WO basic start date - requirement date

Good morning folks,
Would anyone be able to shed some light on any config that would be suitable for the following:
The materials are assigned to a task list that is then assigned to a plan.  That plan is then scheduled and the work orders are generated.
When the materials are added to the work order their requirement date is automatically assigned as the work order basic start date - can this requirement date be pulled from the scheduled dates instead?
The problem is that the material may not be required at the beginning of the WO, so the defaulted basic start date of the WO would not be the way forward.
Thanks
Mantas

hi Mantas
you can set in scheduling parameters with following possibilities
<b>Path Plant maintenance and customer service->Maintenance and service order->scheduling->set scheduling parameter</b>
1)The basic dates are adjusted and the dependent requirements are scheduled for the start dates of the relevant operations.
2)The basic dates are not adjusted and the dependent requirements are scheduled for the start dates of the relevant operations.
3)The basic dates are adjusted and the dependent requirements are scheduled for the order basic start date.
4)The basic dates are not adjusted and the dependent requirements are scheduled for the order basic start date.
so when you add the components you have to assign the operations,after selecting the operation you can change the operation date, after you change the operation dates,the material scheduled dates will be changed to the operation date
(using the option <b>1</b>)
regards
thyagarajan

Similar Messages

  • Production order Basic start date calculation

    Hello PP Sapperu2019s,
    I have an production order for total qty - 865,00.This production order created on 11.08.2011 and I could able to see the Basic start date as 26.06.2011.Please let me know how this basic start date gets calculated. I mean what are all the parameters included for calculating this basic start date.
    My Observation:
    I have checked in OPU3 for the respective plant and order type the scheduling type mentioned as Backward.
    SMK u2013 903 (ie, opening period for planned order u2013 3 days)
    In Routing we have two operations.
    Requesting from forum people to give me the detailed calculation part on how this basic start date gets calculated / arrived.
    Please let me know if you need any more inputs.
    Cheers,
    Kumar.S

    Hi Kumar,
                     As per my understanding this is all decided/maintained through scheduling parameters which are defined in Customizing per order type, plant and production scheduler (from the material master) (Customizing for Shop Floor Control, by choosing Operations > Scheduling > Define Scheduling Parameters). In what follows the parameters are described that affect the scheduling of a production order. Further control parameters are described in the course of this section.
    According to your query I suggests ,In Customizing you can specify that an order is rescheduled as soon as it is a certain number of days late (Start in the past indicator). The system then automatically carries out today scheduling when the basic start date of the order is more than the given number of days in the past. This scheduling is a type of forward scheduling starting from todayu2019s date and where the necessary reduction measures are applied .
    Else you can also specify  that a production order is to be rescheduled automatically whenever it is saved (indicator Automatic scheduling). If changes relevant to scheduling are made in the order and this indicator is not set then the order is given the status NTER (dates not current).
    Hope this would be useful for you at some extent.
    Please revert if required .
    Regards
    Chandra

  • Work Order Basic Start Date and Basic Finish Date to be changed

    Hi,
    Currently the business creates work orders without specifying the work resulting which the start and fish dates on work order are same. Also we have automatic scheduling turned off. In spite of this If I am trying to manual modify the basic start and basic finish dates on work order it does not allow me to do so. This issue is seen with work orders which are Released whereas orders with status outstanding have no issues. Could anyone please let me know what could be the reason?
    Thanks,
    Vinay

    Please check whether Scheduling type only capacity requirement is configured.
    If yes, choose this scheduling type in order, you can able to change Basic start date & basic finish date.

  • Making the Basic Start Date in PM order Mandatory

    Team,
    we created a new PM order type per user requirements. One problem we have is to make the Basic start date field mandatory.Can any one propose how we can make make the basic start date mandatory ?

    Dear,
    Its always better to have forward schedule, and to do so, follow the path
    SPRO-->IMG-->PLANT MAINTENNACE &CUSTOMER SERVICE-->MAINTENNACE &SERVICE PROCESSING-->MAINTENANCE & SERVICE ORDERS-->SCHEDULING-->SET SCHEDULING PARAEMETERS.
    Here you can set the parameters as per your client requirement.
    Regards,
    pardhu

