With in Plant - Storage loc to Storage loc STO in ECC 6.0?

In case of raw materials, we have to bring from outside godowns to inside plant storage location. As per business requirement we are treating the outside godowns as storage location of the same plant.
In this scenario with in Plant, storage location to storage location stock transfer we need to include the delivery cost(freight)
also we need to monitor the stock in transit while goods movement from storage location to storage location since godown located few kilometers away from plant.
In ECC 6.0 by creating Stock transport order can we achieve this. Through Customizing settings shall we achieve?.(Without Split valuation functionality solution is required)
Please help to solve this.
Viju.

We solved this issue ourself.
this scenario can be addressable through SD shipment dellivery route
1. add sales view in the material master. fill all required fields
2. do customization settings in stock transport order under material management purchasing
3. create order, supplying plant and receiving plant identical, mention storage location for receiving plant optional.
4. create replenishment delivery(picking), background create outbound delivery, post goods issue in the outbound delivery document by puting picking qty & storage location in the respective fields.
5. you can view the accounting document generated in the out bound delivery via. Stock show under an order stock. frieght also captured in seperate account.
6. make good receipt referring outbound delivery document.
7. stock updates.
8. process end.
V.Vijay.

Similar Messages

  • Material Transfer from Storage Location 2 Storage loc

    Hi Gurus,
    Here Client want to transfer Material from 1 loc to another. Std T Code is MB1B with Mov Type 309. But here we have to enter material, qty,& batch no.But client's requirement is that he dont want  to enter all these things.He want to select the material,batches collectively sothat seperate entry should be minimised. Is there any functionality through which we can transfer the selected materials?
    Please reply soon its urgent.
    Regards,
    Mayur

    Hi mayur
    First of all 309 movement is ussed for Material to material transfer
    like our friend said for storage loc to storage loc. you need to use 311
    Now when you go to MB1B then goto Edit in that you can see default value
    enter your default value , so after that you need to choose only material and batch
    collectively
    Thanks
    Bala

  • Stock tranfer b/w sto loc with in plant

    how to do stock tranfer b/w sto loc with in plant

    Hi
    as mentioned by Rama Krishna, STO process can be mapped for storage location to storage location transfer. This feature is available from 4.7 (I think service pack 200 or something).
    You have to do configuration
    Check in SPRO - MM - Purchasing - Purchase order - Set up STO - Set up STO between S loc.
    The remiaing process is like normal STPO.
    regards
    Srinivas

  • Storage loc to Storage loc transfer thru STO

    I have seen something for storage location to storage location transfer  through STO in IMG but not getting how to use that.Anybody have any idea about this how to use or work?
    Thanks in advance..

    Hi neetu,
    The tag for activate STO for storage locaton to storage location in MM is for using a Storage location as the supplier ,as of in standard SAP we use Plant as supplier for STO's not storage location's directly in the vendor field at the time of STO.
    its already mentioned in notes you can check that also. and main thing this is not active in Standard system as it may cause some undefined problems in systems.
    Better go ahead with the Standard process.
    Regards,
    Ninad Kshirsagar

  • STO ( stor. loc. to stor. loc of same plant ) creation frm Sales Order

    Hello guys
    I am facing a unique scenario in our current environment. Need you input ASAP
    environment:
    Org 1 - Plant 1 - division 1
    Org 2 - Plant 2 - division 2
    Org 1 wants to take over the sales of all the items belonging to division 2 which are currently being sold by Org 2.
    These items are HAWA and their procurement is currently done outside ECC.
    Now the procurement of these items will continue to be done by Org 2 & even its inventory will be owned by Org 2.
    Proposed Sales Flow:
    1) Org 1 accepts Order for the item with Plant as Plant 2
    2) Plant 2 Delivers the goods to customer
    3) Org 1 invoices the customer
    4) Org 2 invoices Org 1 using Intercompany billing.
    Now the challenge is wrt step 2.
    The Items are shipped from Plant 2 with their Issuing storage location as ABC.
    However these items are initially stocked in a different building outside the Plant 2 .. say stor. location = XYZ
    Now based on the Sales Requirements due for shipment today .. the users will move the Inventory of the items from Stor. Location XYZ to ABC for which they want some reference document for the move (which I have recommended as STO)
    I have come across some threads which give input regarding triggerring STO from Sales Order.
    However my challenge is the STO in this case is between 2 storage locations ABC & XYZ  of the same plant.
    Do you think Sales Order triggering a PR (similar to 3rd Party scenario) & then this PR converts to a STO work ?
    Please let me know the steps if possible.
    THanks
    Vin

