WM-PP interface, Release order Parts

I have some components maintained with a control cycle staging indicator "3" i.e release order parts.
I have tried two different ways of staging these components from warehouse and into the Production supply area. Option 1 is using MF60 (pull list) and Option 2 is using LP12.
My question is
1. What is the difference b/w MF60 and LP12? If they are the same, which one is easier to use for a shop-floor supervisor?
2. Under MF60, i am able to flag an "Immediate TO creation"? Can this be configured to print out a TO immediately on saving the transaction?
3. Can an immediate TO creation be activated for LP12?
Thank you

Hi,
MF60 is used to create TO for material transfer between Storage locations.
LP12 is used for storage locations which are activated for Warehouse Management activate wherein Transfer Requiremrnt thereby Transfer Order for WMgt is created.
In MF60, Stock Transfer Order Document is created whereas in WMgt, Transfer order is created for materials to be put in Storage Locations and not for interstorage location transfer.
reward points if useful.

Similar Messages

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • Material staging only for released prod order parts

    Hi Experts,
    Could any of You pls help me to set material staging only for components of released production orders?
    There is a PP-WM integrated system, where we have mat.staging indicator 3 in control cycle, and run MF60 for WMreleased order parts. Here all CRTD and REL prod order components are listed. But I would like to change it: only REL prod order parts should be seen and replenished.
    Could You pls let me know, how to do that?
    Answers will be apprecited

    Eshwer,
    If a material has its own production order then it should be closed ,Closed in the sense you have to do theVariance Calculation,Order Settlement & finally Close the order
    So irrespective of whether the material is of FERT or HALB type,each production order need to be closed
    Closing the FERT order will not suffice ,It will not take care of the HALB order
    Order Settlement
    When a production order is settled, the actual costs incurred for the order are settled to one or more receiver cost-objects (for example, to the account for the material produced or to a sales order). Offsetting entries are generated automatically to credit the production order:
    If the costs for the production order are settled to a material account, the order is credited each time material is delivered to stock. The material stock account is debited accordingly.
    If the costs for the production order are settled to another receiver (for example to a sales order), the order is credited automatically at the time of settlement. The cost-objects are debited accordingly.
    Closing a Production Order
    The Closed (CLSD) status has been introduced in the production order. It has the following characteristics:
    No more costs can be posted to the order, that is, confirmations and goods movements are no longer permitted for the orderThe order can no longer be changed. Exceptions to this are revoking the CLSD status and setting the deletion flag.
    All actions relating to the status technically completed (TECO) are executed.
    In a collective order, the CLSD status is also set for subordinate orders.
    If the system comes across an order in the collective order that cannot be closed, the orders that come between this order and the leading order are also not closed. Other subtrees are closed if they only contain orders that can be closed.
    So for the above reasons all the individual orders need to be closed
    Hope the above is clear
    Reward points if useful
    Regards,
    SVP

  • Planning release order for a Stock Transfer Requisition (PRqRel)

    Hello all,
    Is there a possibility to stop MRP/MPS from planning a 'Release order for a Stock Transfer Requisition (PRqRel)' ? I would want them planned after they are released (OrdDS).
    Please do help out.
    Regards,
    Rahul

    Hello again...
    The sample code provided on method CHANGE_MDPSX_MDUA of this BAdI should do the trick:
    method if_ex_md_change_mrp_data~change_mdpsx_mdua .
    *  Makes stock transport purchase requisitions not availability-relevant
    *--> substitutes part of the modification of note 190298.
    * For the other parts the same has to be made in methods:
    * CHANGE_MDPSX_MDUP for stock transport planned orders
    * CHANGE_MDPSX_MDUB for stock transport orders.
    *--> delete flag for availability
       clear ch_mdps-vrfkz.
    *--> set changing flag
       ch_changed = 'X'.
    endmethod. "IF_EX_MD_CHANGE_MRP_DATA~CHANGE_MDPSX_MDUA
    BR
    Caetano

