Hi Gurus,
Need some advice from you all, I have a scenario here which MRP generated the delivery schedule lines for material A on 10.08.2011 - 124 KG.
User review the MRP result and didnt confirm the line, but she added in manual line on 11.08.2011 - 124KG.
On 11.08.2011, warehouse performed GR on the delivery schedule lines. It's found that GR was actually updated into the delivery schedule line generated by MRP (10.08.2011) and not the manual line confirmed by user. (11.08.2011).
User is questioning now why the GR able to be performed on MRP generated line which had not been confirmed? Any guru can share with me the fact and good note regarding this on MRP? Thanks!
Michelle

Hi,
Since we are talking here about schedule lines, these are open for GR when the delivery schedule is send to the vendor.
In your case you had a quantity open for 10/08/2011 generated by MRP, then the user added manually another line on 11/08/2011. After this the user will have transmitted the delivery schedule which makes that both the items where marked as transmitted and thus open for GR.
Now when the goods come in the system will post against the first open schedule line that is found until this is fulfilled and then switch to the next open line at the moment of GR. So this is why the GR was put against the MRP generated schedule line as this one was the one with the earlier date.
Regards,
Peter

Similar Messages

  • MRP creating multiple delivery schedule lines in PR

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Dear
    Are you dealing with Single vendor  where you want Multiple Schedule Line item through single PR  which should be generated through MRP run ??
    What you will have to do is to set up the Outline Agreement or Info Record for your vendor and material and then create the source record for this vendor- material relationship and make sure that this source record is set as MRP relevant. Once MRP is run, the vendor is automatically defaulted to your PRs. If in your material master, you have defined the same purchasing group for various material numbers, then with Transaction ME59, it is feasible that you can combine various PRs of the same purchasing group by flagging onto the 'Per Purchasing Group' indicator checkbox. Make a trial test and let me know how it goes.
    Or you can use Qouta arrabgement in that case for different vendor .Please refer : Multiple Requisition  line itme for Quota arrangement
    Just check and revert
    regards
    JH
    Edited by: Jiaul Haque on Dec 25, 2010 1:52 PM

  • Generate Delivery Schedules via MRP Planning run

    The company wants to create Scheduling Agreements and generate the Delivery Schedules from the MRP Planning run - MRP 2 view via JIT.
    Can you generate Delivery Schedules from Schedule Agreements if the company does not have an EDI server or APO set up?
    Thanks,

    Shirley Globe,
    You seem to be putting the experts to the test.
    As it was told you, you can generate schedule lines via MRP run. MRP run can be done (e.g.) trough MD01 /MD02 / MD03. Of course, you have to use the proper selection parameters to achieve your goal.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
    As for how to use SA with MRP please check SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/3b/66596eda7b11d1b6330000e8a738dc/frameset.htm
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 9, 2009 7:40 PM

  • Order of delivery schedule line counter at schedule agreements from MRP run

    Currently we are using schedule agreements for our long term external suppliers, but we are facing a problem with the order of new delivery schedule lines created during MRP run.
    Because of master data settings like, lot size, rounding value, plan delivery time and planning time fence to set as firm new requirements, multiple schedule lines are created with no order for schedule line counter.
    Does anyone is aware of a BADI, user exit or customizing control to have this schedule line counter in order?
    Thank you
    Daniel Guillen
    IT
    Skyworks Inc.

    Hi,
    Pls put this query in SD fourms  and get immly help because this is technical fourms.
    Anil

  • The delivery schedule lines don't get created automatically on MRP run.

    Hi All,
    The delivery schedule lines don't get created automatically on MRP run for subcontracting material.  I have maintained source list as follow eg.
    Valid from | Valid to | Vendor | Porg | PPI | Agreement | Item | Fix | MRP | MRP area
    02.11.2009 | 31.12.2999| XYZ | XY01|     |AA0000XYZE |10 | X |2 | ABC
    Could you please help me about this issue
    Thanks in advance.

    Hi Amit,
    Please ensure the value of Special procurement key in the MRP2 view for the material. It should be maintained as 30 - subcontracting.
    Thanks and Regards,

  • Scheduling agreement, unnecessary delivery schedule lines

    Hello
    We use Scheduling agreements for purchasing spare parts. The MRP run checks the warehouse requirements and creates delivery schedule line to scheduling agreement.
    Now the MRP run creates unnecessary delivery schedule lines to scheduling agreement if the earlier created delivery schedule line's delivery date has been changed manually.
    For example,
    Today the MRP run finds requirement for one article  and creates the delivery schedule line, where delivery date is 2.9.2008 (determined from articles basic data).
    The Vendor confirms the delivery date as 3.10.2008 and the purchaser changes manually  (transaction ME38) the delivery date to delivery schedule line accordingly and prints the created message.
    The next MRP run creates new delivery schedule line, where delivery date is again 2.9.2008.
    now there are two open delivery schedule lines for this article with delivery dates 3.10.2008 and 2.9.2008.
    Why the MRP run does not notice the existing delivery schedule line with the new delivery date 3.10.2008?
    we have changed delivery dates manually several years and this has never happened before.
    could you please help me to resolve this.
    Thanks in advance,
    Srikanth

