Work Center in equipment master

Dear All,
We have created equipment master for 1000 palnt and then assigned work center belongs to 1100 palnt.System accepted 1100 plant work center.My requirement is  plant number and work center palnt must be same.

You will need to develop something to stop this occuring.
The the user-exit link at the top of this forum
PeteA

Similar Messages

  • To find 'Maintenance Work Center' for Equipment (without Production order)

    Hi,
    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client -->  It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • WORK CENTRE IN EQUIPMENT MASTER DATA

    Hello All,
    In IE01 tcode > creation of equipment , pls tell me what is the relevance of work centre in location tab ??
    Thanks,
    Sunny

    Hi
    Work Center
    Definition:Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    Use
    Together with bills of material and routings, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks.
    Data in work centers is used for
    Scheduling
    Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated.
    Costing
    Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
    Capacity planning
    The available capacity and formulas for calculating capacity requirements are entered in the work center.
    Simplifying operation maintenance
    Various default values for operations can be entered in the work center.
    Look at CR01 ,CR02,CR03 Transaction
    table : CRHD Table
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • Table to find maintainence work center in equipment

    Please let me know  where maintenance work center data for an equipment is stored ...I searched in EQUI/EQUZ ..but could not find ...PP workcennter is there but Maint workcenter is not found in these tables

    Hi,
    EQUZ-GEWRK  is the work center on organization tab
    ILOA-PPSID is the work center on location tab
    In each case the work center is stored in a internal format. To find the actual work center / plant, find the CRHD record where OBJID field contains that internal number.
    -Paul

  • PP work center capacity and link in Equipment master

    Dear All
    My client has five equipments which he is clubing them into one work center with five capacities. In equipment master i have given for respective equipments i have given PP work center locations but when i create a maint order for one equip then in planning the capacity avalability is affecting the entire work center for ex if the total work on one equip is 12 hrs then only 8 hrs of capcity should be deducted for to day and 4 hrs for tommorow but in plannig all 12 hrs are getting deducted in todays capacity itself.
    Pls give some inputs from your experiances
    Thanks and Regards
    Pankaj

    Hi,
    Even if we have more than One Equipments in the same work center, PP-PM integration will work.
    This is the standard scenario in any Process Industry or in case of an Assembly line of a Automobile manufacturing industry.
    So it should work. Please check the following points again,
    1. Assignment of Work Center to Equipment Master
    2. System Condition - '0' Not in Operation in Both header as well as against Individual Operations (in Work Order for that Equipment)
    3. Work Order has been released.
    4. Same Work Center is used in Routing and the same is Planned for a period.
    If we have all the above points right, then while dispatching the Production Order system should show the Period of block and should shift/plan the PO accordingly.
    Regards
    Sam

  • Table Link for EQUNR (Eqpt Number) and GEWRK (Main Work Center)

    Hello,
    I need to fetch the main work center from equipment master. I need a direct table link between the equipment number and mainwork center. We are getting a link of equipment number (EQUNR) to work center (ARBPL) and a link of work center (ARBPL) to main work center (GEWRK). But the problem with this scenario is - main work center is not getting fetched from equipment master once work center is missing.
    We want a direct link through some table between EQUNR and GEWRK.
    Puneet

    Hi Puneet,
    Appreciate your problem !
    Many a times in such a situation (which I presume exists where no direct link is available between fields); we have 2 clear cut approaches -
    Approach 1:
    Develop a SAP Query, Functional Area/Infoset, and User Group ( using T code :SQ03,SQ02,SQ01 respectively )
    While developing Functional Area feed in these 2 tables (Table 1- equipment number (EQUNR) & work center (ARBPL) and Table 2 - work center (ARBPL) to main work center (GEWRK) with  work center (ARBPL) as the Primary Key- bridge to join these 2 tables.
    In SAP Query Development; you may take Plant as the Selection Field or any other field as per business requirement to make a search in the query.
    Now when you execute this query, you will get a complete Download of (EQUNR),work center (ARBPL)  and main work center (GEWRK) in one table.
    For SAP Query, you may also approach your ABAP Team Member. This is a cleaner approach than the other one.
    Approach 2:
    Take SE16 download of the Table 1 and Table 2 and join them in Excel (using vlookup if required).This approach is however limited to the data volume that you have to process.
    Please let me know, if you get stuck !
    Thanks,
    RAVI.

