Work Center Daily Capacity
We have a location changing to a plant maintenance schedule where the number of hours worked and the number of available workers will vary each day of the week, however each day of the week will be the same one week to the next, ie., all Mondays will be the same, all Tuesdays will be the same and so forth. Can the maintenance work centers be configured with unique daily capacities?
David Macindoe
David Macindoe,
Yes, it can be configured. You should be able to set the same up from inside the capacity header by creating a new interval and or shifts.
Choose the "change interval and shift" push button from the capacity header screen of the work center.Choose Insert new interval from here and insert a date range, for ex starting from Monday of next week till 12/31/9999 or appropriate and make sure to choose length of cycle to be 7 days, and then choose enter. 7 more line entries will be inserted , and for each entry you can specify the start time, end time, utilization factor and number of capacities.
Regards
Narasimhan
Similar Messages
-
Rotating Off-Days in PM Work Center Available Capacity
Good Day!
Background:
Each Maintenance person is represented by a PM Work Center.
Maintenance person have a rotating off-days which cycle repeats after 21 days.
Requirement:
We want to reflect rotating off-days to PM Work Center Available Capacity.
Options tried but did not worked;
Shift Definition Grouping: Off-days is in HR's Period Work Schedule but only Daily Work Schedule can be pulled into Shift Definition Grouping and then into Work Center
Reference Available Capacity: Can be achieved via Shift Sequence Key in interval of available capacity but needs to maintain for each week with on-going maintenance
Do anyone has implemented this similar requirement that we can reapply/build on?
Your valuable inputs are deeply appreciated.
Thanks!In work center capacity header
click change intervals
click insert
Enter manually
valid from and valid to dates
No of ind capacity - 0 -
Function Module to get a work center's capacity requirements (load) within a given period
Hi all experts,
Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
Selection Parameters: Work center range from and to, Period from and to
List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
Please help to provide some leads for a FM or the logic.
Best Regards
PhilipHello Philip
The following function modules should be useful:
- CY_PRIMARY_SELECTION - Function module for selection of orders for the work center
- CY_SECONDARY_SELECTION - Check for additional criteria
- CR_CAPACITY_AVAILABLE_PERIODS - Reads the available capacity from work center
- HR_PERSON_READ_TIME_INFO - Reads the available capacity from person (modification)
- CY_GET_PART_CAPACITY - used only for the first period to read backlog
- CY_LOAD_DISTRIBUTION - Distribution key
Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
BR
Caetano -
Function with production/planned orders of a work center or capacity
Hi,
does anybody know if a function exists which we could use in a tailor made report, which will list all production and planned orders for a given work center or capacity ? The aim should be to create a report which is more or less equal to the capacity evaluation overviews in CM01-CM07, but then in ALV and with customer specific fields in it.
Many thanks for any valuable feedback !
Kristof Wylin.Will be done in another way. Orders will be collected via KBED.
-
Capacity evaluation for internal and external workers in one work center
Hi ,
Normally in all Industries you have internal manpower to execute work. Say I have a work center named "Mechanical" , I will have 5 people working 8 Hrs for 5 days in a week. We usually configure this in capacity tab of work center for capacity category "002-Labour". In scheduling tab we configure sceduling data for a capacity category "002-labour"
In many industries , depending on load, many time, external labours are hired to give assistance to internal workers. Technically it is like adding one more capacity category "PER-Person" and adding number external labours there and in scheduling tab adding required configuration for "PER" capacity category
Total capacity for any given day would be available capacity in capacity category -002 + available capacity in PER capacity category.
However in scheduling Tab , scheduling basis can be either 002/PER.
How can we add more scheduling basis to refer to more than one capacity category ?
Any other alternative to above problem statement?let us say, you have a work "Pump repair" which is done partly by internal workers say 2 people and 1 external labour. Let us assume the number of people in 002-labour is 2 (internal ) and capacity in capacity category (PER) which is external work center is 3 (Total 5 ).
Now if I I leave scheduling basis as blank, then system will calculate scheduling based on 002 capacity category as it is "Major" . But I want system to consider both 002 and +PER .
You are suggesting two line items "Pump Repair internal" and give 2 numbers and duration as 8 control key PM01 . Create another operation "Pump repair External" use control key PM02 (where in scheduling is enabled) where 1 number - 8 Hrs duration is maintained with another work center.
If I maintain 2 different work centers and two different operations, this will work. But for customer this is just one work and capacity evaluation should be based on capacity category 002 and PER .
How to solve this by maintaining one work center , two capacity categories in same work center and maintaining one control key PM01 in operation? -
Pooled capacity, machine work center can have labour?
Dear All,
1) We have eg. a common pool of welders for Location A and Location B welding work centers. How do we setup the pooled capacity and assign to them?
2) We have eg. 2 CNC machining work centers (Vert and Horiz) but we have labour support to do machine setup, labour related jobs etc. If we need to perform labour capacity planning in this machine-based work center, is this done by maintaining a separate work center for this labour support and assigned to the same Cost Center? Or for machine-based work center, labour capacity planning is not required?
