Why the stock actually is enough currently..The Schedule line still..

Hi,
I am just in creating an Sales Order and i checked the Stock of the material is enough.
Then i put the Material Number and Qty. as the first line item input.
Then i got confused for the next...
As the System popuped an msg firstly:
The sum of the confirmed quantity exceeds the sum
of stock items
Then take me to the screen of Availability Control...Let me choose the date for complete delivery....
Why???Coz as i think that even today could delivery all the goods, coz the stock is enough!! why still arrange the Delivery in the future???  And then confimed Qty. in the future date....
Thanks!

hi,
pls check the factory calender you assigned to your sales organisation. in your factory calender you might have assigned sat,sunday as non-working days
hence the system is showing the schedule lines in future
pls reward points if the answer is helpful
Regards,
Murali

Similar Messages

  • Why the new iPad still has no Flash

    I wonder why the new iPad still has no flash. I love to take photos with my iPhones and iPads, sometimes a flash could be handy when it's dark.
    I know it could be another nightmare for the Apple case makers.

    Apple has never said why, and rarely does explain decisions like that... my guess is that it would have taken space and power away from something else, it's a pretty tightly-packed product. :-)

  • Why the links are still opened in new windows?

    Why the links are still opened in new windows even I selected the option to open in tabs?
    This is one of the web I am reading (sorry that it is in simplified Chinese), I have no problems reading it in tabs in Firefox:
    http://www.sodu.com.cn/mulu_30498.html

    Hi,
    How are you trying to open the windows? Safari does not default to opening new windows in tabs. It can open +external application+ links (e.g. from your email program, RSS viewer, etc) in a new tab, but not links from an existing website.
    To open links in a new tab, you'll need to hold the ctrl key and click the link, or use the middle-mouse button if your mouse has one (or right-click on the link and choose to open it in a new tab).

  • Confirmed quantity on the schedule line tab is 0 in Sales Order Screen?

    Hi,
    I created a sales order but the Confirmed quantity field on the schedule line tab is 0 .
    There is unrestricted  stock present in the plant also.
    I am not able to do delivery because of it.So,please let me know if I need to check anything.
    Regards
    Nicky Samtani

    I checked the avaliability screen and it shows me 3 columns
    Received/Req Quantity = 15.386
    Confirmed = 0
    ATP Quantity = 0.
    Does that mean that There is no stock avaliable for my SO and if it is then why Received/Req Quantity = 15.386  is coming.
    Also is there any way I can get rid of this error by putting some more stock in the plant or anything on similar lines?

  • Need to cancel the schedule line

    Dear all,
    Please advice me, for stock model meaning SO stock is not tied with SO, it will be in Unrest, stock. this scenario i need to cancel the Schedule line qty for confirmed SO & need to assign for Unconfirmed SO which delivery date is near to the Current date.

    Hi
    Backorder processing helps you in this event. Use transaction V_V2. In that give the material number and plant.In the options select sales document and uncofirmed documents required.and below select the priorities of sales document and deliveries.
    Reward if this helps.
    Regards
    Simu

  • Donot want to fix the schedule lines at an Early date even P.O is the creat

    Hi ,
      If a material is sourced via a Scheduling Agreement, then MRP automatically creates schedule lines for this to meet MRP requirements.
    However, if a separate PO is raised for the same material (irrespective of the supplier) at a date after one or more of the scheduling agreement schedule lines, MRP creates a message to reschedule in the PO in front of the schedule lines even if this is known to not be possible. the result is that the schedule lines for standard supply are not put in early enough.
       And We don't  want to fix the schedule lines in a t an early date to over come this.Is there any settings for the same.

    Hello,
    If you want to control MRP messages for rescheduling you can make settings in tcode : OMDW either at plant level or MRP group level.
    You can introduce Tolerance value forward & Tolerance value for displacemt in No. of days here.
    If system finds requiremnts within the tolerance no of days it will not create MRP Exception messages. This way you can avoid unwanted messages.
    Thanks,
    Ram

  • How to change the schedule line date in SO with reference to value contract

    Hi SD Guru's,
    I need to change the schedule line date in the sales order with reference to the value contract by using some algorithm that i will write. The problem that i can't find the suitable place to add the algorithm. I can't add it to the Copy control because there is no schedule lines in value contract and copy control for schedule lines does no exist.
    I can not add to user exit MV45AFZZ  , because order that was created with reference to the value contract, does not go through this user exit.
    Do you have some ideas where i can add it?
    Thanks and Regards
    Viky
    Edited by: Viky Sloutsky on Oct 20, 2010 12:43 PM

    Hello Viky
    How about using program MV45AFZB- USEREXIT_CHECK_VBEP or USEREXIT_MOVE_FIELD_TO_VBEPKOM
    or program FV45EFZ1- USEREXIT_CHANGE_SALES_ORDER
    Does the program go through these exits when an order is created with ref to a value contract??
    Also I am wondering why you need to change a Schedule line determined by Availability check and/or delivery scheduling?

