Hi All,
          why  the processing time for loading is taking longtime i want to know the soltion.
Thanks,
chandu

To analyze the process chain and fix it, go through the below document:
[SAP BW Data Load Performance Analysis and Tuning|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/3a699d90-0201-0010-bc99-d5c0e3a2c87b]
Hope it helps,
Naveen

Similar Messages

  • What is Microsoft's official policy regarding the processing time for HCK2.1 Driver Submissions?

    What is Microsoft's official policy regarding the processing time for HCK2.1 Driver Submissions?
    Can someone point me to a document that states the official policy stating their maximum review time?  This info used to be in the WLK1.6 FAQ but I don't see it for the HCK2.1 suite.
    Thanks!
    Al

    Ian,
    Thanks for your reply. Yes, I'm sure LabVIEW uses the (default) Windows timer. And yes, 1 mS is not guaranteed due to the preemptive nature of Windows (and even "RTOSs" to varying degrees), which is why I see about plus or minus 2 mS. 
    Apparently the Windows timer can be set by API calls. See: http://www.lucashale.com/timer-resolution/. Here's a screen shot of his TimerResolution.exe on a Windows 7 PC:
    Here it is on my Windows XP PC after I set it to "Maximum" (initially it was 15.625 mS):
    Notice that it sets the Maximum to less than 1 mS, which is supposed to be the max, so there are some bugs. Plus the Default button does not reset it in XP, but does work on Windows 7 or 8. (I know this is not the place to "debug" non-LabVIEW applications!)
    I'll bet LabVIEW sets it, too. The only caveat, as I said, is it looks like another application can change it, since the hardware timer is a "global" timer. I have not seen this issue in my LabVIEW applications, have you?
    I guess I need to do some more digging to see the code to set the timer, but it looks like the developers of LabVIEW have it figured it out.
    (FYI, I did notice that running my LabVIEW app (which gives about 2 mS resolution) or a C# app, which gives 15.625 mS resolution, does not affect what TimerResolution.exe reports, so I'm not sure if it's really working correctly. If I figure it out I'll post the results.)
    Ed

  • How to calculate the Processing time for material based on its route ?

    Hello experts,
    I would like to calculate the Scheduled in-house production time based on route.
    Actually this is done in the prod. route in tcode CA02. (via menu Extras => scheduling => schedule).
    After getting the schedule table press the 'scheduling results' button I received the Processing time, Setup and teardown time,... Scheduled in-house production time.
    So I'm looking for a function or any tool to use it in report.
    thanks,
    Eli

    hi,
    from routing screen,extras>scheduling>schedule(give a variant name)>scheduling results>update material master.this writes the info in the temp file.use tcode CA96 to update material master.this updates lot size dependent in house production time in work scheduling view of material master and  deletes the lot size independent inhouse prod, time in MRP2 view.this tool gives more accurate results  for your  inhouse prod. time.
    > Hello experts,
    > I would like to calculate the Scheduled in-house
    > production time based on route.
    > Actually this is done in the prod. route in tcode
    > CA02. (via menu Extras => scheduling => schedule).
    > After getting the schedule table press the
    > 'scheduling results' button I received the Processing
    > time, Setup and teardown time,... Scheduled in-house
    > production time.
    > So I'm looking for a function or any tool to use it
    > in report.
    >
    > thanks,
    > Eli

  • Process chains for loading data to target is not functioning

    Hi SAPians,
    Recently, we have upgraded the firmware on IBM P590 with the help of IBM on Saturday i.e. 06/12/2008 (The firmware of P5-590 was SF235_209. It was upgraded to SF240_XXX) and since then the process chains for loading data to targets are not functioning properly.  We have stopped all the SAP services, database services & OS services from our end and services have been rebooted after firmware upgrade.
    However, the problem with the process chains that load transaction data and hierarchies is solved but the chains that load master data are still not working as scheduled.
    We tried to load the master data manually, by running DTP to load data to an object analysis code (attributes) the request remained YELLOW. After refreshing it several times, the request turned into RED. The error message was - PROCESSING TERMINATED (screenshot 1 attached).
    To mitigate this we tried deleting the bad request and it prompted with the below message:
    "Cannot lock request DTPR_4C37TCZGDUDX1PXL38LVD9CLJ of table ZANLYSIS for deletion (Message no. RSMPC178)" (screenshot 2 attached)
    Please advise us how the bad request should be deleted?
    Regards,
    Soujanya

