When I syncd my calender from my iPhone 3Gs to iMac for the first time, it moved all the events entered as "all Day" forward by 1 day on iCal. It didn't do that to events with a set start and finish time on a day.I have checked the date/time settings on both the phone ( in general settings and under mail, contacts calenders) and on the imac and all are as they should be. Whats next?

Angela,
Quit iCal, open System Preferences...>Language & Text>Formats>Region: and set/re-set the appropriate region.
Then log out/in or restart and see if the problem is corrected.

Similar Messages

  • All-day events moving a day ahead

    I've recently (three weeks or so) started experiencing a problem whereby all-day events in iCal on my Mac appear a day earlier on my iPhone. So, for example, my sister's birthday on the 9th shows up on the 8th on the iPhone. Dates appear OK on the iPad, though. I guess it could be something to do with the leap year, but why does one device do it and not another.....

    First, please check as follows.
    * Launch iSync.
    * Click the icon of your phone.
    * Check the calendar (category) you'd like to sync is checked.
    * Click "option".
    * Check "Sync all day event" is checked.
    I can sync all day events by this way, but have trouble on my N73.
    All day events are synced as "meeting" starting from 12:00am to 11:59pm.
    In iCal, I have a lot of all day events including holidays, so the weekly view is full of black bars covering whole days.
    Should it be synced as "notes"?
    http://discussions.apple.com/thread.jspa?messageID=4513866&tstart=0#4513866
    I hear this problem is partly solved on iSycn 3.0 in Leopard.

  • Why does Ical want to change the original dates to 2001 when syncing from my iPhone?

    Hi I was wondering if anyone could help with this as its driving me up the wall
    over the last few weeks I upgraded to Lion running 10.7.1 and until then my Iphone synced everything fine without any problems I have an Iphone 3G running 4.2.1 and when I sync now I get the Ical sync alert saying that more than 25% of my calender events will change on my computer.
    When I look nothing has changed accept the origianl date which is 1/1/2001 for anything that is being taken off my phone onto Ical and also for anything that is already on Ical, I keep telling it to sync later but everything I try it always comes up the same.
    I asked during the week in at the Apple store but was adviced that this problem had not been heard of before and to book both my phone an macbook in for a genius bar appointment.
    Anyone else come accross this problem or is it just myself?
    Kind regards Andy ;0)

    Anyone able to help with this problem at all its still doing my head in ;0(

  • Unwanted "Message" alarm on all-day events -- why?

    I wish to create an all-day event with an email alarm. When I create the event, I enter the alarm title, check "all-day", and change the default alarm from "Message with sound" to "Email" (which defaults to "11:45 PM the day before". So the event contains only this email alarm, as I intend. After I click "Done", if I then go back and inspect this event, I find that it now has 2 alarms at the same "11:45 PM the day before", the email one I set up and a "Message with sound".
    (I shouldn't need to, but) I can then edit this event to remove the "Message" alarm, but why was it added in the first place? It wasn't there when I created the event.

    Jerry,
    Welcome to Apple Discussions.
    I would check iCal>Preferences...>General> to determine what your setting is in "Add a default alarm to all new events and invitations."
    ;~)

  • All day events created on iPod touch syncing a day late in iCal

    Hi everyone,
    When I create an all day event on the iPod touch and then sync to my mac, the newly created event shows up a day late in iCal, but remains correct on the iPod. I've noticed one or two other forums where people are having this problem but it doesn't appear to have been solved yet. Has anyone got any ideas about why this would happen? It's really bugging me as the calendar was one of the main reasons I bought the iPod in the first place, I'm thinking about taking it back if I can't get it to work. It appears to be a new problem as of some time this year (judging by other's experience, I've only had mine a week) so perhaps a dodgy software update?
    Any help would be appreciated.
    Thanks

    should clarify that I deleted duplicate events on the ipod so that should have left one in ical. there is still one listed in ical on the ipod but not on the computer, so deleting duplicate entry deleted it entirely from my ical on computer and mobile me. no icloud yet

  • Easier way to create All-Day Events?

    Creating an All-Day Event seems a little cumbersome to me and I was wondering if I was missing something. Is there a way to create an All-Day Event from scratch, meaning keyboard command/menu item? The only way I can find is to create a timed event, then mark it an All-Day Event with an extra step. I know you can click inside the Event section of the day in Week view, but if the day you are working on has the most All-Day entries, there is no place to click.
    There is a command for New Event. Why not All-Day Event? I am sure I missing something, but I have searched the Help menus and support groups and cannot find a way to do it.
    Thanks,
    whardy7

    Yes, I have. That is quite obvious. But, what do you do when there is already one there? That one takes up the empty space for double-clicking. If a different day has 2 events, you get lucky. In that case, there is empty space because the All-Day Events box grows to accommodate the highest number of All-Day Events for that given week.
    Let me ask my question again. Once the All-Day Events box is full (which is dependent on the day with the most events - could be 1 event, 2 events, etc.), how do you add an All-Day Event? It seems there is no way. You have to create a timed event, then convert it. If your timed area is already full of events, that can be really tricky.
    I hope that is clearer.