    In addition to the above post,
    as you changed the date manually from 2nd to 3rd....
    so there are was no report for 2nd generated ulitmately...and if generated it was changed...right...
    so when you again run the mrp...the system will generate one more pr for the same article....
    this ultimately happens because of the set del dates in the MMR as i told above..
    Hope it helps..
    Regards
    Priyanka.P

  • Forecast delivery schedule lines consumption

    Hi,
    I cannot fully understand what is the logic behind the consumption of the forecast delivery schedule lines. This is how the problem can be exactly defined:
    - scheduling agreement with delivery orders (LZM)
    - JIT delivery schedules are not used and no delivery schedule is maintained... just a forecast delivery schedule
    - the whole process is manual, there is no EDI implied
    - the cumulative received quantity is updated by an ABAP development that is triggered at delivery goods issue
    The rest, happens normal - forecast schedule lines are updated weekly, the customer send pick-up sheets, a TAM delivery order is created, then delivery, GI...
    The problem: not always the MRP requirements generated by the forecast delivery schedule lines are consumed by the delivery order/GI. If the delivery orders / deliveries are made on the exact quantity of the schedule lines everything works fine. It is also ok when there are two successive delivery orders with a cumulative quantity that matches exactly the forecast line. As soon as a over-delivery is made, everything turns upside-down: older delivered schedule lines appear again in planning as if nothing was delivered until now...
    I suspect that the problem is related to the fact that the whole process is manual and updating the cumulative received quantity is not the only parameter that is counting... is it so? Or the forecast delivery schedule has to be respected 100% in terms of quantities and timing?
    I would really appreciate your help.
    Regards,
    H.

    Also please clarify whether delivery schedule lines in ME38 (even it is created automatically), in Planning time fence, will get affected by MRP run.

  • MRP Out Put  Schedule lines date format to month

    Hi Friends,
    I am working on SAP4.7 Version.
    I have maintained all the relavent MRP datas in material master.
    Like MRP type - PD,
    Lot Size- MB ( Monthly Lot size).
    I have created planned independent requirement in MD61 monthly wise for that material.
    I have given Schedule agreement number in Source in List with MRP indicator - 2.
    I am running MRP for a material with MD02 with MRP parameter Delivery schedules -3 (Schedule lines) .
    The MRP running succesfully and creating delivery Lines with delivery dates.
    But the requirement by the client is..
    The delivery lines should be generated in month wise.
    How to convert the schedule lines generated in day format to Month format in MRP run out put?
    While creating schedule lines with ME38. we have option to select the day format / month format/ week wise?
    But the MRP out put always generated in date wise?
    Any one knows what changes i should make?
    Guide me ..
    Thanks & Best Regards
    Giri

    Hai Boss
              Can you throw some light , how you set default mrp indicator month wise with the help of ABAPER.
    My client requirement also same like you. Yours is month, mine is week. Pl help me out.
    regards
    ssp

  • MRP - Unfix Fixed Schedule Lines with partial receipt

    Dear Experts,
    I am facing a problem that I haven't been able to solve using previous postings in the forum nor reading OSS notes.
    I have a Factory PL01 that needs some raw materials that are bought and received in a distribution center DC01 located in another city.
    Procurement data in material master MRP views:
    In PL01, this Raw materials have external procurement with special procurement key "transfer from DC01"
    In DC01 this Raw materials have external procurement witho no special procurement key (standar purchase order)
    To make things easier we have an LU Scheduling Agreement and also maintained source list to generate automatic schedule lines after running MRP.
    This is working ok.
    My problem comes here:
    When I create the delivery for schedule line (VL10G) the receipt becomes fixed in PL01. Lets say theorical quantity is 20.000 on schedule line but finally supplier can only deliver 18.000 to DC01 and DC01 can only transfer 18.000 to PL01.
    in MD04, plant PL01 There will be a fixed pending quantity of 2.000 for the schedule line that will not be overwritten by MRP runs.
    I would like to "Unfix" this fixed quantity but I can't. I read previous postings and many people say it's not possible and that quantity should be adjusted manually in schedule line to delete the fixed receipt.
    Does anybody knows how to manage this? Can the remaining quantity of schedule line be unfixed? If not: Is there a more efficient way than adjust one-by-one the schedule lines ?
    Please throw me a light about this.
    Best Regards,
    Sebastián Ligueros

    Sorry I cant help you in your question but, i think you can help me in  my.
    I need to use MRP to creade the schedule lines for an schedule agreement LU but even when the Info record is set, plants  are set witht the vendor and customers, MRP is not creating the Schedule lines automaticaly.
    Do you remenber what things are required to do it?
    I also set the source list with the Schedule Agreement and put it as relevant to MRP (2).
    Any help will be great thanks.