    Hi Sowjanya,
    Follow the below procedure to make yellow request to RED:
    Use SE37, to execute the function module RSBM_GUI_CHANGE_USTATE
    From the next screen, for I_REQUID enter that request ID and execute.
    From the next screen, select 'Status Erroneous' radiobutton and continue.
    This Function Module, change the status of request from Green / Yellow to RED.
    Once it is RED, you can manually delete that request...
    Releasing LocK
    Gott Transaction Code SM12 and release the lock.
    Hope It helps you.
    Regardss,
    Nagaraju.V

  • To Check the execution time for each transaction.

    Abapers,
    How to find out the process time for each transaction eg.order entry,shippng,billing, etc in SAP.
    TIA,
    sinthu

    Hi,
        By default you can see the execution time at right side corner of sap session.
    You can use SE30 to get in to more details like database time , abap time etc...
    Hope it helps...
    Regards,
    Vijay

  • Planned orders are not taking into account the processing time

    Hi,
    Could you please tell me why planned orders quantities are not based on processing time from the material master.
    Materials was set before with 1 day in house production , no matter of lot size.
    Based on routings I updated material master with processing time depending on lot size.
    What is bottering me now is that planned orders are not taking into account processing time. (e.g.  based on my processing time 1000 pce are produced  in 3 days, but planned orders show me that 1000 pce are still need  in 1 day , but it  can not be produced in 1 day   ).
    what did I miss?
    Thanks a lot for any information!

    Hello Simona
    The in house production time from tab MRP 2 is lot size independent.
    However, on tab work scheduling you can define a lot size dependent times.
    Please observe that, if you have entered an in house production time, the processing time will not be considered. The F1 help of the field provides the following explanation:
    You can define work scheduling times in the material master record in one of two ways:
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    Therefore, if you want to consider the processing time, you should remove the in house processing time.
    BR
    Caetano

  • Self Service Password Registration Page taking more time for loading in FIM 2010 R2

    Hi,
    I have beeen successfullly installed FIM 2010 R2 SSPR and it is working fine
    but my problem is that Self Service Password Registration Page taking more time for loading when i provide Window Credential,it is taking approximate 50 to 60 Seconds for loading a page in FIM 2010 R2
    very urgent requirement.
    Regards
    Anil Kumar

    Double check that the objectSid, accountname and domain is populated for the users in the FIM portal, and each user is connected to their AD counterparts
    Check here for more info:
    http://social.technet.microsoft.com/wiki/contents/articles/20213.troubleshooting-fim-sspr-error-3003-the-current-user-account-is-not-recognized-by-forefront-identity-manager-please-contact-your-help-desk-or-system-administrator.aspx

  • The error message "No more virtual tiles can be allocated" appears when I try to use the effects in the quick editing mode in my Elements 13. The baton OK has to be pressed several times for loading all effect patterns. The error returns when selecting th

    The error message "No more virtual tiles can be allocated" appears when I try to use the effects in the quick editing mode in my Elements 13. The baton OK has to be pressed several times for loading all effect patterns. The error returns when selecting the particular pattern.
    The problem does not appear, if PH Elements 13 is executed in the administrator mode.
    The available computer resources are rather  large enough: CPU INTEL i7 4 cores,  16GB RAM, 1TB HDD + 32GB SSD, Windows 8.1.
    Please, advice how to solve this problem? Maybe, there is patch or updating available?

    Dear n_pane,
    Thank you for the quick answer. In the meantime I found other way to pass by the problem. I increased the cache level up to the maximum value 8.
    The errors reported as "No more virtual tiles can be allocated" vanish, but I still do not understand, why PSE 13 cannot work properly by the lower cache levels, having available maximum resources it needed (10443 MB RAM and 26.53GB SSD space for scratches), or cannot collaborate with the fast SSDs properly.
    I wish you all the best in the New Year 2015!

  • How to show the processing time taken for a BPEL process in BAM report.

