Whether MRP can be carried out for work scheduling GR. 20 i.e. work to orde

Dear Experts,
Whether MRP can be carried out for work scheduling GR. 20 i.e. work to order.
mahendra

Hi MShirodkar,
Yes, s and it specifies the time needed to process the material in the operations at the different work centers.
The GR processing time depends on the order quantity.
The GR processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
You can define work scheduling times in the material master record in one of two ways.
Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
I hope it clears you doubt any queries please revert me back.
Regards,
Madhu.G

Similar Messages

  • Tax can't carry out for some material and Cusomter

    Hi,
         We found the following two material at Customer(2811165) can't carry out the VAT for create sales order. But the Tax can carry out for the other customer. The customer(2811165) can carry out the VAT for other material sales order. I checked the customer and material the Contry code(KR) and Tax classification(1) is correct and normal. It is only the two material for the special customer can't get the VAT. I check the pricing analysis. The follwoing is the log. Pls help check it.Thanks.
    The mateials:
          KTPJC001-02
          KF-8005-0XXXXXXXXX
    The following is the log:
    Access Message Description
    08 010 Access not executed (Requirement 008 not fulfilled)
    10 010 Access not executed (Requirement 007 not fulfilled)
    20 010 Access not executed (Requirement 008 not fulfilled)
    Best Regards
    Park

    Dear Park
    It seems you have assigned Routine 008 for the table which has the combination of some description and applicable to domestic.  For the same combination, in VK13 / UTXJ, you have maintained a tax code for a domestic customer and you are trying to create a domestic sale order.  Actually routine 008 is meant for Exports and hence the problem.
    If my understanding is correct, Go to V/07, select the condition type JIND and click on "Accesses".  There check whether any routine is maintained under the tab "Requirement".   If so,  just remove  those routines and retry your process.
    thanks
    G. Lakshmipathi

  • No Availabilty Check can be carried out

    Dear All,
    While do the availablity check for material, I face an error :- "No Availability Check can be carried out for Material XYZ".
    As per my opinion,if this material is blocked with some sales transactions like Sales orders & Delivery,it will show the same.
    How to rectify this problem and why it is coming ? Kindly Elaborate.
    Best Regards,
    Ankur

    Hi
    First of all No Availability Check can be carried out for Material XYZ
    This is not a error message and it is a information message
    This comes while sales order creation because
    Say Material X plant 1000 and user A is entering a sales order and hes has not finished sales order creation still in VA01 transaction only
    Say the available qty for thar material is 25 units and user A has put 20 units and has not pressed enter
    Now user B creates another sales order for  same Material X and same plant 1000  say for 15 units
    Now for user B the system will throw this message No Availability Check can be carried out for Material for material X
    Because the system doesnot know at the time of user B craeting sales, what is going to the order of user A and it cannot do Availabilty Check for two sales orders simultaneously for the same material in same plant
    To control this only , define material block for users in we have  Availability Check in sd--basic fns in img
    Once the user A comes out VA01 t code and pressed enter for that material the system then can do Availability Check  for user B or otherwise settings are reqd define material block for users in we have  Availability Check in sd--basic fns in img
    Regards
    Raja

  • Order can not carry out revenues

    Hi Experts ,
                      I was trying to release production order and got message no valuation variant is assigned . Even after assigning it in opn2 and reading PP master data it is showing same error .
    Also while doing goods receipt ( MB1A ) I am getting error : Order 600003045 can not carry out revenues .
    Please guide
    Thanks
    Neal

    Hi neal
    As per controlling config. Planed cost has to be calculated during release are create of prod order. For that you have to assign costing carriant in OPL8. both for Plan and actual . in standard SAP PPP! is costing variant for plan and PPP2 is costing variant for actual.
    For this costing cariant you have to assign costing type and valuation variant.
    Please do it SPRO-Production-SFC-Integration-Order costing
    Do these setting.
    Standard valuation variant for PPP1 is 006 and for PPP2 is 007.
    Regards
    J. Saravan

  • Can I carry out the persistence and ORM tasks using EclipseLink?

    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?
    How about TopLink Essentials?
    Edited by: junez on 18-Nov-2009 05:51

    junez wrote:
    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?And yes, EclipseLink is an open source project so there are no license fees. However, Oracle does redistribute EclipseLink as part of the Oracle TopLink product and therefore customers are able to access support for EclipseLink through Oracle support.
    --Shaun                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • How to check whether MRP run has been executed for a sales order or not

    Dear Experts,
    In Strategy:20, Make to Order scenario, I have run MRP for sales order in T Code:MD50,
    then how can I check whether MRP run has been executed for a sales order or not.  Is there any report where I can find some indication?
    Thanks and regards,
    Vikas

