Which Forecasting Model/ Forecasting Stratergy is suitable for Steel Plant

Hello Friends,
Could you pl suggest me Which Forecasting Model/ Forecasting Stratergy is suitable for Steel Plant.Any one having the steel plant experiance pl suggest me .
Edited by: sivaram2411 on Jan 19, 2011 6:37 AM

Hi Sivaram,
I haven't worked in Steel but worked in Cement industry. Cement is another input to construction industry, just like steel. In India, both have seasonal demand. But I would give a generic suggestion here, though you can check with your network in other steel companies having similar product offering as yours, about the forecasting model they follow.
Choice of forecasting model is not industry dependent. Because within the same industry, each player has a different product mix, different set of customers and in different geograhies. Forecasting model is selected based on the analysis of historical data. So you can take last 2 years available data to start with.
Demand Planning provides the following statistical forecasting models: constant model, trend model, seasonal model, trend and seasonal model, Croston method with exponential smoothing, linear regression, and causal models with multiple linear regression (MLR).
Time series models are the most commonly used forecasting methods.
The flow chart is like this:
Raw Data collection --> Data analysis --> Analyzed data --> Forecasting Model selection
You can use plotting as a method of Data analysis,
We need to find the best forecasting model, so that it gives us the most accurate demand. There is no systematic approach for the selection of a forecasting model and you need to find the best for you by trial and error.
The following factors impact the model selection: (1) Forecast Horizon (2) Data Availability / Requirements (3) Pattern of Past Data (4) Level of Detail in the Forecast (5) Cost Factors (6) Accuracy and (7) Ease of Application.
So use the historical data, analyse it, try using the available forecasting methods one by one to forecast for a period during which the actual data is already available with you and find the one which is best matching the actual figures. The model giving most accurate results, or the one with least forecast error, would be the one you are looking for.

Similar Messages

  • Which kind of cache group is suitable for the intensive insertion operation

    Hi Chris,sorry for call you directly. Because you give me many good answers about my many newbile questions these days:)
    You told me that the dynamic cache group is not suitable for the intensive insertion operation
    because each INSERT to a child table has to perform an existence check against Oracle even if load the cache group into RAM manually(Please correct me if wrong).
    Here I have many log tables that they only have a primary key and no foreign references and they are basically used to reflect changes from the related main tables.
    Every insert/update/delete on the main table will insert a log record in the related logging table(No direct foreign references).
    In order to cache these log tables, I have to create a independent cache group for each one, right?
    I do not want load these logs data into RAM because my application do not use them or these logs will waste my RAM clearly.
    so here comes my question.Which kind of cache group should I use to gain the best performance with no loading them into RAM?
    As my understand,the dynamic cache group load data on demand while the regular cache group need load all the data into RAM firstly and it won't load data from oracle anymore?
    Thanks in advance
    SuoNayi

    Let me be more specific. Consider this cache group:
    CREATE DYNAMIC ASYNCHRONOUS WRITETHROUGH CACHE GROUP CG_SWT
    FROM
    TPARENT
    PPK NUMBER(8,0) NOT NULL PRIMARY KEY,
    PCOL1 VARCHAR2(100)
    TCHILD
    CPK NUMBER(6,0) NOT NULL PRIMARY KEY,
    CFK NUMBER(8,0) NOT NULL,
    CCOL1 VARCHAR2(20),
    FOREIGN KEY ( CFK ) REFERENCES TPARENT ( PPK )
    INSERTS into TPARENT will not do any existence check in Oracle. An INSERT INTO TCHILD has to verify that the corresponding parent row exists. If the parent row exists in TimesTen then no check is doen in Oracle. If the parent row does not exist in TimesTen then we have to check if it exists in Oracle and if it does we will load it into TimesTen from Oracle (along with any other child rows) before completing the INSERT in TimesTen. So in the case where the parent always exists already in TimesTen there is no overhead but on the other case there is a lot of overhead.
    If your log table is truly not related to the main table (not in TT and not in Oracle either) then they should go into separate cache groups. If each insert into the log table has a unique key and there is no possibility of duplicates then you do not need to load anything into RAM. You can start with an empty table and just insert into it (since each insert is unique). Of course, if you just keep inserting you will eventually fuill up the memory in TimesTen. So, you need a mechanism to 'purge' no longer needed rows from TimesTen (they will still exist in Oracle of course). There are really two options; investigate TimesTen auotmatic aging (see documentation) - thsi may be adeuate of the insert rate is not too high - or implement a custom purge mechanism using UNLOAD CACHE GROUP (see documentation).
    Chris

  • Which type of V/A sensor suitable for the use of SCC -2345?

