WIP calculation for Prod.order with status DLV

Dear experts,
Is there any way to change WIP calculation method for Prod.order status ?
In t-code OKGC:: By default system will set:
Order status      Status number         RA type
REL                          2                             WIP Calculation on Basis of Actual Costs
DLV                          3                            Cancel Data of WIP Calculation and Results Ana
PREL                  1                            WIP Calculation on Basis of Actual Costs
TECO                  4                            Cancel Data of WIP Calculation and Results Ana
I can not change any thing in t-code OKGC (gray after insert: CO, RA version, RA key).
As I understanding: Prod.order with status DLV will not be considered to calculate WIP.
But I want to calculate WIP for Prod.order with status DLV. Could you pls guide me how to configure the system?
Thank you!

Hi,
I suppose it is positive variance as the yield from the order is 10 pieces more than the planned quantity of 1000 and it is always a variance and no WIP involved in this case. It can be settled to FI/PCA and to CO-PA by variance categories (if you have configured accordingly)
Therefore the accounting entry would be:
1. Delivery to stock of 10 pieces:
FG Debit
Change in Stock Credit
2. Variances will post the difference:
Change in Stock Debit
Price Difference is Credit
Concerning the valuation method it needs to be tested before it can be implemented.
Kind Regards
Umapathi G

Similar Messages

  • WIP calculation for Prod.order with status TECO

    Hello all.
    My question is the similar to WIP calculation for Prod.order with status DLV
    But I need that
    - if the Production order has status TECO - the system calculate WIP
    - if the Production order has status DLV u2013 the system settle the order.
    1.     I try to change u201CStatus Numberu201D in TCODE OKGC. But I have receive two different result:
    - if I change u201CStatus Numberu201D for status DLV from 3 to 2, then during WIP calculation of the order with status DLV u2013 WIP have been calculated.
    - but if I change u201CStatus Numberu201D for status TECO from 4 to 2, then during WIP calculation of the order with status TECO u2013 WIP have been CANSELED.
    2.     I try to change results analysis key for status TECO from u201CZu201D to u201CFu201D in TCODE OKG3. BUT during WIP calculation the system create error message KJ 363 which require that results analysis key must be change to u201CZu201D
    How can I resolve my problem?

    Hi,
    I don't have the answer if the requirement is that even after producing the materials, till the time accountant checks the order and does this action, it should remain in WIP. Honestly it doesn't make any sense to me or i have not understood this problem. Anyways as per my current understanding I can suggest the following process for your scenario.
    Once production is stopped in between the process, the order should be in PDLV status (partial confirmations happened in the order)
    Now go and clear the reservations manually from the production order .( delete the component line items from the order). Now depending on whether you are following WIP at actual cost, system will post the difference between credit and debit of that production order as WIP for the month end process.
    Once Accountant okays the entries in the production order, he can do the TECO and settle the order. Now WIP will be reversed and variance will be posted.
    To avoid the already produced goods mixing up with your other stock, u might want use Quality Management with the help of your PP consultant.
    Best Regards
    Vimal

  • Variance calculation for production order with settlement receiver as SDI

    Hi...
    I have one query reference to Variance calculation for production order with settlement receiver as SDI(Sales document item).
    I am working on Varaint configuration with strategy 25(Make-to-order for configurable material) with requirement class 046.
    I have created sales order ref. to configurable material,subsequently created planned order & then converted to production order.
    In production order settlement receiver is SDI(Sales document item).
    While doing production confirmation ,variance has been created.
    Now during variance calculation KKS2, I have got error message as no suitable settlement rule found for object Order no.
    Is there any way to come out of this?Or variance calculation KKS2 is not applicable with settlement receiver as SDI(Sales document item).
    Pl. guide
    Redards
    Tushar

    Hi
    In case of non valuated material, concept of variance does not apply...
    Variance is Actual Cost - Cost of Goods receipt posted in stock.. If the later value is zero, your entire actual cost is variance... That is one way of saying it
    But, in SAP, var not calculated in case of non valuated material and that makes sense as well.. Since you are in MTO scenario, it would make sense to analyse costs vs revenues @ sale order level as each SO will be unique in itself
    Regards
    Ajay M

