Work center screen sequence change

Dear Guru,
Can you guide me how to change the screen sequence of work center.
Regards,
Sanjay  Sahoo

Dear Sandeep,
My requirement to change in sequence in Tab page.
I changed the sequence in OP13, But screen sequence does automatically change as per sequence maintain in OP13.
If we use the navigation tool, then only system take you to the next Tab Page which we maintain in the OP13.
Can it be possible to diaplay the Tab Page sequence as per OP13 at the time creation of work center?
Regards,
Sanjay Sahoo

Similar Messages

  • PM-HR assigning work center to employee changes position

    Dear all,
       I have an urgent issue, and I have absolutelly no idea how to resolve it, because it takes place in the module PM, and I dont know anything about it.
       The problem is that when users go to tcode IR02 and make an asignament of a employee to a work center the system also changes the position of the employee for the work center (I mean, SAP in the back ground goes to Infotype 0001 of the employee and changes the position of the employee).
       Is there a way of avoiding it? I think it is due to a bad customizing in the integration PM-HR, but Im not sure at all.
    PS: sorry if this is the wrong forum to post it, I didnt find a PM forum, If you know a forum that fixes better please let me know!!!
    Any advice will be GREATLY appreciated and rewarded
    Thanks a lot in advance

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • Work Center(Capacity Level) Change Documents

    We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
    Thank you in advance.

    Hi Usman,
    I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
    When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
    To avoid it... i followed below steps
    1. Uncheck the capacity requirement indicator in all open orders
    2. when u try to delete, it will say "Capacity is still being used"
    3. Table KBED, use capacity ID and run, it will list out the pending orders
    4. When the table has no entries, delete the capacity category
    5. check all capacity indicator
    - Pithan

  • Book for Screen Sequence Change BP

    Hi,
    We are trying to change the screen sequence for BP. Our requirement is to make available an already exsisting field on to another tab page of BP. Is this possible? Is there a cookbook or some documentation we can refer to in order to change the seceen sequences.
    Currently we are exploring it thru BUPT
    All help is welcome
    Sulakshana

    Hi ,
    You cannot move individual field you can only move a view ... so all the fields in that view including the one you want will move to the new tab page.
    Thanks and Regard,s
    SUmeet

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Change the default work center in CRM 2007 webclient

    Hi all,
    With IC_AGENT role,the default work center is 'Account identification'.When I click the buttone'end' ,it jump to account identification work center ,how to change this default,config or coding ?
    Thanks a lot!
    Best regards,
    LeKa

    Hi Ashwin,
    In our ZIC_AGENT, I have defined the navigation bar that contained the 'IC_BPIDENT:account identification' work center.  This is as default pages whatever ending phone call on webclient or cancell any action, it also jump to 'IC_BPIDENT' view.
    I want to enhance the function, when i end a call from webclient ,it could jump to 'call list' work center instead of 'account identificaton'.
    did you have any ideas ,please tell me.
    Thanks.
    Best regards,
    LeKa

  • Change work center

    Hi all,
    Please excuse my ignorance in what is probably an easy operation.
    What is the transaction code for changing a work center that a production order is setup default to be completed in?
    For example if i have product 'A' that is usually completed in work center '1' but I want to change the data so that next time and every other time I create this product it identifies work center '2' on the production order.

    Hi Gman,
       For producing "Product A" currently you are using work center 1. Instead of using this work center 1 you want to use work center 2. To change the work center, you need to change the routing for the "Product A". Go to CA02  and enter the material and select the routing and press operation, in the operation you will see the work center 1. Change the WC1 to WC2 and save it.
      After changing this, when ever you want to produce "Product A", system will select WC2.
    Hope it clears your doubt. Revert back if you have any questions.
    BR / US

  • Capacity category in work center

    Hi All,
    please clarify me on this,
    capacity category under scheduling tab in work center creation is showing as mandatory, but i do not want to maintain this field because iam not putting anything under capacity tab to avoid capacity planning.
    is there anyway to take off it as mandatory under scheduling tab?

    Dear Sprint,
    Goto OPFA and select the scheduling and click on influencing and mention the work center category in the field contents and
    press enter and for the field capacity select the radio button for input or else display (remove it from the radio button mentioned
    under required) and press enter and then save the data and now create a new work center for the changes made work
    center category and revert back.
    Regards
    S Mangalraj

  • The screen always changes to blue

    I bought a new iphone 5s around November last year, and took it back to China. After power ran out first time, the phone did not work. Screen always changes to blue, and I recovery it several times. Sometimes it works a couple days, and just does not work again.
    Could you tell me what I should do now? The phone is now in China.

