material for assembly process and is sent for assembly of materials. After assembly of the materials the inventory is added to the sales order stock as same as raw material and after PGI the billing is done for raw material only.
    Please let me know the process of raw material to raw material scenario.
    Thanks
    Seshi

    Hi Seshi,
    This question seems to be related to ERP rather than to SAP ME. You'd better post it to ERP-related forum. Please use these instructions to find a proper space.
    Regards,
    Sergiy

Maybe you are looking for

  • How do I fix this error response?

    When I bought my new Macbook Pro, replacing my old Macbook Pro, I can't open alot of documents now that I used to be able to before and they're just .doc documents.  I get this error response: "You can't open the application Microsoft Word because Po

  • How to access the user-id property which is available in VM engine in the rulebase

    Hi Experts, The interview engine exposes various application constants and one of them is the user-id which gives the user-id of the current interview session. This is basically taken from the url for the web-determinations. We would want to use this

  • Open SO even though DO and Invoice are completed

    Hi All, SO still exists as Open even though it had been DO and Invoiced. THere is only 1 item but in the status overview, it kept indicating that SO is Open and even exists in VA05. Please kindly assist.

  • How do I recover my browser history that was deleted today?

    I accidentally deleted all of my internet history, and there were sites on there I needed to bookmark for a school research paper. How do I recover the history? I only need the history from today.

  • PFI line for counter and digital boolean input simultaneously

    Hi, I have a question concerning the digital I/O and the counter. I use a 6210 card for detecting a TTL signal. Physically I wire the TTL output of the device to the PFI0 port for the front counter (ctr0). Meanwhile, I use the same port (line0) for a