Work Center(Capacity Level) Change Documents
We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
Thank you in advance.
Hi Usman,
I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
To avoid it... i followed below steps
1. Uncheck the capacity requirement indicator in all open orders
2. when u try to delete, it will say "Capacity is still being used"
3. Table KBED, use capacity ID and run, it will list out the pending orders
4. When the table has no entries, delete the capacity category
5. check all capacity indicator
- Pithan
Similar Messages
-
Work center-CApacity-Work force planning
Dear Expert !
Please tell me all necessary steps to configure Work center , Capacity and workforce planning .........please provide me all the information of business scenerio where I can use this at user level....with screen shot.
Thanks in Advance
ROBERT SMITH "HP"Check out below links....
http://help.sap.com/bp_bblibrary/600/Documentation/Q60_BB_ConfigGuide_EN_US.doc
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPPS/PPCRP_PS.pdf
Venkat -
Work Center Capacity Shift Interval
Hello,
I'm looking for a function or Tables from which I can get Work Center Capacity Shift & Interval data, Transaction CRC3.
Any help in this regard will be highly appreciated.
Regards,
Hashir Ahmed.hi,
check these tables.
AFIH Transparent table Maintenance order header Application table (master and transaction data)
AFKO Transparent table Order header data PP orders Application table (master and transaction data)
AFRU Transparent table Order Confirmations Application table (master and transaction data)
AFVC Transparent table Operation within an order Application table (master and transaction data)
CABN Transparent table Characteristic Application table (master and transaction data)
CBPR Transparent table CO-ABC: Activity Master Table Application table (master and transaction data)
COEP Transparent table CO Object: Line Items (by Period) Application table (master and transaction data)
CRCA Transparent table Work Center Capacity Allocation Application table (master and transaction data)
CRHD Transparent table Work Center Header Application table (master and transaction data)
CSKS Transparent table Cost Center Master Data Application table (master and transaction data)
CSSL Transparent table Cost Center / Activity Type Application table (master and transaction data) -
Work Center Capacity Intervals
HI,
Where can I get the work center capacity interval dates i.e. valid from, valid to and corresponding week days that are being populated in the table control when you follow the following path in transaction IR03->Enter Work Center and Plant-> Press Enter->Go to Capacity Tab-> Press Capacity Button on the lower left hand corner->Press Intervals and shifts
My requirement is to calculate the weekly capacity of a work center. I have to find the valid interval for current date then find the number of working days in this interval so that I can use it in calculating the weekly capacity.
Regards,
Bharat.I de-bugged the main program behind IR03 and found out that the Valid-from-date is being calculated during runtime for all the records from table KAPA for given work center KAPID.
Anyway thank you all who cared to check the thread.
Regards,
Bharat. -
Hello experts
I am truing to compare between actual Work center capacity (I am using data source 2LIS_04_P_ARBPL).
And standard work center capacity (transaction cro3 in the R3)
I canu2019t find an info cube or data source that will help we extract the standard capacity.
Thanks.
Tal shalomHello,
You can use [0PP_C13 InfoCube (Capacity Load Utilization)|http://help.sap.com/bp_biv170/BBLibrary/documentation/B58_BB_ConfigGuide_EN_DE.doc]
Thanks
Chandran -
Block PP Work Center capacity when breakdown maintenance order create on that work center
Hi All,
My Client want to Block PP Work Center capacity when breakdown maintenance order create on that work center, how can i do it ..
Please help me.
PayalDear Sir,
I have Done Every think but still Production Order is create.
CM50
OIOI
CO02
Payal -
Blocking of work center capacity for capacity planning
How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?Hi,
In capacity header details screen not exactly as "can be used for capacity evaluation " but
"relevent to finite sceduling"
"can be used for several operations"
"long term planning"
these all indicators you can deflag this and check the results ,it may helpful to you. -
Work center capacity header freezed
Dear Gurus,
we're not able to edit the work center capacity header. not able to edit the start and finish times.
it is happening only for one work center. in other work centers same capacity category is editable.
Please help us in resolving this.
Regards,
GowriHi,
Check your work center categeroy definition for which edit is not possible.
The work center category determines which data can be maintained in a work center.
Each work center category is assigned to the applications (for example, production, plant maintenance or quality management) whose menus allow you to maintain work centers with this category.
Each work center category has a number of screens assigned to it which the system displays when work centers of this category are displayed. The screens contain groups of fields (for example, scheduling data). Depending on the work center category, you can make field selections on these screens (for example, defining required entry fields).
Thanks,
nandha -
Any ideas what tables work center capacity gets its data?
I am looking at cube 0pp_c13 in BW and it looks at capacity. I can't seem to find the underlying table it pulls from to populate the structure. would anyone know where to look? I've looked in the code and it seems like it is already filled by the time it gets to the extractor so i can't tell where it pulls.
thanksHi,
Pl check table:CRCA
Work center capacity is allocated here.
Regards,
Senthilkumar SD -
Long-term planning: planning details of work center capacity
Hi,
we need to know what is the effect on planned production orders (generated by MPS, transaction MD40) of the flag <b>“long-term planning”</b> in planning details of work center capacity (table name: RC68K; field name: KAPLPL). We made a test analyzing planned orders scheduling details in <i>Stock requirements list</i> (MD04) and in the <i>Planning table</i> (CM21) in both cases: with "long-term planning" flag set and without this flag for the same work center.
The schedule of planned production order on that work center is the same in the two instance.
Could you suggest us something?
Thank you.Hi Rudy,
Purpose for carrying out Long Term Planning to simulate impact of Future Demand Program on
u2022 Material Requirements
u2022 Capacity Requirements
u2022 Material Cost budgeting (activity by Accounts dept.)
