Work Center displaying wrong in CO14 Transaction
Dear Experts
We are facing a Problem at time of Confirmation Through CO11N,Under work center field there are 2 fields Current to Confirm & Planned to Confirm,user is entering same Work Center in both fields,But when we save the confirmation & check in C014,we are seeing in Current to Confirm field some Other work center which is not there in Routing.
From where system is picking this work center.
I am not able to understand.
Is this a customisation issue,Or a Master data issue.
Regards
Sandeep patil
Hi Sandeep,
Planned to confirm work center is Production Order work center
Current to confirm work center is actual running work center (becase due to some reason for doing other work center)
To Check confirmation parameters (SPRO)
OPK0 (may be included Details area 0410 or 0420)
Regards,
Sankaran
Similar Messages
-
Where can i find Main work center field value in il03 transaction ??
Hi experts,
Where can i find <b>Main work center</b> field value in il03 transaction.
Iam looking for the table from where that value will be filled.
thanks
SureshHi anji reddy,
No that filed is not avaiable in that . can please tell some other soulution ...
ASAP...
thanks,
Suresh -
Dual Core Center displaying wrong CPU clock speed
Hi,
I've got the 965 Platinum board and I have overclocked my E6300 Allendale to 2.331ghz (from 1.86ghz). My problem is that the MSI Dual Core Center is showing my CPU as being clocked at 2.997mhz. It seems to think that, because I've upped the FSB to 333mhz, I must have a CPU with a multiplier of 9 instead of the 7 of the E6300.
If Dual Core Center is not reading the CPU clock correctly how can I trust that it's reading the temperature right (which is really the only reason Ihave it loaded at all). I know the CPU is only set at 2.331 because the BIOS gets it right, System Properties gets it right and Intel's Thermal Analysis Tool gets it right. It's only the Dual Core Center that gets it wrong.Make sure you are using the newest version of DCC.
Other than that, DCC might not be the best tool to monitor your system.
Quote
how can I trust that it's reading the temperature right (which is really the only reason Ihave it loaded at all).
To monitor core tempertatures use Coretemp: http://www.thecoolest.zerobrains.com/CoreTemp/
A very good program to monitor all kinds of stuff ist everst 3.5. -
Work Center Capacity Shift Interval
Hello,
I'm looking for a function or Tables from which I can get Work Center Capacity Shift & Interval data, Transaction CRC3.
Any help in this regard will be highly appreciated.
Regards,
Hashir Ahmed.hi,
check these tables.
AFIH Transparent table Maintenance order header Application table (master and transaction data)
AFKO Transparent table Order header data PP orders Application table (master and transaction data)
AFRU Transparent table Order Confirmations Application table (master and transaction data)
AFVC Transparent table Operation within an order Application table (master and transaction data)
CABN Transparent table Characteristic Application table (master and transaction data)
CBPR Transparent table CO-ABC: Activity Master Table Application table (master and transaction data)
COEP Transparent table CO Object: Line Items (by Period) Application table (master and transaction data)
CRCA Transparent table Work Center Capacity Allocation Application table (master and transaction data)
CRHD Transparent table Work Center Header Application table (master and transaction data)
CSKS Transparent table Cost Center Master Data Application table (master and transaction data)
CSSL Transparent table Cost Center / Activity Type Application table (master and transaction data) -
How To Get Value PRD No TO Work Center NAME
Hi Guru
i created Zreport the Parameter are P_AUFNR TYPE AFKO-AUFNR OBLIGATORY ,
P_ARBPL TYPE S022-ARBPL OBLIGATORY .
Currently i am doing
i enter any Production Order No and Work Center are entering Manually .
i want
after entering Production No User Press Enter Button
and Work center display automatically on F4 Help Related that Production No.Hi amit,
You acn use event At selection-screen on help request.
In this you can use following function module to get screen field value.
CALL FUNCTION 'DYNP_VALUES_READ'
EXPORTING
dyname = sy-repid
dynumb = sy-dynnr
TABLES
dynpfields = lt_dynpread
depending on this value of prod ord on scrren you can restrict next F4
hope this will help.
Thanks Dhiraj. -
How to find work center in REM from the material Documnet number
Hi ,
We want to develop a Z report for the repetitive manufacturing cycle. Please let me know the logic how to get the work center from the material document that is posted after backflushing MFBF tranaction.
I will elaborate it little further. From the material document number that is genearted out of confirmation from that document no how can I find the work center so that we can so show the throughput of each work center.
Please avoid standard transaction of MCRP etc.
Thanks & regardsDear Kumar,
I'm not sure whether you can get the work center details,but you can get the production version number from you can get the
rate routing details.
Give a try by passing the document no to table BLPP and get the document log number and pass on the document log number to
table BLPK,by which you can identify the production version.
