WM- Production order GRN issue

Hi WM Gurus
                i done goods isuue (261 movement type) TR, TO .After production completed i want to GRN..
               i want to move the goods from storage type from 100 storage type to 916 storage type.
               process is GRN from from production  to FG storage location
             with regards
              dinesh

hi friend
thanks for your support
                                i have a confusion when do the GRN for purchase order iam using 101 movement type ..in the production    
                                I  do 261 movement type and do 101 movement using MB31. But 101 same movement type doing for GRN
                               Why is neccesary 801 movement type for production GRN. When i use 801 movementype
                    with regards
                     dinesh
Edited by: code acess on Jun 10, 2011 8:20 AM

Similar Messages

  • Production Order Cancelled Issue

    Hello PP Gurus,
    I have a issue related to production order
    I creae a Sales order with order qty 10
    Then I created 2 Production Order with Transaction CO08 each with 5 qty.
    Then I go through the transaction MDBT and Then ME57. ME57 shows that I need to purchase 10 qty.
    Then when I do MD04 it shows that the 2 production orders and the purchase requisition fo 10
    Then again I do MDBT
    It shows that the 2 production order were cancelled and a PR is opened in its place
    Kindly tell me the reason why the order are cancelled and the PR is still there.
    Regards
    Nilesh

    First I would like to know, whether the material is In housed production or external procurement?
    I feel as per the master data of the material, the material is externally procured. Then why you want the production order for the material.
    It shows that the 2 production order were cancelled and a PR is opened in its place
    I feel as per the  schedule line category in sale order/ material master, the material is relevant to purchase not a production, that's the reason the order is cancelled.

  • Single batch for a component in production order goods issue

    Hi,
    We have a requirement where during good issue to a production order
    through CO11 & MIGO, more than one batch of a particular component
    should not be issued i.e. only one batch for a component should be used
    for goods issue for a production order..If the stock for a particular
    batch not full it should not allow the system to issue that batch. We
    want an error message or any other restriction where system will not
    allow more than one batch for a particular componet to a production
    order.
    Please advise how to design such scenario.
    Regards,
    Chandan

    Hi Chandan,
    Try with below steps,
    - Create Batch Search procedure -
    - Create Batch Determination Strategy for that Material (Create it for both COB1 and MBC1)
    - Set NO. of Batch Split as 1 and don't tick Check box for Change Allowed
    - Then go to Order type Dependent Paramter OPL8 - Assign your Batch Search Procedure and also tick Check Batch (This will check the auto check if Batch Determination is done manually and if you have violet the Batch Determination it will throw an error Massage)
    Regards,
    Dhaval

  • Production order costing issue in MTO with variant configuration

    We have an urgent issue to be resolved in production order costing in MTO scenario.
    We have two level configuration with configuration passed from parent to children. The parent has many configurable materials as child(semi finished BOM items) and BOM items of these child has again different raw materials(3 level BOM with last  level being all raw materials) . The production order for parent  created with reference to sales order.
    While costing production order of parent, total planned  price is displayed as zero as we have maintained price control std price for all configurable materials(parent & child) with zero price being configurable materials.Configurations are correct in production order material and BOM components(configurable materials). BOM item selections, Item quanties are also correct.
    Sales order costing is working fine and rolled-up correctly as per costing settings. We have looked at costing configuration for production order and did not find anything unusual.
    Kindly suggest possible reasons for not showing costing result in production order as per configuration copied from sales order  or any possible configuration or master data likely missing ?
    Thanks in advance.
    Kind Regards
    Ganeshan Kalembeth

    Dear  GANESHAN KALEMB,
                           Kindly open production order in change mode and reschedule order, cost order, check material availability and check capacity availability.
    after doing this in main menu goto  > log > overview > see error list if there is any, let me know, your problem can be solved.
    Thanks
    Muhammad Ashfaq

  • Production Order settlement issue

    Hi ,
    We are planning to do re-work . We want to capture the labor activties for the order. Is it possible to settle the labor activties only for the order settlement ?
    Thanks
    Nic

    Hi Nick,
    From a business stand point you have two options to follow:
    1. settle the costs to the original Production order
    2. Settle the costs to seperate cost center
    for both cases, you need to have seperate Production Order type. Because the settlement paratment are different from regular production order type.
    So please use seperate Production order type with settlement profile being settlement to Cost Center.
    Hope this will solve your issue
    Best Regards
    Surya

  • Production order Printing issue

    Hello,
    when we are trying to print the production order and pick list through co01 or co04 ,it is printing two times, where we can control the settings, we want only one printing , Thanks for the help
    Nick

    Hi Nick,
    Check in the OPK8 in the 'List control for transactions' in that whether you have given in column number of printout - 2. There are two fields "Number of printouts"  check both and Remove it put it one.
    regards
    ramakant
    Edited by: ramakant shekapure on May 18, 2010 12:25 PM
    Edited by: ramakant shekapure on May 18, 2010 12:54 PM

