WIP customization

Hi!
When i am customizing for valuation methods for WIP ( transaction code: OKGC) and press new entries button, system is asking for actual costs or target costs, when i have selected actual costs, system is asking for controlling area,RA version and RA key. After entering this, system is giving error message " specify new values". I don't understand what it mean? I have to define valuation methods for different order status.
regas,
Ramesh B

Hi
Pls note that, We use different RA keys for varied purposes, like RA KEY 00003 for Sales order cost WIP/RA calculation
RA00002 for WIP At Target cost which we will use REM (Product cost collector)
So it is recommended to define each RA key is own customising, like WIP at Actual cost or target cost, so that it will serve the required purpose, instead of using same RA key for different trasactions.

Similar Messages

  • WIP (Work In Progress) Calculation in Process Industry

    Queries :
    •     What is the significance of Yield in PP - PI
    •     How can we co-relate it with the WIP Calculation
    Fact :
    Generally when the Order is having Status CNF (Confirmed) & TECO (Technically Completed), they are not considered for the WIP Calculation.
    Scenario :
    I have came across numerous Process Orders which shows the Yield Value in Negative, why is so, I am not able to understand. More over the Orders which are having status CNF and TECO they are still been considered for the WIP Calculation. Is this a kind of Bug or we need to look into the customization. Please Advice.
    Thanks in Advance for the Information Provided.

    Hi
    Are you refering the yield in COR6N?
    It is nothing but the production qty to be confirmed.
    REg your otherquestion of TECO orders being considered for WIP calculation :
    as such there is no such setting in PP .
    You have to discuss with your FI/CO collegue for clarification.
    Regards
    YMREDDY

  • Mismatch of WIP report total and GL Trial balance

    Per requirement, I am expected to see that the "WIP" reported in GL trial balance and the
    Total WIP we get from the Report “S_ALR_87013127”  (Path-Easy access-CO- Prod.cost Controlling—cost obj controlling—prod cost by period—info system—Object list)" – matches per plant.
    I run the CO43, KKAO, KKS1, CO88 jobs every weekend. I take the spool request from the CO88(Prod settlement) then I  also remove scrap variances for a production orders which error and then run the Variance and Prod settlement(CO88) jobs again.
    I still don't see a match yet. What could be the reason?
    What can I do to correct the WIP from Period 1, 2008?
    I have period 1 open in OB52.However executed MMPV o February 1(priod 2)?
    Thanks.

    suggest to create customize TB report.

  • With Reports 10G can you customize you message and stop formatting?