  • Reverse WIP Calculation on Prod Order

    Issue: Cannot set DLFL flag on order because:  There is still WIP for ORD.
    I Set TECO and settle.  Error:  Status DLV/TECO was reversed after settlement of period 012 2007 
    Our Fiscal year 2008  began May  1 2007
    Order was DLV in Period 12 FY 2007.
    Year-end completed.
    Late in May (Per 01/2008) Production Planner - reversed all GI, GR and Confirmation and set DLFL status.
    Accountant discovered this, removed DLFL and tried to settle order properly, resulting in error:  Status DLV/TECO was reversed after settlement of period 012 2007
    Can't set DLFL, because of WIP.
    Can't settle order to Variance because of error.
    Can't reverse settlement from 2007 in 2008
    Can't open 2007 to reverse settlement.
    I would like to reverse WIP posting and then set DLFL status.
    Any thoughts on how to do this?
    Thanks
    Althea

    Hello,
    If the WIP on a production order (with full settlement) is cancelled depends on the status of the production order. In standard this is DLV or TECO and is maintained in the valuation method in Customizing.
    After the according status has been set on the order the WIP-calculation has to be executed again which will offset the WIP amount (i.e. 100 by -100). Thereupon variances and settlement have to be executed as well. After the settlement the WIP account in FI should have been offset as well.
    Regards, Michael

  • WIP calculation for Sales Order no FI document

    Hi,
    We are using the MTO scenario with valuated salaes order stock and it wll carry revenue and costs wherein we configured the RA key correctly with valuation method as 01 and we defined all configuration correctlly line ID,s and assignment and posting rules etc,. We have incurred the cost on Prodction order assgined to Sales Order and to calculate the WIP  We have done the KKA3 and we run the VA88 it is not psoting any accounting document and it is settling the costs and COPA document is generatig.

    Hi,
    You might have to check your scenario.
    Normally when there is a CO-PA document generated, there is no WIP calculation happening.
    The COS/Revenue is being transferred to CO-PA.
    Kind Regards
    Umapathi G

  • RA/WIP/VARIANCE for Prod Order

    Hi,
    Could any one please tell me How to see RA/WIP/VARIANCE on a Prodction order which is in TECO?
    I mean to say when RA was carried out what was the amounts , when WIP was carried out like that.
    on our Production order (which is DLV and TECO) Total Target costs are Zero, and Total Actual costs are showing in full amount, why we are not seeing any Target costs?
    Please explain,
    Regards,
    Sandhya

    Hi Sandhya,
    When you carried out the WIP at the period-end (KKAX), you will be able to see the WIP Value. Once you settle that Order, WIP get posted to FI.
    Pls check the GL Line Items report to see the Values. You can find the GL's used for WIP in configuration of WIP.
    Target costs are nothing but Standard Cost of Actual Production taken place. Pls check if there is Goods Receipt done or not against that Production Order for which you found no Target Costs.
    Pls check and revert back...
    Srikanth Munnaluri

  • Variance Calculation for Prod order

    Deal All
    I have problem when run prod order variance calculation (KKS2) for period 8 why the order for period 9 is also calculated ?
    why this happen ?
    Thanks and regards

    Hi Aditya
    The program is designed in a way that all open prod orders are considered in it.. however, variance will not be calculated on it
    For eg: You calculate Var in 009 for period 008.. Prod order created in fag end of 008 and processing started in 009... During var cal, system will give an error for this prod order saying "Only rem variances can be calculated for it" or some error of that sort
    you can ignore this error... I got a note released from SAP for this error.... however, that note is under reconstruction now and hence not available
    You can raise an OSS msg mentioning note no 1320759 and ask them when it will be available again
    Regards
    Ajay M

  • Reg. Open Order with Status

    HI,
    can anyone let me know about Open Order with Status normally that we have to create Generic Extractors to extract that data.
    thanx in advance
    peter b

    Hi peter,
    Normally for Open Order with Status, you need to create a generic data source
    on the database table 'VBBE', this table contains the Open Orders along with
    the open quantities, then coming to the status, it is the business process to
    determine since how long the sale order is Open, and the status of the Order..
    I would suggest you to create a table level data souce on VBBE and try to
    build the logic in the extractor if at all needed..
    Hope it would give U an idea to begin..if you can achive any this with this do not
    forget to assign point..
    for any further questions revert..
    Cheers..
    Pattan.