Thank you for contributing.Dear
We have eg. a common pool of welders for Location A and Location B welding work centers. How do we setup the pooled capacity and assign to them?
There is no differnce between pooled capacity and available caapcity .Only thing is you can utilised this capacity pool for various work centre level.
To do that , Goto - SPRO-Production -BAsic Data-Work center-Capacity Planning-Define Capacity categories -Create Capacity Categoery for common pool of welders , Create Capacity in CR11 and assing them into Work cetre Capaicty tab-Pooled Capacity Catogeries and maintian No of indivuial caapcity in Capacity Header -Standard Available caapcity-Indivual Capacity ( Total Number of welders with working timing , utilisation ) .
Quest2 : To address this issue , you can select Setup , Labour and Machine in Defalut tab of same Work centre with proper Standard Value Key .Now , as they are all part of the Production activity , so you can keep the same Cost Centre ( Production Cost Centre ) in the Work centre tab with Formula Key of Labour ,Machine and setup .Goto CR02-Default Tab and Costing tab .
Hope this is clear
regards
JH -
Work center capacity graphical view
Greetings!
How do I see work center available capacity in graphical form?
Also how can I see work center capacity utilization in graphical form?
-HemantHi
I don't exactly remember, the T-CODE is CM02 or CM03.
Regards
MUHAMMAD HUNAIN AHMED -
How to find the reporting for work center machine wise
hi gurus
My question is . In one work center machine capacity category 2 machines are used. Client is asking the report machine wise. i.e as 2 machines are available .What is the capacity utilisation for each machine.Provide me the information for this. Thanks in advance
kalyanHi Kalyan
you have to make some settings in production order & work center first.
In work center capacity header ,you have to make indiovidual capacities as 2.
In the same capacity header screen by going through the menu Goto--->individual capacitities define these different individual machines.
In the production order operation detail screen goto " capacity reqmt assignment " assign the quantities for different work centers.
Adfter this in the confirmation CO11N you have to fill the split field accordingly& confirm different wortk centers seoperatley.
Then you can the report in the CO14 for diferent work centers.
you try this.
Regards
YMREDDY -
Work Schedule in HR Master Data Feeding Work Center!
Hi,
I have several questions on how work schedule in HR master data relates to the work center for capacity planning.
1. How do we assign the employee to a work center? is that in the HR master data or work center or some other transaction?
2. If we can assign an employee to a work center, how the work schedule in the HR master data feeds the work center capacity? Is there any button that I can control whether I want to feed the work center capactiy from HR master data work schedule or from manual input directly to work center?
3. If I can feed the HR master data work schedule to work center, what do I need to do to reflect the vacation time or sick time which is not in the work schedule in the HR master data to the work center?
Thanks,
TingHi,
For starters, please take a look at the following discussion:
Logistics Work Center and HR Work center.
Credits: SDN members
Hope this helps.
Donnie -
Table with all versions of capacities (work center)
Hi,
I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
Thanks
DedeDede,
You will have to use a combination of tables, perhaps a SQVI to join tables
CRHD - Work Center Header (link work center to capacity ID)
KAZY - Capacity version
KAPA - shifts and intervals
In KAPA the times are displayed in seconds
Hope that helps,
~Sunil -
What is the link between material processing & work-center
Hi all,
I have two types of material & few work center.
How can I determine, that which work centers could be applied over a specific material for the material processing.
Regards,
SaurabhDear Saurabh,
You may allocate one or more capacity categories to a work center. Capacity categories are defined in customizing. Examples are labor, machine, energy and so on.
You must maintain data to enable the system to calculate available capacity at that work center for that category. Examples include calendar assignment, start time, stop time, length of breaks, utilization, number of individual capacities. This is maintained in the capacity header screen of the capacity category for the work center.
If you indicate that a capacity is pooled, then it may be used by several work centers. An example is a setup team. They can perform setups at several work centers but can only work at one work center at a time.
Routings within a routing group are used for producing similar materials. One routing group can also contain routings with similar production processes.
The alternative sequence enables you to select alternative operations for a sequence of operations - for example in the case of different work procedures for different batch sizes or capacity bottlenecks.
The parallel sequence enables you to process operations independently of others.
A routing contains the operations to be performed, their sequence and the various work centers involved to manufacture an item.
A routing can include the following:
*The standard values (times) for activities such as setup and processing
*Work centers where the operations are performed
*The material components allocated to the operations
*Any production resources / tools necessary to perform the operation
*Inspection characteristics for operations where inspection is carried out
*Instructions of what to do at each operation
*Skills required to perform the operation
Reward points if it is helpful.
Regards,
Naveen. -
Hi,
When I create a work center, in capacity header data, 'long term planning' checkbox is ticked by default. How to remove this default setting?
Regards,
YogeshDear,
Go to OP36 enter your plant and Capacity category say 001 go in details and remove it. Then create new work center and check. -
FM for checking Available Capacity of Work Center
Dear All,
I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it). It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process. Any inputs would be appreciated.
Thanks in advance.Dear
Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
If you are stick to FM : Help about available capacity
Hope this will address you issue
Regards
JH
Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM -
Capacity Leveling of Work Center
Hi all,
I have a problem with Capacity of Work center (WC).
