hi experts.
after MRP Run i had 3 planned orders, one of them for safety stoock and the others for PIR , and i converted one of Planned orders (For PIR) to Production order,,,,,,,,,,,,,when i made capacity evaluation for the work center using CM01........i found capacity requirements made for Production order and PIR Planned order but no requirements for safety stock order????  whyyyyyyyyyyy?
I want to know when planned orders can reserve capacity and when they cant.
thank you

Abobakr,
I believe you are talking about creation of capacity requirements, not reservation of capacity. 
Planned orders will create capacity requirements when
1.  They are configured to generate capacity requirements during Detailed scheduling (OPU5)
2.  They have been Detailed scheduled (either manually, or using MRP Scheduling 2 ''Lead time scheduling and capacity planning')
3.  They are scheduled using a valid Routing which contains a capacity consuming (finite) work center in one of their operations.
A common reason to see planned orders that are not detailed scheduled is because of the way MRP is run, using Basic dates instead of lead time scheduling.  Another common reason is that the routing is invalid, particularly due to the planned order containing dates that are outside the routing's effectivity dates.
Rgds,
DB49

Similar Messages

  • Planned order splitting during capacity planning

    Hello,
    anybody plese help me during the capacity planning in T.code.CM31 i want to split a planned order and want to assign alternative sequence. how can i do this and the capacity should be reschedule automatically to my requirement date. i am using backward scheduling.
    plese suggest immediately
    Thanks and reagards
    Bhakta

    Dear Bhakta
    MRP does not perfom any Capacity Requirement Planning .While  you are executing MRP with Lead Time Scheduling , MRP proposes Planned Order Dates based on the Routing Operation Timing not based on the Work Centre available Capacity because in SAP Std R/3 we did not have scope to check the finite scheduling and capacity requirement chek .MRP assume that Work Centre has infinite available capacity .
    In MRP run , it will give you Detail scheduling of the Operation in Planned Order -Detail Scheduling tab  and copied the routing , BOM as master data .When you convert that Planned order to Production order , it will copy the Routing details based on the Order Type denpendt Parameters -OPL8-Routing -Alternative sequnce  and Automatic selection -3 option
    Thats why we have Capacity Requirement Planning  for Detail Capcity check and production order scheduling  .
    Note : Earlier to my first  reply , please note that you have option in CM21  enter sequence number  at order level which may applicable to you .CM21-Work Centre -exectute -Select the Order from order pool -Goto Order -Sequence number maintainence
    This number( sequence number operation /order )  that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
    Hope this is clear .Revert if you nees farther help
    Regards
    JH
    Edited by: Jiaul Haque on Jul 5, 2010 3:32 PM
    Edited by: Jiaul Haque on Jul 5, 2010 4:01 PM

  • Determination of Production Order Type when Planned Order is Converted

    Hi SAP Expert,
    Is there anyway to determine the Production Order type by Sales Order type when the planned order from APO is converted? Currently, all the planned orders converted from APO will be a Normal Production Order.
    The requirement as example below:
    >> If Sales Order Type = Normal Sales Order, then the converted Production Order type = Normal Production Order
    >> If Sales Order Type = Replacement Sales Order, then the converted Production Order type = Rework Production Order
    Thanks.
    Regards,
    Hooi Chia

    Hi Pascal,
    Our requirement is exactly same as yours. Can you please elaborate more on ZXCOXU13? I can see the function module suggested by Santosh in the SAP Note but I couldn't find any details regarding ZXCOXU13.
    Thanks.
    Regards,
    Hooi Chia

  • Order Type: LA , when Planned Order --- Prod Order

    In STD SAP, In MD04 when we convert planned order to prod order, a new screen comes
    where we mention planned order ---> prod order,
    In the above screen, ORDER TYPE :LA is mentioned (Bottom Right end corner)
    As far to my understanding goes
    In CO40, Order type PP01 which controls/holds
    the production orders are being generated 
    (pickup from MRP parameters, under Planned order --> prod order (Tcode: OPPQ))
    Then how does, ORDER TYPE: LA is being used & from where the system is pulling the order type LA
    Please clarify

    Hi Eswer,
    Please check with SPRO t.code OMDD
    Order profile is linked with  Order type & Procurement type & SP type&  Acct assisnment cat at OMDD.
    When u run the MRP based on MRP view settings the Ordetype is selected For EX inhose porduction order type = LA.
    When u create planned order manually, u have to select the Order profile manually.
    Regards
    Pradeep

  • Limiting the time when Sales Orders can be confirmed on the same day

    Hello Gurus. The business has a requirement where they want to limit the time of the day when they can confirm sales orders on the same day.
    So, when they receive a sales order, they want that if the order is received after a certain time (e.g. 14:00) then it cannot be confirmed for that same day, it can only be confirmed the next day.
    How can I implement this limitation?

