What is  UTP?(unit test plan)

hi,
what is UTP?
How do you write UTP?(unit test plan)

Hi,
    Are u referring to the UTP which is to be done after u hve completed the coding. If so, UTP is a document where in u write the test cases and the test results of the object that you have developed. It will have the test case, expected result and the result that is displyed in the output. You can also provide the screenshots of the output and also comments in the document.
Hope this helps.
Reward points if helpful.
Thanks.

Similar Messages

  • How to write utp(unit test plan)

    how to write utp(unit test plan)

    Hi,
      Steps to be followed for UTP.
    UTP : Unit Test Plan. Testing the program by the developer who developed the program is termed as Unit Test Plan.
    Two aspects are to be considered in UTP.
    1. Black Box Testing
    2. White Box Testing.
    1. Black Box Testing : The program is executed to view the output.
    2. White Box Testing : The code is checked for performance tuning and syntax errors.
    Follow below mentioned steps.
    <b>Black Box Testing</b>
    1. Cover all the test scenarios in the test plan. Test plan is usually prepared at the time of Techincal Spec preparation, by the testing team. Make sure that all the scenarios mentioned in the test plan are coverd in UTP.
    2. Execute your code for positive and negative test. Postive tests - to execute the code and check if the program works as per expected. Negative Test - Execute code to know if the code is working in scenarios in which it is not supposed to work. The code should work only in the mentioned scenarios and not in all cases.
    <b>White Box Testing.</b>
    1. Check the Select statments in your code. Check if any redundant fields are being fetched by the select statements.
    2. Check If there is any redundant code in the program.
    3. Check whether the code adheres to the Coding standards of your client or your company.
    4. Check if all the variables are cleared appropriately.
    5. Optimize the code by following the performance tuning procedures.
    <b>Using tools provided by SAP</b>
    1. Check your program using <b>EXTENDED PROGRAM CHECK</b>.
    2. Use SQL Trace to estimate the performace and the response of the each statement in the code. If changes are required, mention the same in UTP.
    3. Use Runtime Analyser and Code Inspector to test your code.
    4. Paste the screen shots of all the tests in the UTP document. This gives a clear picture of the tests conducted on the program.
    All the above steps are to be mentioned in UTP.
    Regards,
    Vara

  • Unit test plan for inbound and outbound interfaces

    I am trying to create a UNIT TEST PLAN for an interface. In this interface a flat file in IDOC format is picked up from the application server and processed using EDI_DATA_INCOMING for the relevant posting ( example : Sales order creation from a PO IDOC). IF the file is not in IDOC format then it is reformatted to the IDOC format manually.
    In second scenario(outbound), after sales order creation or billing document creation, IDOC is created which is read and a custom flat file is created and sent to a middleware.
    PLease suggest a unit test plan for these kind of scenarios or send a sample UTP if possible.
    REgards
    Nishant
    PS: points will be awarded to helpful answers.

    Unfortunately this isn't possible, the esa has only one routing table. You'll have to add specific routes for your internal networks.
    I usually avoid two-armed setups because of this and it gets even worse if you want to use virtual gateways (traffic gets sent via the internal interface with an IP from the external interface)

  • About unit test plan document

    Hi all,
    I am new to ABAP environment.Can anyone explain what is meant by unit test plan document and also what is the diff between between code review and peer review.
    Thanks in advance
    *There is enough material online, pl help yourself.
    @Others: Answering such questions is discouraged.*
    Edited by: Suresh Datti on Sep 1, 2009 10:35 AM

    Hi,
    Unit test plan:
    From a technical point of view , once you complete your development you need to test the objet to ensure it is meeting all the requirements..
    For this purpose you prepare a unit test plan. You will have both negative and positive test case in your plan. Execute each case and check whether the output is acheived or not..
    Code review.. Once coding is completed you need to review your code to ensure that you have followed all coding stds..
    Peer review is code review done by; some one else in your team.
    Search SCN for more details
    Regards
    Ansari

  • How to prepare the UNIT test plan

    Hi ALL
    can any body tell me how to prepare a unit test plan

    Use the following colums in preparing unit Test data.
    1. Sr.No.
    2.Test Condition.
    3.Expected Results
    4.Description/Instruction for the test execution.
    5.TestData used for the test.
    6.Actual Result.
    7.Pass/Fail.
    For a login Screen. Unit Test plan wud b.
    1.  1
    2.   User Presses Login Button.
    3.   Data shud be validated.
    4.  As soon as the user enter the fields in the login screen,the data shud be validated and If entered data is correct proceed to the next screen, else popup an error.
    5. User:kiran, Pwd:***
    6. Entered incorrect data,but proceeded to the new screen.
    7. FAIL.