I have a Internal Activity, and i assigned a WC for this Internal Activity. WC's capacity is 100H/day for 1 number of element.
Work of this WC is 250H, duration 5 days, number of element 1. Default capacity of this WC is distributed by Distribution Key define in Activity. . And they are divided equally between factory days in 5 day. That is capacity requirement is 50H/Day
So, i want to edit this WC's capacity following value:
Day 1: 100H/day
Day 2: 50H/day
day 3: 0H/day
day 4: 0H/day
day 5: 100H/day
How can i do it?? I try to use Dispatch Manually but i cant solve this problem.
Please help me for this case.
Thank all.
NLQDear
Capacity leveling depends on some of the basic set up of Capacity Requirement Planning .You need to have proper CRP set up frist .
Couple of check points : -
Did you work centre is relevent for finitie scheduling in CR02-Capacity Header and wht is the over laod percentage for work centre ?
Did you have Capacity Requirement Related Set up like Over all profile , time profile , Startegy Profile -OPD0?
Did your Capacity Check -OPJK -Order Control at order level are active for availibilty Check 1 and 2 and assinged Over all Profile ?
Set up :
1.Please assing a operation control key like PP01 where Details Capacity Check and scheduling is active .
2.In CR02-Work centre -Capacity Header -You should have Follow check box marked
1.Releven for Finitie Scheduleing
2.Can be used for multiple Operation
3.
3.OPU3/OPU5 -Define Scheduling paramter -Mark Scheduling and Capcity Check for planned order or production Order
4.In SPRO -Shop Floor Control-Define Production Scheduling Profile -You need to matian the relevent Parameters like
1.Schedueling Automatically 2.Scheduling Log 3.Adjust Scheduling -Basic date , Depedent Requirement date 4.Scheduling Type -Backward etc .
These are all basic level set up beside CRP overall profile and other profile like strategy /time etc which may in place as you are analysing in CM01.
Please find below some of the useful CRP details : Refer this threads which are self explaintory :
http://help.sap.com/saphelp_47x200/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm
http://www.scribd.com/doc/17026521/SAP-ECC-60-PP-Capacity-Planning-httpsapdocsinfo
capacity planning
http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf
Capacity Planning
capacity requirements planning
How to dispatch operation to do Capacity Leveling at Work Centre Level :
1.Frist Check the over load at work centre . Goto -CM07/CM05-give plant only -then hit the Stnadard view -You will find weekly or daily baiss load ( Requirement , Avaliable Capcity , Overlaod etc )
2.Check the week in which days you are tring to dipatch -if you selet the week check box and double clik it will show u all the dataiul load .Basde on the available capacity in other week-days u need to dipatch in CM22/CM31 or CM25/CM21
While dipatching in CM22/CM31-Select the Stragegy button on the top header -Mark Date entry when dispatching so that when you select the operation of any production order or planned order for certain work centre , it will pop with window having information of Date , Work Centre , Time .Onec you did this you will receive Scheduling log with certain information .
Hope this helps
regards
JH -
Capacity Planer Group --- Maintenance work center
Hi,
I have a query
1. like do we have to create capacity planner groups same as the planner groups in equipment master data....Do they have any link??
2. What would be the start time and end time in maintenance work center, for 24 hrs open manufacturing industry with 3 shifts???
thanks
DMHello Deepak,
There is no relation between capacity planner grp & Maintenance planner group...These are 2 different things..
Now the work centers can be defined for the technicians if HR module is not implemented...
To perform the capacity planning for the technicians, there daily working hrs must be maintained in the system..Though the maintenance is working for 24 hrs,Single technician cannot work for entire 24 hrs..
Hope this will help..
Thanks
Maybe you are looking for
-
How to get a Header UDF value in a FMS ?
Hi ! How is it possible to get a Header UDF value from a Formatted Search in a header ? If we don't want to create as many FMS as there are marketing documents in the system, how is it possible ? Can we have a syntax like the following ? SELECT T0.
-
Syncing contacts between E71 and Outlook
Hi there I have a brand new E71, and a thing of joy it is. One small thing about PC Suite syncing though: there are numbers in the phone that just don't make it into my Outlook contacts. I have PC Suite version 7.0.8.2 and Outlook 2003, on a Windows
-
Hi Bw Gurus, I have a requirement to provide a report on De Installed Equipments from CRM and the asset value from ERP. I can get information like sevice order no, contract no , age of the equipment from the due data etc from CRM. Where as the Asset
-
SSO2Ticket within servlet filter - Orionserver
Hi, I need to validate user that already logged in via SAP portal. So I get ticket as cookie. I read this cookie and try to validate it with SSO2Ticket.java that is JNI wrapper for C application. For this I put 2 files in system32 folder: sapssoext.d
-
Restoring Aperture Database from Vault a Nightmare
When my Aperture HD went south with the database of 90,000 images I imediately bought another 1.5 TB drive and started the restore from the Vault expecting to be able to use Aperture as before. It took 24 hours to restore the database. Now I can go b