What is Work centre

Can u let me know what is Cost Centre / Work Centre ?
What is the difference between production order / process order
Thanks in advance.

Hi
check info given BY sap to clear ur doubt
Definition
Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
Machines, machine groups
Production lines
Assembly work centers
Employees, groups of employees
Use
Together with bills of material and routings, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks.
Data in work centers is used for
Scheduling
Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated.
Costing
Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
Capacity planning
The available capacity and formulas for calculating capacity requirements are entered in the work center.
Simplifying operation maintenance
Various default values for operations can be entered in the work center.
The following graphic illustrates the use of work center data.
Use of work center data
Structure
A work center is created for a plant and is identified by a key. The work center category, which you define in Customizing the work center, determines which data can be maintained in the work center.
The data is grouped thematically together in screens and screen groups. Examples of such screen or screen groups are:
Basic Data
Assignments (to cost centers, Human Resource Management System (HR))
Capacities
Scheduling
Default values
Hierarchy
Technical data
Integration
Task Lists
Work centers are assigned to operations in task lists. If you change default values in a work center, the changes are effective in the task list if a reference indicator has been set for the default value.
Work Center Hierarchies
Work centers can be arranged in hierarchies. These are important in capacity planning. You use hierarchies to cumulate available capacities and capacity requirements in a hierarchy work center.
Assignments to Objects in the Human Resource Management System
A Logistics work center can be assigned to either an organizational unit or a work center in the Human Resource Management System (HRMS). Assignments to other HR-objects, for example employees or qualifications, can be maintained via the HR work center.
Vishal...

Similar Messages

  • WORK CENTRE IN EQUIPMENT MASTER DATA

    Hello All,
    In IE01 tcode > creation of equipment , pls tell me what is the relevance of work centre in location tab ??
    Thanks,
    Sunny

    Hi
    Work Center
    Definition:Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    Use
    Together with bills of material and routings, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks.
    Data in work centers is used for
    Scheduling
    Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated.
    Costing
    Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
    Capacity planning
    The available capacity and formulas for calculating capacity requirements are entered in the work center.
    Simplifying operation maintenance
    Various default values for operations can be entered in the work center.
    Look at CR01 ,CR02,CR03 Transaction
    table : CRHD Table
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • Activity type in work centre

    Hi,all,
    I have a requirement as mentioned below-
    I have certain pm work center like engineer,fitters.But under engineer i have 3 different activity type like Sr.engineer time,Asst.engineer time,Jr.engineer time.I have assigned all these 3 activity type in my work centre in cost tab page along with standard formula SAP008.Now , my requirement is when I assign this work center in my equipment or maintenance order ,in operation tab pages of maintenance order ,only these three activity type should flow from where I want to select my relevant activity type.But instead of this,all the activity type around 10 nos whatever defined by CO consultant , is flowing to my order from where i need to select.I want only those 3 activity type which I had defined in my work center.can anybody please explain how to fulfill my requirement.thanks in advance.
    rgds
    rajib

    hi
    you can make the default cost element by creating the external profile in IMG and assigning to the order type ,also in easy access screen during order creation you can mention as default values in the menu Extras>settings>default values
    As per what cost element has to be specified kindly consult with the CO team,regarding the mandatory field may be you have specified the fields as mandatory in IMG settings,kindly check
    regards
    thyagarajan

  • Work centre change in production order

    Hi,
    During creation of production order, i want  to change the work centre if in the existing operation, that particular work centre is overloaded.
    Could any one let me know what are the steps involved in it.
    Re

    Hi,
    Goto CM25 & select the Overload workcenter &  underload workcenter .
    Inside the planning tabel select the Operation  from "Order (Pool) tabel"  and drag manually to the "under load workcenter " displayed in  upper table (workcenter) for required date. Now the operation workcenter has become changed & rescheduled.
    Regards
    Pradeep

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Difference between PP work Centre and Main work centre in a floc ?

    Hi,
    Can someone tell me the difference between the PP work centre in the location tab of a functional location compared to the Main Work Centre listed in the Organizational tab ?
    Thanks

    Kent,
    The way I understand it, is that the main work centre (Field name: GEWRK) in the organizational tab refers to the actual group who are reponsible for carrying out the maintenance of the object.  Costing and capacity planning is carried out through this Work Centre.  However the PP Work Centre (Field name: ARBPL) in the location tab is a different work centre.  And I'm not sure what it controls (if anything).  I think it refers to the location of the unit, but other than that I don't know what it controls.