    Hi All,
    I have the data as below in the Data object. I would like to show the time taken for each order to complete in the report.
    instance Id     order Id     product Name     product Code     price     status     instance Time      updaterName
    1360010     ord004     Guitar     prod003     2000     requested     9/22/2008 12:12:11 PM     Invoke_InsertSalesOrder
    1360010     ord004     Guitar     prod003     2000     Approved     9/22/2008 12:15:11 PM     Invoke_OrderStatusUpdate
    This data comes from simple BPEL process where sensors are configured at the start and end of BPEL process. Also have a human task activity in between to create the time difference.
    In Enterprise link design studio, I tried to calculate the time difference using expression calculator and store it as calculated field. But that doesn't seems to work because when I execute the plan, second sensor data reaches only after human approval whereas first sensor data would be waiting for calculation and ultimately nothing comes into data object.
    How and where the calculation be done to show the processing time in the report. Please someone throw some light on this.
    Regards
    Jude.
    Edited by: user600726 on Sep 30, 2008 1:30 AM

    I would suggest modifying your data object so that the data can all be in a single row and use the sensor at the end of the process to upsert (update) the row created by the sensor at the start of the process. The time difference between two fields in the same row is then an easy calculation on a BAM report -- No EL plan should be needed.

  • How to set up Airport Extreme with Charter ARRIS Modem TM902A for the first time for WIRELESS.

