WM Putaway (LM03 + Change Bin at confirmation)
Im trying to use standard radio frequency transaction for <u>Putaway by TO</u> (LM03 *) to change the destination bin for a single-step confirmation TO during confirmation, but I only get <u>Selection not possible</u> message. Is there any functional configuration missing? Any SAP Note?
Steps:
- Enter LM03;
- Check Source Information
- Select Source Information
- Check Destination Information
- Choose <u>F7 NBin</u> (new bin)
- Message <u>Selection not possible</u>
*<a href="http://help.sap.com/saphelp_46c/helpdata/en/33/607d5c087b11d3b4ac006094b9b121/frameset.htm">Putaway: Selected by Transfer Order</a>
Thanks in advance.
Best regards,
Raphael
Please do the below settings.
In storage type master data Dst bin ch. during confirm = 1
Warehouse management-Physical Inventory---define types per storage type :in that for that particular storage type un tick all the columns.
Cancel the TO which you have created and once again create the TO, then at the time of confirmation you can edit the destination bin.
Regards
Shakir
Similar Messages
-
Cannot change destination bin during confirmation
Dear SAP experts,
We are in SAP ECC 5.0. We read that we can change the destination bin during confirmation of TO. We have done the pre-requisite:
1. In relevant storage type (001) we input '1' for dst bin ch during confrm field
2. Untick physical inventory during placement to bin
Then we do GR to PO, which generate TR. We create TR into TO and specifying bin INTERIM in storage type 001. During confirmation in tcode LT12, I cannot change the destination bin. What else do I miss in here?
Best regards,
JohnHello John,
Even though config mentions change of destination bin, there are quite a few limitations.
Have a look at below documentation from SAP
http://help.sap.com/saphelp_47x200/helpdata/en/c6/f83e5a4afa11d182b90000e829fbfe/frameset.htm
Snapshot of some imp content.
No destination bin can be entered during confirmation for
dynamic coordinates
transfer orders with return subitems
Lean WM (if the destination bin is defined in the movement type)
posting change TOs
inventory based on putaway
additions to existing stock in storage units
stock removal from or putaway into bulk storage
two-step confirmation
transaction Confirm single item
the case where you are using a putaway strategy
all other items in a TO with storage units, if you have already confirmed the first item for the storage unit. The system changes the destination storage bin for all dependent items during confirmation of the first item.
stock removals from a bulk storage managed with storage units
Check if your putaway falls in any of the criteria.
Cheers,
Nag -
How do i change the Std. confirm key from 'AB' to 'Z1', receiving ACK IDOC.
Hi,
How do i change the Std. confirm key from 'AB' to 'Z1', when loading ACK IDOC.
ThanksHi Jorge,
Thanks for your help.
I change the output mode to "Collect IDocs" method, if I use SAP standard function POIM (RCCLMDAT), it will depend on change pointer to generate IDoc, and it includes function: RSEOUT00 ( and MASS_RSEOUT00 ) to collect and send IDoc.
The collect table is BDCP.
BR, -
PP CS6 is very slow to change bins.
App hangs briefly, says "not responding" for a long while, then finally changes bins. I've cleaned cache. Project was working well for a long time, I made a backup of it, and have started to edit it with a bit of new stuff (proj file went from 24 MB to 25 MB). Plenty of Mem/cpu power available. New windows 7 computer. Not sure of issue. Any ideas? Many thanks.
Hi,
10.0.2531.0 is SQL Server 2008 Service Pack 1 (release April 2009)
No guarantee this will fix your issue, but may be worth testing the latest Service Pack 3 (released October 2011) to see if that helps
http://www.microsoft.com/download/en/details.aspx?displaylang=en&id=27594 -
Order Component quantity gets changed after operation confirmation
Order Component quantity gets changed after operation confirmation.
We are using CO27 to issue the Material to the Order.
When we do the confirmation of operation. Component quantity attached to operation get changed.
