What setup is require to run a consumption-based planning

Dear all,
I know there is a two way to run Consumption-Based Planning in standard SAP:
1 - Forecast-based Planning, and
2 - Re-order point Planning.
My question is what is the configuration setup and material master value maintenance require for the above two procedures?
Thanks
Tuffy

In Material Master
MRP 1 view choose the
MRP type
VB - Manual reorder point or
VM - automatic reorder point
Reorder point
Regards

Similar Messages

  • Consumption-based Planning Question

    Dears,
    I am working on a presentation for a client in order to help them to decide which SAP Planning Tool should be implemented.
    Since it is not a production company and it can be considered closer to a wholesale or retail one my question are related to CBP and SCM:
    -Is necessary to customize and run the Consumption-based Planning tool in ERP before implementing a SCM tool (either APO or F&R)? Are they independent? Could it be advisable?
    -I read in several website that is not possible in MRP to generate Stock Transfer Orders between Storage Location within the same plant. Has CBP the same constraint?
    Thank you very much for your help.
    L.C.

    L.C.,
    -Is necessary to customize and run the Consumption-based Planning tool in ERP before implementing a SCM tool (either APO or F&R)?
    Not exactly.  You will have to do some customization in ERP regardless of whether you additionally implement SCM planning, because all of the execution is done in the OLTP (ERP).
    Are they independent?
    If you mean are ERP and SCM independent, the answer is yes, they are independent.  You can run SCM without ERP, and you can run ERP without SCM.
    Could it be advisable?
    Good question.  Depends on your point of view. Establishing a new implementation of CBP is a substantial project.  Adding on an implementation of SCM means additional complexity.  The payoff is more features. The client has to choose.
    -I read in several website that is not possible in MRP to generate Stock Transfer Orders between Storage Location within the same plant.
    Neither MRP nor CBP planning can create stock transport orders, they create stock transport requisitions.  CBP does not have any more or less restrictions than MRP as far as the creation of stock transport orders or stock transport requisitions are concerned. STR/STOs between storage locations became possible starting, I believe, in ECC 5.0.  R/3 4.7 did not support this feature.
    Sounds like you are going to need a bit of help with your presentations.  The following site contains quite a few high level presentations about SCM planning you might want to incorporate into your presentation:
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000187811&
    Best Regards & Good Luck!
    DB49

  • Long Term Planning : Requirements from "Consumption based planning" missing

    Hello,
    I'm trying to use long term planning ( MSBT,MS01..) for simulation. In the scenario I've set up I want to have all actual requrements and orders as well as fixed orders.
    The problem is that requirements(=forecast) for materials with consumption based planning ( MRP type =VV ) are not transferred from the operative planning. How can this be achieved ?
    Best Regards
    Bernt

    Hi,
    Hard to say... have you looked in the details of the VV MRP setting, your LTP scenario, or your copy transaction in case there is some parameter about this?
    In case you are looking for information about this process, here is a good document  with a detailed description of the Long-Term Planning Process in SAP (with detailed T-codes as well): http://expertplug.com/materials/training/long-term-planning-in-sap
    You have a preview and a detailed description to see if it suits your needs.
    Cheers
    Matthieu

  • Scheduling agreement with Consumption based planning

    Dear Experts,
    I Have a Scenario,
    I need to Bulit a Laptop which is a Finished Material, and the Components like Hardisk, Processor, Ram, Casing, Monitor are my Rawmaterials. By using these rawmaterials we are building the parent material.
    My Client requirement is 1) Plan and schedule the requirement
    2) Replenish the stock based on consumption based planning.
    My query is
    1) How should i proceed for mm based procurement ?
    2) Does i need to create scheduling agreement for rawmaterials and and maintain schedule lines ?
    3) For which materials i need to run the MRP ? weather its parent material or Component material ?
    4) What are the sequence of process need to be carried out ?
    Required ur valuable inputs on this.
    Best Regards
    SAP LEARNER
    Edited by: JAVEED AHAMED on Feb 12, 2010 8:34 AM