    How to set up Airport Extreme with Charter ARRIS Modem TM902A for the first time for WIRELESS.
    When Charter Tech goes to your site, have them connect the modem up, but do not connect the modem to your iMAC or MacBook Pro.  What you want to do is connect the Airport Extreme to the iMac or MacBook Pro first with the Ethernet Cable. You have to do this to configure via Airport Utility to set up the Base Station Name & Base Station Password.
    You will then create/configure a Wireless Network, create your Wireless Password that will be entered on each of your Devices, example, Apple Tv, your iPhone, etc., you want to allow access to your Wireless Network you are creating.
    Wireless Security will be -> WPA/WPA2 personal or just WPA2
    Enter the Wireless Password you want
    Verify the Wireless Password (enter it again)
    After it is created you will see it on the Airport Utility window with the name you created for it and to the left, will be a Dot (circle that will be yellow).
    Next you then want to unplug the power to the Airport Extreme, and then take the end of the Ethernet cable you unplugged from the iMac or Lap top MacBook Pro and connect it to the back of the Modem.
    Next unplug the power cord from the modem and wait about 5 minutes, then plug the power back into the Arris Modem and wait until all lights come back on the modem wait
    about 5 minutes, then plug the power cord back to the Airport Extreme and you will see it the light blinking yellow.  Wait about 5 to 10 minutes, during this time Restart you IMAC or MacBook Pro, and once it is back up click on the Airport Utility and you should see on the Airport Utility screen.
    For INTERNET to the left the light should be green and you should see the Airport Extreme also appear and the light to the left on the screen should also be green.  If they are, you then should be able to click on the Wireless Symbol on top of bar of the screen and click to select the Wireless Network Name you created.
    If you Do Not See the light (Icon) next to INTERNET turn Green, or if you see the Internet Light Green, but the Light (Icon) next to the Airport Extreme is yellow, unplug the power again to the modem and unplug the power again to the Airport extreme and wait about 15 minutes or up to 30 minutes. Then plug the power cord back to the modem wait till all the lights light up then, plug the power cord back into the Airport Extreme and Restart your iMAC or MacBook Pro.
    The Airport Extreme light should change from yellow to green. Open up the Airport Utility to see what the indicators are showing they should both be green.  Again select Wireless network you created under the Wireless Icon on the top right of the screen. Open Safari and see if you are able to Route to a web page or the apple site should appear.
    WHAT TO DO IF YOUR AIRPORT EXTREME WAS PREVIOUSLY SET UP FOR USE WITH ANOTHER CARRIERS ROUTER OR MODEM.
    NOTE:  If you already had your Airport Extreme connected for example, I previously had ATT Uverse and the Airport Extreme was connected to the Wireless Router Model 3801HGV, I disabled the Uverse Wireless and used the Airport Extreme for the Wireless signal in bridge mode, as the Airport extreme Signal is much stronger than the Uverse router, and I was able to obtain a Wireless signal with the Airport Extreme way much better with no signal loss which was very very frustrating with the Uverse router.
    Anyhow if you had it hooked up like this, now that you will be using it with the Charter ARRIS Modem TM902A, you will need to reset the Airport Extreme to clear out the old data it has in memory, with the previous set up otherwise it will not work. Trust me I spent 6 hours trying to make it work reading all Apple Support Community questions and answers relating to this type issue/problem others have been having trying to get their set up working. I tried all the tips, and I finally decided just to see if by chance I would be able to connect with someone with Charter Tech support who might be familiar with Apple to be able to assist me and by luck I did.  He told me why it was not working and was all due the previous configuration with the ATT Uverse router was still in memory with the Airport Extreme. Finally it was 10:30 PM when I decided to call Charter Tech Support and I had been working on this since 3:00 pm pacific. I did not call them earlier as all the post I read said they never received any good help from Charter. After calling them I finished up by 11:00 PM and was able to finally connect Apple Tv, iMac, iPhones and Macbook Pro. We love our Apple Product and Happy all is connected with the new
    Internet Provider Charter. I must say the speed is way way much better than it ever was with AT&T Uverse. 
    THIS IS WHAT YOU WILL NEED TO DO:
    First you will need to unplug the Airport Extreme, then by taking the tip of a pen or paper clip end you need to push the reset button on the back of the Airport Extreme and hold it
    down and at the same time plug the power cord back into the Airport Extreme count to 5 or 10 then release the reset button. Then once he light in front of the Airport Extreme stops blinking you need to plug the Ethernet cable from the Airport Extreme to your iMAC or Macbook Pro, and restart which ever one you have, then open the Airport Utility once it is back up.  If you see airport extreme pop up with the old network name or it shows and yellow triangle click on the Airport Extreme ICON it will not let you configure it but will ask if you want to get rid of it or remove and just do it.  Then Again restart your iMAC or MacBook Pro, open up Airport Utility again, and on the top left you should see under “Other Airport Base Stations” the MAC ID for the Airport Extreme.
    You will then create/configure a Wireless Network, create your Wireless Password that will be entered on each of your Devices, example, Apple TV, your iPhone, etc., you want to allow access to your Wireless Network you are creating.
    Wireless Security will be -> WPA/WPA2 personal or just WPA2
    Enter the Wireless Password you want
    Verify the Wireless Password (enter it again)
    After it is created you will see it on the Airport Utility window with the name you created for it and to the left, will be a Dot (circle that will be yellow).
    Next you then want to unplug the power to the Airport Extreme, and then take the end of the Ethernet cable you unplugged from the iMac or Lap top MacBook Pro and connect it to the back of the Modem.
    Next unplug the power cord from the modem and wait about 5 minutes, then plug the power back into the Arris Modem and wait until all lights come back on the modem wait
    about 5 minutes, then plug the power cord back to the Airport Extreme and you will see it the light blinking yellow.  Wait about 5 to 10 minutes, during this time Restart you IMAC or MacBook Pro, and once it is back up click on the Airport Utility and you should see on the Airport Utility screen.
    For INTERNET to the left the light should be green and you should see the Airport Extreme also appear and the light to the left on the screen should also be green.  If they are, you then should be able to click on the Wireless Symbol on top of bar of the screen and click to select the Wireless Network Name you created.
    If you Do Not See the light (Icon) next to INTERNET turn Green, or if you see the Internet Light Green, but the Light (Icon) next to the Airport Extreme is yellow, unplug the power again to the modem and unplug the power again to the Airport extreme and wait about 15 minutes or up to 30 minutes. Then plug the power cord back to the modem wait till all the lights light up then, plug the power cord back into the Airport Extreme and Restart your iMAC or MacBook Pro.
    The Airport Extreme light should change from yellow to green. Open up the Airport Utility to see what the indicators are showing they should both be green.  Again select Wireless network you created under the Wireless Icon on the top right of the screen. Open Safari and see if you are able to Route to a web page or the apple site should appear.

    I just got a Charter Modem. Model TM822. While I was moving, my Airport Extreme was still at my old place.
    I have a Linksys WRT320N I used for the initial Charter setup.
    I can get my Airport to work here, but the Internet light on the Modem flashes Yellow.
    Hasn't caused any issues so far but one thing I did notice.
    On the Linksys there were 3 DNS servers listed.
    The Airport Extreme only lists 2 and i don't see where I could add another, only change whats already there.
    I tried everything above, but light on modem still flashes yellow.
    I have the technicians cell phone. Told me "that shouldn't be" and gave the same advice listed above.
    I'll break down and call Charter one day, see if it's on their end. NSA tracking may need a reset LMAO.

