Hi,
I have installed the SUP on standalone primary site, and made a collection for Windows Client os 7,8,8.1,XP and Server OS 2003,2008,2008 R2,2012,2012 R2.
I have done Software synchronization, my question is can we make the single package of all the OS updates and deploy this to any OS collections ??? is this way the only right package will be install to right OS..( the xp updates will be install to xp machines
only and server 2012 updates will be install to 2012 servers only) , is any impacts for other os ??
I hope updates is intelligent and it will check first the os ver than only install.. please correct me if am wrong here
Shailendra Dev

my question is can we make the single package of all the OS updates and deploy this to any OS collections ???
I hope updates is intelligent and it will check first the os ver than only install.. please correct me if am wrong here
Absolutely you can and yes, the solution is intelligent enough. You can use a single deployment package for all your updates. As Nick says though a SUG has a hard limit of 1000 updates. 
Have a look here for a good software updates strategy
http://www.gerryhampsoncm.blogspot.ie/2014/12/sccm-2012-r2-possible-software-updates.html
Gerry Hampson | Blog:
www.gerryhampsoncm.blogspot.ie | LinkedIn:
Gerry Hampson | Twitter:
@gerryhampson

Similar Messages

  • How can I get rid of a windows update deployment package?

    We are using SCCM 2007 with a primary site server and four child sites.
    I created a windows update list with a source directory and package. 
    Distributed the package to my primary site server and then from a child site distributed to a long list of distribution points on the child site and three other child sites below it.
    This all worked fine we used the list and package to deploy security updates and added to the list each month, automatically distributing to all sites and distribution points.
    One month the distribution failed on one  child site, all the other sites and distribution points got the refreshed package no problem. (Probably caused by the backup running on that site.)
    This became a permanent problem which we finally fixed by creating a new list and package.
    Now I'm trying to do a cleanup of the old package and partially failed distribution.
    I've started by deleting the package from the primary sites distribution point.
    Next from the child site where the package status is unlocked, I deleted from all the other distribution points.
    The child site shows that the package distribution points have been deleted.
    Unfortunately above and below the child site the package distribution points are still listed and locked.
    (Looking at one of the listed distrubution points the package is on the server.)
    Sorry for the big speech, does anyone know how to remove from the other distribution points and so be able to delete the package?
    Any help or redirection would be great. 

    I don't have an answer, but I sure do have a question!! 
    I acquired the hacker in January.  In February both of my computers were destroyed.  I removed ALL forms of networking from my house -- TWC, all of my routers and adapters, etc.
    I went to Best Buy and bought a new computer, then another, then 2 more -- all getting hit with a prefab image upon getting close to my doorway.
    I am losing my home, etc, because I haven't been able to work in months.  This hacker finds me at the library, and wherever else I try to work, and he messes withmy typing, stalls my screen, empties my USBs.
    I believe I am the victim of remote deployment, but how do I find where/who it is coming from?
    I used my (corrupt) Gateway recovery disks the other day and watched how ActiveX and other rd tools were listed.
    PLEASE, this has been going on for too long.  After  i gave up on computers, my house has been entered nearly every day.  The police literally think I am insane.
    What can I do to get out of this deployment?
    Might there be a network in my  home that I am unaware of??  If so, is it likely in the cable, the tv, the fire alarm, what?
    Warm regards,
    Angel
    None
    None