    Hi
    Consumption based planning and Scheduling agreement are two different functions.
    Consumption-based planning is based on past consumption values and uses the forecast or other statistical procedures to determine future requirements. The procedures in consumption-based planning do not refer to the master production schedule. That is, the net requirements calculation is not triggered either by planned independent requirements or dependent requirement. Instead, it is triggered when stock levels fall below a predefined reorder point or by forecast requirements calculated using past consumption values.
    A form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.
    With release documentation (in the standard system, document type LPA)
    The schedule lines in the system have internal character. This means that you can change them in any way you wish. The schedule lines stored in the system are not transmitted to the vendor until you explicitly create a scheduling agreement release (which may take one of two forms: a forecast delivery schedule or a JIT delivery schedule).
    The release documentation allows you to display the releases transmitted to a vendor over a certain period in order to establish exactly when you transmitted which information to the vendor.
    Without release documentation (in the standard system, document type LP)
    The schedule lines immediately have official character, i.e. they are immediately transmitted to the vendor the moment you save them (transmission time-spot 4 for messages). There is no release documentation in this case.
    It cannot be explained in few lines. You need to study the below link.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm

  • Consumption based planning

    Hi,
    I need to configure the CBP based on Past consuption data of 3 months and also it should give me future forecast values for 3 months. also I want to use safety stock and Reorder level.
    Which MRP type should be used and what are configuration setting required for the same.
    Also pl.guide me on What will happen if there is sedden rise in the requirement is any month?
    Thx

    Hi,
    MRP supports and helps the MRP controller in the task areas. These tasks include
    determining type, quantity and time of the requirement, and scheduling corresponding
    procurement elements. The automatic planning run for MRP determines shortage situations and generates the corresponding procurement elements. Possible
    procurement elements of MRP are planned orders, purchase requisitions and
    scheduling agreement schedule lines. The planned order and purchase requisition are
    internal planning elements that can be changed, rescheduled or deleted at almost
    any time.
    In in-house production, the system creates planned orders for planning production
    quantities. When planning has finished, the system converts the planned orders into
    production orders. The system then converts the dependent requirements in the
    planned order into reservations in the production order.
    In external procurement, the system either creates a planned order or a purchase
    requisition for direct planning of external procurement quantities. Whether purchase
    requisitions are created for direct planning, or planned orders are created first, you
    can use the creation indicator for purchase requisitions/MRP groups in the material
    master record on the initial screen of the planning run. When planning has finished,
    the planned order must be converted to a purchase requisition, which is subsequently
    converted to a purchase order. The advantage of creating a planned order first is
    the additional procurement proposal check that is executed by the MRP controllers.
    Purchasing can only order the material when the MRP controller has checked the
    planned order and converted it into a purchase requisition. Otherwise, the procurement proposal is immediately available for Purchasing.
    Planning Levels of Consumption-Based Planning
    Requirements planning takes place at plant level. In other words, the entire stock that
    exists in the plant is considered in planning. However, the stocks of individual storage
    locations can be excluded from MRP or planned independently. These stocks are then
    not included in MRP at plant level. You can also execute requirements planning
    for individual MRP areas. You can define the MRP areas yourself. This means
    that several storage locations can be grouped together for one MRP area and that
    requirements planning can be executed separately from the plant for these MRP areas.
    MRP areas enable a differentiation of material requirements planning within a plant.
    (MRP areas include the function of storage locations that are planned separately for
    materials requirements.)
    Planning Levels for Materials Planning is either
    1. The Plant with Storage locations planned separately.
    2. MRP areas
    Basically, MRP areas are optional. You can plan all material requirements without referring to MRP areas.
    There are three different types of MRP areas:
    1. Plant MRP areas (obligatory) that are automatically created by activating
    planning with MRP areas. Their numbers match the number of the plant. If no
    more MRP areas are defined, the plant MRP area covers the entire plant.
    2. Storage location MRP areas that are defined by the storage locations assigned
    to them.
    3. Subcontractor MRP areas that provide planning of the requirement of the
    material provided for a subcontractor and are defined by the assignment of
    this subcontractor.
    Prerequisites for Consumption-Based Planning
    The following prerequisites must have been fulfilled in order to carry out requirements
    planning for a plant:
    Requirements planning for the corresponding plant must be activated in
    Customizing for Materials Management under Consumption-Based Planning u2192
    Planning u2192 Activate Material Requirements Planning.
    T-code - OMDU
    The plant parameters for the corresponding plant must be activated in
    Customizing for Materials Management under Consumption-Based Planning u2192
    Plant Parametersu2192 Carry Out Overall Maintenance of Plant Parameters.
    T-code - OMI8
    In the material master record, you have to maintain the MRP data of the materials
    that are subject to automatic planning.
    I hope this may help u !