  • Need a Badi to look the good issue status for prod order before good receipt in MIGO

    Hi ,
    Need a Badi to look the good issue status for compoents for prod order before good receipt in MIGO.
    Example : There are 10 comps need to be issued to production order to make any assy but 6 comps were issued
    and remaining 4 comps are not yet issued.,in this situation if I try to do goods receipt for prod order through MIGO.,system should populate the warning
    message saying still goods issue are pending for prod order.
    Please advise .
    Thanks
    Prasad

    Hi Prasad,
    Before trying with a BAdI, have you tried to control this behaviour thru the Order confirmation parameters (OPK4)?
    Note that you can have a termination in case of having problems in the goods movements..
    Take a look of this and the SAP help:
    Termination of Confirmation if Incorrect Goods Movements
    Controls if the confirmation is terminated in the event of incorrect goods
    movements.
    Use
    This enables you to terminate the confirmation in the event of incorrect
    items, for example, to prevent postprocessing records.
    Dependencies
    The indicator is only evaluated if either no process control key or one
    process control key has been stored that enbles the goods movements to be posted
    in dialog AND for which the "provide error handling for goods movements"
    indicator is active. If there are incorrect goods movements, the system behaves
    as follows:
    A log is issued that gives information on the incorrect goods movements
    If these incorrect goods movements are determined by inventory management,
    then the option of correcting these errors is offered in the error handling
    If the correction is not successful, the confirmation is terminated
    Kind Regards,
    Mariano

  • Closing the Production Order with status PCNF

    Hi Experts,
    May I kindly ask if I can close an order with status Partially confirmed? If not, how can I cancel the confirmation if I had already reversed the goods movement in the confirmation thereby flagging an error of a deficit in the material quantity during cancellation of the confirmation?
    I really need your help since I need to close the production orders with this case.
    Hoping so much for your replies.
    Many thanks in advance.
    Sincerely,
    Ria

    Ria,
    I am not so clear about the exact situation.
    When you say you have reversed the goods movement with MIGO, is it reversal of the documents posted with confirmation or the individual documents?
    You can only cancle the document with MIGO which are independent of the confirmation.
    The  documents which are with the confirmation can not be reversed in any case with MIGO.
    I suggets you go this way,
    1. Check why system is giving you error as 'Deficit......'. The one thing I suspect that you must have performed auto GR & moved out the stock of FG from that location.
    If it's so then bring back the stock to it's original location & cancel the confirmation.
    While cancelling the confirmation where you might have executed goods issue with backflush this error won't arise as the stock will be bring back to storage location form the order.
    Don't reverse the cancellation of the of the documents youhave performed with MIGO for independent material posting on the order. Keep it as it is.
    This way the cancellation of confirmation & material movement will be done & now cost on the order will be zero.
    You can assign the status CLSD as well as DLFL to the order.
    2. In case you find the above activities can not be carried out for some reason then give status TECO to the order.
    Sttle the order so that the cost on the order will be zero, then give status CLSD.
    As far as possible stick to solution no. 1 only.
    Go for solution no. 2 when you don't have any other option.
    Hope this helps you.
    SmanS

  • Actual activity price calculation for production order

    Hi
    Can any one guide me in how many ways we can assign actual activity price calculation for production order?
    I knew only one way by assigning PPP2 costing variant?
    I have another doubt is: if we don't mention any material valuation indicator (moving average, standard) in valuation variant, how system will calculate material prices? is there any other way, to recognize the prices by system?
    regards,
    Ramesh B

