WM staging for Prod Order

Hi,
Gurus,
Can any1 explain me how to do WM staging for Production order?
From , Co02 menu, I selected WM staging fro Menu List. After that I gave quantity for BOm matrerial. is it the correct way?

Denish,
You would need WM relevant components in production order inorder to get this activated. It will work if WM is active for the component materials.
Hope this helps give you an insight.
Thanks,
Ram

Similar Messages

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • GR for Purchase order and GI for prod. order simultaneously

    Hi Guys,
    My client current has an external system, which does both GR for puchase order and GI for Prod. order at the same time. He is now migrating into SAP and he wants the same functionality. Do you have any idea how to do this.
    For eg., Pick list(CO27) will pick and issue the components to production order, if the component is in inventory. if it is not there, it will give error.
    Can we add, if material is not there, it should do GR and GI. is it possible with any customer exit in CO27?
    Thanks
    Srini

    Hi,
    In KANBAN, we have the possibility to do the GR (Goods Invard) if th container is Full and GI (to the production Order) if the Container is Empty.
    It's just a thaught..
    Regards,
    Siva

  • Need a Badi to look the good issue status for prod order before good receipt in MIGO

    Hi ,
    Need a Badi to look the good issue status for compoents for prod order before good receipt in MIGO.
    Example : There are 10 comps need to be issued to production order to make any assy but 6 comps were issued
    and remaining 4 comps are not yet issued.,in this situation if I try to do goods receipt for prod order through MIGO.,system should populate the warning
    message saying still goods issue are pending for prod order.
    Please advise .
    Thanks
    Prasad

    Hi Prasad,
    Before trying with a BAdI, have you tried to control this behaviour thru the Order confirmation parameters (OPK4)?
    Note that you can have a termination in case of having problems in the goods movements..
    Take a look of this and the SAP help:
    Termination of Confirmation if Incorrect Goods Movements
    Controls if the confirmation is terminated in the event of incorrect goods
    movements.
    Use
    This enables you to terminate the confirmation in the event of incorrect
    items, for example, to prevent postprocessing records.
    Dependencies
    The indicator is only evaluated if either no process control key or one
    process control key has been stored that enbles the goods movements to be posted
    in dialog AND for which the "provide error handling for goods movements"
    indicator is active. If there are incorrect goods movements, the system behaves
    as follows:
    A log is issued that gives information on the incorrect goods movements
    If these incorrect goods movements are determined by inventory management,
    then the option of correcting these errors is offered in the error handling
    If the correction is not successful, the confirmation is terminated
    Kind Regards,
    Mariano

  • RE G.I Problem for prod order in MTO

    Hi All,
             I am having stock as sales order stock in unrestricted. when I want to issue goods for prod order in MTO through MIGO. when I am checking I am getting the error as sales order stock not available. Any solutions for this Issue.

    Vachanala,
    If the stock is assigned to the perticular sales order & line item, the error won't be there.
    Agin check the stock in MMBE, & ensure that it is assigned to that perticular sale order number & line item.
    If it's not there then do the assignment to the desired sales order with movement type 413 E in t code MB1B.
    Hope this helps you.
    SmanS

  • WIP calculation for Prod.order with status DLV

    Dear experts,
    Is there any way to change WIP calculation method for Prod.order status ?
    In t-code OKGC:: By default system will set:
    Order status      Status number         RA type
    REL                          2                             WIP Calculation on Basis of Actual Costs
    DLV                          3                            Cancel Data of WIP Calculation and Results Ana
    PREL                  1                            WIP Calculation on Basis of Actual Costs
    TECO                  4                            Cancel Data of WIP Calculation and Results Ana
    I can not change any thing in t-code OKGC (gray after insert: CO, RA version, RA key).
    As I understanding: Prod.order with status DLV will not be considered to calculate WIP.
    But I want to calculate WIP for Prod.order with status DLV. Could you pls guide me how to configure the system?
    Thank you!

    Hi,
    I suppose it is positive variance as the yield from the order is 10 pieces more than the planned quantity of 1000 and it is always a variance and no WIP involved in this case. It can be settled to FI/PCA and to CO-PA by variance categories (if you have configured accordingly)
    Therefore the accounting entry would be:
    1. Delivery to stock of 10 pieces:
    FG Debit
    Change in Stock Credit
    2. Variances will post the difference:
    Change in Stock Debit
    Price Difference is Credit
    Concerning the valuation method it needs to be tested before it can be implemented.
    Kind Regards
    Umapathi G

  • WIP calculation for Prod.order with status TECO

    Hello all.
    My question is the similar to WIP calculation for Prod.order with status DLV
    But I need that
    - if the Production order has status TECO - the system calculate WIP
    - if the Production order has status DLV u2013 the system settle the order.
    1.     I try to change u201CStatus Numberu201D in TCODE OKGC. But I have receive two different result:
    - if I change u201CStatus Numberu201D for status DLV from 3 to 2, then during WIP calculation of the order with status DLV u2013 WIP have been calculated.
    - but if I change u201CStatus Numberu201D for status TECO from 4 to 2, then during WIP calculation of the order with status TECO u2013 WIP have been CANSELED.
    2.     I try to change results analysis key for status TECO from u201CZu201D to u201CFu201D in TCODE OKG3. BUT during WIP calculation the system create error message KJ 363 which require that results analysis key must be change to u201CZu201D
    How can I resolve my problem?