  • Settlement to work center

    I had problems in my company now, in the module PM .. at the moment when the settlement is introduced to the imposition of a cost center in the equipment, but now changes are so important that at the time of settlement is introduced wanted to Cost center of Main work center, where I can do that may need guidance from the expert

    Hello Ramses,
    Though your query is not clear. I want to tell you what I have understood.
    Currently the settlement is done & cost is being posted to the cost center of an equipment.
    Now you want to settle cost to cost center of work center.
    Is this the maintenance work center? or the work center which uses that equipment?
    If it's maintenance work center then settlement of cost to it's cost center doesn't support the logic at all. It means that the work is carried out by the work center & the cost is accumulated to it again. How is this possible?
    If it't the work center which is in-charge of the equipment then you can enter the cost center assigned to the work center, in equipment master.
    With this the requirement can be fulfilled. Also seek help from your finance experts to get the more clarification.
    Hope this helps.
    Mangesh S

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Estimated Start time in notification based on Time defined in Work center

    Hi,
    Following Satish post- I am trying to find solution to the same  problem so i will appreciate any advise.
    When the notification is created ,the estimated start time should be based on priority .This in iteslf is pretty straight & simple. However if the reported time is after work hours or towards the end of work hours or weekends , the estimated start time should be reflected accordingly based on factory calender & work center time schedule.
    In other words the estimated start time should fall within the window of work hours available.
    Example:
    Presume the the working hours for the Organization are 8:00AM to 5:00 PM & a call comes for service at 4:00 PM. Also say , for high priority the defined response time is 5 hours. In such a instance the estimated start date should be set to next day at 11:00 AM.
    Appreciate your help for the configuration that need to be done
    Shirly

    Hi,
          I think ur talking about notification malfunction start time .. currently it just takes the system date and time by default .. and if you need work center timings i believe first u need the eqpt /F.loc to get the work center data in notificaiton ...
    I think u can get these dates can be modified while saving by using user exit  : QQMA0014 QM/PM/SM: Checks before saving a notification or BADI   IF_EX_NOTIF_EVENT_SAVE , but at the same time the eqpt or F.loc have work center details in master record ...or work center needs to be entered manually in notification ..., pls check up ..
    regrds
    pushpa

  • Tables to retrieve work center for target costs

    Dear all,
    currently i developing a report which requires me to display the work centers and their target and actual hours and costs. I tried using production order link tables but they only show work centers that are related to planned costs. May i know which tables can i refer to, in order to retrieve work centers that contribute to the target costs?
    Thanks and Regards
    YM

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • Cost center for equipment

    Hello every one,
    I need some clarification regarding cost center of technical object. In FI asset number is having one cost center while we have to put one cost center in equipment master. When i settle my order system automaticlly pick the cost center from equipment master. Now i wana know that cost center of asset number and equipment master should be same or it should be different. Kindly provide some guidance on the same.
    Regards
    Abhishek

    hi
    I am not familiar with the business impact of specifying the same cost center to equipment and asset . i remember there is a porivison in IMG to update the same certain fiels automatically whenever any of the master record is changed.
    For ex.if you change the equipment master record ,it will get updated to the asset master record also
    As i said earlier it will be better to specify the same cost center in both the cases.kindly take guidance from FICO person also
    regards
    thyagarajan