  • To start consumption based planning

    Hello experts,
    Can you please explain the step by step process for starting the consumption based planing.
    What configuration will be required (like activating MRP for respective plant) & what master data needs to be maintained in the system.
    What Tcode will used to run individual materials (BOM is not there) & what t code will used to run for materials of entire plant for which MRP views are maintained.
    Thanks in advance.
    Abhishek

    Hi,
    In Consumption based planning when the stock falls below reorder point, system will create Procurement proposal automatically when MRP run.
    Maintain MRP type VB - manual reorder point planning & Reorder point for each consumption based material in material master and all the MRP views to be maintain.
    Maintain MRP parameter for Plant, for this use tcode OPPQ.
    Run MRP for single material by tcode MD03, for all materials in the plant use tcode MD02. After MRP run, the materials which are having stock below reorder point, system will create P.R.
    Regards,
    Dharma

  • Consumption based planning in implementation ??

    hi
    Can some body explain me about the configuration setting in consumption based planning for manufacturing company  ??
    FOr manufacturing industry, they have production , and plant maintaienance, and depot plant.
    For above business , what  setting we have to in Consumplanning and MRP???
    Thanks

    Dear
    Configurations for CBP as explained before.
    a) Plant Parameters - t.Code : OMI8, when you execute this t.Code you will get several tabs like for ex.Number ranges, MRP Controllers etc... you need to maintain those are relevant
    MRP Controllers, Number ranges, Available stock most of these tabs are mandatory configurations.
    MRP Controllers - Defined and assigned to the plants, MRP Controllers are the planners who are responsible when it comes to the materials.
    Number ranges : Planned orders, Purchase requesitions
    Available Stock : whether stocks in transit, Blocked stock, Restricted stock are to be considered or not.
    Planning Horizon - 100 days.. during MRP run those materials for which planning file entry is created and within the next 100days will be calculated for MRP.
    b) MRP Group is not a mandatory config.
        In case you need have configured new document type this can be entered in the "External Procurement per MRP Group" tab and this MRP group can be assigned to the material mster, based on this assignment the document type is picked up.
    Each tab has its own significance, Please go through the configuration notes in SPRO you will get a better idea. let me know if you have futher clarifications.
    Jade
    Edited by: Jade on Mar 27, 2010 3:05 PM

  • Difference between MTO/MTS vs Consumption Based Planning?

    Hi,
    What is the Difference between MTO/MTS vs Consumption Based Planning?.
    In what scenario we used these types?? could you please explain me with examples...
    Regards,
    Raj

    Hi,
    MTS = Make to stock, you are simply wanting to build up stock and so this will generate requirements even if there are no Sales orders or demand of any kind. This is the most common option
    MTO = make to order, you only want these items when there is a specific
    But consumption based planning is not completely different, you are still using MTS / i.e. you are creating requirements based on the settings in MRP instead of any demand (but the same applies to MTS)
    So MTS and consumption based planning are more or less the same thing.
    You would use MTO if you produce items only when you have an order.
    So if you have warehouse space and sell a lot of an item, you can use MTS or consumption based planning because you know that you will always be likely to be able to sell the stock.
    If you make things for specific orders (such as special sizes or specifications to match the customer's requirements. Or if you don't sell many of an item and the lead times for production are very short (or you don't have much warehouse space) then you would wait for an order before making the item (MTO
    Steve B