    Oracle, states to come here for answer. they said, OTN should be able to help.
    If any one knows how this can be done can you please help me out?
    thanks,
    We were told this was fixed with 10G so we upgraded to 10G. We have a
    report and we want it to execute if it's less than 10 records if not we want a
    message to come up that the report needs to be scheduled.
    Well we run the report and it displays exceeded record count but the format
    still runs so no time saved on the web.
    If the record count was exceeded we want to HALT the system and not go any
    farther.
    Now if we could modify the system message 1825 we would be o.k. But we don't
    know if that is going to work. If we could change the message we would be
    o.k. with that. that would mean changing the system codes though.
    ### How is the Report being called (Command line, URL or via Oracle Forms): ###
    If false comes back in the beginning then we don't want any report formatting
    to be done. Right now the format is done it seems but no data is displayed
    because criteria isn't met.
    So we dont wnat the formatting to be run when criteria isn't met. But for
    some
    reason it still runs and takes time.
    See we have some reports on the web that can only be ran by date range right
    now the clients can only run the reports for a 6 months range.. Well some
    clients have a lot smaller record count. So we want to change the way the
    reports are ran to a records count. If the count is large than said amount
    then a message comes up that states the report has to be scheduled. If the
    amount is under said amount then the report runs.
    So at this time in the report we do a count then we move onto will the report
    run or not if over the amount we want to abort the process but we don't want
    the client to see the abort. We definately don't want the client to sit and
    wait for the format to run when NO Data is to be returned.
    ### Error messages and error scenario: ###
    So what we want is too see a message "Schedule the report count exceeded" and
    NO formatting done. If under amount we want the report to run.
    ### Provide a detailed step-by-step description of your problem or question: ###
    Or is there a way to customize the messages the client / users will see. And
    no formatting time for no records returned.
    Contact me via : E-mail -> [email protected]
    Text continued in next action...
    20-SEP-04 18:39:53 GMT
    Text continued from previous action...
    20-SEP-04 19:18:51 GMT
    New info : Is there a way if the error messages have to come up that we can
    hide the message or have another screen cover that error message something to
    cover the message so that the user doesn't see the error message.
    20-SEP-04 19:30:23 GMT
    Hi Darlene,
    Thank you for using MetaLink. Iam currently working on a very critical issue.I shall review/research your issue at the earliest opportunity and w
    ill update the SR / call you as soon as we have relevant information. Thank you
    for your patience.
    Best Regards,
    Seema,
    Oracle Support Services
    STATUS
    =======
    @WIP -- Work In Progress
    20-SEP-04 19:30:30 GMT
    Email Update button has been pressed: Sending email to [email protected]
    21-SEP-04 00:32:18 GMT
    Hi Darlene!
    If you are calling the report from a form, try using the EXIT_FORM line in your code.
    Thanks and Regards,
    Seema
    21-SEP-04 00:33:01 GMT
    Email Update button has been pressed: Sending email to [email protected]
    21-SEP-04 14:09:20 GMT
    New info : We will try it and let you know.
    21-SEP-04 14:19:04 GMT
    New info : We are not calling the report from a form so this won't work. Any
    other way. We are needing to do this badly.
    21-SEP-04 14:39:06 GMT
    New info : Can I get detailed steps about how to customize the system message
    or hide the message when we abort the report?
    21-SEP-04 15:38:39 GMT
    Hi Darlene!!
    As talked to you on phone, here are the steps for you to try.
    The below has been run as a test case using emp table in scott schema of a database
    1) create a summary coloumn say cs_1 in the data model.
    2) point the function to count.
    3) Point the source to what ever's count you want it to be pointed to(say empno of emp table of
    scott schema)
    4) create a user parameter say NO_ROWS
    5) in its property palette make its data type number and initial value as 1
    6) I had teh following query for my report:
    select empno, ename from emp
    where rownum <= :no_rows
    This means that the report that will be generated will consist of a total no of NO_ROWS(that we
    shall be specifying at run time). The before report trigger(mentioned in 7 below) shall assure
    that whenever we specify NO_ROWS greater than 5 then the report will display a customized pop up
    message.
    7) create a before report trigger as:
    function BeforeReport return boolean is
    user_excp EXCEPTION;
    begin
    if :cs_1 >5 then
    raise user_excp;
    return (false);
    else
    return true;
    end if;
    EXCEPTION
    WHEN user_excp then
    SRW.MESSAGE(30, 'Data is more please schedule this report:');
    raise SRW.PROGRAM_ABORT;
    return (false);
    end;
    This way when u run a report, an argument is asked whether how many rows do you want to be
    displayed as in the parameter NO_ROWS. then you specify the number. If that number is greater
    than 5(in this case, due to if :cs_1 > 5 then....) then it will pop up a message saying "Data is
    more please schedule this report:"
    In case you do not want to specify NO_ROWS..then you need not put that and modify the report
    query as "select empno, empname from emp;" i.e. without where clause.
    21-SEP-04 16:49:30 GMT
    New info : we will try this then update the TAR.
    21-SEP-04 16:58:09 GMT
    ok you update the tar when you try the above steps.
    STATUS:
    @CUS
    23-SEP-04 02:16:00 GMT
    New info : Information from the person that did this suggestion step by step.
    I tried this step by step, but unfortunately, it doesn't work the way we want.
    First with this suggestion, the user needs to choose how many records they
    want
    to get, or we default a number of records, in order to run the report. The most
    important thing is, whenever you specify the statement return false or raise
    SRW.PROGRAM_ABORT in the before report trigger, the system message will pop up.
    I really hope that people from Oracle would let us know how to customize the
    system message or hide it.
    23-SEP-04 14:23:04 GMT
    New info : I just thought that we have some sort of message, which I guess is
    from the database, when we do claim search on client inquiry. I am just
    wondering if we could try the same thing to the report.
    The some sort of message looks like this on dev box:
    Your search exceeded 5000 records and will surpass the capabilities of this
    connection. Please narrow the search criteria and resubmit.
    It's just a thought, not sure if it's going to work.
    When could we have the DBA Make this change. The servlet.properties???
    23-SEP-04 17:30:55 GMT
    REQUESTED INFORMATION PROVIDED
    ===============================
    Hi Darlene,
    Thank you for providing the requested information. I am currently reviewing/resea
    rching the situation and will update the TAR / call you as soon as I have additi
    onal information. Thank you for your patience.
    Best regards,
    Ajit
    STATUS
    =======
    @WIP -- Work In Progress
    23-SEP-04 18:04:31 GMT
    UPDATE
    =======
    Hi Darlene,
    We cannot modify the system messages nor do I think there is a method to hide the system message. The message that was coming is
    due to the raise srw.program_abort command, which is the element through which
    we can abort the program.
    Thanks
    Best Regards
    Ajit
    @CUS
    23-SEP-04 18:29:26 GMT
    New info : Can you please look into a way that we can get something to work?
    23-SEP-04 18:49:28 GMT
    Hi Darlene,
    I am sorry to say that but I don't think there is any any workaround to this because the system message is what is generated by the oracle reports i
    nternally. Still if you wish you may refer to the otn discussion forum which is
    maintained by teh product management group and post a new thread on it. the link
    to the forum is Reports
    Also since nothing can be done on our side I don't see any reason to keep this TAR open an
    d if you wish we can soft close this.
    Thanks
    Regards
    Ajit.
    New info : Shouldn't there always be a way to do something? I don't understand
    why we were told in 10G that this could be done and now we are told it can't.

