WM material staging screen in CO02

Dear all,
When I goes to the CO02u2019s menu -> Goto -> WM Pick List, there shown two tabs (Only PickParts, & All Parts). There are 10 material items in the Only PickPart tab having staging indicator as "1"; while they are more than 30 material items in the All parts tab having staging indicator of either 1 or 3.
My system background: we're using WMPP delivery as a picking document.
I have several questions:
1 - Why the R/3 divided the material staging into two tab portions?
2 - Can I use the LP10 and LP12 to manually perform material staging instead of directly via CO02 menu route?
3 - Since our setup is using WMPP delivery, will LP10 and LP12 create delivery order as my understand is that LP10 and LP12 will create TR.
Thanks.
Tuff

1 - Why the R/3 divided the material staging into two tab portions?
The first part obviously is for materials staged via pick parts. The second is a comprehensive list of materials that have to be staged from the warehouse irrespective of the type of staging.
2 - Can I use the LP10 and LP12 to manually perform material staging instead of directly via CO02 menu route?
You can use LP10 for staging pick part relevant materials. Typically, WM staging is triggered automatically however, you can manually stage either via CO02 or LP10. Note that LP12 is used for release order parts and it'd require the relevant control cycles that have 'release order part' indicator.
3 - Since our setup is using WMPP delivery, will LP10 and LP12 create delivery order as my understand is that LP10 and LP12 will create TR.
Since your staging set up is set via deliveries, LP10 will trigger the same.

Similar Messages

  • Material staging indicator not populating in prod order WM pick list item

    Hello,
    I have an issue with material staging in an prod order
    1) PP-WM interface is activated
    2) Control cycle for material is created
    3) Production storage location is created for material
    4) storage type is 100 for production
    5) There is one discontinued material and also the follow up material
    6) stock of discontinued material is zero and requirement are passed to follow up material
    When we confirm the order the stagging indicator for both follow up material as well as discontinued material automatically populates zero (Non relevence to pick list items) where as it should be one (1 - for pick list items).
    One more issue user has manually inserted discontinued material as well as follow up material in production order change mode.
    In the BOM of a main material both discontinued as well as follow up material is there with some quantity as a component.
    For the same work center, control cycle , production storage location the indicator is populating.
    These two material (discontinued as well as follow up) are appearing twice in the WM pick list screen where first two line items are OK and populating indicator "1". But in line item last and second last indicator is not there.
    My question is why the stagging indicator is not automatically populating in the production order WM pick list screen in front of components.

    Unfortunately, WM material staging via production orders is not possible
    from the pull list.  Please see the long text of message RMPU 311
    (WM material staging for production order reservation not possible):
    "You cannot carry out a WM material provision for pick parts from
    production order reservations in the pull list". The reasons for this
    are cleary explained in the SAP on-line documentation via the
    following path :
      Logistics -> Logistics Execution -> Warehouse Management Guide ->
      Goods Issue -> Goods Issue for Production Supply ->
      Material Staging for Repetitive Manufacturing
    See the following under the Selection heading :
    The choice of the selection type influences which types of WM material
    staging are supported in the pull list. However, the pick parts can be
    staged via RS headers/planned orders but not with the current BOM
    explosion. The release order parts, on the other hand, can also be
    staged if the current BOM is used for calculating the dependent
    requirements.
    WM material staging via production orders is not possible from the pull
    list.
    I think you may try in CO02 or COR2 for production order or process order.

  • WM- Material staging between two warehouses

    Hi all.
    My question is: is it possible to make material staging when warehouse in production order is different from raw material warehouse and raw material warehouse is managed by WM in two steps? I mean, confirming when it has been picked from origin warehouse and when it has arrved destination warehouse.
    We need to transfer components from 0001-WM (raw material) warehouse into 0007 (production) and it is necessary to do it in two steps because most of the materials wait in a intermediate area. I thought in creating deliveries to use two-step picking but I don´t want to use purchase order (I am not sure if this flow is possible without pruchase order).
    Is there any other choices to handle this process?
    Many thanks in advance and best regards.