  • Authorized Partners for Release Orders with customer hierarchy

    Hello everyone,
          I have created a value contract with order type WK1, in the order type WK1 configuration, choose rule B  for check partner auth. field, namely we want to use
    customer hierarchy to detemine the sold-to-party for the follow-up release order. Also I have created the customer hierarchy with hierarchy type A. There are
    four levels under this hierarchy, it contains four customer nodes and four customers. Every customer is belong to a customer node. The partner determination
    for the customer hierarchy have alredy done, I can see the customer hierarchy "1D" at the partner tab of header in the contract, but when I release the sales
    order against  the contract, input a low-level customer number, still got the message "partner X is not authorized to release from contracts.".
         I want to know if I missed some settings in order type configuration or the copy control from WK1 to OR. If this scenario need integrate with  CRM system?  I
    have found some related information, just list below:
        Partners in the hierarchy (Rule B)
    If the partner who wants to release against the contract is the sold-to party of the contract or at a lower level in customer hierarchy to the sold-to party in the contract, the system accepts the partner as the sold-to party for the release order.
    If rule B is defined for the contract type, you can search for authorized partners for a release order using the contract number. Equally, you can search for the relevant contract for a release order using the partner number. In this case, the partner authorization rule is irrelevant.
    Prerequisites
    If you wish to use group hierarchies other than pricing hierarchies to determine authorized partners, you must have created a hierarchy category and a hierarchy:
    To create the hierarchy category, go to Customizing for CRM under Master Data --> Business Partner-->  Business Partner Group Hierarchy. 
    To create the group hierarchy, go to the SAP Easy Access Menu and choose Master Data --> Business Partners --> Maintain Group Hierarchy.
    Note that you can only create group hierarchies in the SAP GUI and not in the People-Centric user interface.
    You must have activated the necessary settings for the sales contract and the release order in the IMG for CRM. For more information, see Transactions ---> Settings for Contracts -->Define Settings for Authorized Partners.
      Thanks!

    Hi,
    In transcation VTAA at item level have your own cory requirment code which will calcullate net value of the doc, hope this works out
    regards
    sriky

  • PP-WM Interface - Production Order Number to appear in Transfer Order

    Hi
    I ran Material Staging in Production Order for components upon Release. In MF60, listed out the Rel. Order Parts and created Transfer Requirements for these parts. This Transfer Requirements were converted to Transfer Order.
    In the Transfer Order Header, in the Reference Data Tab, the Requirement Number is appearing as P and 1 by default.
    "P" stands for Requirement type 'Production Supply'.
    Actually I wanted it to come as  "F" (Order) and the Production Order number.
    What settings should I do to get this result.
    (When I create a Transfer Requirement Manually, I can input this data. This appears correctly in TO)
    Regards
    Krishnaraj

    answered

  • Create PO(release order) from contract

    Hi,
       I have created a contract using me31k with one item,then I creted a relese order PO with same item.when I enter another item in my relase order PO which is not there in the my contract,here system allow me  to add item  and save without any problem.Why system does not stop this? If it is standard behaviour,then how to prevent ?.
    For this issue,can some body throw some light on this issue,please?
    With Regards,
    Jaheer

    Hi,
       The release order means the PO item created with reference to the contract item. There can be multiple items in the PO in which some items can be with reference to contract - these items eventually becomes the release orders and other items can be without reference to contract.
       In short, you can add multiple items in PO where some items can be with reference to contract item and some are not. This is standard behavior.
    Regards,
    AKPT

  • Absolute condition value in contract and release order

    Hi,
    We are creating quantity contract. When a absolute condition (value) is entered this value is considered for release qty in the contract for calculating the unit price.But when a release order is created for this contract, the same absolute value is for the PO quantity due to which there is a difference in unit price between contract and PO.
    Please advice.
    Regards,
    Pratap

    Hi,
    Verify you steps, find link below:
    http://help.sap.com/saphelp_470/helpdata/en/75/ee0f4d55c811d189900000e8322d00/content.htm
    Reetesh

  • Contract value exceeding in Release order

    Hi  All,
    The target value of the value contract is 200,000 INR. After reaching to the 190,000 INR ( Making different Release order ) the user has made one more purchase order for this value contract with the value 50,000. The system hasnt given any warning /error message that the contract value exceeding...
    In general system should have to give the error message that the contract value is exceeding???
    The message 06-042 & 06-155 set as error message.
    also if your trying to make release order of more than 200,000 INR then it is giving error message 06-42 the value is exceeding
    Please suggest
    Thanks & Regards
    Rajesh

    Please check your release order qty set in contract item / header details

  • Release orders for value contract

    Hi Folks,
    I have question on value contract.
    Customer contract is fullfilled by issuing orders against the contract. When a release order is created for the contract, the system automatically updates the released values in the contract. The release order value is calculated from the total of the open order and delivery values, plus the value that has already been billed to the value contract. System checks this value with "Outline agreement target value" in value contract and issues warning or error message depends on configuration settings in value contract item catagory.
    We have business scenario where system has to check net value of value contract rather than checking "Outline agrrement target value" in value contract. Because we offer some discounts to customer in value contract thus net value of the contract differs from agreement value. So that system will issue error message when release order value exceeds net value of value contract.
    Is there any customizing settings available to meet the requirement?
    Awaiting for your inputs.
    Regards,
    Prabhaharan

    Hi,
    In transcation VTAA at item level have your own cory requirment code which will calcullate net value of the doc, hope this works out
    regards
    sriky

  • Differences between Contract Cumulative Value an Release Orderes Value

    Hi All
    I have found differences in:  EKPO (PO Items)  and  EKAB (Release Orders) tables vs. Cumulative Target Contract value.
    The total amount in EKPO net values is grather than Cumulative Target Value in Contract, in EKAB net values as well.
    Do you know the considerations that the system are taking?....because the Cumulative value must not be exceeded
    Thanks for your tiime.
    Regards
    Mauricio