    Which type/brand of Voltage/current sensor suitable for the connection of SCC -2345?

    Hi TARC,
    There are a lot of options for measuring voltage or current in the National Instruments SCC series.  These are listed below, with the link to NI’s website where these modules can be found.
    SCC Analog Input Modules
    http://sine.ni.com/nips/cds/view/p/lang/en/nid/10339
    2 Channel Voltage Input Module:
    ·         SCC-AI01, 2 Channel Isolated Analog Input (42V, 10 kHz)
    ·         SCC-AI02, 2 Channel Isolated Analog Input (20V, 10 kHz)
    ·         SCC-AI03, 2 Channel Isolated Analog Input (10V, 10 kHz)
    ·         SCC-AI04, 2-Channel Isolated Analog Input (5V, 10 kHz)
    ·         SCC-AI05, 2-Channel Isolated Analog Input (1V, 10 kHz)
    ·         SCC-AI06, 2 Channel Isolated Analog Input (100 mV, 10 kHz)
    ·         SCC-AI07, 2 Channel Isolated Analog Input (50 mV, 10 kHz)
    ·         SCC-AI13, 2 Channel Isolated Analog Input (10V, 4 Hz)
    ·         SCC-AI14, 2 Channel Isolated Analog Input (5V, 4 Hz)
    2 Channel Current Input Module
    ·         SCC-CI20 2-Channel Current Input Module, 0-20 mA
    2 Channel Voltage Attenuator Module
    ·         SCC-A10 2-Channel Attenuator Input Module, 10-to-1
    These modules will work with any standard transducer.
    Hope this helps!
    Ed Waxler | Applications Engineering |  National Instruments

  • Which WAN Mini PCI card is suitable for Tecra A1?

    I'd like to install optional wireless interface into my old Toshiba Tecra A1, but can't figure out what to buy...
    Please, tell me, which card is compatible with my notebook.

    This minPCI WLan card should be compatible with Tecra A1: PA3266u-3MPC
    But you can order also every compatible device from authorized service provider in your country. They will deliver 100% a compatible WLan card.

  • Which "additional graphics card" will be suitable for HP Z420 workstation ?

     Hi Admin ,
    i have recently got "HP Z420 workstation" to manage my dev/deploy environment.
    which is really amazing workstation ,very fast.
    here is my configuration
    OS : ubuntu 14.10
    Device name : ****
    Memory: 15.6 GiB
    Processor : Intel® Xeon(R) CPU E5-1603 0 @ 2.80GHz × 4 
    Graphics: Gallium 0.4 on NVC1
    OS type : 64-bit
    Disk: 465.76 GB
    product: HP Z420 Workstation (C5R15UC#ACJ)
    vendor: Hewlett-Packard
    serial: *************
    width: 64 bits
    capabilities:
    SMBIOS version 2.7,
    DMI version 2.7,
    32-bit processes
    configuration:
    boot: normal
    chassis: mini-tower
    family: 103C_53335X G=D
    sku: C5R15UC#ACJ
    uuid: *****************
    as of now i didn't add any extra harwares into this box.
    it has two video output( DVI and Display port ) by default.
    so now i can able connect 2 monitors into this work station , and everything works fine.
    now i want to add one more monitor into this work station.
    which graphics card i have to purchase ?
    Thanks 
    Thani

    Hi,
    You might get better assistance on the HP Enterprise Business Forum since you have a professional workstation.
    HP DV9700, t9300, Nvidia 8600, 4GB, Crucial C300 128GB SSD
    HP Photosmart Premium C309G, HP Photosmart 6520
    HP Touchpad, HP Chromebook 11
    Custom i7-4770k,Z-87, 8GB, Vertex 3 SSD, Samsung EVO SSD, Corsair HX650,GTX 760
    Custom i7-4790k,Z-97, 16GB, Vertex 3 SSD, Plextor M.2 SSD, Samsung EVO SSD, Corsair HX650, GTX 660TI
    Windows 7/8 UEFI/Legacy mode, MBR/GPT

  • APODP How Forecast model for different product can be define ?