Any solution for this.Dear
Please Follow the Steps
1. Go into Co02 there u do production order with qty select the Component overview u find the Materials there please check hhow much is the qty of that particular material
EX: Production order qty for Header Material is 10 ea
then ur Compannets Qty is 10 or 20
depends on the Componet Qty the Operation takes place that is because u have maintatined a base qty in Routing and BOM
With Regards
Pushpalas -
Product allocation check found changes to the confirmation
Hi friends,
while creating the sales order after entering the material, i am getting the Error -'product allocation check found changes to the confirmation'.i have checked in MMBE stock is there for the material and because of this the schedule line is not confirmed.
what could be the possible Answer ? please help me out.
regards
santoshHi
Double Click on the sub-item and goto schedule lines tab and them from menu select Environment and click on Availability.
See whats the available stcok.
Regards
Madhu -
Change of Bin while confirming TO (Picking strategy FIFO)
Dear WM experts,
We use FIFO strategy for picking. Now for an outbound delivery we have the requirement to generate TO automatically. During confirming of the TO we should have option to change the suggested Bin (in the source storage type).
Could you please confirm what settings in IMG should I take care of for achieving this.
Thanks a ton.
KamalHi,
I'm afraid it isn't possible...
You can set destination storage bin change for your storage type in SPRO:
Logistics Execution ® Warehouse Management ® Master Data ® Define Storage Type
You can find a field called 'Dst bin ch. during confirm'...BUT SAP help says:
'No destination bin can be entered during confirmation for
- dynamic coordinates
- return items
- Lean WM (if the destination bin is defined in the movement type)
- posting change TOs
- inventory based on putaway
- additions to existing stock in storage units
- transaction Confirm single item'
I guess you are using dynamic bins for outbound deliveries...
http://help.sap.com/saphelp_46c/helpdata/en/c6/f83e5a4afa11d182b90000e829fbfe/frameset.htm
Just my opinion...
BR
Csaba
Edited by: Csaba Szommer on Jun 3, 2008 8:38 AM
Edited by: Csaba Szommer on Jun 3, 2008 8:38 AM -
Storage bin available when posting change is not confirmed completely
Dear Gurus, I have a question for you:
My costumer wants to do a posting change when the material is released from QM with a decision usage from Q to unrestricted use. The process is done in two steps: with LU04 the TO is generated and with LT12 is confirmed. When the TO is generated the position is half confirmed. With LT21 we can see the row for the ST (lets say ST 504 Open Storage type) and a second row 922 TR-ZONE. The first row appears green (as confirmed) and the second row appears red (Not confirmed).
My costumer says that " beacause of the strategy given for the storage entry, the storage bin released in the TO (not confirmed completely yet) is available at this moment.
If the storage bin is still physically full, the carrier will found not space for leaving the goods even SAP is telling him there is space available at this storage bin."
I have read that once yo start a TO the storage bin is blocked until the transaction is fully confirmed.
If this is correct I need to demostrate it and I don not find the way to do it.
I hope you understand my explanation and give me any clue.
I appreciate very much some help.
Alagmogena wrote:
Ok, I will tell you the configuration I have. Lets point in a movement 921 quality to unrestricted use.
> Type Storage origin: 902 EQ and RC flags are set on. (confirmation control for storage type)
> Type storage TR: 922 are set on.
>
> Movement type 921 the flags for Confirm immed and Propose confirm are NOT set.
>
> I do a LU01 to create a intruction to change a material from Q to Unrestricted.
> with LT05 I create the TO.
> At this time if I look LT21 the TO created I see the tag source with two positions one for TS 902 green color and the second 922 in red.
> For the tag of target We can see the first position 922 In red and the second position 902 in green color.
>
> Perhaps this detailed explanation will help you to fully understand the scenario.
>
> Thank you again,
>
> Al.
From the above it isn't entirly clear that the first part of the T.O. is actualy confirmed, my settings are to autoconfirm this so I have no example to look at in my system. Perhaps the display shows the first line green before any actual confirmation..
I assume the stock status has not changed when you first view the T.O.? If the t.o. is partly confirmed I would expect to see the stock status changed and a neg in 922 until the second part is confirmed. Perhaps there is no confirmation at all yet, in LT21 what is the confirmation status? If you view the transfer order header there would be a partial confirmation showing with a yellow triangle, do you see this or no confirmation indicated at all? -
Is it true that I can't change the Registration Confirmation HTML page?
I am using Connect 8 on Win2000 using Firefox. I am using Adobe's Connect as an Adobe hosted service, currently on a trial but happy to convert the service if I can iron out all difficulties.