  • Scheduling Agreement - Delivery schedule line number

    Hi,
       I am developing a report to show the Goods receipt postings for each delivery schedules of Schedule agreements.
    I am not able to find Delivery Schedules line(EKET-ETENR) in Material document table(MSEG).
    How do we exactly link the GR quantity to Scheduling agreement Delivery schedules.
    We have line item number but not delivery schedules.
    GR quantity may be posted to different delivery scheules and for some SAs when the MRP Runs it is positng randomly.
    Is there function to find the link,
    Searched EKBE, EKET, MSEG  and other tables also.
    Appreciate your help <offer removed by moderator>.
    Satya
    Edited by: Thomas Zloch on Jan 18, 2011 2:44 PM

    Hi Shravan,
        Thanks for answering, I checked those two tables EKEH, EKEK are release tables. We have some SAs without release documentation. I have to find the delivery schedules using the GR document to which delivery schedules the qty it is delivering.
    It is not posting the qty from top of schedules, for some SAs it posted randomly.
    Any other ideas or any function modules,
    In BW it is possible using extractor but we need in R/3
    Thanks,
    Satya

  • SCHEDULE AGREEMENT-DELIVERY SCHEDULE LINE ITEM PRINTING

    Scheduling agreement is created in ECC.
    Delivery schedule line items are generated using APO and CIFed over to ECC.
    Upon displaying in ME38 in ECC, the delivery schedule line items are appearing as required. The problem is that no output type is displayed for condition type LPET even though the settings are done & condition records are maintained.
    Can someone throw some light on this?

    Hi Anil ,
    Goto Transaction NACE , Select Application EL and then Click on O/p Types.
    Select your o/p and click on Processing routines.
    Make a copy of medium 1 and change it to 5. The program , Form , Form routine would remain the same.
    Maintain condition records with medium 5 in MN10.
    Ensure that email address exists in Vendor Master.
    Check with ur Basis to make sure that the setting are done in Transaction SCOT for sending document via PDF.
    Create a new Agreement and test it.
    Regards
    Ramesh Ch

  • Scheduling Agreement Delivery Schedule Line Remains When Fully Delivered

    Hi Experts!
    I had an issue regarding our scheduling agreements. Issue is below:
    Our delivery schedule lines remain on the delivery schedule list item detail screen (VA32 or VA33), even though the delivery has been delivered and completed. The only way this seems to disappear is when a new schedule line is loaded. Why do the old delivery schedule lines remain on the JIT delivery schedule list even though they have been fully delivered and completed?
    This is an urgent matter. Any responses will be greatly appreciated and points. Thank you for your time!!
    Best Regards,
    WC

    Hi Shravan,
        Thanks for answering, I checked those two tables EKEH, EKEK are release tables. We have some SAs without release documentation. I have to find the delivery schedules using the GR document to which delivery schedules the qty it is delivering.
    It is not posting the qty from top of schedules, for some SAs it posted randomly.
    Any other ideas or any function modules,
    In BW it is possible using extractor but we need in R/3
    Thanks,
    Satya

  • Delivery schedule lines

    Hi Experts,
    Please clarify whether delivery schedule lines if creatd manaully in ME38 will get affected/changed by MRP run.
    Edited by: Shravan A on Apr 15, 2008 7:04 PM

    Also please clarify whether delivery schedule lines in ME38 (even it is created automatically), in Planning time fence, will get affected by MRP run.

  • Delivery schedule line number in make to order

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    Hi
    When you do the MRP Run at MD02, maintain the Delivery Schedules as 3 (schedule lines), so when ever you do the MRP Run, it will run along with the delievry date.
    reward if it helps
    Regards
    Prasanna R

  • Delivery schedule line number in sales order is not populated in production

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Will reward points.
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

Maybe you are looking for

  • Image not printing from Word 2010 to .pdf

    I have been successfully printing Word docs that contain my letterhead logo to .pdfs for a long time.  But right after I installed both Word 2010 and Acrobat Professional 9.4.1, the logo would get cut off when printing. I tried a lot of different set

  • Error in Pre-Pop Adapter for AD using ResourceObjectDefinition Mapping

    Hi I have a PRe-pop adapter for Org name in AD - One of the variables is ResourceObjectDefintion. However OIM is not able to map it to the right object name and throws the below error - cAdapterDataMap/getResourceObjectInfo encounter some problems: E

  • Old custom templates in Pages 5 .select background item?

    I have some custom templates from iWork 09, that worked fine until this pages 5.22 came along. They are in Word Processing Layout, and also have a separate text box or two. In Pages 5.22 I can not longer select them, they just appear on the screen as

  • Junk Mail in Inbox

    Starting on December 26, 2012 I began getting 8-10 spam emails within a one hour period. I have a @me.com account. The spam mail I received was not marked as Junk and showed up in my inbox. After researching, I found that you could "train" the mail t

  • Our web based application allows links to external documents like word- these links work in IE but not in Firefox- any idea why?

    the protocal that works in IE is P:\My Documents\2010 Workshops\Nashville Brazeway\Nashville_Workshop_2010.docx This drive is shared and opens in IE but Firefox gives msg Firefox doesn't know how to open this address, because the protocol (p) isn't a