  • Automatic PR from Consumption based Planning

    Dear all
             While creating automatic PR from Consumption based planning, only quantity has to come,the price should be updated manually,How to do it,Kindly reply to this query

    Hi,
    Price in purchase requisition
    Shows the price of the requested material per price unit.
    Use
    The price and quantity set out in the purchase requisition determine the value of the purchase requisition item or purchase requisition. In turn, this value is applied in determining the release strategy for the requisition.
    In Customizing for Purchasing under Purchase Requisition -> Define Screen Layout at Document Level, you can set price and price unit. The Valuation price field can be set as a mandatory or optional input field.
    Procedure
    Input mandatory:
    If a material master record exists for the requested material, the price is automatically taken from the valuation price field.
    If no material master record exists, you must enter a price when creating the purchase requisition.
    Input optional:
    In this case you need not enter a price.
    Note
    Please note that the value of the purchase requisition item or purchase requisition will be taken into account in the release strategy.
    Also, the value of purchase requisition commitments are determined for items that are assigned toan account from the price (Valuation price field).
    Thanks
    suresh

  • What software is required for running Flex?

    For flash to run on a webserver, we just need to place the .swf file on to the web server. No install required at the web server.
    How about Flex? do we need to install a specific webserver? is there a server side coding or to run a ISAPI filter for windows? Insights would be appreciated?
    Also for a developer what will be required to start of Flex development? Do we need to buy software from Adobe? or is it just a Scripting language that we can run on any windows pc?
    thanks,
    ninja-e
    Software Development Services
    Web Design
    Web Development

    There is no special server required. You simply drop the compiled swf file onto whatever server you are running.
    Think of Flex as the client-side UI. Generally you communicate with some sort of server-side code through standard services such as SOAP or REST. It can does this directly or you can route through JavaScript for another layer of maintainability (so you don't necessarily have to recompile if something on the server-side changes).
    The Flex SDK is a free, opensource project:
    http://opensource.adobe.com/wiki/display/flexsdk/Flex+SDK
    Adobe of course offers their own pay IDE for it which is Flash Builder 4 (formerly Flex Builder). It is an Eclipse-based standalone or plugin. However, it is of course not required and you can easily get by without it.You can use any text editor, but in terms of a free the strongest option is FlashDevelop which is opensource and runs on .NET. There are free plugins for Eclipse and NetBeans, but they are very weak.
    http://www.flashdevelop.org

  • What cast is required to run this code ?

    public class tempClass {
    public static void main(String[] args) {
    Object object = new Object();
    double goodBoy[] = new double[10];
    double badBoy[][] = new double[1][10];
    goodBoy[0] = 1.0;
    goodBoy[1] = 2.0;
    goodBoy[2] = 3.0;
    goodBoy[3] = 4.0;
    goodBoy[4] = 5.0;
    goodBoy[5] = 6.0;
    goodBoy[6] = 7.0;
    goodBoy[7] = 8.0;
    goodBoy[8] = 9.0;
    goodBoy[9] = 10.0;
    object = goodBoy;
    badBoy = object; //what cast is required here ?
    System.out.println(badBoy[0][1]);
    }

    you also might consider this, which seems like it might meet the original intent better:
      public static void main(String[] args) {
        double goodBoy[] = new double[10];
        double badBoy[][] = new double[1][10];
        goodBoy[0] = 1.0;
        goodBoy[1] = 2.0;
        goodBoy[2] = 3.0;
        goodBoy[3] = 4.0;
        goodBoy[4] = 5.0;
        goodBoy[5] = 6.0;
        goodBoy[6] = 7.0;
        goodBoy[7] = 8.0;
        goodBoy[8] = 9.0;
        goodBoy[9] = 10.0;
        badBoy[0] = goodBoy;
        System.out.println(badBoy[0][1]);
      }

  • What roles are required to run the export import?

