Without PRT ,inspection lot shud not get released
Dear all ,
We use to attach PRT at inspection plan with DMS, we attache TDS (test data document) as PRT to to operation at inspection plan, client's requriemtn is that if there will be no TDS document attach to ispection lot , it should not get released .
pls reply .
Regards
Prerna
Dear Prema,
If you do not maintain the PRT for the inspection plan, do not put the release status for the inspection plan.
This will block inspection lot from processing as the status of the inspection lot will be in CRTD. once you assign the PRT release the inspection plan and do the resetting of the inspection lot through QAC3.
Try to explain this Std SAP functionality to client and revert if u need any help.
Regards,
Anil
Similar Messages
-
Inspection lot is not getting updated in quant
Hi Experts,
Need your help..
I have posted two material doc with same material following is the consequences :
1.we have immediate TO creation process , so now we have 2 TO's and 2 inspection lots.
2.When i am doing UD for first inspection lot PCN does get created.
3.Now i do TO confirmation for putaway for TR and then TO creation and confirmation for PCN and material is in bin.
4.When i am confirming the TO(TR i.e putaway TO) ,Inspection lot is not getting updated in the quant due to which i am not able to convert PCN to TO
Because in quant i found previous inspection lot which is different from having in PCN document.
So is there any solution which will update the inspection lot in quant once we confirm TO(putaway TO) ?
Any help on this will be highly appreciated.
Regards,
OMHi jugen,
Thanks for you help but now i going for below development :
Once UD is done system will take the inspection lot from from the quant and will overwrite to the
newly created PCN
So that during PCN to TO creation (LU04) inspection lot will remain same both in quant and PCN .
Do you have any idea on this i mean where in QA32 tcode i have to write this logic ?
Thank you..
Regards, -
Inspection Lot status not getting changed to LTCA from REL for SubCon scenario
Dear All,
For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
Has anybody faced such issue? Is this standard SAP?
Kindly throw light on the process, is correct process followed?
Regards,
Tanuj ParikhThanks.
Thru MBST Inspection Lot status changed to LTCA.
Why system is not cancelling thru MB01? -
PO is not getting released from SRM
Dear Experts,
I am configuring SRM-SUS Scenario on SRM 7.0. I have set up all SRM, XI and SUS cofiguration.
(SRM - SHDCLNT901, XI - XHDCLNT500, SUS- SHDCLNT951)
Shopping Cart and PO is creating fine but PO is not tranferring from SRM to SUS.
when i checked SXMB_MONI in SRM, there is no messeges showing there. It means PO is not getting released from SRM.
Kindly let me know is there any t-code for enable communication between SRM and SUS?
I have correctly configured XI and also transferred vendors from SRM to SUS through SupplierPortalTradingPartner_CreateOrChange_Out messege type but
PurchaseOrderRequest_Out for PO transfer is not getting triggered in sxmb_moni in SRM.
Thanks in advance.
Regards,
Pawan KeshwaniHi,
Thanks for your reply.
I have configured Application Control Workflow correctly ( I am using Workflow without approvals for PO (BUS2201))
And in Rz20, I am getting below messege ("SHD : MTE class BBP_PO , Client 901 : No MTEs currently available*) for PO in Rz20 given below path
(CCMS monitor sets -> SAP (CEN) EnterpriseBuyer Monitors -> Purchase Order)
I am configured ESOA Architecture in XI for SRM-SUS , and my root issue is " I am not able to generate XML messeges in SRM".
Not getting any messege in SXMB_MONI in SRM.
Regards,
Pawan Keshwani -
Change the status of inspection Lot from 'Created' to 'Released'.
Hi,
I am having the below scenario.
We have QM active in our plant. In the material master records we assign two inspection types '01' - Goods receipt insp. for purchase order & '08'- Stock transfer inspection. I didn't make any inspection plan (QP01).
We make a Purchase order ( say Qty=10)with excisable tax code. While doing GR (MIGO) for the purchase order, we capture and post Excise Invoice. Later, Usage Decision is done using QA11(7 qty to unrestricted stock type & 3 Qty to Blocked Stock). Later, i want to send the blocked stock to the vendor, I am transferrring the material from Blocked stock to QI stock type using MT349. But, system is showing the below warning message : 'Preparation for the quality inspection could not be comleted. -Message no. QA187'.
Please let me know how we can change the status of the inspection lot from 'Created' to 'Released' so that I can proceed further making the Return delivery to vendor using T.Code: MIGO.
Thanx in advance.
Regards,
PhaniHi
Check the Usage of the Task list.
Check the date of creation of task list must be prior to creation of lot.
Go to QA02
Inspection specification > Assign task list by click on Task/ specification
Go to Sample, do the SAmple calculation
Save
Check whether lot status is Rel
Regards
Sujit -
Billing Document not getting release to Accounting. (VF01 and VF04).
Dear All,
I am facing an Urgent Issue. The User is Generating Invoices using VF01 and VF04. The Invoices is getting generated but not getting released to Accounting. When the User goes in VF02 or in VFX3 and then releasing the Billing Document. The Account Detemination is correctly maintained and G/L is also getting determined.
