Hi Experts,
We have one scenario
W/C in PP(wc category m/c) = Equipment in Plant maintenance
Is it possible to block the W/C automatically whenever there is creation of maintenance order for equipment(w/c for PP) so that it is blocked in routing and can not be used in production.
Thanks in advance,
Amit Kataria

Dear,
You can lock work center. if work center is lock, now production order will be created with locked work center.
If you require that whenever maintenance order created against specific equipment in which locked work center used, system will not allow to create production or production order execution. In SAP Maintenance, there is integration with PP that whenever maintenance order created, system will not allow to execute production order. Kindly consult with you PM consultant in this regard.
Thanks
Muhammad Ashfaq

Similar Messages

  • Block production work center during maintenance order

    Dear Experts,
    iam trying to do the integration between PM and PP, I want to block the production work center from any production order  when there is any maintenance order opened for a certain equipment which is inside this  work center ,
    till now i did the following:
    1) the production work center is now inside the equipment location tab
    2) when i open any maintenance order i put system condition as zero
    now what i only achieved ,
    - in transaction CM25 the capacity is black for the period of the maintenance order
    BUT the work center is not blocked and any production order can be created without any error
    please help and much thanks in advance
    Best Regards

    Hi,
    Till time you have performed right things to integrate PP-PM & system is also responding according to setting.
    Showing block capicity in CM25 against the Maintenance Order.
    If you want to block production order as well, you need to do one more setting.
    go to t- code OIOI, selection Production order types (those you want to block) & in capacity Availabilty choose Collect conversion as 3 : No creation if there is insufficiant caacity.
    i hope this will definately solve your problem.
    - Yatharth

  • Block PP Work Center capacity  when breakdown maintenance order create on that work center

    Hi All,
    My Client want to Block PP Work Center  capacity when breakdown maintenance order create on that work center, how can i do it ..
    Please help me.
    Payal

    Dear Sir,
    I have Done Every think but still Production Order is create.
    CM50
    OIOI
    CO02
    Payal

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • How Can i Block the Work Center Once is used in Maintainence Order

    Dear Experts,
    How Can i Block the Work Center Once is used in Maintainence Order in PM module.
    In standard its not blocking the Work Center automatically. How this can be achieved.
    Regards
    Raghu
    Edited by: raghu m on Apr 21, 2009 10:36 AM

    Hi Muthukumar,
    1. You can using the user exit or BADI to control this.
    CONFPP01            PP order conf.: Determine customer specific default values           
    CONFPP02            PP order conf.: Customer specific input checks 1                     
    CONFPP03            PP order conf.: Cust. specific check after op. selection             
    CONFPP04            PP order conf.: Customer specific input checks 2                     
    CONFPP05            PP order conf.: Customer specific enhancements when saving           
    CONFPP06            PP Order Confirmations: Actual Data Transfer                         
    CONFPP07            Single Screen Entry: Inclusion of User-Defined Subscreens            
    BADI
    WORKORDER_CONFIRM
    the above are the user exits that are available fro the CO11N tcode.
    2. we have to take a help of the abaper to write coding fort his.
    3. The user exit should be called for the
    Work Center : YYYYY
    then check the relevant Work Center Once is used in open Maintainence Order and if it has a entry if then give a error message else allow the CO11N to perform.
    Regards,
    Sankaran

  • Blocking of Production Work Center

    Hi All,
    I have already maintained the following PM-PP integration points:
    1) Production work center is maintained in equipment master
    2) System condition is entered in maintenance order as "Not in operation"
    Please let me know how to block the production workcenter for production work when same workcenter (as equipment in PM)is planned for maintenance.
    Sundar

    Hi,
       Once you have done the settings, if you have Maintenance Order on particular eqpt belonging to PP Work Center ,
    Then based on system condition the PP Work Capacity will be 0 i believe ..but system will still allow you to create a PP Order on that PP work center .. better thing is to perform Capacity Availablity Check while releasing the PP Order at that PP Work Center and if capacity is not avaialble then u can stop release of the PP Order..
    In PP ->OPJK for combination of PP Work order type and plant u have for business function 02 , u have give Overall Profile
    Release Capacities as 3
    The Overall profile which ur using has control profile & this  should have presentation type as 04  for Capacity availability check to happen ..
    regards
    pushpa