  • GR not in the Sequence of the schedule lines in ME38

    Hi All,
    In ME38, sch lines will be updated with GR qty when GR is done and open qty field gets reduced. When I have multiple sch lines, the GR qty update is not happening sequentially. I.e, If I have 10 sch lines for one Sch Agmt and for first 3 GRs, initial 3 sch lines got updated sequentially and for 4th GR, say 6th sch line is getting updated even though 4th sch line has enough qty corresponding to 4th GR.
    Whats the logic that system applies when updating GR qty in ME38.
    Appreciate your help.
    Thanks

    Hi,
    The schedule line update will depende on delivery date. The delivery date of 6th might be earlier than the the 4th schedule.Thanking you.

  • Credit exposure and the Schedule line category

    Hi,
    I have a problem in credit exposure update in FD33.When I use the schedule line category xx which has req/Assembly marked in schedule line category settings is updating the sales order values in Fd33 even if the sales order (while creating) is blocked due to credit.
    Whereas I use the schedule line category YY which has req/Assembly not marked in schedule line category settings is not updating the sales order values in Fd33  if the sales order(while creating) is blocked due to credit.
    Is this the standard behavior? If so Why.
    Regards
    Babu

    Hi Babu,
    Yes, this is a standard behavior.
    Please refer to note 393304.
    If the flag "transfer of requirements" is not set, that means that credit-blocked order won´t update credit values.        
    In this document has a complete explanation regarding this proceeding.
    I hope it can help you.
    regards
    Ruy Castro

  • Block the Schedule line for Delivery

    Hi,
    I have a requirement in which I want to block the schedule line in my sales order for delivery.
    Also I want that system should not perform the availability check and block the stock on the requested delivery date.
    We want the order handler to take a desicion and remove the block, and then the item should be relevant for availability check.
    To cover the 1st req of keeping the block, I will use a schedule line cateogry which has a delivery block setup in IMG.
    Will setup the schedule line cateogry accordingly.
    But I am not sure how to achieve the 2nd req to not to confirm the schedule line qty till the block is there.
    Kindly advise.
    Regards,
    Harsh

    Hi Harsh,
                 2 ways to achieve this,
    1- Create new reason for rejection & you can stop the requirements to flow to MD04. ( assumption is, item will be waiting for further activities by the Order handler )
    2- Tx: OVB8 & OVB5
    check whether you can include your own logic which is applicable only for newly created delivery blocks. This transactions works well for Delivery block "01"- credit block- for not to transfer requirement to MD04.
    Hope it may work for you.
    Regards,
    ReazuddinMD

  • Firming the Schedule Lines in Sch.Agreement

    Hi , I have done the  following to firm the schedule lines in Scheduling agreement.
    1. Firm Zone as 30 days
    2.Tradeoff zone days as 60 days
    3.Binding MRP indicator as NULL(Lines not changeable within Zones)
    4.In OMIN , Firm Schedule lines enabled for the MRP group
    When i run the MRP, schedule lines are getting created with Firm Indicator (*) for the requirements lying within these zones. After transmitting the schedule lines to vendor , if i change the requirement again, the schedule  lines within Firm Zone are getting adjusted as per the new requirment. I dont know whats the purpose behind maintaining these Firm Zone and Trade off Zone.
    Pointers are much appreciated.
    Thanks and regards,
    Milton Isaac

    Hi,
    Rolling delivery schedules issued under scheduling agreements are divided into different time zones indicating the degree to which lines of the schedule are binding.
    Firm zone (zone 1) (go-ahead for production).
    The schedule lines within this zone count as firm and thus as fully binding. If you cancel a schedule line that falls within the firm zone, the vendor is entitled to charge you with both production costs and the costs of procuring input materials incurred by him as a result of the cancellation.
    Trade-off zone (zone 2) (go-ahead for procurement of input materials)
    This is the "semi-firm" zone, giving the vendor the go-ahead to procure necessary input materials for the manufacture of the item ordered. If you cancel a schedule line within this semi-firm zone, the vendor is only entitled to charge you the material costs. Schedule lines falling within this time zone are thus less binding that those falling within the firm zone.