    K T wrote:
    Yep - not nice...unless you do a TE 'Get Info' in the Finder and √ the 'Open in 32-bit mode' box and try again...then, all seems well in snow leopard land.
    Really? I figure since I have a Core Duo chip, everything always opens in 32-bit mode. In any case, I did file a bug report and will give your suggestion a try later today.

  • WIP posting to different account by order type

    Hi,
    any idea how can I post WIP amount to another G/L account different from customization (OKG8) ?
    We have several order types and I want to post WIP to deferent GL accounts depending on order types (or something like this). In transaction OKG8 I can only define one GL account for controlling area and company code. So all WIP are settled to this account in FI accounting.
    I can not find any possibilities how to change it.
    thanks for advice

    Hi Jud
    You should make these posting to a cost center then..The only way you can control account postings via PO type is having a account assignement category. You can make this as mandatory filed for this PO type..
    Please let me know if your requirement is different..
    CHeers
    R K Bolla

  • How to link Sales Order and WIP job for non-ATO items

    Hello All,
    My client's requirement is to link an Sales Order with a WIP Job as soon as it is booked.
    It is for FG and for a non-ATO item.
    The process should be to have SO booked and then it should raise a WIP job based on it if there ar no inventory stocks.
    Thanks in advance.

    You will have to write an extensive customization that will work similar to planning engine.
    It will have to look at order quantity and then look at onhand, reserved onhand, min-max quantities, safety stocks, move orders etc etc and then create a job if necessary.
    Are you sure you want to do it this way?
    Hope this helps
    Sandeep Gandhi
    Omkar Technologies Inc.
    Independent Techno-functional Consultant
    513-325-9026

  • WIP Reports

    Dear Experts,
    Is any Standard WIP report available for Open Production Orders and the material issued against it.
    and can i see the Cost component wise, of the Production order.
    Please let me know
    Raghu M