  • Blocking the work center

    Dears
    Is it possible to block the work center from Quality department for creating any more production order because of quality issue
    Like what we are blocking the vendor by using quality info record
    Thanks in advance
    Faisal

    Yes Sujit
    I understand that
    But There is any method to evaluate Work center in QM prospective
    In usge decision we have quality score is updating when ever we select respective UD code
    Any tips on this pls
    Faisal

  • Error message when blocking a Work Center

    Hi,
    In order to block the use of a workcenter, it is recommended to go to cr02 and change u2018usageu2019 field to u2018000u2019 All task list types (see previous topic To block the use of a specific workcenter)
    When changing usage to 000, an error message appears : u201CThe work center is already being used, update task listsu201D. How could it be fixed? thanks
    sb

    If you don't want that operation , Then
    Go to CA80- work center where used list
    find out the routing, and delete the respective operation in routing.
    Or
    If you don't want the delete the operation, Then
    In workcenter , CR02 Go to Extras-->status set lock
    While creating a new production order, system won't copy the locked workcenter

  • Blocking Work Center

    Hello Everybody......
    Is there any way to block the work center through creation of notification instead of Maintenance Order.
    My Client wants that as & when the notification for breakdown is being created by production, immediately the work center should get blocked immediately for production scheduling.
    The production planning team being different from production team...may reschedule the order in the time frame which is between creation of Notification & Order. & As during this time maintenance order is not there, so how can the PP get intimated that machine is under breakdown though maintenance has not yet created any maintenance order.
    Regards.......

    Hi Vinay,
                   for your kind information there is an integration between PP and PM  in location tab of notification the workcenter is the pp workcenter and organization tab workcenter is PM workcenter. In the maintenance order header system condition is there it shows whethe the system is in operation or not. Through this integration whenever production people are going to raise an production order against the same equipment which is been under maintenance by maintenance people system will throw a message that the equipment is already maintained by maintenance.
    Regards
    Satish

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

  • Work Center Integration PM-PP

    I have 3 similar Production Machines. I will load any or all of them according to the requirement or acc. to which machine is free.
    so PP person says, he has to assign only one Work Center to all the three machines as he can not assign more than one Work center for a single Operation in Routing.
    But in PM, 3 machines will have 3 different Equipment numbers with common Production Work Center (Work Center at Location tab page)
    If I block any one of the machines for Maintenance, that work Center will get blocked. But physically remaining two machines are free. But PP person can not dispatch the Order as work center is blocked.
    Plz guide how to proceed

    hi,
    SAM,
    For 3 production machines PP Persone should create 3 pp workcenters......,
    as far as my knowledge is concern in standard SAP this is not possible.....
    although Capacity spiliting option is available in PP workcenter.
    but that dosn't solve our proble..
    if u set system condition - not in operation for a equipment
    .. this will capture whole PP work center..... rather than perticular equipment.
    Try to conyence them for 3 pp workcenter.
    regards,
    Amit kushwaha

  • Work center selection during UD

    harhe e Hi,
    We have the following scenario,
    Production guys confirmed order confirmation or make backflushing confirmation to update the WIP/FG stock,
    then quality cleared such stock through posting to unrestricted or blocked stock or rejection store location,
    Quality person requires during UD posting ,work center/Machine selection should be there in QA32 transaction,
    so that the analysis could be made for the work center,
    Best Regards,
    Devendra

    Using Inspection Point assignment, you can record the Work Center / Machine.
    But with Inspection Point, you can't have F4 selection option in standard. You have to type the Work Center code manually which may prone to error.
    You can check for some user exits to define Sub screens to pop up.
    QEEM0029  User-Exit for Characteristic Overview Subscreen
    QEEM0030  User-Exit for Subscreen: Characteristic Single Screen
    QEVA0004  Exit for changing information line in usage decision header
    QEVA0005  User subscreen for displaying add. data for usage decision
    QEVA0006  Entry to usage decision transactions

  • PP-PM Integration (Work Center)