    Dear,
    In MTO scenario with Planning strategy group 20 in material master .
    After sales order is created, Run MRP , then planned order will be created then go to planned order details in MD04 or MD12 you will get sales order number in assigment tab.
    or check the Table PLAF field  PALTR ,and field name KDAUF its sales order, for all created planned order.
    Regards,
    R.Brahmankar

  • Operation ' Change Attribute TSTATE ' could not be carried out for Request

    hi,
    i am unable to delete the request Id  from  DSO. and when i checked that, it says request is partially activated(error occured during the activation)
    and when i checked the logs i got the following error messages:
    Operation ' Change Attribute TSTATE ' could not be carried out for Request 609249
    Termination in problem report 'RSS2_DTP_RNR_SUBSEQ_PROC_SET' in row '      361'
    i even thought it was BASIS issue but it was not.
    due to this error the process chain is failing daily
    kindly help
    regards
    laksh

    hi arvind,
    i tried using the both the methods you had mentioned, i am able to delete the request at that moment but its again coming back, i think as it is a partially activated request so may be that is why it is happening
    but the problem is still there
    regards
    Laksh

  • Operation ' Modify attribute TSTATE ' could not be carried out for Petition

    Hi Experts, when try compress a infocube appear this error
    Operation ' Modify attribute TSTATE ' could not be carried out for Petition xxxx
    The petition status is green.
    Any idea?
    Enrique.

    hi arvind,
    i tried using the both the methods you had mentioned, i am able to delete the request at that moment but its again coming back, i think as it is a partially activated request so may be that is why it is happening
    but the problem is still there
    regards
    Laksh

  • "No Availability Check Can Be Carried Out"

    Q.- In which all business situations we can get an error message - "No Availability Check Can Be Carried Out" except Material is blocked by another user?
    Please replay as early as possible.
    Thanks and Best Regards,
    Amol
    Edited by: amwsapsd on Aug 25, 2010 8:06 AM

    It will Pop -up the same Message in case if the Order , Delivery note & Reservation of Material is Processing.
    You can then block the relevant Transaction as per the requirements.
    Best Regards,
    Ankur

  • With all the games coming out for iMacs what Gaming Pad or Jotstick works with the Imac

    With all the games coming out for iMacs what Gaming Pad or Jotstick works with the Imac

    Now the bad news. In my "Print to Video" pop up, if
    I select "Color Bars" , "Black", or any other option
    and take out my bars and tone and slug from the
    timeline, the print to video does not print anything
    to tape except for a nice nothing blue. I don't
    even get my actual timeline video printed to tape.
    Jerry,
    You are a genius! Man do I feel silly. So just for the benefit of others who might read this post, I did exactly as you said, and of course when I restarted FCP, I had to identify my Firewire NTSC setting for the drive. This time, instead of leaving my tapedrive offline, I left it on and immediately saw on my drive monitor the video coming off of my timeline.
    Every thing works perfect. I now have a clean timeline with just the content I'm working on and don't have to worry about bars, slugs, post black. Just a few checkboxes and I'm ready to send my tapes off. Really nice feature.
    Thanks!
    iMac   Mac OS X (10.4.6)   2GB DDR2, 500GB Disk, 20" LCD

  • Allocate CO-PA  message Scalling carried out for segment SVVC1

    Hello
    i need some help
    when my user want to allocate COPA by transaction code KEU5
    she got message warning "Scalling carried out for segment SVVC1"
    Diagnosis
    the standardization of negative tracing factors was carried out in segment SVVC1.
    System response
    The tracing factors of the receiver are changed . this change the value for the receivers.
    Procedure.
    Standardization 4 was carried out.
    and I also found warning message.
    "Sendor base in period 8 is 0 therefore no allocation is possible"
    Diagnosis
    the total base value for sendor   Costcenter nameXXXXXX  in period 8 is 0. this value is derived from total of all receiver allocation bases.
    System response
    it is not possible to distribute the sender value because calculating the receiver values according to the formula.
    sender value X receiver allocation base / sender base would terminate the program . the sender is therefore not credited for period.
    Segment for allocate have segment for allocate from costcenter AAA costelement group BBB
    I check in Cost center report. using selection screen input cost center AAA and cost element group BBB for period 8
    and i found that value is -70,000
    and why doesnot -70,000 cannot allocate ?
    and does have way to solve it or not ?
    please help
    Edited by: dittaporn nanasilp on Sep 4, 2010 11:12 AM

    OK

  • Is employees personal work schedule is same as daily work schedule?