    Dear
    see the following line whcih i received from my friend on the above subject hope this what you looking for
    If you have inhouse produced material half done ( not yet fully processed).
    The Rules:
    1. You will only get the WIP only for Milestone/Reporting Point Operations.
    2. The Production order status should be REL and not DLV or TECO.
    3. Without Auto GR, i.e Manual GR also after partial/final Confirmation you will gt the WIP.
    You can use the Transaction: KKAS/KKAX (Individual Processing).
    WIP is for Material in REM and For Order in Discrte Manufacturing.
    If your Production Order ststus is not DLV or TECO, then System will consider your Order for WIP Calculation.
    In COOIS, input the Status as REL and Not DLV and Execute.
    If you have confirmed/Backflushed some quantity, the remaining quantity is in some intermediate stage then system will consider this for WIP Calculation
    find Customization settings for WIP as below :
    1. Define Results Analysis key : Tcode - OKG1
    2, Define Cost Elements for WIP Calculation : Tcode - KA01
    3. Define Result Analysis Versions : Tcode - OKG9
    4. Define Valuation Method ( Actual Costs): Tcode - OKGC
    5. Define Line Ids : Path - SPRO--> Controlling> Cost Object Controlling> Period End Closing->Work in Proces----> Define Line Ids
    6.Define Assignment : Tcode - OKGB
    7.Define Update : Tcode - OKGA
    8.Define Posting Rules in WIP Calculation & Results Analysis : Tcode - OKG8
    9.Define Number Ranges : Tcode - OKG6
    10.User defined messages for WIP Calculation & Results Analysis : Tcode - OPR4_KKA
    11.Assign messages to a Responsibility Area : Path - SPRO--> Controlling> Cost Object Controlling> Period End Closing->Work in Proces-->User-defined Error-Management-> Assign messages to a Responsibility Area
    Use the following T-codes for calculating WIP
    KKAG WIP: Display Worklist
    KKAO WIP Calc.: Collective Processing
    KKAQ Display WIP - Collective Processing
    KKAS WIP Calc. for Product Cost Coll.
    KKAT WIP Display for Product Cost Coll.
    KKAV WIP Calculation for Cost Object Hier
    KKAW WIP Display Cost Object Hierarchy
    KKAX WIP Calculation for Order
    KKAY WIP Display for Order
    KOB8 Orders: WIP/Results Anal. Line Items
    Hope it will help u to some extenct.
    Regards
    Faisal

  • Order number on WIP Line items

    Hi
    I am not able to see Production Order number on WIP line itmes from FB03 or FAGLB03.
    Is there a particular customization to get Order number into line item display?
    I tried Define Special Fields for Line Item Display..but I don't have AUFNR field in that config. setting.
    Appreciate your response.
    Thanks
    RK

    Thanks for the reply! I can see order number in assignment filed and text field earlier also. I will try sort key option.
    However I am curious why it is not updating order number filed.
    Thanks
    RK
    Edited by: RAVI KRISHNA on Apr 14, 2009 8:57 PM
    Edited by: RAVI KRISHNA on Apr 14, 2009 8:58 PM

  • WIP SETTLEMENT

    I am trying to run WIP settlement through KKAO and CO88 system creates document with document type "SA". I want to change the document type. Please confirm where i have change the customization?
    Regards

    Navigation:
    For the product cost by period:
    IMG-controlling- product cost controlling-cost object controlling-product cost by period-product cost collectors-check order types- select your order type to check for the settlement profile.
    IMG-controlling- product cost controlling-cost object controlling-product cost by period-product cost collectors-period end closing-settlement-create settlement profile-select your settlement profile and change the document type here.

  • Truecrypt, PGP, wipe apps etc?

    I just switched from an android device after many years on a PC. There I was able to take security and privacy into my own hands, not relying on the Google corporation but independently (well, using third-party apps). I also don't want to rely on Apple for my security but have independent apps for that.  I cannot find Pretty Good Privacy by Zimmerman, nor Truecrypt. Maybe Android didn't ' have those - though they certainly would operate on my PC. But I cannot find even any of the multiple customizable selective delete cache etc apps that I used on my Android device. Am I looking in the wrong place or is Apple not compatible with apps that pit the user in charge of his own privacy?

    Are you talking about a Reset where you hold down the sleep and home buttons, wait for the Apple logo, then let go of the buttons, no it will not wipe out your apps.

  • Basic Snow Leopard install with special customization:  setup assistant infinite loop problem.