  • Assignment of single capacities to a work centre

    Dear experts,
    I have following problem:
    We created capacities which we want to use for capacity planning using CR11.
    In the work centre maintenance I want to assign these capacities using CR02. -  Capacity header view --> ' go to individual capacities' . Here I want to fill the table 'capacity assignments - individual capacities' . When I put in the capacity code I get the error message CR100 'the capacity exists already'.
    I can only create new capacities (using new capacity codes). that doesn't help since we need to assign pool capacities which means these new capacites can not be assigned to the other work centres later on. For my problem it does not matter whether the capacity to be assigned is a pool capacity or not.
    What I want to do is exaclty what I found described in SAP documentations, unfortunately without detailed instruktions .
    What do I need to do to be able to assign these individual capacities?
    thanks in advance
    Kurt

    Dear,
    In Work center i.e CR02 capacity header, click Goto -> Individual Capacites . This will take you to the "Assignment tot the Individual Capacity" screen. Here you give names of the individual capacities and Click "Choose (F2)" , where you can maintain the header details for this individual capacity.
    For example:
    when You  give individual capacites as '2' ,youI have to go to GOTO field and select there Individual capacities. It asks for capacity and its short text.In capacity field  you can  give person1, person 2 etc and its short text as Ramesh, Kishan (name of operators).
    Regards,
    Ram,

  • Prod Order Work Centre Details

    Hi,
          Please let me know in which table we will get  production
    order wise routing and work centre details
    Regards
    Prakash B.

    Hi Prakash,
    Before cretaing Zreport, please check with std report COOIS. i think it will fulfill your requirement.
    Selection criteria is
    list= oprations
    Profile =standatd profile
    Prod order box = select.
    Give ur production order list & plant then excute. inside trhe report u can change the layout as u need
    i doknow what is ur requirement exactly.
    please try and come back
    regards
    pradeep

  • Work-Centre Capacity

    Hi Experts,
    We want to maintain the capacity of work centre can you please answer the following :
    1.We have created workcenter such as AUTO at second level & AUTO-WELD,AUTO-FITT on third level in Hierarchy.
    Could you tell me how I have to maintain the capacity, should i maintain on third level or second level basically what is the process of maintaining capacity to work centre.
    2.If i maintain capacity only on third level could i see the total capacity on second level of hierarchy summation of welder & fitter workcentre .
    3.IF I Have one engineer common for  4 welder  & 4 fitter under the AUTO-WELD & AUTO-FITT workcenter, what could be the indual capacity 5 or 4 for one workcentre.Here ,should i consider engineer also for both the workcenter or should i skip this engineer for both workcentre.
    AR
    Edited by: Amit  Rana on Feb 8, 2010 7:22 PM

    Hi experts,
    I have modified the question, & expecting your valuable input.
    AR

  • Work centre formula?

    Hi
         what are the impacts of formula we used SAP0,SAP008,SAP004 in creating maintenance work centre.If we do not use these
         formula what will be the impact.
    regards
    sanjay

    Hi,
    Formula SAP008,SAP004 are used in plant maintenance,customer service & Project network kind of scenarios.
    kapil
    Edited by: Kapildev Farakte on Dec 22, 2009 5:35 AM

  • Work centre

    hi all,
    pls help me with,
    WHAT ALL IS TO BE INTEGRATED WITH WORK CENTRE IN HR..I MEAN IS IT ORGANIZATIONAL UNIT..I MEAN WHAT?n hw to integrate it.
    thanx n regards