    Fernando,
    Let me restate your requirement so that I understand your question: 
    A Sales order is created 'today' with a requested delivery date of 'today'.
    There exists adequate material in Stock to confirm the order.
    You want the confirmed date to be 'some-amount-of-time-later-than-now"
    (say 18 hours or so)
    Which confirmed date in the sales order are you talking about?
    Confirmed Material Availability date?
    Confirmed Loading date?
    Confirmed Transportation planning date?
    Confirmed Goods Issue date?
    Confirmed Delivery Date?
    Many people with this requirement use 'delivery scheduling', and add a half day or so in pick/pack processing time.  This means that you are recognizing that it takes a bit of time to create the delivery notice, print the shipping papers, pick and pack the parts, and get them ready for the carrier to ship.  So, for an order entered 'now', it wouldn't be due to ship from your warehouse until 'a half day from now'.
    To enable Delivery scheduling  IMG>SD>Basic Functions>Delivery scheduling and transportation scheduling>Define scheduling by sales document type. Select the relevant ordertypes, tick delivery scheduling.
    If this is already selected, then you can increase the pick/pack processing time of the shipping point in IMG transaction OVLZ.  It can be set to a fraction of a day (2 decimal points).
    Regards,
    DB49

  • SNP Planned order not following resource bucket capacity/factory calendar

    Hi gurus,
    SCM 5.0
    I am running SNP heuristics for a product and expecting planned orders for it.  It has corresponding production data structure and multimixed resource.  The resource has an assignd factory calendar and SNP bucket capacity.  The bucket capactiy availablity dates of the resouce is consistent with the factory calendar workdays/holidays.  Using simple lot for lot strategy, I am expecting heuristics to schedule the planned orders on the dates of the demand in compliance with teh SNP bucket capacity availability of the resource.  APO does not schedule on holidays consistent with bucket capactiy.  This is true until...
    We have a public holiday in factory calendar that needs to become a workday. To remedy this, we put a special rule for the factory calendar and explicitly made that holiday into a workday.  The changes were synchronized with APO, and this is also reflected in the bucket capacity of the resourc: former holiday now has bucket capacity after the calendar change.  However, when running heuristics, it still does not create SNP planned order on that former holiday that has been changed into workday.  Even if it is a public holiday, there is already a special rule for the factory calendar and the resource bucket capacity reflects this correctly. But SNP heuristics seems not to follow this change.
    Any ideas on this? looks like a bug.

    Hi Edgar,
    Yes, when your resource reflects the addional capacity of the holiday turned working day, then it is expected to be considered for the SNP planned order.
    Instead of SNP heuristics, you may try to check interactively in SNP planning book, if manual order creation in the bucket works out.
    Since this is a mutlimix  resource , it can also be checked if in PPDS planned order can be created on the day.
    The above checking may not solve your problem , but will get to know if at least manully the bucket is being considered or not.
    regards
    Datta

  • PPRM Planned Order Reservations

    I have a problem with Planned order component reservations not showing up in MMBE Stock Overview. This was not a problem when we were using standard PP and planned order type LA but since we have moved over to PPRM and are  using planned order type PE, we can no longer see  the reservations in MMBE
    How can i get these reservations to show

    Hi,
    Pl check the following.
    1. See if planned order is detail scheduled or not. If not then check the scheduling parameters. This will make sure that BOM is exploded in the planned order.
    2 Check the MRP type of the component. This could be reason for the reservations being not shown,
    Regards
    Vineet

  • Planned order Order reservation dates

    Hi Gurus,
    Any tcode or table for PldOrds order reservation dates information with material.
    Thanks and Regards,
    Deethya.B

    In General,
    In discrete manufacturing,
    after MRP system will create a dependent requirement as a result plan order will be created, once the plan order is converted into Production order, then only reservation will be created
    you can see the reservation with reference to production order in RESB table
    for REM
    system will create a reservation with reference  to plan order ,
    you can check it out in RESB table itself with reference to plan order- the reservation dates
    Edited by: Sundaresan . E. V on Feb 22, 2011 9:18 PM

  • Where do I find planned order capacity

    We need to incorporated planned orders into our capacity.  I found the extractor for production orders but planned is not contained in it.  I found the table to get planned orders but thee is no capacity in the PLAF table.  any ideas where this information resides?