  • Required Unit test Plan for Data migration

    Dear All,
    I am looking for unit test plan Draft documents/templates which covers
    1. Testing tools
    2. Methods
    3. Error handling
    4. Reviews and approvals
    The project is a Oracle 10g data migration from one schema to another schema.
    It will be a greate help if anyone can forward the same to me.
    Thank you.

    Hi Vaishali,
    You may wish to refer the links below...
    https://service.sap.com/instguides --> SAP NetWeaver --> Release 2004s --> Upgrade
    https://www.sdn.sap.com/irj/sdn/developerareas/bi
    latest on upgrade tp BI7.0
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    Upgrading BW 3.X to SAP NetWeaver 2004s BI (PDF 2.6 MB)
    Front End Migration strategy
    Here's the migration strategy: Rolling out the New SAP NetWeaver 2004s BI Frontend Tools
    Presentation
    http://csc-studentweb.lrc.edu/swp/Berg/Articles/PM_2006_upgrade_NW2004s_Bjarne_Berg_v12.ppt
    Here are the frontend requirements:
    Troubleshoot the SAP NetWeaver 2004s BI Frontend Installation
    Here are the backend requirements in the product availabilty matrix:
    https://websmp110.sap-ag.de/~form/handler?_APP=00200682500000001303&_EVENT=DISP_NEW&00200682500000002804=01200615320900001250
    Migration of Web Teplates
    832713 - Migration of Web templates from BW 3.x to Netweaver
    Assign points if this helps.
    Regards,
    Anil

  • Need Sample Unit Test Plan templates for SD

    Hi Experts,
    I am in need of some SD unit test plan templates used in any of your implementations.
    Pls Help.

    Dear Preethi
    As already expressed, you are asking the confidential document which nobody would like to share.
    However, AS-IS will be prepared by Core team people and your duty is to go through the process in depth.
    May be the AS-IS from SD purview, I can list as an example as how it should be
    The excel sheet of AS-IS header tabs will have to contain the following header tabs
    -  Scenario like Exports, Domestic etc,
    -  Under this scenario, Groups like OE, Aftermarket, Stock Transfer etc.,
    -  Under this Groups, Process like Business Plan, Scheduling, Preshipment activities, Post shipment activities etc.,
    -  Finally this process has to be break down into a detailed list of activities.
    So you have to go through these process in detail.
    As for as testing is concerned, there is no need to check the customer master.
    All you have to do is to carry out all standard T.Codes like order creation, create delivery, PGI, Billing and Excise Invoice.  Again try to cancel all documents from billing to sale order and ensure that you are able to cancel those documents.  Check for the FI implication on the COGS and material cost.
    Also while testing, you can also check whether you are able to create one delivery against multiple sale orders and one invoice against multiple deliveries.  If not successful, analyse the reason for split, maintain the required datas in masters and retry the process.
    thanks
    G. Lakshmipathi

  • Abt unit  test plan

    hi
    can u plz explain abt unit test planning?
    es

    hi bramara,
    Unit testing is used to test the proper working of a single module.
    Integration testing is used to test the integration between the modules,
    when the complete business scenario of a client is tested (say from sales order creation to receipt of money from customer).
    Unit Testing
    When you test every single document is called unit testing.
    String Testing
    One transaction full activity is called string testing. For example Vendor
    invoice, goods received and vendor payment.
    Integration Testing
    It is purely with other modules and we have to check whether the FI testing
    is working with other related modules or not.
    Testing of combined parts of an application to determine if they function
    together correctly.There are three types of integration testing.1. Big bang
    testing: Testing with all modules combined together invariable of its
    levels. Often done for small projects.2. Bottom up test:Testing by
    integrating lower level modules and ascending towards the higher-level
    modules.3. Top down: Testing the higher-level modules and descending towards
    the lower level modules.This can be accomplished with dummy modules to
    replace the under construction modules with so-called stubs and drivers.
    not.
    Regression Testing
    Testing for whole database. Bring all the data into another server and do
    the testing is called regression.
    Thanks,
    <REMOVED BY MODERATOR>
    kushagra
    Edited by: Alvaro Tejada Galindo on Jan 31, 2008 9:45 AM

  • How can we do unit test plan

    hi experts can u help me plz

    Hi,
    Check this
    http://www.softwareqatest.com/qatfaq2.html#FAQ2_6b
    You find a description about Test Plan.