  • How to increase the waiting time for response in Adapter Engine not in IE

    Hi Experts,
                It is a SOAP to Proxy Synchronous interface. SOAP system is sending the request to PI, PI sending the same request to ECC system, After execution of some logic response back to PI in 7 minutes. In ABAP Stack(sxmb_moni) processing the response message also successfully with success flag after completion of these 7 minutes. But exactly 5 minutes later getting the error at Java Stack RWB- in communication channel monitoring i.e
    com.sap.engine.interfaces.messaging.api.exception.MessagingException: com.sap.engine.interfaces.messaging.api.exception.MessageExpiredException: Message bd2bf8d0-b2c2-11e0-c383-001cc4fb5cb7(OUTBOUND) expired.  We have set the "runtime-HTTP_TIMEOUT" parameter as 3600. thats why in Integration engine it is processing successfully.
    kindly suggest me how to increase the waiting time for response in Adapter Engine. Exactly after 5 mins getting the above error in rwb, but in Integration Engine getting successful flag after 7 mins until then it is waiting for response with  status flag Log version.
    Thanks & Regards,
    Srihari.

    Hi,
    Please see
    How To... Investigate Timeouts In Synchronous XI/PI Scenarios
    It will answer all your queries
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c059d583-a551-2c10-e095-eb5d95e03747?QuickLink=index&overridelayout=true

  • Take long time for loading

    Hi Experts,
    One of my data target (Data comming from another ODS) is taking long time for loading, basically it takes below 10 times only, but today it is running from last 40 minesu2026
    In Status Tab it showing....
    Job termination in source system
    Diagnosis
    The background job for data selection in the source system has been terminated. It is very likely that a short dump has been logged in the source system
    Procedure
    Read the job log in the source system. Additional information is displayed here.
    To access the job log, use the monitor wizard (step-by-step analysis)  or the menu path <LS>Environment -> Job Overview -> In Source System
    Error correction:
    Follow the instructions in the job log messages.
    Can anyone please solve my problem.
    Thanks in advance
    David

