WM -Production Supply

Hi
   i configured the WM -PP Configuration
After material staging and clicked the Proceed option in the production order . i found the TR thru lx09 (t code) and
i did TO...after this i have same  stock is appearing in (production supply) -storage type 100 .
after this process, i did GRN against production order... but stock is still available the storage type100 have some quantity ...
is it right??? ....if wrong means what i do for storage type 100 stock.pls suggest me to do steps
note : in the control cycle which i have maintained the storage type 100.
with regards
dinesh
Edited by: code acess on Oct 11, 2011 8:40 AM
Edited by: code acess on Oct 11, 2011 8:42 AM

hi mgl
        same production order only, i followed this steps only
1 .created production order ,release and saved
2 . i did material staging
3 i did proceed.
4. i did TR and Transfer order, confirmation-now stock is showing storage type 100
5 . production order confirmation
6  GRN against production order
7. I did FG for TR and TO
my question is after production grn done, stock is showing in storage type 100. so what i do this storage type stock .....is it right
way i followed the steps
with regards
dinesh

Similar Messages

  • Movement type for production supply missing in warehouse

    Gurus,
    I am getting this error when i use TC-LP11
    movement type for production supply missing in warehouse
    What should be done?

    All I can suggest is checking the master data:
    Must have at least one Prod. Supply Area and one control cycle set up.
    PSAs are part of the WM-PP interface and are created in WM and are used to group together Work Centres (which are Production master data).
    Created under application menu:
    Logistics/LE/Master data/Warehouse/Production Supply   (Tx LPK1/2/3 see also LS41) and assigned to Work Centres under application menu:
    Logistics/Production/Master data/Work centres/Work centre/Change (Basic data view).
    (To find out the PSA aka Supply Area from Process Order Display Tx select:  Goto \ List \ WM Picklist  and scroll to right)
    A Control Cycle defines for a given material, Plant and PSA:
    which WHS to get the material from
    which interim storage type to take it to
    which bin to place it in (can be dynamic for pick parts)
    Logistics/LE/WM
    Master data/Control cycle record/Create
    Regards,
    Nick

  • Production supply Area assigned to Mov Type 319

    Dear All,
    What is happening in background if we set production supply area to mov type 319(Replenish for production).
    Also please tell what is KANBAN Interface & why it is used.
    Thanks & Regards,
    Olet Malla

    Hi
    Yes you do not have WM-PP interface.
    With WM-PP Interface you can automate the entire process based on Production order status.
    For example when you confirm the Production order system will genearate TR automatically for all the components. This can be further automated to complete the warehouse operation by changing the status of Production order.
    [Advantage|http://help.sap.com/saphelp_46c/helpdata/en/c6/f840fb4afa11d182b90000e829fbfe/content.htm]
    Karthik

  • Production supply area (PSA)

    Hello,
    I would like to know how to define the production supply area in the material master record. It would be of much help and precise if anyone could mention the view in material master in which the Production supply areas could be assigned for a material.
    Thanks,
    Maxx.

    If you set this up on material master, it will always stage material to this area. You can achieve the same by maintaining a control cycle. With control cycle and leaving this field blank on material master, you can map it to the level of storage bin for production staging.

  • Wm to production supply issue

    Hi gurus ,
    My question is simple but i am not getting the answer .  Pls guide me.
    In our system  Warehouse is not subjected to Production.
    Only packaging is done for the material & material despatch takes place.
    In short work flow is.
    TR>TO>Packaging -->TO confirm >TR( for dispach)>TO -->confirm TO
    Now i want to cleare the concept for production plant.( with PP module & without PP module)
      The material which are related to Bom I mean
    the Mtrl(for e.g. A,B,C,D) which we supply to Procuction supply (100 st.type) will be processed which will now form single finished(for e.g. F) componant. this mtrl now we want to Put in Final storage bin (from 100).
    Now my point is how the system will treate in WM point of view i.e. we know the material A,B,C,D is present in the 100 st. type & Finished componant F is not present in st type 100??
    pls.guide me.

    Hi,
    If you use mvt 201 for component consumption, the GI happens in IM and WM movement comes after that. /This scenario differs from material staging with production supply (storage type 100) where the WM-movements happens before GI (independently from GI)./
    In this scenario a negative quant comes to existence in 911 + bin (bin correspond to the cost center) and you fill up this negative quant form normal storage bin.
    GI > WM-movements is the sequence and GR can happen independently form this because there's no real order and this way there's no realcontrol.
    Disadvantage of this scenario is that you cannot control your component flow in WH if there are several "production order" in progress with reference to the same cost center - the same bin is used in 911.
    If you want to have stronger control you should implement PP modul.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Feb 24, 2009 10:22 AM

  • Errror : production supply area not available fieldin  work center .