    Hi,
    I don't have the answer if the requirement is that even after producing the materials, till the time accountant checks the order and does this action, it should remain in WIP. Honestly it doesn't make any sense to me or i have not understood this problem. Anyways as per my current understanding I can suggest the following process for your scenario.
    Once production is stopped in between the process, the order should be in PDLV status (partial confirmations happened in the order)
    Now go and clear the reservations manually from the production order .( delete the component line items from the order). Now depending on whether you are following WIP at actual cost, system will post the difference between credit and debit of that production order as WIP for the month end process.
    Once Accountant okays the entries in the production order, he can do the TECO and settle the order. Now WIP will be reversed and variance will be posted.
    To avoid the already produced goods mixing up with your other stock, u might want use Quality Management with the help of your PP consultant.
    Best Regards
    Vimal

  • Workflow for prod. order

    Hi all,
    Can any one tell me how to activate workflow for prod. order
    Std. template WS20000387.?
    Thanks and regards.

    Hi Rohit
    SInce the steps are too many I am sending you the below documantation on Workflow scenarios in PP which may be useful to you
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMPP/BCBMTWFMPP.pdf

  • SAP format for prod. order

    Is there any std. SAP format for prod. order? I want to print prod. order.

    Hi,
    I'm not able to understand your question properly.
    <b>But in SAP the T code CO04N is meant for printing production orders.</b>
    If useful reward your points.
    Thanks & regards
    Karthik @ Mangal
    Message was edited by:
            Mangal

  • Material Staging for manufactoring order

    Dear experts,
    I have following scenario:
    The Source - Storage and the Production Supply Area are assigned to the same Storage Location.
    When performing material staging  for an manufacturing order, how can I AVOID that the stoch in the PSA will be considered as availible stock?
    Thank you very much in advance.
    BR
    Denis

    Dear Freddy,
    It is the standard SAP behaviour,if already reservation exists for the same material and same storage location the system will
    not propose anything to stage,instead I would suggest you to mention some other differents torage location for the second
    production order for the same component and then check what is the result in MF60.
    Either you clear the existing stock transfer reservation or else meniton a different storage location for the second order and
    check.
    Check and revert back with your findings.
    Regards
    Mangalraj.S

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • GR Sto location for Prod order and GI sto location for another prod order

    Hi  ,
           Material A is produced inhouse as well consumed by other plant for their production Order .
    Plants -  -1000 ,1200
    Material A is produced in 1000 , Production order GR location is 0001(in MRP 2 view -Issue st location )
    In plant 1200 material  A is used as raw material , by using the spl procurement key withdrawl from from alternative plant ,material A directly consumed for the production order of plant 1200 ,for this order i want get the material from the sto location of  0002 of the plant 1000 .What are the settings to be made to meet this requirement ...
    Best Regards,
    Kumar

    >
    kumar kumar wrote:
    > Dear Abhijit Gautam  and Karthik ,
    >                                                       i hope you both mis understood the scenario.
    >
    > Material A ->  Produced inhose in plant 1000

    >                               Used as a raw material in plant 1200 .
    >
    > In plant 1000  - - - >  Material A production order GR location is 0001 , And I want to issue the material to production order of the Plant 1200(using the spl procurement key withdrawl from alternative plant ) from the storage location 0002 .*
    >
    > *In the MRP 2  view if i put 0001 when i create the Production order in plant 1000 GR location copied as 0001 , and when i create the producion order in plant 1200 the issue location for the material is copied as 0001 (here i want the storage location 0002 , i do not want to change the sto location  manually in the 1200 plant production order  )** How to make settings or need to use any exits ....
    >
    > I am expecting some replies.........
    Kumar,
    There is no need for any user exit, you can achieve this by defining in the BOM- Item details where material A is used as raw material in Plant 1200.
    Please maintain Prod. storage location as "0002" in the Status/Lngtext tab in the BOM Item level details for component A in the BOM where ever it is used in plant 1200.
    With this defination along with special procurement key for withdraw from plant 1000, when you are performing backflush in plant 1200, system would derive plant as 1000 and storage location as 0002 for component A.
    Regards,
    Prasobh

  • Production in other plant, Sloc determination for prod. order

    Experts,
    we are using production in other plant. Demand in plant A, Router & BOM in plant B. Mfg. should be done in plant B. The components in plant B are Prod.stor.location 0003 (MRP 2 View).
    If I create a production order the system always uses Stor.Loc 0001 in component overview and for with draw material.
    My expectation was that system uses Sloc out of MM of plant B. What might be the reason for that behaviour ?
    Thanks in Advance
    Jörg
    Even if I put Stor.loc 0003 in BOM line Item system goes with 0001 in prod.order.

    JORG,
    I am assuming you have raw materials in plant B. In the BOM of material in plant B, maintain storage location as 0003 for all line items and do read PP master data for the production order on current date so that correct storage location is picked up.
    Also check if production versions are maintained and what is the issue storage lcoation maintained in production version?
    check and revert,
    Santosh Sarda

Maybe you are looking for

  • Audition 3 - Paste in Multitrack, slow stop, and clicking

    Hi,   Long-time Cool Edit Pro 2.0 user being forced to upgrade due to Windows 7. I'm testing AA 3 and 'm having some problems. First, I'm thrilled it's now possible to copy/paste in multritrack view. However, is it possible to paste clips from multip

  • How to register 10g ODBC driver list in the Create New Data Source window

    Hi I've checked the dll for the odbc is in the correct home path. However, i don't see the list of the driver when i try to create a new data source. Is there a way besides reinstall the client again. Thanks Rgds Ung

  • Error writing project file

    I am creating a dll project and keep getting the error Error writing project file Name.prj (An unspecified error has occured, probably due to corrupted data) Yet the projects compiles and creates the dll and lib files.

  • Which of these options is best for MacBookPro?

    I appreciate your answers. Thank you.

  • Change TimeCapsule IP Address

    Is it possible to change the time capsule's IP Address to be something else than 1. For example I need it to be 192.168.0.2 instead of 192.168.0.1 because that is the IP Address of my managed switch.