    Hi,
    Have you got this,
    We are also stuck at the same point
    Would appreciate your inputs
    Regards
    Lalan

  • Planned order and Production order Not appearing cm21 transaction code

    Hi
    I have created a planned order for a material through MRP run
    As soon as the planned order is created its available in the cm21 transaction code . But once i dispatch the planed orders , the planned orders can be seen only as a BAR in the upper right side of the screen .
    1.Can any body please let me know how i can view the details of this dispatched planned orders in the same way when the planned orders were un dispatched ?
    2.If i create a production order manually or convert a planned order to production order i cannot see these production orders in cm21 neither on cm22 , can any body please let me know what i have to do so that i can view these production orders as well in cm21 or cm22 transaction code.
    Thanks and regards
    Sankar N

    Hi Pradeep
    I have checked the generate capacity requirements and it worked ,Thank you
    Presently i can view only the work centre details in cm21 screen extreme left , how can i see the details of the orders that are dispatched at this work centre ,in the similar way we see in the order pool, bottom left of cm21 screen .
    Thanks
    Sankar

  • Conversion of planned order into subcontracting order

    Hello Gurus,
    my problem concerns a subcontracted material.
    This material may be produced internally (managed with production order) OR produced externally (managed with subcontracting order) depending on the available capacity of the production line.
    For this material MRP must generate planned orders, so the planner can choose either to produce either to subcontract.
    The planned order is then converted manually into production order or into purchase request.
    With procurement type = X, it is possible to do so. However when I convert my planned order into purchase request, my item category is NOT automatically set up to L.
    So I have to enter the item category manually even if I have only one purchasing info record (with record category = 3).
    Do you think it is possible to create automatically a "subcontracting request" from the planned order ?
    Many thanks for your help
    regards
    Amaury

    Hello,
    I am afraid that when I enter procurement type=X & special procurement=30 in material master data, planned orders created by MRP have then a order type = NB (standard purchase order) and special produrement type = 3 (subcontracting).
    So this kind of planned orders can only be converted into purchase request and NOT into production order.
    It looks like it is not standard to do so in SAP and that I will have to manage subcontracting in prodution order; 1 routing for internal operation and 1 routing for subcontracting.
    Thanks
    Amaury

  • Planned Order to STR Conversion - incorrect Valuation Price

    Hi Experts
    Not sure if you've encountered this before:-
    Material A in Requesting Plant has Valuation Price of USD10.
    Material A in Supplying Plant has Valuation Price of USD20.
    Material A is planned through MRP in Requesting Plant with Planned Order as the output.
    When Planned Order is converted into STR (MD14/MD15), the Valuation Price appearing in the STR picks up USD10 (from Requesting Plant), even though Supplying Plant is correctly defaulted in the STR.
    Any idea on the above?
    Another observation - for the same STR created, if the Supplying Plant is cleared in Change Mode (ME52N), system will reassign the supplying plant accordingly, and the Supplying Plant (USD20) is now correctly updated into the STR.
    Thanks in advance

    the valuation price of a purchase requisition is always copied from material master valuation view of the ordering plant.
    there is no difference for requisition that is used for a stock transfer order to a sister plant, compared to a requisition that is used to purchase from an external vendor. It would be very confusing if SAP has a logic break within.
    the valuation is used for release strategy.
    most requisitions do not know from where they will be fullfilled, source determination is not mandatory in requisition creation process. this is the usual task of purchasing department. Hence the requisition can only know the valuation price of its own plant.

  • Automatic Plan Order Creation on Sales Order save

    Hi friends,
    We are having an requirement where Automatic Plan Order should be created on Sales Order saving.
    We have Material A in Plant 1000 & Plant 5000.
    Plant 5000 in plant where Manufacturing is carried out & Plant 1000 is service Plant.
    We are using Special Procurement key for Material A in 1000 Plant which triggers procurement from Plant 5000.
    When Sales Order is entered in Service Plant 1000, after saving Order Plan Order should be created in both Service Plant 1000 & Manufacturing Plant 5000 along with Sales order reference.
    I have tried using Strategy Type 81 but Plan Order is created while saving Order only in Service plant (1000), but with Procurement Type (E - In-house Production) & No Plan Order created in Plant 5000.
    Can you please guide me how to meet requirement?
    Thanks in advance.