    Hi Experts,
    Thanks for your answers, and my load failed when the data comes from one ODS to another ODS. find the below job log
    Job started
    Step 001 started (program SBIE0001, variant &0000000007169, user ID RCREMOTE)
    Asynchronous transmission of info IDoc 2 in task 0001 (0 parallel tasks)
    DATASOURCE = 8ZPP_OP3
             Current Values for Selected Profile Parameters               *
    abap/heap_area_nondia......... 20006838008                             *
    abap/heap_area_total.......... 20006838008                             *
    abap/heaplimit................ 83886080                                *
    zcsa/installed_languages...... ED                                      *
    zcsa/system_language.......... E                                       *
    ztta/max_memreq_MB............ 2047                                    *
    ztta/roll_area................ 5000000                                 *
    ztta/roll_extension........... 4294967295                              *
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 1 in task 0002 (1 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:31:55, End = 06.09.2010 01:31:55
    Asynchronous transmission of info IDoc 3 in task 0003 (1 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 2 in task 0004 (2 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:00, End = 06.09.2010 01:32:00
    Asynchronous transmission of info IDoc 4 in task 0005 (2 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 3 in task 0006 (3 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:04, End = 06.09.2010 01:32:04
    Asynchronous transmission of info IDoc 5 in task 0007 (3 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 4 in task 0008 (4 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:08, End = 06.09.2010 01:32:08
    Asynchronous transmission of info IDoc 6 in task 0009 (4 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 5 in task 0010 (5 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:11, End = 06.09.2010 01:32:11
    Asynchronous transmission of info IDoc 7 in task 0011 (5 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Asynchronous send of data package 13 in task 0026 (6 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:01, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:44, End = 06.09.2010 01:32:45
    tRFC: Data Package = 8, TID = 0AEB465C00AE4C847CEA0070, Duration = 00:00:17,
    tRFC: Start = 06.09.2010 01:32:29, End = 06.09.2010 01:32:46
    Asynchronous transmission of info IDoc 15 in task 0027 (5 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 14 in task 0028 (6 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:48, End = 06.09.2010 01:32:48
    tRFC: Data Package = 9, TID = 0AEB465C00AE4C847CEF0071, Duration = 00:00:18,
    tRFC: Start = 06.09.2010 01:32:33, End = 06.09.2010 01:32:51
    Asynchronous transmission of info IDoc 16 in task 0029 (5 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 15 in task 0030 (6 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:52, End = 06.09.2010 01:32:52
    Asynchronous transmission of info IDoc 17 in task 0031 (6 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 16 in task 0032 (7 parallel tasks)
    tRFC: Data Package = 10, TID = 0AEB465C00684C847CF30070, Duration = 00:00:18,
    tRFC: Start = 06.09.2010 01:32:37, End = 06.09.2010 01:32:55
    tRFC: Data Package = 11, TID = 0AEB465C02E14C847CF70083, Duration = 00:00:17,
    tRFC: Start = 06.09.2010 01:32:42, End = 06.09.2010 01:32:59
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:32:56, End = 06.09.2010 01:32:56
    Asynchronous transmission of info IDoc 18 in task 0033 (5 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 17 in task 0034 (6 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:33:00, End = 06.09.2010 01:33:00
    tRFC: Data Package = 12, TID = 0AEB465C00AE4C847CFB0072, Duration = 00:00:16,
    tRFC: Start = 06.09.2010 01:32:46, End = 06.09.2010 01:33:02
    Asynchronous transmission of info IDoc 19 in task 0035 (5 parallel tasks)
    Call customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 100,000 records
    Result of customer enhancement: 100,000 records
    Asynchronous send of data package 18 in task 0036 (6 parallel tasks)
    tRFC: Data Package = 0, TID = , Duration = 00:00:00, ARFCSTATE =
    tRFC: Start = 06.09.2010 01:33:04, End = 06.09.2010 01:33:04
    Asynchronous transmission of info IDoc 20 in task 0037 (6 parallel tasks)
    ABAP/4 processor: DBIF_RSQL_SQL_ERROR
    Job cancelled
    Thanks
    Daivd
    Edited by: david Rathod on Sep 6, 2010 12:04 PM

  • Steps to reducing time for loading of data

    Hi
    Could any one tell me how to reduce the time for loading of records into a particular cube or Ods. For ex: iam loading some 1 lac records.It was taking for me some 5 hrs. I want to reduce the time to 3hrs or 4hrs.What are the very first steps to be considered to make fast.
    Regards
    Ajay

    Hi Ajay,
    Check the following.
    1> Any routine you have in transfer rule and update rule should not fire database select more then one time in the same code.
    2> Load Master data before transaction data.
    3> Reduce the data pack size in infopackage.
    4> Delete old PSA because you may space issue while data loading .
    5> If you are loading in ODS then remove Bex check in ODS maintenance screen if you are not doing report on that ODS.
    hope this will help you.
    Suneel

  • How to improve the activation time for a standard DSO

    Hi all,
    I'm facing an issue related to the activation of a DSO. The SM37 log is as follows....
    12:03:16 Job started
    12:03:16 Step 001 started (program RSPROCESS, variant &0000000006946, user ID BWREMOTE)
    12:03:20 Attivazione is running: Data target ZFIZIASA, from 93,627 to 93,627
    12:18:00 Overlapping check with archived data areas for InfoProvider ZFIZIASA
    12:18:00 Data to be activated successfully checked against archiving objects
    12:18:02 Status transition 2 / 2 to 7 / 7 completed successfully
    12:18:13 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4IC45QJA588GKZ0M7JEJ3HCAR with ID 1218130
    12:18:19 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4IC45QJA588GKZ0M7JEJ3HCAR with ID 1218190
    12:18:20 Parallel processes (for Attivazione); 000003
    12:18:20 Timeout for parallel process (for Attivazione): 000300
    12:18:20 Package size (for Attivazione): 020000
    12:18:20 Task handling (for Attivazione): Processi batch
    12:18:20 Server group (for Attivazione): Nessun gruppo di server config
    12:18:20 Activation started (process is running under user BWREMOTE)
    12:18:20 Not all data fields were updated in mode "overwrite"
    12:18:20 Process started
    12:18:20 Process completed
    12:18:20 Activation ended
    Please have a look into the bold 3rd & 4th line. I couldnt able to analyse where the issue is and what to do to minimize the time for activation.
    It is very challenging, please reply!
    Please help.
    Thanks in adv.
    Ajay