  • Hi experts what is UTP

    hi abapers,
    what is UTP can please expplain me who will do UTP.

    UTP means unit test plan....
    Unit test plan means Code Walk through...After development of object, code walk through needs to be done & even try to break the code while executing for errors..Also check EPC etc....
    Steps to be followed for UTP.
    UTP : Unit Test Plan. Testing the program by the developer who developed the program is termed as Unit Test Plan.
    Two aspects are to be considered in UTP.
    1. Black Box Testing
    2. White Box Testing.
    1. Black Box Testing : The program is executed to view the output.
    2. White Box Testing : The code is checked for performance tuning and syntax errors.
    Follow below mentioned steps.
    Black Box Testing
    1. Cover all the test scenarios in the test plan. Test plan is usually prepared at the time of Techincal Spec preparation, by the testing team. Make sure that all the scenarios mentioned in the test plan are coverd in UTP.
    2. Execute your code for positive and negative test. Postive tests - to execute the code and check if the program works as per expected. Negative Test - Execute code to know if the code is working in scenarios in which it is not supposed to work. The code should work only in the mentioned scenarios and not in all cases.
    White Box Testing.
    1. Check the Select statments in your code. Check if any redundant fields are being fetched by the select statements.
    2. Check If there is any redundant code in the program.
    3. Check whether the code adheres to the Coding standards of your client or your company.
    4. Check if all the variables are cleared appropriately.
    5. Optimize the code by following the performance tuning procedures.
    Using tools provided by SAP
    1. Check your program using EXTENDED PROGRAM CHECK.
    2. Use SQL Trace to estimate the performace and the response of the each statement in the code. If changes are required, mention the same in UTP.
    3. Use Runtime Analyser and Code Inspector to test your code.
    4. Paste the screen shots of all the tests in the UTP document. This gives a clear picture of the tests conducted on the program.
    All the above steps are to be mentioned in UTP.

  • Need to write international Unit Test.

    Hello All. I�d like to write a 16-bit charset unit test and view the results in eclipse. Can anyone tell me how to do so?
    I�m writing an application that needs to support international characters. The app will someday support Japanese, Hindi, Hebrew, Chinese, etc. No one in the office has written code in these languages.
    I�d like to write a JUnit test to ensure that my persistence layer can save �Hello World� in one of these languages and retrieve the exact String. I found a site showing me how to write Hello World in Japanese http://unix.org.ua/orelly/java-ent/servlet/ch12_03.htm, but System.out.println("\u4eca\u65e5\u306f\u4e16\u754c"); displays �?????�. I�d like to be able to preview the unit test from Eclipse and run it from ANT. What do I need to do to accomplish this?
    Thanks in advance,
    Steven

    Hi,
      Steps to be followed for UTP.
    UTP : Unit Test Plan. Testing the program by the developer who developed the program is termed as Unit Test Plan.
    Two aspects are to be considered in UTP.
    1. Black Box Testing
    2. White Box Testing.
    1. Black Box Testing : The program is executed to view the output.
    2. White Box Testing : The code is checked for performance tuning and syntax errors.
    Follow below mentioned steps.
    <b>Black Box Testing</b>
    1. Cover all the test scenarios in the test plan. Test plan is usually prepared at the time of Techincal Spec preparation, by the testing team. Make sure that all the scenarios mentioned in the test plan are coverd in UTP.
    2. Execute your code for positive and negative test. Postive tests - to execute the code and check if the program works as per expected. Negative Test - Execute code to know if the code is working in scenarios in which it is not supposed to work. The code should work only in the mentioned scenarios and not in all cases.
    <b>White Box Testing.</b>
    1. Check the Select statments in your code. Check if any redundant fields are being fetched by the select statements.
    2. Check If there is any redundant code in the program.
    3. Check whether the code adheres to the Coding standards of your client or your company.
    4. Check if all the variables are cleared appropriately.
    5. Optimize the code by following the performance tuning procedures.
    <b>Using tools provided by SAP</b>
    1. Check your program using <b>EXTENDED PROGRAM CHECK</b>.
    2. Use SQL Trace to estimate the performace and the response of the each statement in the code. If changes are required, mention the same in UTP.
    3. Use Runtime Analyser and Code Inspector to test your code.
    4. Paste the screen shots of all the tests in the UTP document. This gives a clear picture of the tests conducted on the program.
    All the above steps are to be mentioned in UTP.
    Regards,
    Vara