Also give a try using this FM,RM_DISPLAY_AFRU_REM,I guess you can get the exact work center details from here.
check and revert back.
Regards
Mangalraj.S -
Displaying the Capacity Load in a Work Center
Dear Sir,
i would like to Displaying the Capacity Load in a Work Center for the previous periods . that is for the last two months i would like to know the capacity load in my work centre. in mc01 capacity load are displayed for the future but not in the past
thanking you
arun kumarHi,
In CM01 transaction Menu click on Settings -> General;
In the data area Interval to be evaluated start field will be blank by default. you can enter in -value so that start date would go in past.
click on Time periods button . check Period of database selection From date. You can get details only from the date for the Overall profile attached.
if this has not solved your purpose, you have to change OverallProfile.
Planning -> Profiles -> Overall Profiles.
Select another Overall profile.
Regards,
Krishna Mohan -
Work Center not appearing in CM25 display
Hi All,
We have three work centers assigned to three consecutive operations in a planned order of plant XX. We have a Z (modifed version of SAPCRPG001)overall profile in CM25 with the initial selection screen where we give plant XX as the input and execute the transaction. In the output we are able to see only the data of the first workcenter whereas the other 2 doesnt appear at all.
However when viewing the same in standard profile SAPCRPG001, we are able to see the data for all the three work centers. (Red Bar graphical view)
We are unable to find out how Z profile is restricting the 2 work centers from getting displayed in CM25 output for a given planned order.
I have compared the first work center with the other 2 and could confirm that there is no any change at work center level.
What could be the issue ?
Thank youHi Brahmankar & Dimas,
Thank you for the above message. We have checked the above settings and observed that it is for selection screen setup. However i would like to clarify once again the actual issue, that i am facing.
I have 3 work centers in a process order (as shown in attached image 1)
. Each have different operation time. When i view this order in CM25 using standard profile SAPCRPG001, i am able to see three workcenters with respective loads along with the red bars in the graphical view (as shown in attached image 2).
Now, when i use the Z profile instead of standard SAP profile, I am able to see only one work center with its load and corresponding red bar in the graphical view (as shown in attached image 3). I am fine with seeing only one work center, but i would like see the cumulative load of all the three work centers against this work center i.e the red bar should be longer and euqivalent to the sum of loads of the three work centers.
I have explained the same in the attachment file with relevant screen shots. Please advice.
Image1
Image2
Image3 -
How do I create a new Work Center for the transaction launcher and links
Hi
The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
Regards
DeclanHi Robert,
Thanks again for taking the time to reply.
Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
Is this correct?
Cheers
Declan -
SAP HR : Wrong working days displayed in Z report
Dear Friends ,
I have made a z report for SAP- Hr to show working days of employee of a particular month
when I am running report for all the employees then working days are wrongly displayed in alv
report but when I am running the report for a particular employee then the working days are
correct . I have done debugging also , every thing is fine in debugging , Now I am confused
where is fault I have to run the report for all employee.
Kindly suggest .
Regards
Rihan
SAP-abaperhye ,
here, some code for your reference ,
LOOP AT it_empall WHERE pernr EQ stru-pernr.
SELECT SINGLE SUM( abwtg ) FROM pa2001
INTO absdays
WHERE pernr = it_empall-pernr
AND endda BETWEEN p_begda AND p_endda
AND begda BETWEEN p_begda AND p_endda.
"FOR RESIGN
select single begda from Pa0000 into enddt where pernr eq it_empall-pernr
and massn eq 'H6'.
"FOR HIRING
select single begda from Pa0000 into begdt where pernr eq it_empall-pernr
and massn eq 'H1'.
totdays = p_endda - p_begda.
totdays = totdays + 1.
if enddt GT p_begda and enddt LT p_endda.
X = ( p_endda - enddt ) + 1 .
workdays = totdays - x - absdays.
stru-kaltg = workdays.
elseif begdt GT p_begda and begdt LT p_endda.
X = ( begdt - p_begda ) .
workdays = totdays - x - absdays.
stru-kaltg = workdays.
else .
workdays = totdays - absdays.
stru-kaltg = workdays.
endif.
ENDLOOP.
Note : here p_begda AND p_endda are month start and end date.
and begdt and enddt ( these are employee joined and resigned date)
Pls suggest ..... -
Wrong Work center picking up Time sheet
Hi
Scenario is as follows:
Earlier Employee has HR assignment to one Work center 1 -WC1
Later, Employee was Assigned to Work center 2- WC2
Problem: When booking time sheet in CAT2 , for service order, WC1 was picking up, even though in Service order WC2 is assigned.
We have deleted the Employee HR assignment from WC1 , but still in Time sheet WC1 is coming.