  • Work center & Routings migration

    HI,
      i want to migrate the Work center master Data and Routing master data thru ALE,
      i didnt get any Process code and message type for those.
       which is the best process to migrate Work center and Routings Master Data...
    Reply me ASAP,
    Regards
    Satya

    hi
    u can go for LSMW for migrating WORKCENTRE and Rate routing
    for uploading  work centre  the details r given below.
    Object               0260   Work center
    Method               0000
    Program Name         RCRAPDX2
    Program Type         D   Direct Input
    for Rate routing:
    Object               0170   Routing
    Method               0001   Batch Input
    Program Name         RCPTRA01
    Program Type         B   Batch Input
    regadrds
    raghu..
    Edited by: Raghuveer Puram on Dec 18, 2008 9:23 AM

  • To track the preventive maintenance work on the equipment itself

    Hi Experts,
    I have working on the requirement to track the preventive maintenance work on the equipment master data it self.
    I have thought of following way of  doing it.
    1. Create a charateristic "Plan no" having refrence to maintenance plan table & field (MHIS - WARPL)
    2. Create a charaterisic "Last completion date" having refrence to maintenance plan table & last date completion field (MHIS - LRMDT)
    3.combine these two charateristic in class say "Inspection data"
    4.Assign this class to equipment in classification tab
    5. Create a maintenance plan , generate order and complete the order.
    6. After doing this, these  data should updated in charateristic values as given above. But it is not happening.
    Am i missing something here. Or can you suggest me other way of doing this.
    Regards,
    Amar

    Hi,
         yes you are right we can use object information key and can navigate to required detail.
    But the client want the report in a tabular format.
    like Equipment no       Last testing done on   Maintenance plan no 
    There is one report in classification system that is CL30N in which you can find this kind of report provided the "Last Testing done on " and "maintenance plan no" you have used as  charateristics.
    Regards,
    Amar

  • Automatic assignment of Main Work Center in WO's

    Hi gurus,
    We massively uploaded PM plans and launched the WO's.
    Per default the system assigned the Work Center at Equipment level. Any idea how to change this setting?
    Thanks,
    VL

    Hi VL,
    In ECC 6.0 tcode IW38. execute tcode as per your required input parameter and get out put.
    For output at top go to Order>>>>Mass Change.
    There you will get option to change maintenance work center for all order.

  • Is it possible to find the Equipment for given PP work center?

    Hello PM Masters,
    Is it possible to find the Equipment for given PP work center?
    Please tell me which table will lend me the EQUNR when I have the PP work center (ARBPL).
    Thank you.

    Yes,
    Provided you maintain this value in Equipment master Location tab like this.
    And then query by this field in IH08
    Jogeswara Rao K

Maybe you are looking for

  • How can I add a link to the "New Tab" tab in Firefox?

    When I open Firefox my home page tab and 2 "New Tab" tabs opens. On the New Tab page there are some links. I want to add a link to this page like before.

  • Return Purchase Order (MVT #161) Sales Area Determination on Purchase Order

    Hi, I am working on return purchase order (Purchase order with return check box ON at item level) and creating outbound delivery with VL10B and doing PGI to vendor. Can someone help to figure out how sales area (sales org/distribution channel/Divisio

  • ORA-01516: nonexistent log file, datafile, or tempfile

    Hi, in 10g R2 on Win XP when I do : alter database rename file 'C:\oracle\oradata\ORCL\USERS01.DBF' to 'C:\oracle\oradata\ORCL2\USERS01.DBF'; I receive : ORA-01511: fail to change name ... ORA-01516: nonexistent log file, datafile, or tempfile 'C:\or

  • Need help rotating a drawing without creating distortion

    I have drawn something in Illustrator CS3 using the shape tools and have addded a few effects. I want to rotate this shape at different angles and use it throughout my project. When I free rotate it becomes distorted and no longer looks like what I h

  • Mail cannot Display Chinese Correctly!?

    I have set up Google mail in Mail on the iPhone, but I cannot read emails written in Chinese. Is it just me or is it Apple's bug? I think Apple should fix this since 1.1.3 firmware already offered support for Asian font like Chinese. For now by going