  • Difference in Maintenance Plan date to Order basic start date

    If i creat a strategy plan and schedule, i am getting difference in PLan date in Maint plan to Basic start date. What is making this difference. How to overcome this. I need Order start date same as PLan date.
    Plz help me frnds.
    Guruprasad

    hi
    can you explain in details with your maintenance plan with the dates.Normally your call date and plan date will be different becase of call horizon ,but the order basic start date and plan date will be equal only
    kindly revert back
    regards
    thyagarajan
    your order basic date will be when you have maintenance call is generated.kindly check
    Edited by: thyagarajan krishnamurthy on Feb 25, 2009 9:46 AM

  • Basic Start Date and Schedule Start date

    Dear All,
    In a Preventive Maintenance order generated through IP30, I am getting Basic Start Date and Schedule Start date as different dates. For all other orders those date as coming same.   I am using forward Scheduling. Can any one of you please tell me what would be the problem?
    Regards,
    Babu R

    [SAP Note on Scheduling - Note 45433|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=45433]
    Regards,
    Maheswaran.

  • Order basic start date.

    Hi,
    We are updating the basic start da of order using FM BAPI_ALM_ORDER_MAINTAIN.
    We are deleting the basic finish date and then updating the basic start date.
    I am observing the following:
    1) For some orders, the basic finish date is recalculated, whille for some it is not, and the basic finish date get deleted and the field becomes blank.
    2) For some orders, the basic start date is updated when the start date is in the past and in some cases, it is not?
    Please explain the reason.

    Hi,
    The following settings are there in OPU7:
    Do not adjust basic dates,dep reqmts to operation dates
    Scheduling type - forward scheduling
    Automatic scheduling is checked
    start in past = 0
    Can you please explain what to check when saving in the FM?
    Regards

  • Basic finish date earlier than basic start date while backward scheduling

    I am encountering an issue where in when I am selecting backward scheduling for a process order and I am entering the Basic finish date, afte which system is giving me a Basic startdate which is after the basic finish date.
    For eg:- When i give the basic finish date as 08.12.2011, system is giving me basic start date as 09.12.2011
    I have checked the recipe of the material. In the recipe one major flaw that i found out was that all the activity timings were maintained as 0. But when i created a similar scenario in the testing client, i am not getting the issue.
    Please help.

    Hi,
    Check what is maintawined in number of days the start day is allowed to be in the past in scheduling parameters of the order type, in OPU3. If there is an opening float defined in schedule margin key of the order, and concerning this float backward scheduling finds a start date which falls into past, lead time scheduling will automatically switch to forward scheduling starting from today. 9.12.2011 could have been deducted this way. Also check the factory calendar if days upto 9.12.2011 are defined as working days.
    Regards.

  • Basic start date and finish date changing in the past

    Hello Gurus,
    I set the scheduling parameters as " Do not adjust basic dates, dep rqmts to order start " and also assigned the priority to populate the basic finish date. System does calculate the finish date based on the priority and start date as current date but it does allow me to change both dates in past or future which should not happen.
    Please do note that I activated the defaulted date as current date as well. Even I removed this mark and did not work.
    Please let me know if there is any way to restrcit the changing it alteast in the past.
    Mahee

    This can be prevented using one the following ways depending upon your needs
    ---> Set the "start in past" field to appropriate value using transaction OPU7 for order type /Plant combination
    ---> Make the "Basic start date  and Basic end date" fields as "Display only" through the Field selection config for the order type.
    ---> Use the user exit on "SAVE" of the order to check for the same
    Regards
    Narasimhan

  • Basic start date and basic finish date in the maintenance sub-order

    Hi guys,
    when I create a maintenance sub-order by the transaction IW36 are the Basic start date and the Basic finish date taken,inherited from the principal Maintenance order?And if it is in this way,is there the possibility to put these two dates as a current day only on the  maintenance sub-order ?Thanks in advance...
    Maximilian

    Here is my code
      DATA : lv_date_diff TYPE i.
      lv_date_diff =  caufvd_imp-gltrp - caufvd_imp-gstrp.
      caufvd_exp-gstrp = sy-datum.
      caufvd_exp-gltrp = sy-datum + lv_date_diff.
    This is a 4 year old answered message. Please open a thread for your specific query.
    -Paul
    Moderator
    Edited by: Paul Meehan on Nov 24, 2011 8:42 AM

  • Changes in basic start dates and its effects

    Dear All ,
    Greetings!!!!
    Can you please guide me in "changes in basic start dates in Prod Ord".
    Actually,We are now starting to plan order creation as following parameters:
                                                     Schedulling type:- Capacity req only.
                                                     Finish date:- 31st(or last date of that month)
                                                     Start date:- 1st( of that month).
    Is it possible to change the dates now for existing Production orders.
    What will be its effects
    It is a kind request to you,to please guide me and correct me if I am wrong .
    Thanks