    Well actually the Selling Org ABCD is of a different Company code .. it is a typical case of Intercompany Sales .. where the Plant WXYZ is belonging to another company code.
    I have setup the Intercompany Sales Process .. and want to trigger the Stock movement as mentioned above.
    I have configured the STO for storage location - stor. location in a Plant. ...
    However I am struggling to trigger a STO from a Sales Order.
    I tried using the Schedule Lines to trigger a Pur. Req ... however the Supplying Plant field remains blank (which is the same in this case as it is a stock movement between 2 locations of the same plant).
    The flow looks somewhat like this
    Sales Order -
    > Stock Transfer PR in Plant WXYZ -
    > Delivery Doc for the STO --- > MIGO to receipt the inventory in 0001 -
    > Delivery DOc for Sales Order -
    > Invoice for end customer --- > Intercompany Invoice
    If anyone has automated creation of a STO from a Sales Order .. please advice
    Thanks
    Vin

  • Approval for storage location to storage location or plant to plant movemen

    Hi all,
    Our client's requirement is when goods transfer from the storage location to storage location with movement type 311 or plant to plant with movement type 301, untill & unless the authorised person at the receiving end approves it, the movement should not be happened?
    How to map this? Any release strategy?
    Thanks in advance.
    SmanS

    You can map the process in SAP using 2 step stock transfers.
    Storage location 1 313 movement type - it will be in transit until you do receiving in the receiving storage location 2 using movement type 315
    Similarly for plant to plant movement type 301 and 305.
    There is no customization available in SAP to do this with the single step stock transfers that you are currently using. 
    Thanks and Regards,
    Maheshwari

  • STO for storage location to storage location with delivery charges

    Dear Users,
    Please advice the configuration & pre-requisites for storage to storage location STO with delivery charges within a plant.
    Thanks & Regards,
    Shyam

    Moderator message:
    Please put some efforts into a search
    Storage location to storage location stock transfers have been many times discussed as well as delivery charges in UB stock transfer order.
    Do not just post your requirements and expect others to do your job.
    If you dont know how to search, then please see these blogs:
    A good way to search the forum is with google. See this blog with details for a good search
    Getting the Most out of Google: Optimizing Your Search Queries
    This blog describes how to use the SCN search:
    How to use SCN search
    The discussions are not a replacement for proper training
    Thread locked

  • Transfer between storage location to storage location within same plant

    Dear Gurus,
    We r doing storage location to storage location transfer within same plant through purchase order.
    Due to excise requirement we have to raise excise invoice for the same for captive consumption purpose.
    Is it possible to make it One step procedure so that GR will take place at same time as GI the way it works for plant to planrt.
    In ECC 6.0 option is there for transfer between storage location. I configured but it is not working.
    Please check the same.
    Rgds,
    Saurabh

    Hi Saurabh,
    The proceedure you are following is a bit wierd. But I think this is as per your business requirements.
    You can continue to follow the same proceedure as this may  not be possible through one step movement type.
    Best Regards,
    Prateksha.

  • Partition failed with the error: The target Core Storage volume is locked

    partition failed with the error: The target Core Storage volume is locked
    Hello everybody!
    Please help me.
    I'm using MacBook Pro (Retina, 13-inch, Mid 2014), Processer:2.6 GHz Intel Core i5, Memory: 8 GB 1600 MHz DDR3.
    my computer i have divided in 3 drives: 1-Machintosh HD (Mac OS) 2-Bootcamp (Window OS) & 3-Data (drive for data storage).
    I don't want to use Window OS on my computer anymore so I decided to delete drive Data (the third drive) & Window OS (the second drive).
    I want my hard drive become a single drive back but when I was formatting, there were some problem display:
    then i clicked ok and it displayed like this:
    then i try to format or create new partition,  it's nothing happen when press button apply.
    my computer has storage space 256GB but now when it is happened like this my storage space is only 127GB only.
    so please help me.. what so I do with this problem.
    Thank you.!

    arajs wrote:
    I used Boot Camp Assistant (for instaling Windows XP) and there was Partition error:
    +*The disc cannot be partioned because some files cannot be moved.*+
    +Back up the disk and use Disk Utility to format it as a single Mac OS Extended (journaled) volume. Restore your information to the disk and try using Boot Camp Assistand again.+
    so I tried Yasu, verified permission, verified disk, and everything was ok, but in Disk Utility I was trying to split or change size of my disk but there is one error again:
    +*Partition failed.*+
    +Partition failed with the error: No space left on device+
    but I have 64GB free space!
    how must I "+Restore your information to the disk+" or what else can I do?
    thanks!
    This is a standard error message.
    If you would have checked into the bootcamp forum you would have instantly found the solution.
    http://discussions.apple.com/forum.jspa?forumID=1244&start=0
    All that error message means is that you do not have enough conguous disk space available. No big deal at all for an older system. You have bits of files strewn over the "free space."
    The solution as you would find in the bootcamp forum is to clone your HD, using a file-file clone, then test the clone to be sure it is working and then to erase your HD and clone back.
    Works every time.
    Message was edited by: Theodore