    HI
       hi friends
            i want  to maintain production supply area in work centre...
            production supply area means storage location??
          i have a confusion between storage location and production supply area
    pls suggest me where i missed the setting
    with regards
    dinesh

    Production supply area is not a storage location. It is linked to one, but you may have more than one supply area per storage location.
    Supply areas are used in KANBAN processes, and I think that also in WM-PP interface.

  • Production supply area (PSA) and supply area

    Hi,
    Is there any difference between supply area and Production supply area. it woul be good if you could explain me the difference.
    Thanks,
    Maxx

    Both are same
    Production Supply Area is the link between Warehosue Management and Production function.
    Production supply areas (PSAs) are used for material replenishment and are situated directly on the shop floor in the production department. The supply area groups work centers near production storage bins based on the material staging methods. You need to enter the PSA in the work center master data.
    http://help.sap.com/saphelp_46c/helpdata/en/c6/f8412f4afa11d182b90000e829fbfe/frameset.htm
    Hope this helps.
    An area on the shop floor where material is provided that can be directly used for production.
    The supply area is used, for example, in KANBAN production control and for material staging using Warehouse Management (WM).
    Proposed Supply Area in Material Master Record                                                                               
    The supply area is used as an interim storage area on the shop floor    
         which is used to provide materials directly at the production line.                                                                               
    The proposed supply area is mainly used for KANBAN materials that are   
         only or usually provided at one supply area in a plant. Here, this supply
         area can be easily saved in the system.                                                                               
    The proposed supply area is used, for example, to determine the supply  
         area for the dependent requirements of a material.                      
         The supply area in the dependent requirements of a material is required:
         o  to enable the system to calculate the KANBAN control cycles          
            automatically                                                        
         o  to enable you to select requirements in the pull list with reference 
            to a supply area

  • Material batches from Production Supply Area St. Type

    Hello Team,
    1.  User do LP12 for WM Staging [MvT 319]
    2.  He Goto LB11 and creates TO.
    3.  But when User creates TO for 319 MvT, system picks up batch from Production Supply Area.
    It should NOT pick up material batches from Production Supply Area.
    Please suggest at earliest..
    Thanks
    Tushar

    Hi,
    Check customizing settings
    check PK05, check if you have maintained the proper production supply area , WM storage loc. As I see it you are doing prod supply for release order parts. Also see cr02, basic data , see if you have assigned proper production supply area.
    check storage type 100 is properly defined , movement type 319  are created and their assignment made in WM.
    Also check if you have activated PP/WM interface.
    If all the settinsg are done , there should be no problems.
    Regards

  • Difference between Production Supply Area and a Storage Location

    Hello Experts,
    Basic question but wanted to get more clarity on the concept as i never worked on the PSA
    Can someone tell me the exact difference between PSA and a SL. I understand PSA is a Kanban, WM and SL is an IM concept. Can a work center have a storage location assigned or just a PSA? Can a GI be done from PSA or just from a storage location.

    Hello
    The production supply area is a master data used by WM, while the storage location is used by MM-IM.
    Check this link for details:
    Production Supply Area - Warehouse Management System (WMS) - SAP Library
    The goods issue is done with reference to the storage location
    It is possible to assigne a storage location to a production supply area and assign the production supply area to the work center.
    BR
    Caetano

  • Replenishement directly from external supplier to production supply area

    Hi Experts
    I'm new in WM,
    We have a big tanks for oil which will be used by the production as a component during the production process, these tanks is in the PSA "Production supply Area" and the supplier provide the oil directly to PSA ( not throug the Warehouse) so these tanks are under the production control.
    we need to implement this process in SAP.
    we need the stept by step implementation of that request
    your support is highly recommanded for us
    Many thanks in advance
    Olfa

    There are many ways to do your requirement. One among them is, Implement KANBAN Process using External Replenishment.
    Evaluate options using PK01 .. External proc.
    Regards,
    Sathish

  • Picking in WM for production supply area

    Dear expert,
    In my scenario when production order is released it will automatically create TR. Then convert to TO to move from fixed bin (source) to production supply (storage type 100). Now, i want to do picking this material from production supply (storage type 100) to supply area in work centre for production.
    How to do this?