    Hi Kundan,
    Thanks for the response!
    Actually, I have two identical DSO, having all the char & KF same and feeding the data from same DS at the same time but the issue is...
    1) For 1st DSO, Activation log....
    01.07.2010 02:02:41 Job started
    01.07.2010 02:02:41 Step 001 started (program RSPROCESS, variant &0000000006946, user ID BWREMOTE)
    01.07.2010 02:02:46 Attivazione is running: Data target ZFIZIASA, from 93,751 to 93,751
    01.07.2010 02:19:27 Overlapping check with archived data areas for InfoProvider ZFIZIASA
    01.07.2010 02:19:27 Data to be activated successfully checked against archiving objects
    01.07.2010 02:19:27 Status transition 2 / 2 to 7 / 7 completed successfully
    01.07.2010 02:19:28 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4ICC6UMXYT00Z2DYOQV8QL8CJ with ID 021
    01.07.2010 02:19:30 Parallel processes (for Attivazione); 000003
    01.07.2010 02:19:30 Timeout for parallel process (for Attivazione): 000600
    01.07.2010 02:19:30 Package size (for Attivazione): 020000
    01.07.2010 02:19:30 Task handling (for Attivazione): Processi batch
    01.07.2010 02:19:30 Server group (for Attivazione): Nessun gruppo di server config
    01.07.2010 02:19:30 Activation started (process is running under user BWREMOTE)
    01.07.2010 02:19:30 Not all data fields were updated in mode "overwrite"
    01.07.2010 02:19:30 Activation ended
    2) For 2nd DSO, the activation log is..
    01.07.2010 02:01:13 Job started
    01.07.2010 02:01:13 Step 001 started (program RSPROCESS, variant &0000000006947, user ID BWREMOTE)
    01.07.2010 02:01:35 Attivazione is running: Data target ZFIGL_02, from 93,749 to 93,749
    01.07.2010 02:01:43 Overlapping check with archived data areas for InfoProvider ZFIGL_02
    01.07.2010 02:01:43 Data to be activated successfully checked against archiving objects
    01.07.2010 02:01:53 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4ICCAR91ALHE1VHSB6GV9PAPV with ID 02015300
    01.07.2010 02:01:54 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4ICCAR91ALHE1VHSB6GV9PAPV with ID 02015400
    01.07.2010 02:01:56 Program RSBATCH_EXECUTE_PROZESS successfully scheduled as job BIBCTL_4ICCAR91ALHE1VHSB6GV9PAPV with ID 02015600
    Now my client is asking to lower the activation time for 1st one as it is taking for 2nd one.
    I'm toatally blank now that what & how to do it!
    The volume of data ...
    ZFIZIASA
    Active table - Number of entries: 13.960.508
    Change Log Table - Number of entries: 13.976.530
    ZFIGL_02
    Active Table - Number of entries: 21.923.947
    Change Log table - Number of entries: 21.938.657
    Thanks,
    ajay
    Edited by: sap.ajaykumar on Jul 6, 2010 1:47 PM

  • Can two bluetooth headsets access the ipad at the same time, for example, to watch a movie together on an airplane trip?  does bluetooth work when the ipad is in airplane mode?

    can two bluetooth headsets access the ipad at the same time, for example, to watch a movie together on an airplane trip?  does bluetooth work when the ipad is in airplane mode?

    This article: http://www.iphonefaq.org/archives/97903 helped to clear up confusion I had re your point
    when Airplane mode is on you can turn on either or both wifi and bluetooth
    It makes it clear that airplane mode turns off processes involving cellular networks, which doubtless involve rather strong transmissions, while allowing others such as wi-fi and Bluetooth.  I'm puzzled though why the iPod rather than the iPhone has the airplaine mode when it has no cellular capacity.  Perhaps it's there but doesn't actually do anything other than making it possible to conform to a request to switch into airplane mode, and display an airplane icon to satisfy flight attendants who are checkng up on you!

Maybe you are looking for