    Hi,
    I want some info on roles are required to run the export import.
    I have done the following in sys user:
    GRANT EXP_FULL_DATABASE TO IMP_TEST
    GRANT IMP_FULL_DATABASE TO IMP_TEST
    But Doing the above command the IMP_TEST will get all priviles (also the system tables)
    Is there any mechanism to restrict the user to export and import only the tables not anything?
    Thanks and Regadrs

    Hi!
    If you create a user like this
    CREATE USER imp_test identified by password;then the user will be able to import or export only its own schema. If you grant the exp_full_database and imp_full_database roles to this user like you did then the use will be able to export or import the hole database (with SYS schema). But as far as I know you can't set any more restrictions to the user.
    yours sincerely
    Florian W.

  • Assistance with Requirements to Run a Shockwave Based Simulation

    I am attempting to use a web-based simulation that requires Shockwave version 10 or higher FULL and IE 7 or higher. I currently have Shockwave 11.6.8R638 and IE 9. I am also using Windows 7 and the Standard VGA Graphics Adapter with driver 6.1.7600.16385. The simulation requires use of the Shockwave XTRAS.
    When I run the simulation I do not see parts of the simulation on the screen.  I believe I meet all of the requirements to run this simulation, can anybody see what, if any, requirements I do not meet?
    Thank you in advance for any help you can provide.
    -Mark

    Most likely cause would be that the simulation does not match your screen size and is not rescalable. Try viewing the simulation at a higher screen resolution, as high as possible. You can also try changing the percentage screen size of your browser. This can be varied with most browsers from about 20% to 400%. If you are the producer of the simulation, then you need to examine your output options to insure that the simulation outputs as percentage of browser.

  • Usage of MRP Procedures in Consumption Based Planning during Implementation

    We have following procedures in CBP:
    1. Reorder Point Planning- Manual and Automatic
    2. Forecast based Planning
    3. Time phased Planning.
    In SAP implementations, which of these procedure is mostly used in companies in real time.
    Though the CBP planning node is in MM SPRO and  MM study material also contains CBP. During implementations, for CBP the responsibility rests with MM consultant or PP Consultant or both.
    Please share your views on this.

    Dear ,
    Let me share my views on this as we are runing CBP-Forcast base planning  in our trading business .
    Decision on CBP-Forecast base planning method are based on the following criteria
    1.Stockable and low value material
    2.Fast Moving with good sales pattern ( Trend Analysis , Historical Trend analysis on Product Group , Statistical Sales analysis )
    3.Inventory turn around based on the monthly physical inventory and sales
    4.Good service level percentage over an period .
    5.Consumption pattern .
    Decision on CBP-Re-order point planning method are based on the following criteria
    1. Material which are higher valu and Non Stockable
    2. Customer oriented traded goods
    3. Strategic vendor with good Sales pattern .
    4.Re-order Level based on Sales Forecast (Manual or Automatic )
    In SAP implementations, which of these procedure is mostly used in companies in real time : It is based on the business requirement (Trading /Manufacturing ) .Mostly Trading business goes for CBP-Forecast Base planning method (MRP Type -VV) IF THE MATERIALS HAS GOOD CONSUMPTION PATTERN OVER A PERIOD OF TIME .
    MRP is both the part of Supply Chain Planning and Manufactruing . Material master parameters are maintained by MM .CBP is one kind of MRP where Demand Management comes into PP whereas after MRP run , procurement proposal handeled by MM.So there is no hard and fast rule that it is only part of PP.It is the combination of MM and PP.
    Hope this will help you to analysise your requirement .
    Regards
    JH

  • What are the requirements to run a Swing application?