T.Codes used -
u2022 Demand MD61, MD62, MD63
u2022 Scenario Creation MS31, MS32, MS33
u2022 LTP Variant Creation & Execution MSBT, SM37
u2022 LTP statistics Evaluation SM37, MS04
u2022 Data Set Up MS70, MSB&
u2022 Evaluation based on Set up data MCB), MCEA, MCEB, MCEC
u2022 Capacity Evaluation CM38
To Summarize -
u2022 In long-term planning, production plans for future demand programs are simulated using MRP runs with reference to the planning scenarios.
u2022 The parameters for the simulation in the simulation planning area are defined in the scenario.
u2022 The Evaluation of LTP Statistics enables identification of Material for which LTP processing was terminated.
u2022 The Data set for purchasing & Inventory Control enables reports for demand analysis
u2022 LTP run with setting for u201CLead time scheduling and capacity planningu201D enables simulation of capacity situation/overload on work centers.
Hope it is helpful to you.
Srini -
Work center capacity graphical view
Greetings!
How do I see work center available capacity in graphical form?
Also how can I see work center capacity utilization in graphical form?
-HemantHi
I don't exactly remember, the T-CODE is CM02 or CM03.
Regards
MUHAMMAD HUNAIN AHMED -
Capacity planning at Work center Hierarchy level
Hi,
I have created Work center Hierarchy, now want to see the cumulative capacity of subordinate work centers at Superior Work center level, but using cm01- std overview, i can't see.
Can anybody tell me , what-ever is missing?
with thanks,
Rasika
9869028103HI Mangalraj,
Thanks for your reply. I had tried that , even though there is no cummulation done.
System is showing same error ,as 'There are no capacity requirements for the
selection and settings'.
what i have given input is Superior Work Center, Plant and Planner group.
I didn't mentioned the capacity at superior WC.
PLEASE HELP.
Rasika. -
Varying Maintenance Work Center Capacity by Days of the Week
I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week. I got an answer and it worked.
We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays). Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010. When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date. It's also the same capacity as shown in the 'Standard Available Capacity' section.
I looked back at the work center I had modified previously and it's showing the same thing. It's like it's ignoring the validity dates.
Any ideas?
David MacindoeDavid,
I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
Regards
Narasimhan -
Updating Work Center Capacity Header Data (UoM : KAPEH)
Hi All,
Using an LSMW all the Work Center were created, but it was having a wrong value for the Capacity header data unit of measure KAPEH. Due to that it's giving an error of " In table T006, entry ****** is missing".
I tried to maintain the Time Dimension using SPRO but I can't create the value which has been passed as HR (Hours), because it's already used by some other UoM.
What would be the way one should update the value of KAPEH.
Thanks & Regards
Harryin the t. code CUNI or OPCF
Select the time intead of AAAADL , - Next to unit of measurement
and click Unit of measurement
and Create a new time unit as HR
It will solve your problem
or create a LSMW for CR02 to change the field KAPEH HR to H
this will solve your problem -
Reg: Combined work center / Capacity requirement planning .
Hi,
i need few informations regarding work center.
1. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.
Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..?
We are planning to carry out Proper scheduling and capacity planning for this resource.
3. And May i know how to carry out Proper scheduling and capacity planning of resource.. So if capacity is not available ,i should be not able to go-head even with the releasing of order. How to carry out this. Is any customization required.
4. Can we create combined resource Ex: Crane and laddle.
I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?
Please let me know.......THANK U IN ADVANCE.
Edited by: dan01234 on Dec 30, 2010 6:21 AMDear
Frist of all , I would appreacite if you can create seperate theard as you have multiple question .Refer : http://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement
However , please find the answers :
1.. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
Yes you can with Usage Type 009.But there may be diffienece in Standard Value Key and Formula Key which will be used for calcuating activity and also Capacity Reuiqemenet .
.2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..? We are planning to carry out Proper scheduling and capacity planning for this resource.
A resource is plance where certain operation will happend sequentially as per Master Recipe or Routing .If you have Plate where you carry our certain engineering optiaon rather utlising thoem at requorce to excute the opration , then you can very well create them as resource or work centre .This Resource /Work centre will be having optaion , material , scheuling , CRP etc .Do u think that u will doing the same for Plate ??
If you are interested to carry out CRP/Scheduling the refer this theard : Capacity Leveling of Work Center
4. Can we create combined resource Ex: Crane and laddle.I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.? :
Yes you can if both of them are intregal part of the resource /work centre as per as Setup , Machine , labour hrs is concern based on selection of Standard value Key and Formula Key .Wor centre or Reosurce cost captured through Actvity type ( KP26 with fixed or variable rate aginst costing elenemts) and Formula Key as assinged in the reosurce or work centre -Costing tab .
Check and revert
Regards
JH
Maybe you are looking for
-
Outlook for Mac no longer supported????
can anyone confirm that mountain lion no longer supports sync with Outlook and you can't sync Outlook with icloud? This is what I am being told by support but seems too rediculous for words?
-
I want to install onyx but my security preferences won't let me download it. Is it safe to change them and download from an unidentified developer? Will they be able to access my information?
-
Hdmi carries only sound but not people voices
I have an early 2012 macbook air and an hdmi cable with hdmi port to the TV and thunderbolt/mini display end to my mac. When browsing and watching youtube videos, it carries both picture and sound/voice nicely, however, when I play dvd/bluray movies,
-
IPhone works great , Just have a new sim card installed
I read a lots of comments about the Iphone 4S . I had all the problems where it did work for a few minutes and tried everything . Main thing is you need a new sim card 128mb not the 64 . Do not use your old Sim card that you have on the Iphone 4 , Lo
-
3/15/2011. I have the connection to play my iBook files on my television. How can I also play my television on my iBook (and its monitor)??? Many thanks for replies. C Yopst, Chicago, IL