  • RE: Accessing multiple Env from single Client-PC

    Look in the "System Management Guide" under connected environments page
    72. This will allow services in your primary environment to find
    services in your connected environment. However, there is a bug
    reported on this feature which is fixed in 2F4 for the HP and H1 for all
    other servers. The following is from Forte:
    The connected environments bug that was fixed in 2F4 is #24282. The
    problem
    was in the nodemgr/name server source code and caused the following to
    occur:
    Service1 is in connected envs A and B.
    Client has env A as primary, B as secondary.
    Envmgr A dies before the client has ever made a call to Service1.
    Afer env A is gone, client makes a call to Service1 which causes Envmgr
    B to
    seg fault.
    You should upgrade your node manager/env manager nodes to 2F4. The 2F2
    development and runtime clients are fully compatible with 2F4 servers.
    Kal Inman
    Andersen Windows
    From: Inho Choi[SMTP:[email protected]]
    Sent: Monday, April 21, 1997 2:04 AM
    To: [email protected]
    Subject: Accessing multiple Env from single Client-PC
    Hi, All!
    Is there anybody has any idea to access multiple environments from
    single client-PC? I have to have multiple environments because each
    environment resides geographically remote node and network bandwidth,
    reliability are not good enough to include all the systems into single
    environment.
    Using Control Panel for doing this is not easy for those who are not
    familiar with Windows. The end-user tend to use just single application
    to access all necessary services.
    I could consider two option to doing this:
    1. Make some DOS batch command file to switch different environment
    like, copying back/forward between environment repositories and
    set up forte.ini for changing FORTE_NS_ADDRESS. After then, invoke
    proper client partition(ftexec).
    2. Duplicate necessary services among each environment.
    But, these two options have many drawbacks in terms of system
    management(option 1), performance(option 2) and others.
    Has anybody good idea to implement this? Any suggestion would be
    appreciated.
    Inho Choi, Daou Tech., Inc.
    email: [email protected]
    phone: +82-2-3450-4696

    Look in the "System Management Guide" under connected environments page
    72. This will allow services in your primary environment to find
    services in your connected environment. However, there is a bug
    reported on this feature which is fixed in 2F4 for the HP and H1 for all
    other servers. The following is from Forte:
    The connected environments bug that was fixed in 2F4 is #24282. The
    problem
    was in the nodemgr/name server source code and caused the following to
    occur:
    Service1 is in connected envs A and B.
    Client has env A as primary, B as secondary.
    Envmgr A dies before the client has ever made a call to Service1.
    Afer env A is gone, client makes a call to Service1 which causes Envmgr
    B to
    seg fault.
    You should upgrade your node manager/env manager nodes to 2F4. The 2F2
    development and runtime clients are fully compatible with 2F4 servers.
    Kal Inman
    Andersen Windows
    From: Inho Choi[SMTP:[email protected]]
    Sent: Monday, April 21, 1997 2:04 AM
    To: [email protected]
    Subject: Accessing multiple Env from single Client-PC
    Hi, All!
    Is there anybody has any idea to access multiple environments from
    single client-PC? I have to have multiple environments because each
    environment resides geographically remote node and network bandwidth,
    reliability are not good enough to include all the systems into single
    environment.
    Using Control Panel for doing this is not easy for those who are not
    familiar with Windows. The end-user tend to use just single application
    to access all necessary services.
    I could consider two option to doing this:
    1. Make some DOS batch command file to switch different environment
    like, copying back/forward between environment repositories and
    set up forte.ini for changing FORTE_NS_ADDRESS. After then, invoke
    proper client partition(ftexec).
    2. Duplicate necessary services among each environment.
    But, these two options have many drawbacks in terms of system
    management(option 1), performance(option 2) and others.
    Has anybody good idea to implement this? Any suggestion would be
    appreciated.
    Inho Choi, Daou Tech., Inc.
    email: [email protected]
    phone: +82-2-3450-4696

  • Accessing multiple Env from single Client-PC

    Hi, All!
    Is there anybody has any idea to access multiple environments from
    single client-PC? I have to have multiple environments because each
    environment resides geographically remote node and network bandwidth,
    reliability are not good enough to include all the systems into single
    environment.
    Using Control Panel for doing this is not easy for those who are not
    familiar with Windows. The end-user tend to use just single application
    to access all necessary services.
    I could consider two option to doing this:
    1. Make some DOS batch command file to switch different environment
    like, copying back/forward between environment repositories and
    set up forte.ini for changing FORTE_NS_ADDRESS. After then, invoke
    proper client partition(ftexec).
    2. Duplicate necessary services among each environment.
    But, these two options have many drawbacks in terms of system
    management(option 1), performance(option 2) and others.
    Has anybody good idea to implement this? Any suggestion would be
    appreciated.
    Inho Choi, Daou Tech., Inc.
    email: [email protected]
    phone: +82-2-3450-4696