  • Delivery before the schedule line date in scheduling agreement.

    Hi All,
    I have a situation where in I am using JIT delivery schedule for processing the delivery requirement from customer. In this, lets say, I have a schedule as 08/05/2009 for material A to deliver 1000 qty and the material is made available to me after production as of 07/05/2009 and I want to despatch the material on 7th only and not on 8th. The system does not allow me to do this.It allows me to make a delivery only on 08/05/2009.
    Is there any alternative to this and is this SAP standard behaviour.

    I think you can change the schedule line date in scheduling agreement itself and do the delivery.
    regards,
    Sudhir

  • BAPI for VA02 to check availability & update the Schedule lines

    Hi Experts,
    Is there a BAPI which can 'check item availability' & update the Schedule lines for the same order?
    I have checked 'RV_AVAILABILITY_CHECK' 'BAPI_MATERIAL_AVAILABILITY' 'SD_BACKORDER_UPDATE'
    but it is not solving the purpose.
    Kindly give your suggestion for the same.
    Thanks.

    Hi,
    Please let me know if you were able to achieve this functionality. I have a similar requirement wherein I need to check for the material availability and update the schedule lines in the scheduling agreement. I checked the FM SD_BACKORDER_UPDATE, but it doesn't seem to be helpful.
    Regards,
    Dawood

  • Credit Release thru VKM3 remove the schedule line delivery block ...

    HI Gurus,
    I have created the sales order with the delivery block at the schedule line. i have save the order . The order goes to the credit block . So when i release credit block with the help of VKM3 then system also removes the schedule line level block.
    This is not std behaviour . Can any one come across such scenario ?
    Details: I have removed the routine 101 in the OVB8 so that if order goes to credit block still order will have the confirm qty.
    Also in the OVAK order type is mark D for automatic credit check.
    Thanks in advance

    Hi ,
    I have checked the sales order thru the program but we are not using any user exit for the same.
    Now i have found that if the qty is confirm on the first date i mean on the date given then system does not remove the block & if the ATP check suggest the diff date so there are two schedule line in this case block get removed ..
    May be this is like after credit removes system must be running the ATP check again ..
    Please help

  • How to change  delivery  block for all item in the schedule lines via va32

    dear sap expert:
    i onle can  change delivery block for one  sales order item in the schedule line  every times via va32,it will take so many time because there are hundreds of item  in a sceduling agrrement. how to change all the item  one times.
    please give me a way to resovle the problem.
    best regards.

    dear:
      the fast change function cann't resovle the problem,i first double click the item of schedule agreement  ,then select the schedule lines option, finally in the delivery block input the reason of bolck.
    best regards.

Maybe you are looking for

  • Windows 8.1 Hyper-V virtualization rights

    So in Windows 7 Pro we had XP mode.  It was a full copy of XP which was licensed under the Windows 7 Pro license.  Do I have the licensing rights to install Windows 7 Pro on my Windows 8/8.1 machine using Hyper-V? Quite often my company uses XP mode

  • New mac crashed

    long story short: bought my parents a new imac for christmas and spent the last month creating a family website for them on it. the other day it crashed. apple gave me a new one, and they were able to provide me with the web files (including the doma

  • Regarding query transport in BW quality system

    Hi Experts , When I transport my query to BW quality system. It is showing error like "error activating element " . I searched in SCN and found that name for this technical element can be seen in RSZELTDIR table. I got technical name and it was query

  • Mulit-colored artifacts using Spot Healing Brush-CS3.

    This is the first time using this tool. Not sure what's causing this (see attached screengrab of tiff image captured at 200% view). These colored artifacts happen only after using the Spot Healing Brush tool in CS3 AFTER I save, close and reopen the

  • SetRootVisible - not as advertised

    Hi Everyone, I can't get JTree.setRootVisible to work. I've subclassed JTree and call setRootVisible in the constructor. Then I add the nodes. If I call it passing true, all the nodes I add are collapsed but visible (which is fine). If I call it pass