  • Production order creation issue

    Hi all
    I've got a unique problem
    BOM,Routing and Production version is maintained for a material
    But when i try to create a production order or convert a planned order to a production order for this material
    It takes me to the information message screen
    which has some 438 messages against information messages and no error messages
    Multiple routing have got selected(Task list 50659842/01 selected according to sel. criteria 01) -around 18 messages like this
    No config changes were done recently
    Please give your valuable inputs
    Thanks
    SVP

    Yes the culprit was one BOM component which had its routing marked for deletion
    Because of which system was not allowing to generate the production order for the header material
    Thanks for your inputs
    One of the message was this "Task list group XXXXXXX group counter 01 is flagged for deletion
    As there were lot of messages i failed to look at this intially
    SVP
    Edited by: SVP on Sep 8, 2009 4:37 PM

  • Production order close issue

    Hello all,
    When i try to close a production order i am getting following error message and not allowing to close
    the error message as follows:
    WiP in Financial Accounting is still to be cleared/settled
    Message no. KD276
    Diagnosis
    Work in process was settled for your object ORD in Financial Accounting but has not yet been cleared.
    You can only close your object when no work in process exists for this object in Financial Accounting.
    Procedure
    If results analysis has not taken place:
    Carry out results analysis to determine or clear the work in process on the object.
    Carry out settlement (again, if applicable) to post the clearing of the work in process in Financial Accounting.
    Close the order.
    If settlement has not taken place:
    Carry out the settlement, to post the clearing of the work in process in Financial Accounting.
    Close the order.
    but the we have already executed WIP , Variance and settlement for this order and there is no balance showing for this order.
    Can anyone let me know how to proceed on this.
    Thanks
    babu.

    Dear Babu Bhai
    Hope you have checked the order cost analysis and KKBC_ORD for this order and you observed that there is no balance. However I have seen in some cases when there was need of GI reversal, the user, instead of reversing the material document made a fresh MIGO using mov type 262 against the production order and this situation came. The order was showing zero balance but the system was giving the same message. I did reversal of the document posted by user and then reversed the original GI document and got the success. you can check your order from this angle also.
    The first line of 'diagnosis' is saying that you have created and settled the WIP against this order, may be in earlier period but in this period you are calculating only variance on this order hence the system is not able to do the WIP equal to ZERO. So as suggested by Ajay sir do WIP calculation on this order.
    How ever I am just adding to Ajay Sir view that you also have to do variance calculation on this order and after that do settlement. Then try to close the order, I hope it will go through.
    Regards
    Rajneesh Saxena

  • Production order confirmation issue

    Hello,
    When we are trying to reverse the production order 262 happened , 102 didn't occurred. No COGI update
    Afterwards we didn't confirm the order as well as we cannot reverse the existing order also. Some data inconsistency happened. 
    Can anyone recommend any sort of trouble shooting or any OSS notes ?
    Thanks,
    Nic

    Dear Nick ,
    Please chek the set up in OMJJ-Cluster Maintaince-Movement Typ 102  is allowed  for production order reversal 262 movement type  in Allowed Trancstion /Update Control .
    Analysis and revert back .Hope this will help you even after appling the OSS Notes : 175842.
    Regards
    JH

  • Production Order confirmation Issues-VC Environment:

    I have the following scenario,
    My ROH is a Sheet Board. My FERT (configurable material) is a BOX.
    The manufacturing process is such that the ROH fed is converted into FERT at the end of last operation. There is no SEMIFINISHED part in between.
    All my operation details are wrt the ROH.
    Sales order would be for FERT and hence the Production Order is also for FERT.
    Currently the confirmation is taking place wrt the quantity of FERT, but it should take place wrt the ROH material quantity being fed at each operation.
    How should I confirm the Production Order at each Operation wrt the ROH Quantity?
    Thanks & Regards,
    Jags

    Dear,
             If you want operation confirmaion go to co11n t.code then enter the operation desired, then confirm the fert, Confirmation is for finished product. In any manufacturing process the raw material is consumed giving fert, hence the consumption field is present in goods movement, which is present in the top of the screen. first enter fert confirmation, then enter the tab goods movement,  automatically your RoH is visible with the quantity given in the Bom. Suppose if you want to change the quantity as desired You can change the quantity and save. The saved quantity is saved in the consumption Account. If you want you can directly get the consumption report. There are standard reports which give the report of consumption. This is the part of controlling.

  • Product order form issue

    I'm putting together an online order form for shirts & sweatshirts.  As the layout has it now, I do not have the room to put various size options (11 total) with the option to enter a quantity for each size available in a text box.  Is there a way to do this or can it be imported from excel?

    It is the Form Action Comment forms that only offer black text, not Wufoo's form.
    Happy Holidays

  • Automatic goods issue of components upon creation of Production Order

    Hello gurus.
    The business would like to have the components in a Production Order automatically issued (with Movement Type 261) upon the creation of a Production Order.
    I was investigating this possibility under the Production Scheduling Profile option in IMG, but there is no automatic action for this.
    Do you know of another way this could be achieved? I'd like to do this preferably without having to implement User Exits or Batch Jobs.