    Hi, All!
    Is there anybody has any idea to access multiple environments from
    single client-PC? I have to have multiple environments because each
    environment resides geographically remote node and network bandwidth,
    reliability are not good enough to include all the systems into single
    environment.
    Using Control Panel for doing this is not easy for those who are not
    familiar with Windows. The end-user tend to use just single application
    to access all necessary services.
    I could consider two option to doing this:
    1. Make some DOS batch command file to switch different environment
    like, copying back/forward between environment repositories and
    set up forte.ini for changing FORTE_NS_ADDRESS. After then, invoke
    proper client partition(ftexec).
    2. Duplicate necessary services among each environment.
    But, these two options have many drawbacks in terms of system
    management(option 1), performance(option 2) and others.
    Has anybody good idea to implement this? Any suggestion would be
    appreciated.
    Inho Choi, Daou Tech., Inc.
    email: [email protected]
    phone: +82-2-3450-4696

  • Multiple Hierarchies from Single Dimension Table in OBIEE-11g?

    Is it possible to have Multiple Hierarchies from Single Dimension Table in OBIEE-11g?
    Like 1)Year-Qtr-Month-Weeks 2)Year-Month-Days

    Hi,
    or if your lowest level is the same like
    Day->month->year->Total
    Day->businessMonth->businessyear->Total
    Then yes, it is.
    Create the first, then you start to create the second by adding your top(business year) level on the same level as the one you have (year) both under your total.
    Then when you would add your second base level, there is a special option for it, something like use other hierarchy level/shared level (sorry can't recall and does not have a connection right now) then you select your existing day level under your businessmonth level.
    Hope this helps,
    Regards,
    D

  • Can we call multiple Smartforms from single Driver Prog?

    Hi all,
    Can we call multiple smartforms from single Driver Program. Here Driver program is custom Program.
    I want to give Print Parameter only once and output should get printed one after the another smartform in same order of smarforms were called.
    If yes, then how?
    Thanks in advance.

    Yes, you can do this in your Smartform driver program.
    Each time you call you Smartform function module you will need to change the values in structure OUTPUT_OPTIONS slightly.
    On the first call set TDNEWID to X.
    After this, set it to space
    On the last form set TDFINAL to X.
    This will put all of the output into one spool request, in the order they are called in the program.
    Regards,
    Nick

  • Mask multiple movieclips from single mask

    Hi,
    h have big movieclip 450X350 and there are many small thumbnails i need to mask those from big movieclip, I need to animate those so that i can't put those in a single movieclip, Is it possible to mask multiple movieclips from single movieclip...?

    If you want to mask them using Actionscript then you should be able to place them inside a movieclip/sprite as separate animations/movieclips and then assign the mask to the container.
    You can mask multiple layers under one layer if you use the timeline

  • WIndows Updates Deployment - Downloading

    I have SCCM 2012 SP1.   I have several templates setup, when deploying windows updates.  
    For Non-Critical systems,  updates are downloaded and installed.
    for Critical \ Business Systems,  we have decided to push updates 2nd Saturday of each month.   However, it possible to push updates to clients,  stating that Updates are Available,  but not downloaded or installed ?     this
    way,  the owner of the system can look in Software Center,   and see what updates are available and manually download and installed approved updates ? 
    Thank you for you time...

    Hi,
    If you deploy the software updates as "available" instead of "required" then the updates are available in the Software Center for selection and manual deployment instead of automatically install the updates.
    Regards,
    Jörgen 
    -- My System Center blog ccmexec.com -- Twitter
    @ccmexec

  • Unable to burn DVDs on iMac. Folders dragged to DVD window appear as documents. DVDs from same package burned OK last year. Using Lion. CDs burn OK.

    Unable to burn DVDs on 2009 iMac ( Lion ). Folders and any files dragged to DVD window appear as blank documents.
    Burned DVDs from same package ( Memorex ) last year OK. CDs burn OK. DVDs are several years old, if that matters.