    Hi,
    Work Center (CR01 - Create, CR02 - Change, CR03 - Display)
    Using the data maintained for a work center, you can
    determine which machines or people are to be used in the operations
    calculate costs, capacities and dates for the operations
    OP42 - Configure the default value for Work Center during the initial creation.
    After creating many work center in the Routing, the users might want to check what materials and components allocation have been updated with this work center.  You can used this program Work Center in Routing - Search through all the routing for the material and component allocation used.
    The standard program transaction CA80, checks where the work center was used in the routing.  However, it did not list the components allocation for the work center.
    Pooled Capacity field - When a production order 1234567 has the capacity requirement on its work center Wxxxxx. It means it has the requirement on pooled capacity Pxxxxx.  If more than one work center shared this pooled capacity, the requirement (transaction CM01) will be shown on all the work center with the SAME shared pooled capacity.
    In HR system we will the cost per each Work Center level. This work center we can assing org unit leave or postion level also.
    Please revet back further clarifications.
    WarmRegards,
    Devi.,

  • In work centre

    dear sir when i am creating work centre .in capacity categories  i am puuting machine. . but it show s capacity of type 1 and 2 are only for resourses. how i will solvea and also in scheduling capacity what i will put.
    please tell me step bye step procedure

    Hi,
    Please check in OP40 for category 001 where you must assigned Status profile (Resousce) remove it. and check the its application and  maintain R-Routing there.
    In scheduling u need to maintain the capacity category and scheduling formula.
    Hope it will solve your issue.
    Regards,
    R.Brahmankar

  • Linking of work centre with SAP HR

    Hi All,
    We are trying to link the work centres in PP with SAP HR.I am stuck on the first step,when I click on the HRMS button it says that there are no assingments to HR organization term.
    Can somebody please tell me what are the steps for integrating work centres with SAP HR.
    Thanks in advance.Points will be rewarded
    Regards,
    Anshul Goyal

    Hi Anshul Goyal  ,
    Check the following link,I have also not worked on this,i think it can be done,revert if you have any query
    http://help.sap.com/saphelp_46c/helpdata/en/b1/c03e4a439a11d189410000e829fbbd/frameset.htm

  • RESOURCE & WORK CENTRE

    What is the difference between Resource & Work Centre?Is it necessary to create
    Resource before creating Work Centre.Please make me clear.

    Dear,
    Normally PP-PI is recommended for process oriented industries like pharmaceutical,chemicals industries,cement industries etc. It is similar to the discrete but instead of routing, it uses the master recipe where the process messages are maintained.
    1) Batch Oriented process manufacturing.
    2) Process order based manufacturing.you copy the process described in a master recipe and adjust it to the actual production run.
    3) Master Data includes Master Recipes and resources.
    4) Process Management:In this area, you coordinate the communication between PP-PI and process control during the execution of a process order
    Discrete manufaturing  is used in  manufacturing companies
    This method is applicable to the manufacturing set up where small lots are manufactured with frequent changes in the settings.This manufacturing is accounted through production orders. With normal routing.
    Please check this thread to get more idea.
    /message/3760818#3760818 [original link is broken]
    Hope clear toyou.
    Regards,
    R.Brahmankar

  • Work centre capacity utilization

    Dear guru ,
    i have a work centre that always work in the same moment for 3 different production order.
    If my total daily available capacity is 11 hours for my 1 individual capacity is right that I assign to the work centre a capacity utilization of 300 percent in order to have a daily available capacity of 33 hours and I can use capacity levelling in the best way ?
    Or there is other better solution for solving this problem ?
    Thanks for your help.

    you can also put no. of individual capacity as 3.

Maybe you are looking for

  • More on "maximum open cursors exceeded"

    It seems a lot of people have been seeing this error message, but reading through the posts on the topic hasn't given me any new insight on the problem. Here's an account of my particular situation: I am using the XSQL servlet, v.1.0.0.0 with the thi

  • HT204023 I lost my personal hotspot where can I get it back?

    I lost my personal hotspot where can I get it back? Been using in the past few days and this morning it just disappear

  • S parameter De embedding - Is there any VI in labview to perform de embedding

    Hi I am trying to develop a program in labview which reads the S parameter data from the excel file and does a 2-port de-embedding of the SHORT and OPEN parameters. As in case of MATLAB we have a dedicated function for performing 2-port de-embedding

  • Unable to share saved video through whatsapp

    Hi Everyone... How can I share a saved video from my phone album through whatsapp on my lumia phone??

  • Problems using Type Tool

    Hi I'm a bit of newbie to Indesign and was just wondering if someone could help me out. I'm having problems with the Type Tool. I've been working on my first few documents, (simple 1 page postcards), but when I go back to add some more text using the