After creating Curriculum, I created an event and set up a number of guests. This is training, not really an event, but it is a series of online modules that the class attendees will need to view before the face-to-face classes started. Most things went well (allowing for user error, of course ;-) ), but when the attendees got their invitations and then went to the registration page, after completing this page, they got an HTML page that said
"Thank you for your registration request. Your information has been submitted to the event host."
I can preview this page at "http://meetxxx.adobeconnect.com/e1qrzebyxs7/event/registration_confirm.html"...but I can't change it here.
I did searches here, and I came up with 2 thoughts: (1) I can buy Adobe Contribute to update that page (which I otherwise would have no use for), or wait until Connect 9 (Q1 2012) where changing this page will be an available feature.
Is this it? Do I have no way of accessing that page via FTP? I would be more than happy to grab that page, update the text (which is all I want to do), and reload to that folder.
The problem is that the default message on the page assumes that the administrator is going to have to see the registration in order to approve it...but I have already indicated on the set up that I don't need to approve registrations, but that the email with the link to the online modules can be sent immediately (which happens)...so I want this page to say something like "Thank you for your registration request. You will be sent an email shortly with the link to the online modules."
Do I really have no alternative to change a message on a page that has clearly inappropriate text for the situation?
Thanks!
BillThanks, but unfortunately, this is not a message, it is the HTML page that it shown after a student registers for a course. I can see how to preview it at
but I can't edit it here, nor anywhere else I can find...note that I am looking the "Registration Confirmation" link (last one).
Bill -
Mass change for field Confirmation control Key in PO / SA
Dear All,
There is a need to do mass change in value for field Confirmation control Key in PO / SA. Some of them have PO history. If we have PO history system wont allow to change conf. ctrl key. Also since it is a production system we can not cancel previous po histories. This is in SAP 4.7 where we dont have mass change tcode for Scheduling agreements.
Can we maintain the values thru table entries. like using se16n maintain entries check box. This option is greyed out. can we activate that & do this requirement.
please suggest.hi Greetings!
The confirmation control key can not be changed in the scheduling agreement if GR for item had already been posted. If the GRs can be canceled , it is possible to change the confirmation control in the SA item.
Version 4.7 do not support Mass change of scheduling agreements, hence you have to either create a SCAT or BDC to perform the task.
Gobinathan G -
How to prevent action (lead selection change) with popup (confirmation)?
Hello all,
I have an application where I want the user to confirm when he selects a new line in a table. When the user selects a new line in the table an other used component reloads its data based on the new line selected. If the user has not pressed the save button before selecting a new line, any changes in the used component will be lost.
Currently I use onLeadSelect action on the table to call the load_data method(id=xxx) on the used component in order to display data relevant for id=xxx based the new line.
I can open a popup to confirm from the onLeadSelect-action or the WDDoBeforeAction, but the action still happens; it doesn't wait for the user to respond. And then any changes are lost...
I may have to store the parameters sent to the onLeadSelect method in context and continue when the button action from the pop-up returns via subscribed method, but I think this is an unelegant way of doing this.
There must be a better way...? Any ideas?
Regards,
Christian Frieron the lead select event handler you can show the popup and no other logic. Move your logic to the ok and cancel button handlers of the pop up.
-
Hi SAP Guru
I have an issue in my WMS setup.
I currently assigned Storage Type XXX for palletization. PUTAWAY STRAT : P
Mixed Storage : X
Addition to Stock : X
In the master Data setup i have input the palletization information already under SUT IP.
For Material X = 100 GM for each pallet ( IP)
For Material Y = 200 GM for each pallet ( IP)
For each storage bin i have dividied into 4 sections ( or quants )
so bascially naming convention will be like this
C11000 / 1
C11000 / 2
C11000 / 3
C11000 / 4
Now the issue is, when I create a TO for material X ( 10GM) , the system will automatically propose the bin.
The system will assign the material to bin C11000 / 1
If i create another TO for material X (5GM) different batch, the system will automatically propose the bin
The system will assign material X to bin C11000 / 2.
IF i create TO for material Y ( 10GM )
The system will assign material Y to bin C11000 / 3.