    The music is a tune that was purchased/downloaded from the iTune store. The slide shows (five of them) consist of digital photos (jpg) that I have taken. The interesting thing is that I also have an eMac (about three years old) that I have created the same iDVD project (identical music & identical slide shows). I have been able to burn a DVD disk of this project on my eMac WITHOUT A PROBLEM. The thing I do not like about the eMac is that I purchased family pack of iLife 6 last year (because I liked some of the new Themes). However, when I installed it on my eMac, for some reason it takes about 5-10 minutes to get iDVD 6 "up and running." Once it has loaded the Themes, however, I am "good to go." I've had this computer into the "Genius Bar" at the local area Apple Store TWICE and they are unable to get it to work more efficiently. The even reinstalled the entire operating system to no avail. So, the solution is to launch iDVD 6 on my eMac and then go do something else for 5-10 minutes. But at least I am able to burn my iDVD projects to DVDs.
    With my iMac, iDVD launches quickly but is useless since I am unable to burn my iDVD slide show projects to DVD.
    So, as a result, I am pretty much ready to "call it a day" with the iMac and will go back to my eMac.
    Thanks for your time.
    SCC Jeff

  • Updating multiple records from single form (ASP)

    I have a nested repeat region.
    I have created in the parent, a form with 3 fields and an update button.
    the child records all have multiple columns, 3 of which correspond to the parent.
    Athe parent is bound to the child records by the shipmentID
    I need to be able to update all child records from the form in the parent.
    The case is this.
    The child records are orders with shipdates and frequencies
    The parent contains a form with fields for shipdate and frequency
    The administrator needs to change the shipdate and/or frequency for all child records.
    (The child records are forms as well--but that's another issue that works fine)
    Shipment ID
    Date Field
    Freq Field
    UPDATE Button
    ShipmentID
    Record 1
    Data case1
    Date
    ShipmentID
    Record 2
    Data case 2
    Date
    I am doing this in classic asp with an SQL database.
    So how do I get the form to update all record
    [Subject title edited by moderator to make clear ASP involved]

    Hi,
    This is one of those questions that would require far more explanation that is reasonable to expect in a forum. You should do a little poking around in the nearest Barnes & Nobles. About a half hour in a chare with a good ASP book and vanilla latte should have you on the right track.
    Lawrence   *Adobe Community Expert*
    www.Cartweaver.com
    Complete Shopping Cart Application for
    Dreamweaver, available in ASP, PHP and CF

  • Multiple dimensions from single logical table

    Hi,
    I cannot seem to create multiple dimensions based one one single logical table. For example, I have a Time table from which I'd like to create a calendar time dimension and a fiscal time dimension. However, as soon as one dimension is created, I cannot create another dimension from the same logical table.
    Is it possible?
    Thanks

    Jlin,
    If I understood your requirement correctly you need to create multiple Hierarchies out of a single Logical Dimension table, this is possibe the base rule for creating a hierarchy is you should have a common starting point( Grand Total Level) and a common ending point( Detail Level), first create this and create sublevels and share the Detail Level as a child. This will allow you to create multiple hiearchies out of a single dimension. One level will have drill down on the Calendar dimension and one one the Fiscal and both will have the common detail key like day key.Hope this helps.
    Arjun

  • Sccm 2012 window update deployment

    Hi
    I am trying to deploy the software updates in servers, but the issue i am facing is that when i create the package of 170 patches and deploy on servers 2008, then the advertisement coming at client side is in different batches. Example:- In first instance
    50 updates advertisement comes at client end and once i Install them and restart the servers then in second instance remaining server advertisement will come.
    As I have taken the downtime, so I want that all the advertisement comes in one Instance, can somebody suggest me how to do this ?????
    Thanks and Regards Deepak

    Hi Deepak,
    For 170 Patches yeah its more than enough but if you take office sp3 patch its around 680 MB ,if all the patches are Security/cumulative patches then i would its more than enough based on the deployments which i have done.
    If your system's RAM is 4 GB or more than that i would say it will get installed in a go also sometime like jason said there may be multiple reboot required for patching on few machines.
    How you planned the deployment is it mandatory with reboot or mandatory and suppressed reboot?
    Kamala kannan.c| Please remember to click “Mark as Answer” or Vote as Helpful if its helpful for you. |Disclaimer: This posting is provided with no warranties and confers no rights