Please suggest.
Thanks.Is it possible for anyone to tell, from where the work center is being picked up in CAT2. We are processing time sheet booking for service order. The work center in service order is something different than what is picked up in CAT2.
-
How to get a list of production orders for a work center?
Hello SDN Community,
I have an requirement to display in a pop-up window a list of production orders for a work center.
Does anyone know which screens/transactions would show this relationship?
Or better yet, does anyone know how to demonstrate this from the tables themselves?
Thank you,
Dean Atteberry.Hello Mangalraj.S
>>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
>>and execute,by this you will be able to see the operations for each order and to which
>>work center they are assigned.
The system I am working on is ECC 6.0.
For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc". But nothing that says PPIOO000 - operations and layout.
>>Or else in the in input screen of COOIS,enter the work center for which you want to see which
>>are the production order's assigned and execute.
For system I am working in, I do get a grid display when entering a work center. It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc." But no column with Work Center.
Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
Thank you,
Dean Atteberry. -
Work center selection during UD
harhe e Hi,
We have the following scenario,
Production guys confirmed order confirmation or make backflushing confirmation to update the WIP/FG stock,
then quality cleared such stock through posting to unrestricted or blocked stock or rejection store location,
Quality person requires during UD posting ,work center/Machine selection should be there in QA32 transaction,
so that the analysis could be made for the work center,
Best Regards,
DevendraUsing Inspection Point assignment, you can record the Work Center / Machine.
But with Inspection Point, you can't have F4 selection option in standard. You have to type the Work Center code manually which may prone to error.
You can check for some user exits to define Sub screens to pop up.
QEEM0029 User-Exit for Characteristic Overview Subscreen
QEEM0030 User-Exit for Subscreen: Characteristic Single Screen
QEVA0004 Exit for changing information line in usage decision header
QEVA0005 User subscreen for displaying add. data for usage decision
QEVA0006 Entry to usage decision transactions -
Read Routing and work center details from transfer order
Hello
I am using transaction LT31 to print a form for the transfer order.
The customer wants me to print a field that is in the work center details of the routing for this material and plant.
I can see this data with transaction CA02 where i enter material and plant,and then the work centers are beeing displayed.From here i can double click on the work center and see the field Supply area that i have to print.
My answer now is,how to read details on the work center starting from my transfer order number.Which is the table connection between transfer order table LTAK and the tables where i can find the work center details.
Thank youI have found the solution:
ltak-tanum = mseg-tbnum
read aufnr from mseg and go to afko
mseg-aufnr = afko-aufnr
read plnnr from afko and go to plpo
afko-plnnr = plpo-plnnr
from plpo read arbid and go to crhd
plpo-arbid = crhd-objid
from here,we can find the arbpl and the field that i was looking for PRVBE -
Set up of System Monitoring with SPS 15 only through "Work center"
Hi!
We use SAP Solution Manager SPS 15 and would like to set up System Monitoring function in order to monitor satellite systems.
Is is only possible as of SPS 15 with tcode "solman_workcenter"?
I have heared as of SPS 15 the tcode "dswp" provides only Display view...
Thank you very much!
regards
H. ThomassonHello
Is is only possible as of SPS 15 with tcode "solman_workcenter"?
--> If you want to configure Solution Monitoring, you can follow rkt in service market place. With SP15, SAP has given additional functionality to access solutions or projects through work centers. Now its up to you to use this functionality or you can directly go to solution_manager or DSWP to configure, doesnt matter.
I have heared as of SPS 15 the tcode "dswp" provides only Display view...
--> Have you tried? Its not Display, either way through work center you are going to access the same transaction. Please check.
Thanks
Sharmishtha
Maybe you are looking for
-
Process & optimize issue with timeid
Hi, I work on script logics with BPC 7.0 xls2007 sql2005. I need to process my application but I have this issue message : - Errors in the OLAP storage engine: The attribute key cannot be found: Table: dbo_tblFactEPS, Column: TIMEID, Value: 100000
-
Satellite M40-145 - low DVD recording speed
My DVD-RW isn't burning over 2.4x speed. I tried with several DVD-R/+R brands, updated Matsu****a driver firmware, reinstalled recording software (Nero 6 and 7) but the problem mantains. What shoud I do?
-
Skype for business and integration with my pabx
how much would it cost for me to get skype-for-business for 500 users ? who can assist me with the information?
-
IPhoto - cannot view multiple photos & my thumbnails are gone
When I open iPhoto, suddenly it is only showing 1 photo at a time; my multiview is completely gone, as is the scrollbar of thumbnails at the top. I tried going to View>Thumbnails, but the options under that are light gray and non-clickable. I don'
-
How do I reinstall Flash Professional CS4?