    Hi, all,
    Based on this post: https://discussions.apple.com/thread/1395118?start=0&tstart=0, I'm assuming there's a problem with setup assistant running after a customization install reboot.  But I could be wrong.
    Here are the details:
    MacBook Pro
    Clean OS X Snow Leopard install (I was "told" by IT I had to wipe the disk and re-install OS X after backing up personal files).
    Installed extras I need/want (in particular, XCode, though I went ahead with the other optional software as well).
    Installed the IT supplied "Supplemental CompanyName Installation Disc" (also referred to as "CompanyName Supplemental Installation Disc" ), which is supposed to create a customized, IT supported, setup.
    When the supplemental install is done, the system is rebooted.
    There is then a "Welcome" screen (starscape, with almost endless bombardment of the word welcome in various languages), finally followed by:
    a) select language; b) select keyboard; c) select timezone; d) Don't forget to register your Mac, with a "done" button.
    Clicking the "done" button goes to a blank grey screen. and then loops back to redo the "Welcome/language/keyboard/done" sequence, ad nauseum (that is, infinitely repeated).
    Per the above mentioned post, I have rebooted to the Install DVD and run disk utility, repairing permissions.  No difference on reboot.
    Boot to safe mode goes to the same setup assistant sequence, not a login screen.
    Another Mac user here suggested checking for /var/db/.applesetupdone, since missing it, or if it's correupt, could cause this problem.
    So I booted to single user and checked for this file.  It is not there.  On the off chance the file is a simple flag and the content doesn't matter,
    I did fsck/remount and touch /var/db/.applesetupdone but this did not change anything either.
    Presumably, the file must be present and must contain some data.  If this is true, can it be created manually and put in place via single user mode?
    Or are there other, better solutions someone could suggest?
    Many thanks.
    Bob

    Ah, it seems I finally found something useful, at http://hintsforums.macworld.com/showthread.php?t=84825
    One of the responders supplied the content of their .applesetupdone file.
    I was able to get this onto my Mac, in /var/db, as .applesetupdone (just to be safe, I linked that name to .AppleSetupDone, the name as mentioned on the above site).  Note that both names begin with a dot (hidden, in UNIX parlance).
    On reboot I was presented with the CompanyName specific login screen.  It took a little bit more mucking around with passwords, but I was eventually able to login without any problem.
    Bob

  • Wip Query have to display only rejection items

    Hi,
         This is my customization form wip query
    select m1.docnum 'WIP NO', d.U_RejQty 'WIPRej',d.U_RewQty 'WIP re-work' ,d2.U_RejQty 'QCRej',d2.u_rewqty'QC Re-Work',d2.U_Opename 'Operation',
    m1.u_qchname as PreparedBy,m1.u_shift,m1.u_remarks,m1.u_remrej,m1.u_Remscrp,m.docnum 'FO NO',m.plannedqty,m.rlsdate,m.itemcode,m.u_tdrawno,m.CardCode,n.cardname,
    (select itemname from oitm where itemcode=m.itemcode) 'Description'
    from OWOR m
    left outer join [@SHJ_WIP_UPD1] d on  m.DocNum =d.U_OrderNo
    left outer join [@SHJ_WIP_OUPD] m1 on m1.DocEntry =d.DocEntry
    left outer join [@SHJ_QC_INS5] d2 on m.DocNum =d2.U_OrderNo and m1.DocNum =d2.U_WIP
    left outer join OCRD n on
    m.CardCode=n.CardCode
    where m.rlsdate between {?FromDate} and {?ToDate}
    and (d.U_RejQty>0 or d.U_RewQty>0) and ( d2.U_RejQty>0 or d2.U_RewQty>0)
    In ths query am displaying the rejection items and rework items alone but for me its showing all the items rejection and rework items zeros also showing.
    am getting output like this
              I need output only highlighted item because there only rejection items
    Regards
    Vinoth