    Hi Gurus,
                 I had forecast 1000 products and in that thousand products i have 300 slow moving products and 700 fast moving products.
    I had taken Linear regression model for this products and run the forecast. My question is i wanted to forecast 300 slow moving products with Seasonal Model , can anyone please mention how we can forecast 1000 products with two different forecast models?
    Waiting for your answers
    Regards & Thanks
    Raj

    Hi Raj,
              A little concept clarification here. The was forecasting model works is"
    1. You create a forecasting model giving a key figure for which you want to forecast and assign a univariae or MLR or composite profile to it assigning a key figure which you want to use as history and a statistical model. (TCODE: MC96B)
    2. Create a selection profile in interactive planning screen (TCODE: SDP94). Select all the products you want to plan for in this profile along with other selections.
    3. Assign forecasting profile to the profile. This way you can assign different forecasting models to different profiles.
    In your case,
    1.Create two forecasting profiles one with Linear regression and the other with Seasonal model.
    2. Create 2 selection profiles one with the 300 products and other with the other 700 products.
    3. Assign Linear regression to one selection profile and seasonal model to another profile.
    Hope this elaborates the solution. Please let us know if you have any other questions.
    Thanks.

  • Which ip phone model suitable for a network of 2 or three branches

    hi experts,
    i want to perform a ip phone solution for a network of 2 or 3 branches so which ip phone model that will be suitable for this solution, thanks alot for your quick reply

    hello p.bevilacqua thanks again for your reply, i have a capinet of an internal telephone system
    so i want to implement voice over ip solution over this system between the sites over the internet, so do u know a study guide for this solution. thanks alot and i appretiate your quick reply

  • Forecast Model in Demand planning and  E book Sap trainingcourse

    Dear Experts ,
    I am Exploring differnt Forecast Model , like  constant
    model, trend model, seasonal model, trend and seasonal model, Croston method
    with exponential smoothing, linear regression, and causal models with multiple
    linear regression (MLR).
    is there any SAP links or material or course availabe to learn more about Forecasting Techniques that we can use in Demand Planning in APO
    if you have idea please help me to learn .. i am really starving for this techniques
    Thanks in advance
    Cheers & Thanks
    Raj

    Hi Raj
    Below link will give you entire information on forecasting models, forecasting accuracy technequues etc,:
    http://help.sap.com/saphelp_apo/helpdata/en/33/437a37b70cf273e10000009b38f8cf/frameset.htm
    For MLR refer the following link:
    http://help.sap.com/saphelp_apo/helpdata/en/ac/216ba4337b11d398290000e8a49608/frameset.htm
    Which is the best model to use:
    You should try running forecasting using various model(seasonal, seasonal linear, linear, constant etc) and comapre
    the forecast accuracy and find out which one is the best suitable.
    Another way is to choose auto model which will select the best possible forecast strategy and give the result.
    I hope thos will help you.
    Please let us know if you require any more information.
    Thanks
    Amol

  • Apps suitable for specific country

    Hi is ther anyway of showing which of the bb apps are suitable for a specific country. 
    I have search for many a happy hour trying to ascertain if the app is North America / USA targetted or will work in the UK, and have used precious download MBs only to find it it a USA app in reality or is not UK specific.
    Any ideas on how I can improve relevant searchs please to get  UK / London function apps?

    IF your BlackBerry is a UK registered device and IF you are searching in AppWorld, you should be shown ONLY UK supported applications.
    1. If any post helps you please click the below the post(s) that helped you.
    2. Please resolve your thread by marking the post "Solution?" which solved it for you!
    3. Install free BlackBerry Protect today for backups of contacts and data.
    4. Guide to Unlocking your BlackBerry & Unlock Codes
    Join our BBM Channels (Beta)
    BlackBerry Support Forums Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

  • Forecast model for Summer / Winter

    Experts-
    Need your help in customizing Forecast model in material master (Forecasting tab). Where these are defined in configuration? How to create new forecast model for Summer and Winter? 
    Here we are dealing with seasonal demands for purchasing different materials.
    I am trying to figure out how to define Season codes for summer and winter? So I can flag material for Summer/Winter? As well as run forecast based on these codes? I understand that I can define season model or trend model, but in that case I will be unable to define which material is for summer and which one is for winter?
    Looking forward for your inputs-
    Thanks in advance.

    Started using MRP controller for summar and winter parts.

