What is  WBS element & what is it's use

Hi,
What is  WBS element & what is it's use

Perhaps the following thread can provide more information...
WBS Element
You may also find some additional information at the following link...
http://help.sap.com/saphelp_47x200/helpdata/en/4c/225ce546e611d189470000e829fbbd/frameset.htm

Similar Messages

  • What is superior WBS Element

    Dear All,
    What is superior wbs element? Is is the 1st level wbs element?
    Regards,
    Smile

    Hi,
    by using SE16 transaction,
    check PRPS table, field PSPHI - gives superior WBS Element
    or
    table PRHI      (WBS element Hierarchy pointer), field PSPHI - gives superior WBS Element
    Regards,
    Sandeep
    Edited by: Sandeep Theurkar on May 28, 2009 3:20 PM

  • GR/IR difference with foreign currency - WBS element

    I am working in the MM area and hadling Service entry sheets, GR and Invoice, Finance is complaining and having problem at project(WBS Element) closing time. we are using Project system to control budget. Now finance is not able to close budget code because they are having commitment and giving error. the situation is like below: There is a difference of .01 AED in the Foreign currency amount, finance also claim that system was behaving OK with 4.6C, Now after upgrade to ECC5(4.7) it has started this problem
    Goods Receipt:
    3,702.73     USD          13,600.00     AED
    Invoice Receipt:
    3,702.73     USD          13,600.00     AED
    Service Entry Sheet:
    3,702.73     USD          13,600.01     AED
    Please help me to sort out this problem
    Mazhar
    Message was edited by:
            Mazhar Hussain

    Hi
    Header exchange rate picked up at time of PO creation with reference to document date in header.
    If you fix exchange rate then it will be same for all items in purchase order.
    In your case if exchange rate is different then check whether you have done goods receipt in two lots (say 8 items first and then 2 items) with different posting dates. Check accounting documents generated and in that document check translation dates for checking exchange rate in OB08 transaction.
    And in invoice what is the currency you are using - if you do not use any special currency (foreign) then PO currency will be picked up. If exchange rate fixed indicator is not there in PO - depending upon system baseline date (posting date) exchange rate will be coming.
    Thanks

  • BAPI for Production order creation against wbs element

    dear all,
    I am using BAPI (BAPI_PRODORD_CREATE) for Production order creation against wbs element.I am putting following input paramters in this
    material no,
    order type
    plant
    qty
    basic start dt & end dt
    wbs
    But during GRN it is not taking the account assignment as project stock i.e. its picking movement type 101 but it should be 101Q.
    For this what changes are required.
    regards
    ravi arora

    Hi,
    2 options i can think of:
    1. Create a BDC program by recording co10
    2. Create a planned order with order type PR using BAPI_PLANNEDORDER_CREATE, specify the WBS element & other details. Now use BAPI_PRODORD_CREATE_FROM_PLORD to create a production order with reference to the planned order created earlier.
    I believe option 2 should meet your need. Check & revert.
    Regards,
    Vivek

  • Passing WBS element

    hi friends,
    I am working on SAP SRM 5.0 and trying to pass WBS element from catalog to EBP using new_item-custfield3 from custom BSP application.
    For this i am using badi BBP_CATALOG_TRANSFER-ENRICH_ITEM_DATA. After transferring the catalog items and clicking on the magnifying glass icon against the item, i am unable to see the the cost assignment data and getting the error "No G/L account was entered. Enter a G/L account" though i am passing the G/L account from the badi.
    Please suggest me the solution for the above problem...
    regards,
    B.Siddhesh

    hi ramesh,
    Thanks for your prompt reply.
    Could you please tell what are the mandatory values to be filled in ET_SC_ACCOUNTING ?
    As of now i am passing
    P_GUID,
    ACC_NO,
    ACC_CAT,
    G_L_ACCT,
    BUS_AREA,
    CO_AREA,
    PROFIT_CTR,
    FUNC_AREA, and
    WBS_ELEM_E to ET_SC_ACCOUNTING.
    regards,
    B.Siddhesh

  • Problems deleting WBS elements

    Hi,
    I'm trying to delete a number of WBS elements via CJ20N and I'm presented with an error message as follows:
    "There are CATS records that have not yet been tran"
    (Message no. CJ001)
    I'm not sure exactly what this means or how to get around it (or even view the offending records) - Any ideas?
    We are using WBS elements to capture project costs from Timesheets using CAT2.
    I'm guessing that I need to transfer the postings against the WBS that I want to delete to another WBS - What transaction is used to do this?
    Any pointers or advice will be appreciated.
    Thanks in advance,

    Hi,
    You can use transaction CJ88 to settel the wbs element.
    Award points if useful.
    Thanks & Best regards,
    Subbu.