  • Unit Tests / Integration tests

    Hi Experts,
    I am planning to enchance the existing extract structure in R/3 by including new fields.
    After that, I need to enhance my structures and existing infoproviders in BW.
    I have just finished the blue printing phase.
    I would like to know what are the unit tests / test scenarios / test plans / test cases that I need to consider? Is there a list of standard unit tests?
    Also, what about integration tests?

    hi,
    Unit testing is the one in which the developer himself test the code.
    In Unit testing the developer will test whether all the statements will execute based on different conditions.
    There should not be any dead code after Unit test.
    Dead Code means, for any given combination the control will not go to the statement.
    you can go thru the following links
    http://en.wikipedia.org/wiki/SAP_Implementation
    http://hosteddocs.ittoolbox.com/CM021805.pdf
    Look at the below link
    http://softwarefinder.mbtmag.com/search/for/Techrepublic-Cost-of-SAP-Implementation.html
    refer to the following links.
    http://blogs.ittoolbox.com/eai/implementation/archives/gui-windows-types-unit-test-template-12961
    Integration testing is usually where the func team run processes end to end. If security is involved then generally you are validating that the roles contain required transactions, there aren't any gaps where roles can't support the processes. You may want to test org levels and +ve and -ve test controls here but it really depends on your implementation. Most security testing is usually done in UAT but you would preferably have func team using real end user roles in IT, though generally not in the first passes where they validate their config
    Ramesh

  • Test Plan APO

    Hi all,
    I would ask a favor, I need help to make a test plan for APO system. What would be the test plan to determine if it is well implemented in APO.
    Thanks for your help
    Rob

    Hi Rob,
    I guess the answer for this may not fit in this space. But you can start identifying all the functionalities in the APO system you have built.
    Perform the unit test for all of the functionalities separately and then go ahead with the scenarios with integration with other functionalities.
    It again depends on what sub modules you have implemented in your APO instance.
    Regards,
    Rag

  • ABAP UNIT TEST

    Hi ,
    I am new to oops concept but i am able to understand.
    Now i have to create some Unit test plans in ABAP.We are using SAP Netwever 7.1 and WEB AS 6.0
    I tried from SE24 but i couldn't get the correct path.
    Can you please explain me: if i have a Z program then where and how to write number of Unit test classes. And how it will integrate to with our actual program/FM/any object
    Thanks
    Umashankar.

    You can create the ABAP Unit class as a local class in your program, FM, or class which will test the functionality of that individual code lines. Once you implement the ABAP Unit, you can then run the Unit Test by main menu > Execute > Unit Test. E.g. from Program, Program > Execute > Unit Test.
    Check this previous discussions:
    ABAP Unit, how to use
    Unit Testing concept
    Regards,
    Naimesh Patel

  • Test plans

    Hi friends , I am new to SAP testing and have been given a scenario to write test plan and cases.
    the scenario is like this . there are two output types configured in Nace : Z123 and Z456.
    Z123 : Sends an email  with the invoice doc as PDF attached to a mail to the AR team for checking.
    Z456 : After checking they send the same invoice as PDF to the customer of the invoice  through VF33  transaction .
    can some one tell where to find the Customer for an invoice?
    Can any one suggest what are the possible test plans /cases  that can come up in this scenario?

    If this is related to some sort of financial module or system, then perhaps it's better to move this thread to one of the EBS or Peoplesoft forums.

Maybe you are looking for

  • Latest security update and the disappearance of my external drive

    I'm sure you're going to tell me that one has nothing to do with the other, but after running the latest security update, the Iomega MiniMax external drive that's been connected to my TiBook for the last 3 years has all of a sudden disappeared from m

  • Costing problem while running Process order

    Hi, This is a  problem relating to costing of HALB material.. While doing process order for a fert material (BOM of FERT material contains a HALB and two ROH materials) a window occurs while saving ' Error when calculating costs, see log'. Why is thi

  • Vista/Win7 - Using Aero for more than window decoration?

    I was wondering if it's possible to use the 'glass' effect in java as found under Windows Vista and 7. For example, windows explorer uses the glass effect for more than just the window decoration, there is also a bit below the titlebar containing the

  • C7 setting card in use for Internet downloads

    Is it possible to set which card and folder Internet downloads are saved to? BBC iPlayer downloads seem to be saved to the root of the mass memory card and I cannot see any way of changing this. I want to change this to my Kingston memory card.

  • Can't Debug in Eclipse - PS starts but Extension doesn't load

    Windows 7 Pro I can create my extension in Eclipse and Export it.  Then use Extension Manager to install it and PS sees it......but if I right click on the Project in Eclipse and use 'Debug As', PS starts but the extension doesn't appear in it's list