  • Formula or Methodology used for Seasonal & Linear Regression Forecast Model

    Hi all,
    I am using the Forecast Model 35 (Seasonal & Linear Regression Model) for Statistical Forecast generation.
    Now I am facing the Issue that my Model 35 is consistently Under Forecasting.
    Can anyone let me know what Formula or Logic is used by the Model to generate the Statistical Forecast.What are the Parameters that can really improve the Under Forecasting trend for Model 35.
    kindly help...
    Thanks & Regards,
    Vishal.S.Pandya.

    Couple of quick checks that you should do
    1. Make sure there is no Like Profile active for that planning object that is interfering
    2. Do a Strategy 56 to test for season and trend. See if streatgy 56 indeed recommends regression model
    3. If strategy 56 fails for season or trend, and you enforce seasonal or linear regression model - i would expect to see the behaviour you are seeing
    4. Make sure there are adequate time buckets for forecast initialization
    5. Make sure the forecast initialization buckets are representative of the forecasts and are not outliers
    IN this regard do check
    http://help.sap.com/saphelp_scm50/helpdata/en/19/06f74ee2ed11d3b78d0000e82debc6/content.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/96/d261f8e39011d3b78e0000e82debc6/content.htm

  • Finding the forecasting model selected by Model 56

    Hi,
            If I use statistical model 56 and run statistical forecasting, how do I know strategy 56 is finally selecting? I see the errors and the parameters when I click the "forecast comparison" icon. But I wan to know which model the system finally selected? Is there any tale that tells me that?
    How do I do the assignment of forecasting model to a selection id and forecast and see the results in the background? ANy tables, programs???
    Thanks.

    Hi Sinivas,
                         Thanks for the reply. But I am asking is to see what model 56 finally decides to go with? I mean trend or seasonal or....how can I know that the automatic model has selected a particular model after testing for all the models.
    Hope this is clear.

  • Best way to know correct forecast model - process chain set up with multiple forecast models

    Hi Experts,
    I need your help in selecting best forecast model for our company. We have some of the models already used for our company, and because of multiple models used it is taking very long time for process chain to finish. There is no existing documentation available on which model was used why initially. Please help me to make out forecasting process smooth.
    - What is the best way to know, which forecast model is correct and should be used for our forecasting process.
    - In case multiple forecasting models are really required to be used, please suggest ways to optimally schedule them in process chain.
    - At times we get messages like "not enough data available" for specific model - any way to avoid this.
    - How to optimally use parallel processing profiles forecasting process in process chain.
    - Things which should be avoided.
    Request your help, please share your experiences.
    Regards
    NB

    Hi Neelesh,
    There are many points you need to consider to redesign forecast process for your company/client.
    You need to select the best suited forecast model first depending on the business. This has to be well tested & agreed by business users. Complexity will be an outcome of this exercise with business users. Best id to give then a brief intro on all available models & then help them selection the best one as per their requirement.
    Auto selection models are generally more time taking & should be used only when you have no idea at all on the business/demand pattern.
    Run time will depend how you are clubbing the CVCs to get the forecast generated & also parallel processing. For parallel processing profile you will need to do trial & error testing along with help from Basis team on how many free dial up processes are available.
    Even you can run many forecast calculations in parallel if the product/cvcs are totally different. - As per my personal experience maximum run time reduction can be achieved here.
    Daily run is not advisable except only for businesses where you have too much dynamism in demand planning i.e. you expect the demands to be changed overnight. Most of the companies run forecast on monthly basis or at weekly basis at the max.
    "Not Enough data" will be a problem if you are having the irrelevant models used in forecast profiles. This means users are not bothered to maintain the needed data for he forecast calculations or they are not aware at all of the situation. Running such models on daily basis is not advised at all. Better users should use interactive forecasting & saving the results in such cases.
    Just to give a crude example we get forecast calculated on monthly basis for approximately 4 lac cvcs in less than 3 hrs using moving avg, seasonal linear regression, seasonal trend, croston models. We use parallel profiles also everywhere with 10 blocks & 500 cvc/block.
    Hope this helps. Let me know if you have nay more questions & also the results using any of this.
    Regards,
    Rahul

  • Forecast model K (Constant with smoothing factor adjustment)