    Try This
    select m1.docnum 'WIP NO', d.U_RejQty 'WIPRej',d.U_RewQty 'WIP re-work' ,d2.U_RejQty 'QCRej',d2.u_rewqty'QC Re-Work',d2.U_Opename 'Operation',
    m1.u_qchname as PreparedBy,m1.u_shift,m1.u_remarks,m1.u_remrej,m1.u_Remscrp,m.docnum 'FO NO',m.plannedqty,m.rlsdate,m.itemcode,m.u_tdrawno,m.CardCode,n.cardname,
    (select itemname from oitm where itemcode=m.itemcode) 'Description'
    from OWOR m
    left outer join [@SHJ_WIP_UPD1] d on  m.DocNum =d.U_OrderNo
    left outer join [@SHJ_WIP_OUPD] m1 on m1.DocEntry =d.DocEntry
    left outer join [@SHJ_QC_INS5] d2 on m.DocNum =d2.U_OrderNo and m1.DocNum =d2.U_WIP
    left outer join OCRD n on
    m.CardCode=n.CardCode
    where m.rlsdate between {?FromDate} and {?ToDate}
    and (isnull(d.U_RejQty,0)>0 or isnull( d.U_RewQty,0)>0) or ( isnull(d2.U_RejQty,0)>0 or isnull(d2.U_RewQty,0)>0)
    Regards
    Kennedy

  • More WIPEdit plugin customization questions

    Hi,
    I see from another thread called "WIPEdit plugin customization" that you can NOT remove/hide the tool bars that show up in the MLT (i.e. copy, paste, bold, etc..).
    I'm just wondering what other options are available as customization?  I see that the wes_book.pdf talks about:
    1. Edits in the wipedit.ini file to change user or server side custom dictionaries
    2. A variety of WIP Edit ActiveX controls/API's to add buttons or how to display the forms.
    Anything else that I'm missing that can be customized?
    thanks!

    Hi,
    There isn't a way to remove\hide or restrict these options whether from the toolbar or right click menu in the WipEdit plugin. (or Documaker Studio Data Entry Check).
    thanks

  • Project closure - labor cost from WIP to COGS a/c upon closure

    Dear Projects experts,
    We are implementing v12.2.3, In Oracle PA, for a specific project type, our business users want labor cost first charged to a WIP Cost a/c, and upon closure of the project, the cost should be moved to a designated COGS a/c. Is there a way to achieve this? Do we need to do any extension/customization? Can this be done in SLA custom rules? Thanks a lot for sharing your ideas/suggestions.

    This is CLR exception. You cannot just LoadLibrary the managed library. The error code is the generic well-known code and means, again, CLR exception.
    There is no easy fix (options are hosting CLR (I would not recommend), etc.
    - Sergei meleshchuk

  • How to customize install with the restore DVD's

    HI,  Is there a way to customize the install of the restore DVD's for Vista.
    For example, I wouild like to have 2 partitions.  Also, I do not want all the extras installed, mcafee, etc.
    Thanks
    Solved!
    Go to Solution.

    Is the restore partition intact on your Thinkpad?
    If you run the restore from the restore partition it gives you the chance to do a "Custom Restore" where you can choose to not install some of the programs.
    When you run the cd's it wipes all partitions and installs the resore partition. Then it restores windows from the restore partition without the option to do a custom restore. You would have to restore asecond time from the hard drive to get the custom restore.
    T60 2623-D7U, 3 GB Ram. Dual boot XP and Linux Mint.
    T400 2765-T7U Windows 7
    Registered Linux User #160145
    FYI: I am not employed by Lenovo

Maybe you are looking for

  • Mouse disconects

    My wireless super mouse disconects-reconects sporadically.  The pointer will lag and be in accurate.  I have a 21.5 mid-2011 i5core 4gb iMac running lion.

  • Photo appearance changes after being placed

    I hope someone can please help me Im using CS4 and creating a magazine I have the Display at High Quality And I am trying to Place 314 DPI Tiffs that I have created in photoshop. They are high quality images and they look PERFECT on photoshop. I will

  • Guys i am not able to access my photos from my iphone when i synchronize it with my mac! what should i do?!

    i cannot see my photos that are on the iphone (4s) on itunes (when i synch) -i use a mac- why is that and what should i do? thnx

  • 1 iPod, 2 Libraries

    I have an iPod Video and I am running it on my user account on my PC. I have about $250 worth of songs on my library. On another user account (same computer, etc.) I downloaded about $25 worth of my favorite songs. I sorted them into a playlist. I wa

  • Options' moneyness monitoring

    Hello, Is there any functionality in SAP that allows monitoring when Options are in money and may be Exercised? Transaction TI94 only monitors Expiration date. Thank you! Kalvis