  • Will Macbook Air(2012) with 256G storage flash have storage problem

    Will Macbook Air (2012) with 256G storage flash have storage problem described in "MacBook Air Flash Storage Drive Replacement Program"?
    In the web page http://www.apple.com/support/macbookair-flashdrive/, it says that Apple has determined that certain 64GB and 128GB flash storage drives used in the previous generation of MacBook Air systems may fail.  I wonder whether Macbook Air with 256GB flash storage may come into the same problem?

    Welcome to Apple Support Communities
    No. 256 GB flash storage does not have that problem. However, it's important that you make backups of your data to keep your files safe

  • As iMac user upgraded to Mountain Lion and lost all Legacy connection with years of Apple/Mac data storage. How can recovery since every default says "no longer supported, After years of Mac software use now it is not accessible ??????

    As iMac user upgraded to Mountain Lion lost all Legacy connection with years of Apple/Mac data storage. How can recovery since every default says "no longer supported, After years of Mac software use now it is not accessible ??????

    Please provide more details. What version OS X were you using?
    Are you saying that Mail faIled to upgrade and you lost your old mail?
    Are you asking about PowerPC applications that require Rosetta to run like AppleWorks and Microsoft Office 2004?

  • So I had a large amount of music on my Iphone 4S, and so i bought a storage plan with 10 more GB's of storage. I went to sync the rest of my music, assuming it would now let me have it on my IPhone, but it said I still didn't have enough storage. Help?

    So I had a large amount of music on my Iphone 4S, and so i bought a storage plan with 10 more GB's of storage. I went to sync the rest of my music, assuming it would now let me have it on my IPhone, but it said I still didn't have enough storage. Help?

    You bought icloud storage.
    This has nothing at all to do with the storage on your iphone.  You cannot increase the storage capacity of your iphone at all.

  • I was given a 16Gb ipad mini retina with cellular but I need more storage. We do not have the receipt as it is a gift. I like to swap for a 64Gb unit and pay for the difference my self, how do I go about doing that? I have not open the packaging yet.

    I was given a 16Gb ipad mini retina with cellular but I need more storage. We do not have the receipt as it is a gift. I like to swap for a 64Gb unit and pay for the difference, how do I go about doing that? I have not open the packaging yet.

    Hi
    Thanks for that. Yes, the ipad was purchased recently. I called Apple last Friday and they ask for the receipt. I wonder if anyone were able to swap their ipad for a larger storage in the past at the apple store without a receipt? 16Gb is such a small storage.

  • QM - restrict lot creation in I. Type(08) for S Loc to S Loc transfer

    Hi All,
    Thanks in advance for reply.
    We have requirement for restriction in creation of Inspection Lots using inspection type u2013 08, while stock transfer from storage location to storage location only.
    Inspection type 08 is used for stock transfers thourghout various plants.
    But in one of the plant, there is internal stock movement from one storage location to another. During this posting system is creating inspection lot(origin 08), which is not required.
    Our location is WM and HUM managed.
    Please let me know how can I restrict creation if Inspection lot in above case.
    Best regards,
    Ravi

    Hi,
    Actually we need QM activate for 311 movement type.
    We have two scenario in same plant & same material.
    1) Storage Location to storage location transfer(HUM managed location)
    2) Plant to Plant transfer(without HUM managed location)
    In material let say A, I have maintain insp type 08 & in insp type details i have activated isp with HU. Hence when I do the location to location tansfer,system is creating Inspection lot for 08 with handling unit.
    But when I transfer the same material from one plant to other,system is not creating lot as this transfer is not with handling unit.
    For this I have created one more insp type Z1 & attach to insp lot origin 08 but still insp lot is not created while plant to plant transfer.
    Pls suggest.
    Thanks,
    Ritesh/Ravi.

  • Storage location to storage location

    Hi all,
    I am doing STO from storage location to storage location in MIGO. While doing so is it possible to get excise tab in migo.   If there any settings for that please let me know..
    Regards
    Mahesh

    Hi
    Excise will be levied only if the material moves from a plant to another plant or a depot.
    If u try to move a material from a storage location to another within a plant  then there will not be any excise involvement.
    Check with ur finance guys .
    Also if u r trying to move ur material to a storage location outside ur plant, then  the same has to created as a plant or a depot and then STO has to be done.
    Basically for India excise comes to paly a role when the material leaves the premises only.
    Check and revert .
    Thx
    Raja

Maybe you are looking for