    Hi All,
    i am using forecast model K in materail master. I would like to know the system calculation on forecast value?
    For Example:
    Consumption qty maintained in  material master for last 3 months.
    Period          Total consumption
    04.2011     100
    03.2011     150
    02.2011     200
    When i am using Forecast model K, system is calculating as follows,
    Period       Orig. HV   Corr. HV   Ex-post FV     Orig. FV
    M 02.2011          200        200
    M 03.2011          150        150        200
    M 04.2011          100        100        155
    M 05.2011                                                           106
    05.2011     Forecast value is 106, Basic value is  105.500, Error total is  -105 and MAD is 27.
    I would like to know the system calculation of these value. Particularly Basic value and MAD.
    And also the difference between Forcast Model D and K if possible.
    When i am using Forecast model D, system is calculating as follows,
    Period       Orig. HV   Corr. HV   Ex-post FV Orig. FV
    M 02.2011          200        200
    M 03.2011          150        150        200
    M 04.2011          100        100        190
    M 05.2011                                           172
    Basic value  172.000,         MAD 38,         Error total  -140
    Thanks in advance,
    Babu

    MODEL K:
    Constant Model with First-Order Exponential Smoothing  
    The constant model with first-order exponential smoothing is derived as in formula (5). A simple transformation gives the basic formula for exponential smoothing as shown in (6).
    To determine the basic value, you only require the basic value from the preceding period, the last past consumption value and the alpha smoothing factor. The smoothing factor weights the most recent consumption values more than the less recent ones, so that they have a stronger influence on the forecast.
    The forecast value is the basic value for the last period for which historical data is avaialble, that is the last ex-post period.
    where k> n
    How quickly the forecast reacts to a change in consumption pattern depends on what value you give the smoothing factor. If you set alpha to be 0, the new average is equal to the old one and the basic value calculated previously remains; that is, the forecast does not react to current consumption data. If you give alpha the value 1, the new average equals the last consumption value.
    The most common values for alpha lie between 0.1 and 0.5. An alpha value of 0.5 weights past consumption values as follows:
    1st historical value : 50%
    2nd historical value : 25%
    3rd historical value : 12.5%
    4th historical value : 6.25%
    and so on.
    The weightings of past consumption data can be changed by one single parameter. Therefore, it is relatively easy to respond to changes in the time series.
    The constant model of first-order exponential smoothing derived above is applicable to time series that do not have trend-like patterns or seasonal-like variations.
    MODEL D:
    I think that simple constant model is just a normal average.

  • Forecasting Models in Demand Planning.

    Hi experts,
    want to know in details and also to practice various forecasting models in Demand Planning, from beginning.
    please suggest.
    Regards
    Bhupendra

    Hi Bhupendra,
    There are various forecasting models to use in business like automatic model and manual model as a broad category. 
    In detailed, there are models like constant model, trend model, season models, trend seasonal etc.,
    Forecasting models are very simple and mostly based on STATISTICAL TECHNIQUES.  If you have sound knowledge in various statistical methodologies, it will be very easy to followup all the models.
    Moreover, while selecting the best model for an organisation, one needs to study and identify the key performance indicators for improvement and accordingly the forecast model needs to be aligned.
    The method to find this kind of model is the BEST FIT METHOD (it could be one or more or combo of it).
    In demo systems or sandbox system, you can populate various data with various models and try to analyse the one which satisfies business requirements. You can also take the help of BUSINESS PLANNING ANALYSER to build the customised forecasting model which can be part of business side or from consulting side.
    Regards
    R. Senthil Mareeswaran.

Maybe you are looking for

  • Why will my brand new iPod touch allow me to purchase songs but not download them?

    Can someone tell me why my new iPod touch is allowing me to buy songs but not downloading the songs currently being purchased?  The new songs actually show up on my iPad but not my iPod which is the device they were purchased on.

  • Microsoft Surface Pro 3 and Access

    Currently, we are using a handheld unit to collect process data from our line which is then uploaded into our Quality Access database via ODBC link.  we are upgrading computers and plan to change this handheld to a Microsoft Surface Pro 3. Question: 

  • Add zfields to report created by fki0

    Hello Experts,                 i wants to add new fields to report created by fki0 and also i want to create a single report for all vendor ageing.

  • First web site

    hi all, have been working on my first site please have a look and tell me what you think http://web.mac.com/gareth.barlow/iWeb/mac%20time/Home.html it's not complete but just looking for some views on it, are there too many pages and are the colors o

  • Computer Stuttering Repeatedly

    Every 10 seconds or so my system freezes then starts moving again. This is quite annoying. I've ran Disk Utility and fixed permissions, ran Apple Hardware Test and no problems were found. Please help!