    1 - Why the R/3 divided the material staging into two tab portions?
    The first part obviously is for materials staged via pick parts. The second is a comprehensive list of materials that have to be staged from the warehouse irrespective of the type of staging.
    2 - Can I use the LP10 and LP12 to manually perform material staging instead of directly via CO02 menu route?
    You can use LP10 for staging pick part relevant materials. Typically, WM staging is triggered automatically however, you can manually stage either via CO02 or LP10. Note that LP12 is used for release order parts and it'd require the relevant control cycles that have 'release order part' indicator.
    3 - Since our setup is using WMPP delivery, will LP10 and LP12 create delivery order as my understand is that LP10 and LP12 will create TR.
    Since your staging set up is set via deliveries, LP10 will trigger the same.

  • Material staging during Process Order..TR issue

    Hello,
    For creating a TO I am going to transaction LB13 for a Process Order but I am not able to see the TR.
    When I went in the Process Order and manually clicked WM staging I found that there is an error as mentioned below. The problem is it is an issue for only some Process Order as most of the other Process Orders are getting the WM staging(TR created automatically) and I can see in the LB13.
    Can you tell me based on the error what the issue would be.
    Is it something to do with the config in Production Scheduler Profile for TR creation?
    No picking request was generated for operation 0020 due to incompleteness
    Message no. LP133
    Diagnosis
    The pick requirement created for the pick parts ( material staging indicator "1") is incomplete. Errors occurred while the system was staging goods for WM. Therefore, the system could not convert all the relevant components into pick requirements. For this reason, no pick requests were created since material staging of only part of the components would cause problems in production.
    Let me know ASAP
    Thanks
    SAP Fans...

    Hi,
    For the operation 0020 check what is the resource used. Now check what is the supply area you have maintained for that resource or in material master.
    use transaction LPK3 and check out the control cycle set-up. the staging indicator should be 1.
    Also check the component screen of the process order and make sure the storage location is the same that is used in production supply area.
    Also make sure the material has been correctly assigned to that operation for which you are getting issue.
    Once you do these changes....you might have to create a new order to test this.
    Try and revert back.
    Swapnil

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Rounding Profile for Material Staging

    To All
    Is it possible to use a rounding profile for materials used in material staging transaction LP12?
    Currently it totals production order demands. e.g.
    Prod Order 1000000
    Material A
    Requirement 0.6kg
    Prod Order 1000001
    Material A
    Requirement 0.7kg
    So quantity to be staged to the PSA is shown as 1.3kg.
    I know I can manually overide the quantity and enter 2 kg and process. However, how can I get LP12 to 'round up' the total quantity so that the screen diplays 2 kg to process instead of manually entering it?
    Do I use the Rounding Profile in MRP1?

    Rounding Profile is used to define the quantity of the planned orders during MRP run. It's not related to staging.
    I wonder if you can use some different strategy in the control cycle : "2" crate parts and this can solve your issue...
    But if you can work wtih cummulative quantities from released order, there is no solution in the standard.
    Another option to explore is the HU (handling units) .

  • Material Staging time in Schedule Lines (Shipping Tab) of Sales order

    Hi Gurus,
    I would like to know how the time is arrived at, in the Schedule line of a sales order.
    I have maintained the Working times in the Factory Calendar. via Route Dependent with Pick Pack time as 3 Hrs 30 Min.
    and working time in Shipping point is from 08:00 to 20:00 hours.
    When i create a sales order now, i could see that material staging time is determined.
    But now i would like to know, what time should be determined here.
    Thanks in Advance,
    Regards,
    Vasim.

    Hi,'
    The following link
    http://help.sap.com/saphelp_scm70/helpdata/EN/3a/92e217b3f54a5eae7a4ac8a99e5e87/frameset.htm
    details on material staging in GATP.
    Regards,
    Mrinal

  • How to prevent error message for material description in MDG material detail screen, when user click on check action

    Dear Experts,
    I have a requirement for making material description as non mandetory in change request view of mdg material screen.
    I have done that using field usage in get data method of feeder classes, but still message is displaying.
    This message 'Material description is mandatory is displaying with check action only, but not with save or submit after i anhance field property as not mandetory.
    How to prevent error message for material description in MDG material detail screen, when user click on check action.
    Thanks
    Sukumar