    I have found the issue, the delivery complete indicator restore the Cumulative Amount in Value Contracts (Quantity = 0). After that, a new PO could be created with Agreement link limited for the amount restored.
    So the all PO generated related with the contract could exceed the Cumulative Amount established in contract
    Thatu2019s a problem because All PO could be received even though the delivery complete was activated
    This behavior is only for Value Contracts
    Saludos
    Mauricio

  • Open Order quantity in Release order of Contracts

    Hi all,
    We are developing new PO format for Release Order ( Contract) where in we want to print the Open order quantity & Open order value along with Contract number.
    What is the best logic for Open order quantity, where in it has consider all the previous release order quantities minus the target quantity in contract.
    Open order quantity = target quantity in contract - all previously release order quantities.
    Thanks in advance.
    MM
    MM

    hai sajid,
    As u said,
    open order quantity = total quantity in contract - total quantity released against that contract ( Through release orders )
    it is right,
    with regards
    srinivas

  • Release Orders Blocked for Delivery

    Hello Experts!!
    We have V.23, release orders blocked for billing.. is there a similar transaction where we can release orders blocked for delivery??
    Help is greatly appreciated.

    Hello Carla,
    Yes in the T-code "V.23", you can release the billing block for SALES ORDER in one single click. While releasing the delivery block for the Sales order the following T-code are useful:
    1. VDBLOCK
    2. V.14
    3. VA14L
    When you are using these T-codes, you get the list of all the Sales order which are blocked for Delivery. Then you can select the document for which you want to remove the delivery block and do the required updation.
    Regards,
    SARTHAK

  • Creation of release order possible during release strategy

    Hi folks,
    we have currently contract and purchase order release strategy parallel in place. Both are working fine.
    We are using quantity and value contracts.
    Quantity contracts are changed frequentely by the business; with every change (adding new items, changing prices of existing items), the release strategy is pulled again.
    Our release indicator is set to 6 and has value change 0,00%.
    The business requirement is now to release a contract with status X (e.g. 10 items and a total item value of 10.000EUR). After release, call offs can be created for all the released line items.
    If a new line item 11 is added, it should still be possible to create call offs for item 1-10 but not for item 11.
    Item 11 should undergo a new release.
    Has anyone ever come across such requirement?
    I have tried version management. However, version management will only force a new release whenever the version is completed.
    Even then, the complete contract is subject to release strategy and it is not possible to create call offs.
    We dont want to set error message ME347 "Release orders against contract xxxx not possible (contract not released)" to warning, as this will allow to always create call offs regardless of the contract  being released or not.
    Any ideas greately appreciated.
    Thanks!!

    I suppose program checks in EKKO whether contract is released,, irrespective of version exist it or not. IF you are able to direct it to EREV, then may be version 0  or ( current  - 1 ) released can be returned.
    Isn't it a special case that your version 0 data is intact in version 1; Even if someone change lines 1 to 10 , with or without adding line 11, it still triggers version 1. How do you ensure that lines up to 10 are not changed. you may have to look in CDPOS CDHDR with object Revision..
    This is  just an idea which you may discuss with your developer to see whether a copy of the program can be modified..

  • Contract and release order for service: connection and field selection

    Hi Experts,
    I have some questions about contract and release order (PO against contarct) for services.
    A -I want ot know if there is any standar way to oblige the creation of a release order to a contract. I mean i had some users  that create a release order w/o reference to the contract and it works fine anyway. The document is a copy of the NB. I cant find the way to reference the 2 purchase document clearly.
    B - Using a release order, when copying the item from contract catalogue by clicking the service selection icon,  description and net price are correctly copied:  the description is not modifiable  but the net price can be change by the user. Can some body explain me where to modify this setting? where is the field selection and where in SPRO step by step please,
    thanks in advance
    Livio

    ... Nobody is so nice to suggest me any solution?  
    For the point A probably the only way is user-exit.... but for B i don't have any idea, please let me know
    thanks
    Livio

Maybe you are looking for

  • Why is there no option to resend a text message?

    I know I can hold down the message and press forward but why not have a resend option?

  • Auto cad agent record

    Hi All, any idea where I can enable auto record for agents as soon as a call is presented to them? Many Thanks

  • Assign audio to a button

    Hi there I am building a complex dvd with loads of different menus. On one of the menu, I am trying to assign a specific audio to a button without ever leaving the menu page so that I keep access to the other button at all time. Each button needs to

  • Poor quality, jaggy bitmapped titles - how to acheive good quality results

    Using imovie HD and idvd you can achieve half decent results by upping the quality of your exported project. On completion of your imovie project... 1) select share (to quicktime) (top menu...forgive me if I get the names wrong..typing from memory) 2

  • Solaris SPARC ... CC compiler

    Hi According to many newsgroup members; Sun Studio11 offers CC compiler as default, and get installed when SS1 installation take place. I still could not find where and in which directory structure cc compiler get installed. I scavered all the server