    Hi there hussamfromaden,
    You may find the troubleshooting steps in the article below helpful.
    iPhone: Hardware troubleshooting
    http://support.apple.com/kb/ts2802
    Will not turn on, will not turn on unless connected to power, or unexpected power off
    Verify that the Sleep/Wake button functions. If it does not function, inspect it for signs of damage. If the button is damaged or is not functioning when pressed, seek service.
    Check if a Liquid Contact Indicator (LCI) is activated or there are signs of corrosion. Learn about LCIs and corrosion.
    Connect the iPhone to the iPhone's USB power adapter and let it charge for at least ten minutes.
    After at least 30 minutes, if:
    The home screen appears: The iPhone should be working. Update to the latest version of iOS if necessary. Continue charging it until it is completely charged and you see this battery icon in the upper-right corner of the screen . Then unplug the phone from power. If it immediately turns off, seek service.
    The low-battery image appears, even after the phone has charged for at least 20 minutes: See "iPhone displays the low-battery image and is unresponsive" symptom in this article.
    Something other than the Home screen or Low Battery image appears, continue with this article for further troubleshooting steps.
    If the iPhone did not turn on, reset it while connected to the iPhone USB power adapter.
    If the display turns on, go to step 4.
    If the display remains black, go to next step.
    Connect the iPhone to a computer and open iTunes. If iTunes recognizes the iPhone and indicates that it is in recovery mode, attempt to restore the iPhone. If the iPhone doesn't appear in iTunes or if you have difficulties in restoring the iPhone, see this article for further assistance.
    If restoring the iPhone resolved the issue, go to step 4. If restoring the iPhone did not solve the issue, seek service.
    Issue not resolved
    My issue is still not resolved. What do I do next?
    Contact Apple Support.
    -Griff W.

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • Changing default Work Center during CATS time entry

    Hi Folks,
    I am hoping someone here can throw some expert advice.
    Currently during time entry in CATS, we have Work Center coming in from the Work Order. Its getting defaulted without any option to change it. Business here has a need to change it. I have llooked into the CATS profile to see if there is a place that enable the WC to be defaulted.
    In Transaction CAC1, there is a section that shows what fields are being defaulted during CAT2 time entry. However I do not see the Work Center as one of the option there.
    Can any one help?
    In short, where do we disable the defaulting of the WC from the Word Order during time entry?
    Thanks in advance.

    Hi,
    Adding to what Kapil said; if the work centre is a grayed out in time shet screen then you can go to CAC2 transaction and make it editable. By this way users will be able to change the work centre on screen.
    Regards
    Sreekanth

  • Shift sequence query in PP work center

    Dear All,
    I am having one problem while maintaining shift sequence in work center. I have maintain all config settings in OP4A shift 1 shift 2 shift 3 but when I create work center and select shift sequence, it is only taking shift 1 and not all 3 shift for all 7 days.
    Can anyone tell me the solution?
    Thanks in advance.
    Regards,
    Max

    Dear Santosh,
    Thanks for the valuable inputs.
    I have created following sequence in OP4A.
    1, Create a Group eg. CB
    2.Create a shift definitions like SHIFT1,SHIFT2,SHIFT2, START/END DATE, START/FINISH TIME OF SHIFTS, NO BREAKS ARE THERE and assign it to group.
    3. Define individual shifts SEQUENCE DAYWISE wrt to groupo.
    4..Assign grouping in capacity header of work center.
    5.Now go to add interval option and create a new version of capcity which contains desired shift sequence from the shift group assigned.
    7. assign proper valid froma and valid to dates.
    8. In capacity header screena ssign the newly created capcity vesrion as active vesrion.
    BUT STILL i WILL ABLE TO MAINTAIN ONLY FIRST SHIFT SEQUENCE FOR ALL 7 DAYS.
    SYSTEM IS NOT SHOWING 2ND AND 3RD SHIFT.
    PLEASE HELP ME OUT.
    THANKS
    MAX

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Work center Change

    Hi All,
    How to change the work center once its get combined?
    Can I change my child order work center after creation of combined order?

    Dear Hardik,
    There are two options:
    1. Change the workcentre in Routing and do Read PP master data which will pick up the current Workcentre (Provided no Goods Movements are carried out on order). The status of the order will be changed from REL to CRTD.
    2. Manually change the Workcentre in Order.
    Regards,
    Pradeep

Maybe you are looking for