    Hi all,
    In my client place, they have 10 similar Production machines with equal capacities and perform same function.
    So, as per the availability of any of those machines, production people will load the machine against Production Order. To do this, they have created only ONE workcenter with 10 Individual Capacities.
    So, they have assigned that Work Center in the Routing and as per the availability of 10 individual Capacities, they can confirm and dispatch the P.O.
    If we consider PM, 10 different Equipment nos have to be generated with the same work center. So if I block any of those 10 Equipments, that work center will get blocked and they can not dispatch the PO.
    Please guide and give your inputs to how to proceed in this scenario.
    Thnx in advance
    Sam

    hi,
    u r correct. I am also looking for a rectification only.
    In case of Process industry, this std scenario will work , as if any one of the machine gets stopped, all other machine can not run.
    to put in a simple way, if output of one machine is the input of next machine, then we can accomodate ONE workcenter for all the machines in that chain/assembly/line.
    in my case the requirement is, none of the machines' output is linked with others input.
    If anybody could find any user exits/Badi or any other solution, please give ur valuable points.
    Sam

  • Account and contact person search in more Work Center pages

    Hi All,
    I have to face the following problem. Currently I am at customer and the customer wants to have four different work centers (broker, cedent, original insured). The work center pages should show the AB SEARCH. In those ABs the links Search Brokers, Search Broker Contacts; Serach Cedent, Search Cedent Contacts etc.)
    I Use the Target IDs MD-BP-SR and MD-CONP-SR for all searches.
    Everything went fine (I checked simultanously in WebUI). After I entered the third ORIGINAL INSURED the AB of all Work Center appeared the same. All had Cedent Accounts, Cedent Contact Person as links in the AB Create. When I make the Cedent links unvisible no Work Center has them in.
    How can I solve this problem? I work on that since two days. Has anyone an idea? Even here in SDN I couldn´t find a solution for that.
    The CRM is a brandnew one? Could it be that the search MD-BP-SR can only be used in one workcenter??
    Thanks to all for your help,
    Martin

    Hi Pieter,
    thx for your answer. AB=Assignment Block. This Search Block.
    I would like to have 4 WC for Cedent, Broker, Original Insured an Prospect (XXX). These WC should have all an AB / Work Center Link Group that includes Search XXX Accounts and Search XXX Contacts. I have an developer here, that would add the role, so that we can search role specific (Roles: Broker Original Insured, Broker etc.). An better idea for that?
    But my problem is, that the WC pages look all the same. Even if I go to WC Prospect, that should incl. the Work Center Linkgroup Create (Link will be Create Prospect) it doesn´t appear, because all work center pages look similar.
    I entered all (LogLingID, WC Link Groups etc.) from scratch, but I compared with standard.
    I would love to help, but it is not really clear to me what you are doing.
    You mention you have 4 workcenters, all with an option to search for accounts and a search for contacts.
    CORRECT.
    How are you planning to differentiate between them all if you use the same target id's (MD-BP-SR and MD-CONP-SR)?
    Is your issue that you changed the description of the links, and they appear the same?
    You also mention 'AB'. What would that be?
    Yes. The Links all have Search Cedent Accounts in every WC Link Group. But why?
    Regards Martin
    I would upload a screenshot or send it, but don´t know how...first time posting a thread.

  • PP-Diffrence between "Capacities" tab & "Scheduling" tab in work center

    Dear Friends,
       While creating work center in t.code CR01, i am entering the following formulae in "Capacities" tab:
    1. Setup formula
    2. Processing Formula
    3. Teardown formula.
    I am entering the same details(formulae) in the "Scheduling" tab also.
    What is the difference of maintaining the formulas is two diffrerens tabs?
    If i do not maintain the formula in "Scheduling" tab, How it will effect?
    please explain me.
    Regards
    Senthil

    Hi,
      Thank you.
    Let me consider some example.
    Assume in routing i have maintained standard time as 10 min for each quantity.
    My total production order quantity is 100.  (Order number 300000)
    So the formula in "Capacities" tab will calculate the total capacity  required to complete the production order as 1000 min. Is it so?
    1000 min means, 16.6 hours.
    let us assume that, the particular work center has been blocked for another 83 (three and half days) hours by other production orders. So i can not start the work immeadiately. After three and half days only i can start the production order 300000.
    So if i maintain the formula in "Scheduling" tab only, the system can propose the information that Planned start date as 07.09.2007 & Planned End date as 07.09.2007. (Based on the forward scheduling / backward scheduling). Is it so?
    Regards
    Senthil