    Hello Sukumar
    In IMG activity "Configure Properties of Change Request Step", you can completely deactivate the reuse area checks (but will then loose all other checks of the backend business logic as well).
    You can also set the error severity of the checks from Error to Warning (per CR type, not per check).
    Or you provide a default value for the material description, e.g. by implementing the BAdI USMD_RULE_SERVICE.
    Regards, Ingo Bruß

  • Material master screens requirement

    Hi guru's,
    I've a unique business scenario and would like to get your inputs on this.
    Here is my business scenario:-
    Our material master screens/tables are hugely customized. We have lots of custom fields on mara, marc, mvke and mbew. We have been using custom screen sequence (yz) for material master for a long time and not any of the SAP provided standard screen sequences. Lot of the these custom fields are put in yz screen sequence screens. We have lot of materials on production with these custom fields populated. We got a business requirement to activate material ledger now and requirement is to put back 21 standard screen sequence. But 21 screen sequence doesn't have any of the custom fields.
    I know one way is to setup new screen sequence(copying 21) and put these custom fields but I would like to get your expert advise before moving forward.
    What are other ways to achieve this ? Any easy ways ?
    Can we just modify accounting view on yz ?
    What other impacts are we going to have for material ledger activation from MM point of view and during go-live ?
    Sorry I've not worked on Material ledger activated environment before.
    hope to hear some inputs.
    Thank you in advance.

    can anybody post their input please ?

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • In Material Master Screen,functionally what is Picking Storage type in the

    In Material Master Screen,functionally what is Picking Storage type in the Warehouse Management Screen.Pls explain its functionality

    This indicator points to the customizing of picking strategies. This way SAP knows which picking strategy to take for a particular material, as the picking strategy may differ from material to material

  • In Material Master Screen,functionally what is BAckward Consumption period

    In Material Master Screen,functionally what is BAckward Consumption period & Forward Consumption period in the MRP Screen.Pls explain its functionality

    Hi,
    The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
    The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
    Prerequisites
    ·   You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
    ·    In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
    ·    If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
    Regards,
    Vijay

  • In Material Master Screen,functionally what is Mixed MRP in the MRP Screen.

    In Material Master Screen,functionally what is Mixed MRP in the MRP Screen.Pls explain its functionality

    THis indicator will define whether the material is available for the following....
    Subassembly planning with final assembly
    Gross requirements planning
    Subassembly planning without final assembly

  • In Material Master Screen,functionally what is Requirement Group in the MRP

    In Material Master Screen,functionally what is Requirement Group in the MRP Screen.Pls explain its functionality

    Hi,
    The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
    The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
    Prerequisites
    ·   You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
    ·    In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
    ·    If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
    Regards,
    Vijay

  • In Material Master Screen,functionally what is Safety time and safety time

    In Material Master Screen,functionally what is Safety time and safety time indicator in the MRP Screen.Pls explain its functionality

    Hi,
    The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
    The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
    Prerequisites
    ·   You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
    ·    In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
    ·    If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
    Regards,
    Vijay

Maybe you are looking for

  • APD Process for Cube -  ODS data transfer.

    hi, Two data sources (cube and ODS) are feeding another ODS. I want to delete the data in Data target (ODS)belongs to that particular infosource for every data load if it comes from the same infosource without using process chain or events. (I want t

  • Error when creating Recordset using CF and Postgres

    I'm a complete newbie when it comes to databases and development so go easy on me. I have created a simple database with a schema (ABC) and 2 tables (_Address, _Member) in Postgres 9.0.  I have installed CF 9 in development and am creating a new appl

  • Pinning the sql query in cache

    Hi All, I want to pin the sql query is cache because the physical reads are very high. Can anyone tell me steps to pin the sql query in the cache. Current version 10.2.1.0 OS : Windows. Reads CPU Elapsed Physical Reads Executions per Exec %Total Time

  • Desktopman​ager doesnot recognize my password

    7100v: i havepassword enabled my 7100v, on the handheld. however, when i run the desktop manager it asks for the password and it doesnot recognize the password assigned to the handheld. what to do? Solved! Go to Solution.

  • Creating a reports folder that's only visible to the Admin role

    Hi all, I want to create a new Shared Custom Analyses folder to contain Admin reports. I need to make this folder only visible to users with the Administator role. But you can't seem to add the Admin role when setting up User Visibility to Shared Rep