  • WBS Element - Order Number Relationship

    Hi,
    I need to know the specific Order Number (example: PM order) with cost posting on WBS element.  I am use COVP / COEP field OBJNR to see the WBS Element (those starts with PR*), but I do not know which field is the Order Nmber contained in the table.
    Please advise in which table can I see the linkage between WBS and Order number for cost postings.
    Thanks!
    Regards,
    Vivian

    hi,
    plz go thru following thread.Might be it will help u
    WBS Conversion Routines
    Conversion - Internal number to External number
    WBS element
    <b>plz reward if useful</b>

  • User Exit - adding defualt WBS Element in addi.tab for IW31 - Servi.Order

    I am facing a problem with adding WBS Element in Addit.Data tab for Service Order creation using IW31.
    At the time of creating service order using TCODE IW31, I have to maintian default values like WBS ELEMENT, for this I am using a USER EXIT "IWO10010".
    The problem is getting dump error. Becuase, it is NUMC type and I am passing the value with character + numeric. Like "EX/1232/22".
    Field length is NUMC - 8.
    "CAUFVD-PSPEL"
    If I create manually without using user exist, the field WBS Element is accepting the value and service order is creating successfully with WBS Element.
    This is also same as CAUFVD-PSPEL.
    I Couldn't understand How the SAP system will works?
    Any solution for this.
    Note: Creating Service Order IW31, Passing WBS Element with user exist with same field (CAUFVD-PSPEL) giving dump error showing "Passing Character values". If I create manually, and enter character + numeric in the same field CAUFVD-PSPEL, system creating service order without any error.
    Help me out
    thanks
    Sekhar

    self answered

  • PM Budget - Statistical WBS element

    Hello,
    My intention is monitoring the PM budget for a plant by linking every PM order to a statistical WBS element.
    After posting on the PM order and performing costplanning via CJ40 i get a overview in transaction: S_ALR_87013543 - Actual/Plan/Variance Absolute/Variance %.
    However. Not every PM order shows up in the report. I thought it had something to do with the moment you assign the WBS element to the PM order but this didn't prove to be a valid statement (before or after actual postings on PM order).
    I can probably find out by extensive testing, but i was wondering if anybody knows if there are specific rules regaring the usage of statistical WBS elements in PM orders? More specificaly, when the assignment will NOT work and the actual costs will not show up in S_ALR_87013543.
    Kind regards,
    Peter Hageman

    Settling was done towards a Costcenter. The WBS element used is a statistical WBS element, that only can be used for reporting purpose. how the settlement rule is set up doesn't matter in this case.
    Issue no longer exists.
    Solution was evident. WBS element in the order was stored on the location tab, and in order to use CJI3, you have to link it on the additional data tab...

  • Link of vendor in sales order through WBS element

    Hi
    My sales order line items are having WBS assigned.All these line items are direct bought out items from vendors and supplied to customer.
    Please suggest me link of vendor in sales order through WBS element.
    I want to use the same logic for billing split criteria for individual line items(hence for individual vendors) Presently my client is getting common invoice for all line items but they want separate invoice for each line items.
    Awaiting for your valuable inputs
    Thanks
    Manoj

    Hi Manoj,
    I need to understand your process in more detail.
    How do you procure?  Create a sales order with TAS item category to create a PReq and PO?
    Very simple explanation: Resource Related billing/DIP profiles are used to accumulate costs on WBS elements and then bill the client as needed.

  • How to update the value in wbs element in the iw32

    Hi All,
    Can anyone help me in providing the USER EXIT OR BADI at the time of saving the IW31 / IW32  work order creation or Change. I need to populate the PSPEL ( WBS ELEMENT in Additional data tab with the value coming from Field Exit.
    Here is my analysis on the same.
    I have written Field Exit for Settlement Receiver field in Maintain Settlement SCREEN à 1 and Exporting the value.
    IMPORT the same value into Variable and need to pass the value to PSPEL field ( WBS ELEMENT ) in Additional Data Tab  using any USER EXIT or BADI at the time of save Work Order .
    I tried to use the USER EXIT u201CEXIT_SAPLCOIH_009u201D  and passed Manually at the time of Debugging into CAUFVD-PSPEL and executed. But the Value is not appearing in the Screen after execution.
    Any help is greatly appreciated.

    hi check this exit...
    IWO10012

  • IDOC and then create WBS element

    Hi guys,
    I need some help here.
    The process is like this. I'm creating an IDOC which would then create a WBS element.
    The message type used here is /ISDFPS/PS and Basic Type is /ISDFPS/PS01.
    I'm posting the IDOC using FM "IDOC_INBOUND_SINGLE.
    The segments that I'm populating are:
    /ISDFPS/E1BP_PROJECT_DEF
    /ISDFPS/E1BP_WBS_ELEMENT
    Its posting and creating the WBS element successfully but there is a small issue.
    Lets say I have a Project Definition A  and under that I have a Parent WBS B
    How do I put the newly created WBS element under the Parent WBS B?