    Hi Jiaul,
    Thanx for reply.
    I have already assigned the Special Procurement Key to Material A in Plant 1000.
    In Plant 1000 procurement type is F (External procurement)
    But when Plan Order is created after saving Sales Order it is created with Procurement type E (In house production).
    If I delete Firm Plan Order generated & run MRP for Sales Order / Item. It gives me required output generating Plan Order in both Plants.
    Regards,
    Rameshvar

  • Need Report in which using PC/CC , planned order could be found out.

    Hi All,
    Is there any standard report to find a Plan report for 2009 using which one could see the orders planned for respective department and where we can book time. Any report ( if any) in which using profit center or cost center the planned orders can be found out.
    Please do let me know.
    Regards,
    Ajay

    reenek:
    Welcome to the Apple Discussions. From what you've described the library to keep is the iPhoto Library_1. But before you do try the following:
    1 - Rename each iPhoto Library folder so that you can easily identify them. They can be named anything you'd like, Library 1, Library 2, Library 3 or whatever.
    2 - Launch iPhoto with the Option key depressed and, when asked, locate and open Library 1. Check it out as to contents.
    3 - do the same for Libraries 2 and 3.
    4 - now you'll know exactly which one to keep and which to delete.
    5 - now download and run iPhoto Library Manager to rebuild your remaining library. It creates a new library and copies the files and data it needs from the old one, leaving it untouched and unchanged. If you have some unneeded folder in your library they will be ignored by iPhoto Library Manager. Here's how:
    Using iPhoto Library Manager to Rebuild Your iPhoto Library
    Download iPhoto Library Manager and launch.
    Click on the Add Library button, navigate to your User/Pictures folder and select your iPhoto Library folder.
    Now that the library is listed in the left hand pane of iPLM, click on your library and go to the File->Rebuild Library menu option
    In the next window name the new library and select the location you want it to be placed.
    Click on the Create button.
    Note: It can take some time to create the new library if you have a lot of photos. One user reported that with a library of about 5,000 images it took about 12 hours so plan ahead.
    Good luck.
    Do you Twango?

  • Planned order creation problem

    Hello everybody,
    When I am creating a planned order manually in MD11, I receive the message "Planned order xxxxx will be created".
    Then I receive a popup window telling me "Express document 'Update was terminated' ".
    But, when I am having a look in MD04 to see the planned order, I can't see it.
    It was still okay yesterday morning, but since yesterday afternoon, no more planned orders can be created manually. Do you have an idea about what can be the reason of this?
    It's just like if the order creation was delayed... But for how long, and waiting for what???
    Thanks in advance for your help.
    Regards,
    Rudy

    Hi,
    There is something issue with ur data while saving..hence it is not saving and throwing the message. so that while upadting data in table  is not acccepting.
    GOTO SM14->click on ALL UPDATEREQUESTS push button->U will find the reocrds,select ur userid and double click on it,now u can see the module name,select it and double click on it,now u will get one small dialog box,there u can find the abap editor symbol ,click on it..it will take u to the program where it has taken place
    Please refer this thread,
    Update was terminated
    Regards,
    R.Brahmankar

Maybe you are looking for

  • OS X Lion installed, want OS X Snow Leopard on External HD

    I upgraded to OS X Lion (which I love), but I would like to install OS X Snow Leopard on an external hard drive. Unfortunately after inserting the Snow Leopard disk, I am receiving the message: "You cannot install this OS with the current OS you are

  • How do I split, in Acrobat 7.0?

    Hello Can someone please point me to a plug-in or an add-on, that would split a file, set to a criteria That I would set up? I have a large file, about 1000 pages long, In the file it has important information, that is sent out to different clients.

  • InfoSets Marketing

    Hi all, I'm working on marketing subjects : Segmentation and Campaign Management. I would like to use an InfoSet as a DataSource in the segment builder. The aim of this DataSource is to be able to target the BP who are in the Partner Tab of an opport

  • Safari crashes or will not complete loading - just updated to 3.2.1

    Hey there, I hope this post gives enough information for a quick answer. I just did a software update to 3.2.1. Rebooted after the install and since then I haven't been able to use Safari fully - initial start wouldn't load my tabs/windows from previ

  • Logic pro New select all following

    Hey I used to use select all following a lot , now i only see select all following in same track . is that feature just hidden or removed ? Id hate to hear its no longer possible side note wheres the new manual ? Message was edited by: Theodore Becke