    Hi,
    Is employee's "personal work schedule" is same as "daily work schedule"?
    Where they are maintained?
    Thanks,

    Hi Thaman,
    The personal work schedule represents the lowest level of work schedules. It contains the work schedule of one individual employee.
    You can refer to the personal work schedule for the working times of a specific employee, as well as any working time provisions that apply on a particular day. The personal work schedule also contains any changes made for individual employees from when maintaining infotypes, in addition to any changes made for entire employee subgroup or personnel area groupings.
    The daily work schedule determines the structure of working times in your enterprise at the daily level. You can also define actual normal working conditions and those that differ from externally or internally determined daily working times. In this way, you set up working times defined for specific employees.
    The daily work schedule, along with Break Schedules, comprise the working times for a particular day.
    Use the below for maintaining Work schedule....
    Choose Human resources -> Time management -> Administration -> Work schedule -> Change.
    If you are looking for IMG configuration of WS, pls let me know...
    Regards
    Ghouse

  • The error showing as Fiscal year change has not carried out for the coCd

    Hi all,
    I am facing a very critical situation. My client has the last closed fiscal year as 2006(from 2006 april to 2007 march).For the fiscal yr. 2007(2007april to 2008 march) they have already finalised and submitted the reports made from some parallel software.They now want to tally this report with SAP system and to adjust the SAP system entries as per this report.This work was running fine.But on 01.04.2009 none of the asset reports are running.The error it's throwing is as-
    Fiscal year change not yet made for company code PWAL
    Message no. AB059
    Diagnosis
    You have not yet carried out a fiscal year change for company code PWAL, although the current system date is in the new fiscal year.
    Procedure
    Carry out the fiscal year change for company code PWAL.
    Proceed
    The error is quite understandable.We have to close 2007 and then perform the fiscal year change.But the problem is that the adjustment for the year 2007 is not yet complete.Is it the only solution with me that I should close the yr.2007 and again open it after the fiscal yr. change? If that is done can I take care of the adjustment in the posted depreciation? Or is it possible that the system date can be made back to 31.03.2009(very stupid ask!). The real problem is that my client has mistakely created some assets in the year 2007(by AS91 after changing the take over date) those should have been shown in the next year and also some assets are creted in the year 2008 by the same strange method those should be shown in the year 2007.What I am doing now is deleting these legacy assets and creating the new assets in the correct year.And this process is not yet complete.If I close the year 2007, then the depreciation of these legacy assets will also be posted.Later how can I reverse the effect?Also without seeing the reports I can't make the adjustments.Please suggest/advice.
    Debabrata

    Hi Debabrata,
    You have to do all fiscal year closing steps for 2007. When you reopen it you can do a repeat run for 2007. (You can do the reapeat run only for the new/ changed assets.)
    Try first to test this in an actual test system (document it and do the same in production). Perhaps as you know when 2009 is open I want to close 2008 in one week.  All changes they make in the asset system (change depreciation keys, recalulating,...) can result in postings in 2007 / 2008 what they don't want and later fiscal year problems. You will found a lot off masages about this on the form.

  • How can I sign out from CC if my PC does not work?

    Hi there, I have downloaded the CC programes on my PC Desktop and Apple MacBook. My PC stopped working and I have acquired a new Apple Desktop. Now I try to download the programs on the new Apple. I have received the message that I have to lock out from Creative Cloud on my PC Desktop. How can I lock out if I cannot start my PC? Thank you.

    Contact support by phone or web chat and they can handle iit on their end.
    Mylenium

  • Can the time out for loading a page be extended for busy sites?

    (Error:)
    Problem loading page
    The connection has timed out
    The server at xxx.xxx is taking too long to respond.
    * The site could be temporarily unavailable or too busy. Try again in a few moments.
    Question: Is there a way to extend the time out for sites which are known to be busy?

    This issue appears under two different Mozzila "Questions". Both appear to have the same OUTDATED, INEFFECTIVE ANSWERS. A lot of us are on WIN7 now and still have erratic network speeds due to cable multiplexing -- but have been trained to leave the registry alone. Has not anyone solved this problem -- other than going notoriously unreliable FIOS ??

Maybe you are looking for

  • Can my IPhone4 be repaired in the Apple store even if i didn't buy it from there?

    Hi. I was just wondering but does anyone know that if I didnt buy my IPhone4 from the Apple store could i still get it repaired for free? As I havent had it a year yet. If not, Could i still pay for it to get it repaired? How much are costs of damage

  • Error produced when trying to pass variables to a Matlab script

    For some reason, LabVIEW produces an Error 1047 (Unable to pass variable to the script server) whenever I create an input variable to a Matlab code block. Outputs work fine (for example, connecting an output "a" to a Matlab code block that says "a=ra

  • Manual conditions type - Net value effect

    Hello, For some materials when I enter the manual condition type the system updates the net value immediately (without me clicking on the "update" button). For some other materials when I enter the same manual condition type (in the same order type),

  • Using nested tables

    Hi experts, is there a way of using nested tables, for example: Field1 ---value1-1 ------example1-1 ------example1-2 ------example1-3 ---value1-2 ------example2-1 ------example2-2 ------example2-3 ------example2-4 ------example2-5 ---value1-3 ------e

  • What are the apps shown in the latest uk tv advert

    Does anyone know what the menu translator is in the new uk tv advert