  • Issue: all day events arent shown in year view

    Hi,
    the normal behavior would indicate an event in bold in the year view. but this only happens on days where normal events (no all day events) have been set up.
    i cross checked it with a 2012 client. working as expected. all day events show up in the year view.
    excerpt from the manual:
    Code:
    Changing How All-Day Events Are Displayed
    You can change the way that all day events are accepted into your calendar by using the Options menu.
    1. Click Tools > Options, double-click Calendar, then click the General tab.
    2. In the Accept Options area, click the drop-down menu located beneath Accept All-Day-Events I send to myself as, then choose the option you want.
    3. Click OK.
    sry, but i dont see how i can change the way how all day events are displayed.
    is there still a need to copy the view files to the groupwise server?
    thx

    bahsig wrote:
    > sry, but i dont see how i can change the way how all day events are displayed.
    The setting you quote is actually to determine how all-day events that you
    create for yourself are handled (for any future event you create). By default,
    all-day events have a display of "free" (as opposed to "busy" or "tentative" or
    "out of office"). If your calendar is "free", then there is no bolded
    indication that you have something scheduled in the year view.
    If you look at an all day even in your calendar, you will see a box under
    recurrence that says either "free/busy/out of office/tentative". In order for
    an all day event (or any event really) to bold the calendar number, this value
    cannot be "free".
    There is no need to copy views to the Post Office any longer. Views are in a
    fixed location on the server (/opt/novell/groupwise/agents/data) and the POA
    always has access to them.
    Danita
    Novell Knowledge Partner
    Upgrading to GroupWise 2014? We've got you covered
    http://www.caledonia.net/store
    If you find this post helpful and are logged into the web interface,
    show your appreciation and click on the star below...

  • Duplicate all-day events on calendar

    I noticed that on my iPod Touch calendar, all of my all-day events go on for two days. For example, a person's birthday is showing up as going from Dec. 1-Dec. 2. On my computer's iCal, all of my all-day events look normal. What could be causing this?

    I've had this happen to some of my all day events also. Somehow the events end up going from 11pm to 11pm (instead of 12am to 12am) and thus they span two days.
    I'm still not entirely sure what has caused this. I've also had some of these events (these are mostly recurring events, like birthdays) that have ended up on a different day entirely - June 6 instead of October 31, for instance. In those cases the Recurring Event props got changed from a specific date to 'third Wednesday' or some such.
    I have had to edit manually in Outlook -- if they say 11pm to 11pm, change it to 12am instead. And check the recurring props to be sure they are correct.
    You might also want to check your location settings. I have sort of wondered if this has to do with location as I had it set to Indianapolis (which only started observing DST last year - maybe that isn't factored into the software yet?) and wondered if that is what messed things up, since all day events did shift by 1 hour. I have location set to New York now but can't prove that fixed anything -- I found a few more events messed up today, but then just now remembered to check World Clock, and it was still set to Indy. <shrug>
    Judy

  • OS5-Issue with reminders/alerts of all-day events

    Hi there,
    in our company we are used to set up anniversaries and birthdays as all-day events with a reminder at 08.00 AM in Lotus Notes which are synchronized together with individual calendar entries to the Blackberries. After upgrading the first Bold 9000's to OS5, the alerts for birthdays and anniversaries don't go off anymore.
    The Calendar entries are configured in Lotus Notes as all-day events with a reminder 8 hours after the start time (In the BB-Calendar these are shown as negative values). In the calendar-overview these entries are on the OS5 devices now shown without the bell-icon. If I open one of these events the reminder is configured with a negative value.
    Although it is and was never configurable directly via the blackberry-devices (where you can only set the time the alarm goes off in advance, means positive values) , it always worked with all OS 4.x devices.
    But it seems that with OS5 it's not possible to remind this way anymore.
    Unfortunately, it's no option to put birthdays and anniversaries at for example 8 o'clock in the morning with a reminder at the same time, because the users don't want to have (sometimes multiple) events within their day schedule.
    Could someone please verify that this is a OS issue. The used OS is 5.0.0.681, Lotus version is 8.0.
    If this issue persists with all 5.x versions we are forced to downgrade back to 4.x.
    Thanks in advance
    cu

    push
    please help!