Should the system fill in C11000 / 1 before moving on to C11000 / 2 and so on?Thanks alot , it was alot of help.
Is there a way , where I can divide the bin in to 4 pallet?
I understand you can use the capacity usage check at bin level.
It would be nice if you could comment on the logic I have with how this work.
Material X is palletized ( WM2 ) , 10000GM = IP
Material Y is palletized ( WM2) , 20000GM = IP
I have activated Cap Check for storage type XXX with 5
I have enter the LET capacity usage for SUT ( OMM1) as 1
For the bin master data, i have put the capacity usage as 4.
So bascially the effect will be, for Material X , i can putaway 40000GM of goods into this bin
Material Y can putaway 80000GM of goods into this bin
The bin can handle 20000GM of Material X and 40000GM of Material Y ( Mixed storage )
Thanks for the help ! -
Propose Change against a confirmed PO in SUS
SRM Gurus,
We have following requirement in MM-SUS scenario:
1. Buyer submits PO to SUS from ECC.
2. Supplier responds with POR without any changes in qty./date/price and the same is updated in ECC PO(Buyer also confirms the same).
3. Due to delay for some on supplier side, in SUS supplier wants to propose new qty./date for he same cofirmed PO.
I am not able to understand how to handle the step three....
we are using ECC6 and SRM6.0
with regards
ManjunathHi,
I am afraid that making changes to the standard , or even developing your Z code for your requirement will be very complicated ..
from the business point of view --> supplier should only confirm --> if he is very certain that he will be able to deliver the goods according to the dates specified..
once the supplier has confirmed --> the supplier can do no changes --> only way out is for the purchaser to make changes and send over again to SUS.
in this case the status of the order in SUS will go from 'confirmed' to ' changed'.., and there it is possible to confirm again..
but in MM --> if you have created follow-on documents ( goods receipt) , then i am not sure wether --> the purchaser will be able to make changes and send over to SUS again.. -
Availability check during changing to reconsider confirmed quantity
Hi there,
Is it somehow possible during changing the order quantity of an already confirmed item to reconsider the confirmed quantity?
When decreasing the quantity he sometimes reschedules the item and the the whole confirmed quantity is one month back.
Regards and thanks,
AlexBut I don't want to have a new ATP check.
Example:
Yesterday I got 3 pieces of material X confirmed.
Today my customer only wants 2 and I have to reduce the quantity now. But then a new ATP check runs even if there are enough stocks. -
Schedle line confirmation date is changing to shorter confirmation date
Hi friends,
The confirmed date in the schedule line is not in line with the planned
delivery time maintained in MMR.
When sales order with free of charge document type is created, the
confirmed schedule line is in line with planned del time for a material
of item category ZPTN-free of charge Purchase to order. After coverting
PR to PO the confirmed schedule line had been changed to earlier date
which is not in line with the planned delivery time in MMR.
Please provide your expert views and suggestions..
With warm regards
Janahello, friend.
please check if your purchase requisition has been configured for processing time. then check if the purchase requisition was converted to purchase order within the processing time specified, if any.
regards.
Maybe you are looking for
-
I am a complete novis with the linux system, it was a gift to me, I can in no way get the up date to install on the system, i have tried every which way i can think of...please please help!!
-
GUI_DOWNLOAD problems with CR+LF when transfering from unicode system
Hi, I was successfuly used FM GUI_DOWNLOAD in a non-unicode systems for years. Lately I faced a challenge to rewrite my code for a unicode system. The configuration is: - SAP R/3 unicode system; - data to be downloaded at presentation server in a non
-
Hi, I have developed the BAPI which gets the data from few tables and puts them in one structure. But when I am running I am not getting the output. When I am debugging the same the structure is getting populated but it is not getting returned. Pleas
-
hi all my web.xml coding is <servlet> <servlet-name>FacesServlet</servlet-name> <servlet-class>javax.faces.webapp.FacesServlet</servlet-class> <load-on-startup>1</load-on-startup> </servlet> <servlet-mapping> <se
-
Price not decending or ascending properly
I am trying to process information and want to order it by price. I have a form to choose to show the price ascending or decending. I'm getting values like this: £79,950.00 £52,500.00 £164,950.00 £14,500.00 The prices are stored in my database like t