    Fernando,
    Automatic goods issue is not possible.
    But you can certainly think of backflushing the components while confirming the order with CO15 or CO11N.
    Make the required settings in material master, work center or routing. It will get copied to the order.
    The same can be maintained in the order too.
    There is one more option available in 'Define confirmation parameters' T code OPK4.
    Execute the above T code.
    In 'Generally valid settings', mark 'All components' under 'Goods moveemnt'.
    Also in 'General individual entry'  under 'Error handlings/ logs' mark ''Goods movement'  & if required mark 'Termination for incorrect goods movement' so that if any problem arises with the GI/ GR, the termination would be terminated.
    Hope this helps you.
    SmanS

  • Issue more than Planned in Production Order

    Hi All,
    I have a problem with 2007B SP00 PL11 for Issue for Production.
    In 2005B, I can issue the BOM Components more than planned. But in 2007B version, I am unable to issue more than planned. When I right-click at Production Order to Issue Component or at Issue for Production and copy from Production order. no items are displayed.
    I have already issued in full at the 1st issue. Then subsequently, i need to issue some more qty for certain components. But i am unable to do that.
    Has this feature of issue more been changed in 2007B?
    What other method can be adopted without changing the planned qty?
    Please advise.
    Regards
    Jessie

    Hi guys,
    Thanks for the fast response.
    Duplicate the previous issue to create the over-issue is not a good solution. It is very troublesome. itis not a good procedure to ask customers to do this step.
    Changing of the planned qty will mean that i am not able to trace my initial plan and have to go back to the BOM. again, this is not logical. especially when the queries are using figures directly from production order tables.
    Since it can be done in 2005 version, why is SAP taking it out this feature in 2007?

  • Partial issue in production order

    Hi Experts,
    Can u Pls help me know how to make partial issue and partial receipt
    Scenario : Production order : 100
    Issue : 500
    Receipt : 300
    Rejected : 200
    Expecting your reply .
    Karthi

    Karthi,
    I believe you should go through both of these topics relating to Production Orders and MRP.
    https://websmp105.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000321882005E&_SCENARIO=01100035870000000183&_ADDINC=
    https://websmp105.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700001061692007E&_SCENARIO=01100035870000000183&_ADDINC=
    Best wishes
    Suda

  • Good issue  by MB1A against Production Order

    Hi Dear PP profesionals,
    Could you advise me about the follow scenario.
    I am using MB1A to do re-stcok (262) and consume (261) against Production Order only for one o two component(ROH Materials).
    Just I created Production order by 100 EA, after I confirmed it but I need to do some ajusment in some components.
    For one them I need to do re-stock from production order to storage location in this case I am using MB1A against production order  with movement type 262 the quantity to back storage location is by 5 EA.
    For the other component I need to consume 5 EA more then I am using MB1A against production order with movement type 261.
    After excute MB1A for both cases I go to the production Order but I can not see reflected this changes
    For first one I expect to see 5 less if when I confirmed production order were issue 100 EA after ajusment with MB1A I expect see 95 with movement type 262.
    For second one I expect see 5 EA more if initialy I consumed 100 EA after ajusment with MB1A I am expectin see 105 EA.
    Could you advise me about iit, f I am expecting is correct or MB1A only make ajusment without any reflected in Production Order?
    Best Regards,
    Julio PP

    Hi PP_HKV,
    I did as you told me  about use MB1A/261 against production order and you rigth, This not up date any quantity in production order for component only I can see this movoment in option   GOTO --> Documented goods movements, but not in component overview in field Qty withdrawn, It is the same case when I use MB1A/262 transation allow me to do the movment but the quantity in production order for component is not up date only it is show in GOTO --> Documented goods movements
    I see in standard process it is not work as I expect. Is there some way for to do that any bapi o customization?
    Thanks in advance,
    Julio Werekeitzen

Maybe you are looking for

  • Page break between line items and address in invoice

    Hi Team, I am getting a Page beak problem between line items in an invoice. If i have 10line items which needs to be displayed in the output all are displayed in 3 pages. but my problem is when displaying the line item details in any page it should b

  • Get Windows Folder Paths on Win 2000

    I downloaded the windows_folder_path.vi from NI site, where I can see that "This VI is supported on Windows 2000, XP, and Vista." If I use it in an executable that searches for Application Data folder, it works under XP, but it doesn't under a fresh

  • Search result pages problem

    When I perform a search on a specific category on these forums, I get the first page of the results. But when I go a next page, I don't get a page with results of my search, but  the results of a search on all categories.

  • Files for Burning

    My movie file is way to big for any CD to burn on...when transerred to Quicktime file it becomes a 13.1 GB size file, and my DVD only holds 700 MB....is there a way to get this file burned? Do I split it up?  Or do I need a DVD with more space? any s

  • Backup and restore georaster table and rdt table by image id

    Hellow everyone, I want to backup my georaster table and rdt table by the Specified image id and also can use these georater rows to restore? How can I do? the geraster table structure is as follows: image_table id NUMBER, filename VARCHAR2(255), ras