    Dear,
    Costing variant PPP2 is linked to some valuation variant inn OPL1
    System will check the valuation of material and activity according to this valuation variant
    For material valuation there are many stg acceding to which system will take the price the raw material,
    Valuation strategy for material component
    Strategy sequence that determines the valuation of the materials used in the cost estimate.
    Use
    The materials are valuated using the price in the material master record or the values calculated in a material cost estimate.
    Procedure
    You can enter a single strategy, or you can enter multiple strategies in the form of a strategy sequence. If you enter multiple strategies, the priority of the strategy determines what price or what values are selected.
    Examples
    Assume that the following strategy sequence is entered for material valuation:
    1. Planned price 1
    2. Standard price
    3. Moving average price
    If the system finds a value in the Planned price 1 field (costing view), this value is taken as the value for valuating the material.
    If the system does not find a value, the value in the Standard price field (accounting view) is used.
    If the material does not have a standard price, the system uses the value from the Moving average price field.
    if you have not mentioned, then system will give error that "valuation stg not found"
    Valuation strategy for internal activities and processes-
    Strategy sequence that determines how internal activities and processes are valuated in costing.
    Use
    The activities and business processes used are valuated with the prices from Cost Center Accounting or Activity-Based Costing to determine the production costs or process costs. The prices can either be calculated iteratively through price calculation, or entered manually by the user.
    Procedure
    You can enter either a single strategy or more than one strategy in the form of a strategy sequence. If you enter more than one strategy, the priority of the strategy determines which price is selected.
    Examples
    The following strategy sequence is entered:
    1. Actual price of the previous period
    2. Plan price of the previous period
    3. The most current plan price
    If the system finds a price for the activity type, this price is used for valuating the internal activities. If no price was calculated for the previous period, the plan price from the previous period is used to valuate the activity type.
    If the system cannot find a plan price for the previous period, it looks for a future plan price, using the next price in the posting period to valuate the internal activities. For example, if plan prices have been entered for periods 2 and 3, and a plan price is calculated in period 1 for period 4, the system uses the price from period 3 in accordance with the valuation strategy Most up-to-date plan price.
    Again if you have not mentioned, then system will give error that "valuation stg not found".
    You can use any costing variant for actual (PPP2)and planned(PPP1) according to your requirement.. check in OPL1

  • GR for Purchase order and GI for prod. order simultaneously

    Hi Guys,
    My client current has an external system, which does both GR for puchase order and GI for Prod. order at the same time. He is now migrating into SAP and he wants the same functionality. Do you have any idea how to do this.
    For eg., Pick list(CO27) will pick and issue the components to production order, if the component is in inventory. if it is not there, it will give error.
    Can we add, if material is not there, it should do GR and GI. is it possible with any customer exit in CO27?
    Thanks
    Srini

    Hi,
    In KANBAN, we have the possibility to do the GR (Goods Invard) if th container is Full and GI (to the production Order) if the Container is Empty.
    It's just a thaught..
    Regards,
    Siva

  • RE G.I Problem for prod order in MTO

    Hi All,
             I am having stock as sales order stock in unrestricted. when I want to issue goods for prod order in MTO through MIGO. when I am checking I am getting the error as sales order stock not available. Any solutions for this Issue.

    Vachanala,
    If the stock is assigned to the perticular sales order & line item, the error won't be there.
    Agin check the stock in MMBE, & ensure that it is assigned to that perticular sale order number & line item.
    If it's not there then do the assignment to the desired sales order with movement type 413 E in t code MB1B.
    Hope this helps you.
    SmanS

  • Single invoice for multiple orders with different divisions

    Dear All,
    while I am trying to do single invoice for muliple orders with different divisons invoice is gettting splitted..In copy control vbrk routine I  tried with 003 and 007 etc..but result is same..what configuration need to be done for getting the single invoice
    Thanks In advance
    Regards
    CNRNAIR

    Hello
    single invoice for multiple orders with "different divisions" invoice is getting split
    FYI - Different Division means different Sales Area.
    So, sales doc (whether sales order, Delivery & Billing) is applicable to EXACTLY one sales area.
    Thus, combining docs with different sales area is practically impossible.
    Provided, you are using common division.
    Hope this assist you,
    Thanks & REgards
    JP

  • BAPI For Create Goods Issue for Sales order with picked quantity

    Hi friends,
            Is there any BAPI available to create Goods issue For sales order with picked quantity...............?
    we hv used BAPI_OUTB_DELIVERY_CREATE_SLS
    with sales order .......its creating delivery order but not doing goods issue with piked quantity........

    pls,reply its argent

Maybe you are looking for