    Rahul ,
    yes you can change the date of existing production order , only difference it will make is you need to reschedule it and you may face soem capacity availability problem , as the start date for all the order will be same.
    other then this i dont see any issue in it.
    wait for experts suggestion from the forum.
    Hope it help you
    Regards
    Ritesh

  • Tolerance on basic start date

    Hi,Experts,
    In case of Preventive maintenance order generated through system,can we make some settings so that user will be restricted to deviate the basic start date more than 7 days.Means User can only postpone or prepone  maximum 7 -days compared to the planned date of maintenance order .Thanks in advance.
    rgds
    rajib

    User - Exit  IWO10009 can be used and ask ur abap team to check in respect to basic start date in reference to system date and if difference is more than 7 days then dont allow to save the order.
    This can be done using mentioned user exit.

  • Change document for Maintenance Order Basic Start date

    Hi Gurus,
    I want to trace the changes to MO basic start date. But the change document indicator for MO Basic start date is not enabled.
    Is there anyother option to trace the changes to MO Basic start date??
    Thanks,
    Prabhu.

    Prabhu,
    Not all fields are tracked for changes.
    In the past we have developed some functionality to add these missing fields to the change documents.
    In this case you could utilise IWO10009 (at save event) to save the change documents.
    PeteA

  • Basic start date and scheduled finished date...can we have Planned date?

    Is there any "Plan Start Date" in SAP, the date where scheduler must put manually in the system to determine the "committed" date for the work to be executed - based on earliest and latest start date which automatically calculated by SAP?
    Our plant must keep the Basic Finish Date unchanged since it is the Required Date of the Work to finish.  We found that the Plan Date does not change and I was wondering if there is any way we can have the Planned date on the order header or have the basic finish date unchanged?
    Appreciate your advices

    Hi
       As per your query screen variant is the better option to be choose so that here you can go with user id based restriction
    Attaching the complete the scenario
    Transaction and Screen variants with an Example
    http://scn.sap.com/docs/DOC-39667
    Try these document & try to configure if you have any further please revert back.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Basic start date & Basic finish date based on Priority

    Dear Experts,
    When I am creating Notification & selecting Priority, System gives pop-up “do you want to specify new dates?” If I select yes system automatically change required start & required end based on Priority.
    Now my question is do we have same functionality for Maintenance order as priority field is available there (If we are directly creating a MO)?
    Even if we are creating WO from notification, required start & end dates copies to Basic start & Basic finish but if we change priority then no change in basic start & finish dates. Why?

    Greetings Parag,
    You may select the Priority in the initial screen of IW31 and the dates will shift accordingly, if you maintained the Relative Start &/or Relative End in
    SPRO > Plant Maintenance > Maintenance Processing > Maintenance & Service Orders > General Data > Define Priorities > Define Priorities for Each Priority Type
    If you want to change date based on Priority on the Order header screen, it's not possible in the standard to my knowledge, but you may easily develop an enhancement utilizing the user exit
    IWO10012 Maintenance order: Priority handling on central header
    or
    IWO10009 PM Order: Customer Check for 'Save' Event

Maybe you are looking for

  • Best practice for JSF 2.0 composite component?

    Following the various tutorials and blog entries I have found, I have managed to implement a few composite components. I want to do a more complex one, but haven't found and example yet to follow and my own proficiency in programming model isn't suff

  • Twist: Can't make two external monitors work

    I'm trying to get two external monitors to work with my twist. One is connected via mini-HDMI, the other using a Thunderbolt adapter (I've tried adapters for VGA, DVI and HDMI - same result). Only one external monitor (mini HMDI) works, although Win8

  • How to remove OS X upgrade pop ups?

    I am usually using my Mac Book Pro to stream media content to my big screen TV for a presentation or to watch movies. Quite often I get this pop up that tells me that I need to upgrade OS X or something else. Is there a way to remove it? (I don't wan

  • Confused about how to use paint()

    Hi, I have been working really hard to try to get the following program to work but I am really confused on how to use paint(). I do not have anyone to ask so I thought this forum could help. Anyways, here is my problem... I am trying to recursively

  • Approval limits

    Dear all I neeed to set approval limits for concerened employees and set hierarchies for purchase requistions and Purchase orders in oracle purchasing. how can it be done. Kindly update Regards Arifuddin