  • Latest Organizer update in the Blackberry Desktop Software does not sync Outlook 'all day events' in Calendar properly

    On my Blackberry Torch 9810:
    When syncing with Microsoft Outlook 2007 for an 'all day event' in Calendar, Outlook stores the appointment as from 12:00am to 12:00am so Blackberry Organizer thinks it is an appointment for 2 days rather than one.
    So for example if you make an 'all day event' entry for Feb 25 in Outlook, Blackberry Organizer syncs it on the device as an "all day event" on Feb 25 and Feb 26.  Very annoying indeed!
    Technically Outlook should store it as 12:00am to 11:59pm for a one day
    event.    But since they don't, I hope Blackberry will fix Desktop Organizer
    Software to cope with this issue and send out a new update!
    Does anyone know anything about this?

    I was getting a similar problem... birthday and anniversary and some other all-day events (but not all!) in Outlook were being set to either 1pm-1pm or 2pm-to-2pm, from the day before to the day of the actual event.  e.g. my New Years Day event was being set as starting 31 Dec 1pm and ending 1 Jan 1pm.  The 2pm vs 1pm difference seemed to correlate to the times of the year without/with daylight savings.
    Presumably I'm seeing 1pm or 2pm and not 12am-12am due to my own time zone (GMT +10).
    I made the change recommended by Bifocals and it has fixed this problem.  However, I did need to -manually- go through and change all the events in Outlook back to be proper all day events - that did not happen automatically.
    For those (like I was) wondering how to set the "the corresponding options on the Blackberry"... you open the Blackberry Calendar, then hit the application button, then scroll to Options then General Options.  The Start of Day and End of Day settings are what need to match Outlook.  FYI, I have a Bold 9000 and am using Outlook 2007.
    I'm really hoping that when I next upgrade my Blackberry software that it retains this setting change.  I find it really annoying that some (or all?) other settings (e.g. Mobile Network: Data Services & While Roaming) are reset to defaults on every software upgrade, meaning I have to remember what I set and to go back and set them again after an upgrade.  Grrrrr.....

  • All day event marked as FREE NOT busy in Outlook 2010

    I would like to have all day events default to BUSY not FREE in everyones Outllok Calender. 

    Hi, maybe this will help
    http://office.microsoft.com/en-us/outlook-help/create-an-all-day-event-HP001230353.aspx
    Don
    This answer applies to Outlook 2007 specifically.  Is it the same for 2010?
    Thanks.

  • Calendar All Day Events, Calculated Columns, Timezone and DayLight Savings - Issues

    Hi
    I have a calendar where I am trying to display in one column using a calculated field (TitleWithTimes):
    Start time (only display time) - End Time (only display time) : Title i.e. 00:00 - 23:59 : Test Event
    So I add an all day event to the calendar for this month (February), it appears correctly:
    i.e. 00:00 - 23:59 : Test Event 1
    I am based in the UK so my time zone is currently GMT/UTC.
    However if I add any all day events to the calendar in April when the time zone switches to GMT+1, the start and end times appear incorrect.
    i.e 01:00 - 00:59 : Test Event 2
    Field: TitleWithTimes
    =TEXT([Start Time],"hh:mm")&" - "&TEXT([End Time],"hh:mm")&" : "&Title
    This issue only occurs with ALL Day Events when the events are scheduled for a in the period of the year where the Time Zone becomes GMT + 1. My regional settings everywhere in SharePoint are correct as are all the SharePoint servers.
    I have done lots of searching and troubleshooting to try and resolve this issue but it appears nobody has found a reliable fix for this issue with calculated fields, all day events and time zones? Does anyone have any ideas of workarounds?
    Thanks

    Hi,
    I understand that you had issues about the calculated field in calendar.
    This is a reproducible issue, when creating an all day event, the calculate column based on the Start Time/End Time is different from the original column value. The date is stored in SQL in GMT time and is displayed in SP in the correct time in lists. So
    returning the start time in a calculated column for an all day event returns the start time in GMT time, which is not the current time most likely.
    As a workaround, you can regenerate the calculate column to add one day/minus one day based on whether the event is an all day event, or create a workflow to copy the start time column to your created date/time column.
    Here is a similar thread for your reference:
    http://social.technet.microsoft.com/Forums/sharepoint/en-US/27ab0bb0-245b-46ca-9f87-c0eb043653ef/date-formatting-in-calendars-returns-wrong-day?forum=sharepointgeneral
    Thanks,
    Linda Li
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Linda Li
    TechNet Community Support

  • Unable to create all-day events or see old ones

    I can create an all-day event but on ical but then it disapears from the desktop but shows up on ipad and iphone through icloud. 