  • Call Multiple Files From Single ColdFusion Scheduled Task

    Our host only allows us to have 5 scheduled tasks per account but we need to run cfml applications to import data for multiple sites (at least 15 processes).  What I'd like to do is combine all the 'sample requests' for all sites into ONE scheduled task that will run them one after another thus cutting back on the number of scheduled tasks needed.
    We're using ColdFusion to connect to a MySQL DB to gather all sample requests. First the app retrieves all the unflagged records from a remote db then begins looping through all the returned records. On the each loop, the app 'scrubs' the data by properly formatting phone numbers, fixing address abbreviations, etc. Next the app saves the scrubbed data to a local MS SQL table then starts the loop over on the next row. Lastly the app sends out an email saying it has completed successfully.
    What I'm trying to do is Create a New Parent App that will run as a scheduled task to do the following:
    - New Parent App Runs as Scheduled Task and calls/includes first of X sample request app files
    - New Parent App runs first sample request app as described above (which can take up to a minute to process)
    - Parent app waits until after first sample request app completes, then Parent App goes on to second sample request app, etc.
    - After all sample requests are complete New App sends completion email with date and time
    The problem I'm having is getting the scheduled task to wait for apppage1.cfm to finish before loading apppage2.cfm and so on. Can you give me a simple codeset that accomplishes this?
    I've attached a sample of the include page the needs to complete before moving on!

    Our approach is a bit more comprehensive.
    First, we (meaning my co-workers) wrote a custom tag that does something like this:
    <cftry>
    <cfinclude the template>
    <cfcatch>
    log any errors
    Then our actual scheduled job go like this:
    set a really long timeout (and none of the actual jobs can have their own timeout)
    set some variables
    use the custom tag for each job we want to run
    send mail if any errors occurred.

  • Master data update bringing in multiple records for single entry

    Hello,
    I found that if I deleted and reloaded data in a master data object, it was showing me correct number of records. However, just a full update was not overwriting it with correct number of data records. there were always 1 or 2 extra blank records. I thought master data update should overwrite previous records and we need not delete and reload it.
    Why would this happen?
    Thanks!

    Hi there,
    Are you refering to time dependent master data? From to values are present?
    If so, that's the correct situation, since BW (OLAP) instead of R/3 (OLTP) allows you to mantain historical data, i.e., a material can be valid from a specific time period with several attributes and other attributes can be valid for the same material in another time space.
    Diogo.

  • Mask multiple movieclips from single movieclip

    Hi i am trying to mask 3 thumbnails from 1 movieclips
    mc.samsungchamp.mask=mc.msk
    mc.samsungduos.mask=mc.msk
    mc.samsungace.mask=mc.msk
    but these thumbs are is not showing masked.

    Is this not possible to mask all movieclips through one movieclip, without putting movieclips into single movieclip.??

Maybe you are looking for

  • Is there anyone here with 1.1.1 phone that has firmware 04.01.12_G?

    is there anyone here with a 1.1.1 phone that has firmware 04.01.12_G on it? I'm trying to figure out why there are 2 FW versions for this update. Thankns, John

  • PDF Filename

    Hi Gurus!   I have uploaded file through archivelink. It generates an object id automatically. May i know how can i get filename? like a.pdf i am uploading , i want to retrieve 'a' (name). Thanks in advance.

  • All folders - view permissions

    I'm trying to grant users the minimum permissions they need to work with their reports. Granting Full Control permission on the folder containing their reports doesn't seem to work, because without View on the All Folders list, they can't even see th

  • Logical Stanbdy database not working

    Dear Friends, I configured a logical standby database in oracle 11g. First i configured the physical standby. Its working fine. Data transfered. Then i convert to logical standby. The commands are working correctly. SCN also changed in logical standb

  • Editing colors of Keynote chart data series

    I am attempting to edit a Keynote chart (Scatter plot) with 3 data series.  I selected the first Chart option which plots the data by color (Blue, red, white).  I do not see an option to adjust or change the default colors.  In the "Edit Chart Data"