Please could you advice what may the Issue. Your Urgent Help is appreciated.
Thanks.
Farhan.Dear Alan,
Yes I got the error message by pressing SHIFT + F4. Invoice Generated but no Accounting Document Getting Generated. A Balance has occured in Transaction Currency AED with the following details.
Technical data
Tech. data details
Client
Group Number
Sales Document Number 0004803850
Item Number of the SD Document 000000
Schedule Line Number 0050
Counter in Control Tables 00
Message Identification VF
System Message Number 050
Output Type W
Message Variable 01 0004803850
Message Variable 02
Message Variable 03
Message Variable 04
Detail
Diagnosis
A balance has occurred in transaction currency 'AED' with
the following details:
Exchange rate '00', amount ' 8,600.00-' and
currency key 'AED'.
The data in the transaction currency were transferred from
the calling application.
System response
Your data cannot be processed in FI.
Procedure
The error is probably in the calling application.
nical data
Tech. data details
Client
Group Number
Sales Document Number 0004803850
Item Number of the SD Document 000000
Schedule Line Number 0702
Counter in Control Tables 00
Message Identification F5
System Message Number 702
Output Type E
Message Variable 01 00
Message Variable 02 8,600.00-
Message Variable 03 AED
Message Variable 04
Group Type
Group Type
Same error I am getting when I am releasing the Billing Document to Accounting in VFX3.
But When I generate the Invoice using VF01 its getting released to Accounting.
Please advice why the Issue is only coming in VF04 Collective Invoice and in VFX3.
Your Urgent Help is appreciated.
Thanks,
Farhan. -
Cancellation Billing doc not getting released to accounting
The original Billing document has been cancelled. But the accounting
document of the cancellation document has not been generated.
We are getting the error " Automatic clearing of billing document
90318566 and canc. doc. 7651735 not poss.Message no. VF208". We are in
ECC 6.0.
This error has come for the first time. what needs to be done ?.
thanks
amitwe are not maintaning this doc type , S1 in OBA7.
we have a z table , which is :
VKORG WERKS FKART NUMKI KTGRD
MSI S1 66 10
MSI ZAMC 53 10
MSI ZBCM 53 10
MSI ZBCO 53 10
MSI ZBFB 53 10
MSI ZBPR 53 10
MSI DALS S1 66 10
MSI DALS ZBCO 53 10
MSI DALS ZBFB 53 10
It has been working since many years. Why this is not getting released, not able to get any clue .. -
File not getting Released!!
Hi,
I am facing an issue that the files which are contributed through manual checkin for a particular Account is not getting released. It got stuck with GenWWW status. Please find the error message in content info page.
A web-viewable file for Content item XXXX cannot be created. This item will need to be resubmitted for conversion. /Path/documents/clinical_archive/XXXX.pdf (File too large)
Eventhough I resubmit the file for a conversion it is getting failed with the same error.
We are using 10gR3 system with IBR. This issue is occuring for files which are checkedin for a particulat Account Name.
Please advise me how to resolve this issue.
ThanksAdd system*,requestaudit,task*,indexer* + Full verbose and update . Clear the server output .
Resubmit or check-in a new content item with same account and then once it fails , refresh server output and copy the entire logs to a text file and Attach it in this post . -
Shopping cart not getting released from sourcing cockpit
Hi,
Am trying to release a shopping cart from sourcing, but it's not getting released. Mentioned below are the methods I've tried and area'a which I verified for possible error. The major challenge is it's not throwing any error message. Your inputs & guidance are really helpful & appreciated.
- Moved the SC to workarea in sourcing cockpit and tried creating PO - Failed w/o any error.
- Verified in backend BBP_PD - No error message
- verified in rz20 - No error message.
- Attributes used in SC - Verfied all the major values such as Vendor, account assignment, basic data etc - No issues.
- Tried creating PO creation in backend w/o posting it - able to create PO with same data.
Thanks & Regards
AswiniHi
Check it up any errors in the web application monitor. you must get some error message..
update us what was the error message. did you assign the vendor before you create a vendor in the sourcing cockpit?
are sc again goes back to worklist?
regards
Muthu -
Deployment warning: SC null null not known yet, can not get release level
Hi everybody,
During the deployment I'm getting the following warning (application_00.log):
SC null null not known yet, can not get release level for vendor: 'se.sync', name: 'BPE', location: 'Deployment Manager', counter: '42', change number: 'null'
BPE is the application name and "se.sync" is the provider-name from application-j2ee-engine.xml.
This seems to indicate that some release level (version?) is not set... How can this be fixed?
Regards,
MiloszHi Milosz,
the warning is because the deploy controller checks for correct version numbers in the DC/SC that is deployed.
You can just ignore it, your application should run just fine.
Regards,
Christian -
Transport request not getting released by se10
Dear all,
I am trying to release transport request of development server via. transaction se10.Now my problem is that the child(DEVELOPMENT/CORRECTION) is getting released while the parent request is not getting released.