    Friends, Let me correct my stand here.
    In my system, I simulated scenario, I am not getting REL status for higher level  TECO WBS, when I undo TECO for network activity. I tried to find out  why my  system is behaving in that way.  I referred note " 938066 - CJ20N: Cannot Undo TECO status of activity"
    According  to it correction is provided in Support package SAPKH60005 and I am at
    SAP_APPL     600     0002     SAPKH60002     Logistics and Accounting .
    So, My system is not correctly behaving. I have verified the same with one another note  Note 542974 - Status inheritance in different transactions
    Thanks to Ahmed &  A Bhardwaj  for overlooking me.  So, I re look and got the reason. Rashid, take solution given by Ahmed & Bhardwaj ( The same is up to mark )
    With Regards
    Nitin P.

  • Creating WBS element using bapi BAPI_PS_INITIALIZATION

    Hi All,
    I have created Project definition successfully  using function module "BAPI_PROJECT_MAINTAIN" .
    But while trying to create Wbs-Element for the project definition using same function module  "BAPI_PROJECT_MAINTAIN"   we are getting the following error
    Key does not correspond to mask: TR.XXXXX.X.X.XXX
    Could any one help me out to resolve this issue.
    Thanks in advance.
    harsha p

    Hi harsha p,
    Error CJ609 "Key does not correspond to mask:TR.XXXXX.X.X.XXX" is always caused by an inconsistency between the project/WBS object number and the coding mask. Therefore, to solve the problem can you please try to run report ZZADJUSTPOSID from note 453280 attached?
    The report should be imported into your system manually by SE38.
    Please run it first in test mode to check the wrong entries and then correct them in update mode.
    Best Regards,
    Edna

  • Actual Date in WBS element

    Hi,
      Actually in my WBS elemrnt the actual Date fields are disabled in change mode,  i need to enter the actual dates, How to do...
    Thanks in Advance....

    Entering actual start and finish dates for a WBS element, depends on below
    1. WBS element has been further described using activities
    2. Whether you have already entered actual dates for subordinate WBS elements.
    WBS Elements W Activities
    1. You can always enter actual start.
    2. You can only enter actual finish, if all subordinate WBS element already have an actual finish.
    WBS Elements W/o Activities
    1. You can only maintain the actual start, if all activities that are assigned to WBS element have status "PREL" or "REL".
    2. You can only enter actual finish if all subordinate WBS elements already have an actual finish and all activities for this WBS element have system status "final confirmation".
    Regards
    Sreenivas

  • Is there any BAPI for Upload Documents of WBS elements?

    Hi Guys,
                 Can anbody tell me is there any BAPI for Uploading Documents  of WBS elements ?
    Thanks,
    Gopi.

    hi
    check these BAPI
    Change WBS Elements Using BAPI                                                                               
    BAPI_BUS2054_CHANGE_MULTI           
    Create WBS Elements Using BAPI 
    BAPI_BUS2054_CREATE_MULTI                                                               
    Delete WBS Elements Using BAPI                                                                               
    BAPI_BUS2054_DELETE_MULTI                                                               
    Detail Data for WBS Elements                                                                               
    BAPI_BUS2054_GETDATA                                                                      
    Reading the GUIDs using the WBS Key
    BAPI_BUS2054_GET_GUID_FROM_KEY                                                     
    Reading the WBS Key using the GUIDs                                              
    BAPI_BUS2054_GET_KEY_FROM_GUID                                                                               
    Check Existence of a WBS Element                                                 
    BAPI_PROJECT_EXISTENCECHECK                                                                               
    Element                                                 
    thnks
    sitaram

  • Need Employee Names and Employee Numbers that charge a WBS Element

    Hello,
    Does anyone know how I can get a list of employee names and employee numbers that are charging a series of WBS elements?
    Thanks

    Hi,
    You could use transaction CATS_DA with Receiver Account Assignment and enter the WBS element.
    Good luck!
    Tammy

Maybe you are looking for

  • JOptionPane localiztion

    JOptionPane localization Hi How can localize JOptionPane Dialog to fit some local I am using Arabic in my application and and I use Arabic locale but JOptionpane is still in English instead of yes no cancel I want another words appera thanks

  • Speaker issue in nokia e5

    i had a very strong impression of nokia that nokia makes study and good quality phones, that was the reason i have been using nokia phones for last 8 years. but nokia e 5 has harassed me mentally like anything. My phone got replaced by nokia, my keyp

  • [Novice Problem] With CharacterFormat

    Hi everybody, I am working with TLF for few days and I don't understand something... I have created a textflow, and I want to apply a style (color, fontFamily...) on selected characters But when I use CharacterFormat, the style is applied on all the

  • How to use nested tag in Struts

    Hi.. Can any one guide me how to use nested tag in Struts. So far i already tried bean tag with no error but when i try to use nested tag i got error like javax.servlet.ServletException: Cannot find bean: "" in any scope Below are my class: action cl

  • Diff between XI & Biztalk

    Hi,   What is the diff between XI & Biztalk. Does Biztalk approuch poin-to-point or hub architecture. XI approuch Hub architecture. Biztalk approuches???? Thanks Koteswara rao