    I'm trying to send a simple swing application to a friend that has Mac OSX, but the buttons don't show up.
    Do people actually need the Java SDK in order for swing apps to work? Or is plain java enough? (He has normal java, because we play minecraft sometimes)
    Anyway, my buttons are not showing up on his computer, not even when I use the cross platform look at feel

    Here is the code I'm using, it's an application that makes the user select a folder and stuff will happen to it.
    import java.awt.Font;
    import java.awt.event.ActionEvent;
    import java.awt.event.ActionListener;
    import java.util.logging.Level;
    import java.util.logging.Logger;
    import javax.swing.JButton;
    import javax.swing.JFileChooser;
    import javax.swing.JFrame;
    import javax.swing.JLabel;
    import javax.swing.JPanel;
    import javax.swing.UIManager;
    import javax.swing.UnsupportedLookAndFeelException;
    public class SomeGUI extends JFrame implements ActionListener, Runnable
        public JButton exit;
        public JButton run;
        JPanel panel;
        JFileChooser chooser;
        String returnpath;
        JLabel progress;
      public SomeGUI()
         try
         UIManager.setLookAndFeel(UIManager.getCrossPlatformLookAndFeelClassName());
         catch (ClassNotFoundException ex)
             Logger.getLogger(SomeGUI.class.getName()).log(Level.SEVERE, null, ex);
         catch (InstantiationException ex)
             Logger.getLogger(SomeGUI.class.getName()).log(Level.SEVERE, null, ex);
         catch (IllegalAccessException ex)
             Logger.getLogger(SomeGUI.class.getName()).log(Level.SEVERE, null, ex);
         catch (UnsupportedLookAndFeelException ex)
             Logger.getLogger(SomeGUI.class.getName()).log(Level.SEVERE, null, ex);
          setTitle("BenkyoAdd");
          setSize(206,100);
          setResizable(false);
          setDefaultCloseOperation(EXIT_ON_CLOSE);
          setLocationRelativeTo(null);
          setVisible(true);
          panel = new JPanel();
          getContentPane().add(panel);
          panel.setLayout(null);
          run = new JButton("Run");
          run.setFocusable(false);
          run.setBounds(0,0,100,30);
          panel.add(run);
          run.addActionListener(this);
          progress = new JLabel("Please click run");
          progress.setFont(new Font("lol",Font.PLAIN,14));
          progress.setBounds(10, 30, 200, 50);
          panel.add(progress);
          exit = new JButton("Exit");
          exit.setFocusable(true);
          exit.setBounds(100, 0, 100, 30);
          panel.add(exit);
          exit.addActionListener(this);
          chooser = new JFileChooser();
          chooser.setFileSelectionMode(JFileChooser.DIRECTORIES_ONLY);
        public void actionPerformed(ActionEvent e)
         if(e.getSource().equals(exit))
             System.exit(0);
         if(e.getSource().equals(run))
             progress.setText("Select a folder...");
             chooser.showOpenDialog(panel);
             this.returnpath = chooser.getSelectedFile().getAbsolutePath();
             exit.setEnabled(false);
             run.setEnabled(false);
             progress.setText("Copying to output folder...");
             new Thread(this).start();
      public static void main(String args[])
          new SomeGUI();
        public void run()
         new Changer(this, this.returnpath);
         exit.setEnabled(true);
         exit.requestFocusInWindow();
         progress.setText("Done! You can now exit!");
    }

Maybe you are looking for

  • How to transfer music/video to itunes from an external drive?

    How to transfer music/videos from an external device?

  • Safari claiming I am not connected to the internet....

    This could possibly be a wireless internet issue, but I'm leaning more toward it being something wrong with Safari: Usually, late at night when I am browsing the internet, the website I'd been using successfully already will stop loading and the "you

  • Remove/delete duplicate cash flows on facility

    Hi all Due to a error in SAP std, for a facility a number of duplicate commision flows are created when drawing a contract against a facility. The issue is solved with the implementation of SAP note 1389873 so no more duplicates are created.  Is ther

  • To switch between map layers

    Hello, I have several layers at my map and would like to switch some of them if necessary. This is because sometimes the objects overlap each other and total picture doesnt look impressive Can somebody give me the necessary code? I found one on this

  • WLC - AP 1252

    We have a strange issue.. AP 1252 came up with Autonomous IOS, and we had converted it to LWAPP usign 12.4(10) OS.. We have defined the dhcp configurations on the core 6500 switches, for it to return option 43 and 60 to the LAP. 6500 trunks to 3750-E