I checked everything and its showing 'test call of transport control program ended with return code 0208.' I even checked overview of system,overview of connection type,over view of transport protocol and they are fine.my only doubt is after going to se10 when I click transport proposals its showing "WORK FLOW NOT ACTIVE' .
Is my problem is because of this. Please help its very urgent as due to this I am not even able to transport any request on production server.
Helpful contribution will be duly rewarded.
Thanks & Regards,
VICKYAre you the owner and in the right client ?
use SWU3 to activate/configure WORKFLOW. -
Inspection lot status not matching R/3 and APO
Hi,
I am getting an error in CCR report saying that "The inspection lot is in "released" status in R/3 but not in APO". Here I am giving the steps that I have followed to get this error.Please let me know why this error is coming. Can some give idea about this.
1.Planned order converted and released (not an early lot create material).
2.Good receipt done, inspection lot created. Rescheduled in released process order prior to the original start date, in the planning board. Dates update in the order in APO successfully,
The inspection lot shows in APO as the product is not forward processed. (The stock will not appear until the usage decision is made.) There is a CCR report discrepancy, error code 405. The inspection lot is in "released" status in R/3 but not in APO.
Thanks in Advance,
Ramesh MHi Sajeev,
Sorry for late response.
Yes,I have made changes to process order dates after GR.
And I am populating these date changes to Insp. lot in user exit in R/3 and sending that Insp Lot to APO using the function module CIF_ADD_INSPLOT_OUT.
I can see the date changes in R/3 as well sa APO.But the release status in R/3 is intact and APO is removed.
This is causeing CCR error 405.
Let me know if you need further information.
Thanks,
Ramesh -
Inspection lot is not required at the time of part scrapping
Dear All
Question- We are developed (Z)Scrap process in ECC6
In scrap process,In backgroun rejected parts are moved From PR01 to
RJ01 (Mvt.type-131)
For some parts 04 Inspection type active, due to this parts are
directly not transfered in rjo1.For these parts Quality Inspection
lots are created.
We don't want Quality Inspection lots at the time of scrap.
Plz. give any suggesionDear Deepali,
You are not Scrapping a Material, You are just transferring it to Scrap Location RJ01.
and as 04 insp. Type is active, and 131 Mvt is used, system generates an inspection Lot.
i think, by using 03 Insp. type will be beneficial.
you can transfer Scrap Qty to RJ01 without inspection lot.
Regards,
Amol -
Inspection lot should not be created in stock transfer
Hai QM masters,
I have a following scenarios in my client side
My client have 5 plants
1)When a material is moved from one plant 1 to plant 2using stock transport order inspection lot is created since i have activated the 08 inspection type in the material master for partcularly for the movement type 349.But we have to restrict for the stock transport order from plant 1 and 2.Hw to restrict this?
2)Second scenario is When a material is tranfered from plant 2 to plant 4 using stock transport order inspection lot is created with number starting 800000XXX since i have activated the 08 inspection type in the material master.But when they do 349 movement inspection lot created with same number range how to restrict this?
Regards
Mohanraj.CHi Shyamal,
THank you for ur reply.
I have activated the 08 inspection type for a material (say A) in both plants 1,2 and 3 for the 349 movement type.
But when they do stock transport order from plant 1 and 2 inspection lot get created when they receive it in plant 2.
My requirement is this shouuld not be created.
For the second one when they do stock transport order for material A from plant 2 to plant 3,the inspection lot no. is 800000XXX which starts with 8 which is the same as the inspection lot created when they do 349 in plant 3.My requirement is they should have different number ranges.
These happens because in both the scenarios inspection lot origin is 08.
How to restrict these?
Regards
Mohanraj.C -
Inspection lot number not recorded in production order
Experts,
when I release a production order, the inspection lot is created correctly (type 04 - early lot creation) but the inspection lot number is not recorded in the production order. Why not?
RgdsDear,
Only 03 type will be recorded in header, not 04. It is normal
Maybe you are looking for
-
I have an older iPod touch that streams my iTunes with iTunes match. My iPhone 4s used to stream as well. Since updating my iPhone I can no longer stream to my phone. Is there a way to back date my operating system on my iPhone so I can stream again
-
How is this OS upgrade rolled-out?
Its been a while since the OS 10.1 upgrade should have started, and I'm pressing 'check for updates' at least once a day. I'm wondering how this works, why don't I get it on day one? I bought my phone via a webstore, so without a subscription. I put
-
List of all computers in network
dear I want a list of all computers in the same network on which my vi is running. i.e. if my vi is running on one computer i want the list of all computers which are connected on same network. please suggest me a good solution. falgandha
-
Moving Domain for iWeb from one computer to another
Have moved my website domain from Library in one computer running Leopard into Library in another computer running Lion. Deleted default Domain in new Library, but when I open iWeb app the empty default Domain opens with nothing in it and returns bac
-
How to choose some elements containing some Specific alphabets from an array?
for example, an array contains the following elements: AA1 AA2 AAB CAA ABC BBE BAA . I want to choose out the elements containing AA,that is AA1 AA2 AAB CAA BAA. Can you give me the relevant procedures? thank you!