    Hi BPO,
    Please define your requirement better. What causes problem to you?
    Are you speaking about raw materials or SFG that you get when you book confirmation against your PrdOrd?
    You can create storage bins under storage type 100 as well (to store your goods there) and you can define storage typr search (SPRO) and storage strategies (WM view in material master).
    You can define control cycles for your supply areas...
    What's your problem exactly?
    Thanks,
    Csaba

  • Production supply area w/Min Max

    Hello,
    I have a WM scenario that i want to prototype, and i would like to know the steps involved in this WM scenario.
    The scenario is :
    Production Area Supply w/ Min Max
    Illustrate the material replenishment to the PSA based on min/max levels for raw materials and intermediates; Min level based on requirements for 2 production runs, Max level based on requirements for 3 production runs.
    the material for the replenishment is taken from the storage types.
    pl. do mention the steps or how to carry out the scenario with the t codes involved in it.
    Thanks,
    Maxx

    I suggest you checking system by two ways:
    1) Set PSA to work center, now it works? If so please check BOM settings carefully.
    2) Don't use dynamic production bin, just try a physical bin. If it works please check control cycle settings.
    Note: You create the dynamic storage bin "production order" in the control cycle for pick parts. The system then stages all the materials for a specific production order in a dynamic storage bin with this production order number.
    When you system emit errors again please use LS24 to check if having a dynamic bin with a production order number.

  • WM-PP Production supply quantity is not reduce after Confirmation and GRN

    HI
       Iam configured the WM-PP,  Against production i did material staging, TR-TO Process and Grn . But the raw material stock is not
      reduced from the Storage type 100. kindly suggest me where i missed the configuration...
      with regards
       dinesh

    Hi experts,
    Please provide your expert comments

  • Production supply area question

    Hi
    I need to stage materials from WM storage location (0001) to production line.
    Generally in WM, material staging happens by staging the materials to the PSA. So I create PSA and assign it to the workcenter.
    Next step is to assign this PSA to the storage location. My question, is this storage location a different storage location or is it the same 0001 location?
    Thx

    hi ,
    This should be a new storage type  and need not have to be a storage location.  You can use the same 0001 itself.
    cheers
    Rav

  • Handling Units in WM Production Supply

    Can anyone explain this process to me?
    I have a sloc which is both HUM and WM managed, I create a staging request into 100 with the PO reference as the dynamic bin.
    I create a TO which references the HU but I cannot get the TO to confirm as I receive the error message 'Material list 0000000385 for order 1000053 does not have any valid items'
    Thanks
    Wighto

    Your staging should be different.  One for WM Managed another one for HU Managed.
    WM Managed will have TO as the picking document.  HU Managed will also have TO as the picking document.  When you confirm the TO in HU Managed, pick, pack will be performed which will be associated with a HU.  Here you reference the HU.  (There are settings for HUM Staging, I believe you have set it up as explained in SAP help documents). If not, please check all your settings and you should be ok.
    Please let me know if you need any more information.  If this is helpful, please reward.
    Thanks.
    with regards,
    Muthu Ganapathy.

Maybe you are looking for

  • Windows Vista to Windows 7 Upgrade problems

    I have ASUS desktop. I upgraded Windows Vista to Windows 7. When i start my pc I get a message Can't Open ASIosys!!(2). The first day I installed Windows 7 everything ran pretty good except for getting this message. I then did all the Microsoft Updat

  • MATSHITA DVD-R   UJ-816 - Region Code Setting

    Dear All, I've exhausted my available changes on my Superdrive. Does anyone know of a safe way to lift the restriction? I have the MATSHITA DVD-R UJ-816 on a PowerBook GR 12" 1Ghz. Thanks in advance for any help! Paul.

  • Weblogic/transaction/internal/TransactionHelperImpl class not found error

    Hi All, I am getting the follwing excepition while running the application. which jar i need to add in the class path. I am using weblogic 10.0 sever. pls help as soon as possible. Exception in thread "main" java.lang.NoClassDefFoundError: weblogic/t

  • Mp4 movies with h264 codec on iPhone

    I've been converting DVDs to mp4 format to take on my iPhone on vacation. I can get the mpeg-4 codec movies to download and play on the iPhone, but I can not get mp4 movies created with the h264 codec to download to the iPhone from iTunes. The messag

  • Deciding to Update Firmware

    Hi, I've used the Nokia Firmware updater on my PC/Phone, and it worked pretty well. I have a few questions though, and I'm hoping someone here can help out... Is the "Most Recent" firmware, version and date, listed somewhere? I don't want to have to