    ethankromhout wrote:
    I opening a ticket on this as well, but I thought someone here might have a quick insight. It was brought to my attention by a user today, that if you create an all day calendar event in Calendar Express or UWC, it simply fails to appear in the calendar view. Searching for it you can find the event, but it won't show up in your week or day view, and won't affect you availability, even if that option was selected when creating the event.
    The user feels this started last week. We did apply a point patch, 125816-12 on 2/17/2009, though that same patch was applied in test and I don't see the problem there. The internal Sun IT systems hit the very same issue last year (bug #6709380 - "All day events not showing for all the users in Sedge Calendar"). Restarting the calendar server (front-end and back-end) fixed the problem in that case.
    Unfortunately we were never able to track down the root cause of this intermittent problem (not for a lack of trying mind you) -- the internal systems are now running CS6.3 and have not hit the problem since.
    One thing I can suggest however is upgrading the back-end to the same revision as the front-end. With calendar server it is best to keep the back-end and front-end at the same revision.
    Regards,
    Shane.

  • Outlook 2010 all day Event sync Problem

    I have just migrated to a Bold 9900 (from a 9800 Torch) and am having problems with Outlook EVENTS. When they are synced via Desktop (7.0.0.43) they roll over and appear as a 2 day event. I am running Outlook client 2010 under Windows 7 and all was working well until I migrated from the Torch. I have checked Time zones on PC and phone and only issue I notice is that Windows 7 is using UTC while handset is GMT, but same is true for Torch 9800? Events are appear correctly as expected on Outlook.
    Any suggestions greatly appreciated.
    Solved!
    Go to Solution.

    Part of the problem appears to be that the new desktop manger software (v7, no longer intellisync) does not include the "All Day Event" flag as a a field that is synchronized between the blackberry and MS outlook.  You can see that this field is no longer included in the detailed field mappings for the outlook calendar. 
    You can sucessfully create and sync an all day event initially.  Problems begin when you later try to modify the "all day event".  If you try to convert the all day event into a regular appointment at a specified time, you must  "uncheck" the all day event flag on either platform (outlook or blackberry).  Desktop Manager never recognizes the change in the all day event flag (since the field is not synced), which then creates a corrupt MS Outlook entry (an appointment with BOTH a specific start/end time AND also with the all day event flag checked, is mutually exclusive in MS Outlook 2010.  Maybe somebody could fix this bug in next release....  

  • Calendar Question: Why do all day untimed events switch to all day timed events???

    I've complained about this on other threads, but so far nobody has answer.  Can somebody please tell me why all day untimed events on the Pre sometimes switch to all day TIMED events (i.e., an event that starts at 12am and ends at 11:59pm)??  My guess is that this is yet another glitch with Google calendar sync, but I would like somebody to weigh in if they know how to fix it.  Thanks. 
    PS--I'm also still waiting for someone from Palm to address the daylight saving time glitch too, if anybody is out there.  Thx.
    Post relates to: Pre p100eww (Sprint)

    This is happening to me as well.  So far, I've noticed it only with repeating events, and not with all of them.  I started noticing the problem in late October, at the same time that I noticed some all-day repeating events being moved forward a day (see separate thread).  As of today (the 12th), I see a repeating yearly all-day event on the 14th that is changed to a 12:00-11:59 event; and a similar problem with an all-day event on the 20th that is supposed to repeat until the 22nd.  In that case, the event is showing only on the 20th and 21st, with the 22nd not showing the event.  In this same time period, there are many all-day events repeating yearly that are NOT showing any problems.
    At the moment all events seem to be showing up correctly in Google Calendar, which my Pre is syncing to. - Dan

Maybe you are looking for

  • How do you get a list of your contacts nick names and their phone numbers on line and print them out?

    How do you get a list of your contacts nick names and their phone numbers on line and print them out?  I've been trying to figure out how to get the list to print out but I can't even find a complete list to view on Verizon's web site.  Does anyone k

  • Can I perform a lookup to verify the value of a variable is contained in another list column?

    I am working in Sharepoint Designer and am trying to figure out how I can set a condition in an approval workflow to only complete a task if the value of a variable is contained in another list column. So if I had a list called A with column A1 and I

  • JavaFX - problem with civil library (FMJ)

    Hi, I'm using the library com.lti.civil (from FMJ) for a desktop application that uses video capture. At integration with JavaFX it gives me an error: com.lti.civil.CaptureException: java.lang.UnsatisfiedLinkError: no civil in java.library.path at co

  • MobileMe View Permissions

    I have posted before but got no response so I thought I would try rewording. I must be missing something. I just started using Aperture 3 and created 2 albums, then posted them to MobileMe (using Aperture) - all well so far. In Aperture I then create

  • New Vista driver 2_10_0000 for build 52